SF30_-17-B-0003_0001.pdf
PDF 330 KB Posted
- Solicitation number
- W912EP-17-B-0003
About this file
W912EP-17-B-0003 Amendment 0001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Tampa Harbor Maintenance Dredging, 32-Foot Project, Alafia River Channel and Turning Basin, and Manatee Harbor, Maintenance Dredging, 40-Foot Project, Entrance Channel and Turning Basin, Hillsborough and Manatee Counties, Florida Shore Protection Project, St. Johns County, Florida
This Amendment is being issued for the follow ing:
Bid date has changed from 31 Aug 2017 to 06 Sep 2017 by 2:00 PM Local Time.
See SF30 Continuation page for details of this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP-17-B-0003
X 9B. DATED (SEE ITEM 11)
02-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Aug-2017
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EP-17-B-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00010A - LINE ITEMS & PRICING SCHEDULE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Tampa Harbor Maintenance Dredging, 32-Foot Project, Alafia River Channel and Turning Basin, and Manatee Harbor, Maintenance
Dredging, 40-Foot Project, Entrance Channel and Turning Basin, Hillsborough and Manatee Counties, Florida Shore Protection Project, St. Johns County, Florida
Amendment 0001
SUMMARY OF CHANGES
1. SPECIFICATIONS:
A. In some Volume 1 sections, asterisks appear before and after the line or lines where revisions have been made to the text, and pertain only to changes made by this amendment. In some cases, replacement clauses are attached to this amendment.
B. In Volume 2 sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.
Changes to Specifications:
Volume 1 of 2 – Technical Specifications:
DELETE Section 00010A LINE ITEMS AND PRICING SCHEDULE and its Attachment A INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS, and REPLACE with the attached (See Attachment 1).
Section 00700 Clause Change:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 45 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work
W912EP-17-B-0003
ready for use not later than 180 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
The total completion time of 180 191 calendar days includes the following:
Base Bid 95 calendar days (includes mob/demob) Option A 31 calendar days Option B 30 calendar days Option C 9 15 calendar days Option D 15 20 calendar days
Volume 2 of 2 – Technical Specifications:
N/A
2. DRAWINGS:
N/A
3. OTHER:
Site Visit Roster Dated 16 Aug 2017 (See Attachment 2)
(End of Summary of Changes)
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
TAMPA HARBOR MAINTENANCE DREDGING 32-FOOT PROJECT, ALAFIA RIVER CHANNEL AND TURNING BASIN, AND MANATEE HARBOR MAINTENANCE DREDGING 40-FOOT PROJECT, ENTRANCE CHANNEL AND TURNING BASIN
W912EP-17-B-0003 00010A-1 Amendment 0001
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE
ALAFIA RIVER CHANNEL
STA. 3+45.28 TO STA. 173+50
0001 MOBILIZATION AND DEMOBILIZATION 1 JOB $_______________
0002 EXCAVATION, UNCLASSIFIED
(ESTIMATED QUANTITY - SEE NOTE 4) 78,000 CUBIC YARD $___________ $_______________
0003 TURBIDITY MONITORING 1 JOB $_______________
0004 ENVIRONMENTAL SPECIES OBSERVERS 1 JOB $_______________
0005 MOBILIZATION AND DEMOBILIZATION FOR 1 JOB $_______________
SEA TURTLE TRAWLING AND RELOCATION
(HOPPER DREDGES ONLY) (SEE NOTE 5)
0006 SEA TURTLE TRAWLING AND RELOCATION 1 DAY $______________ $_______________
(HOPPER DREDGES ONLY) (SEE NOTES 5 & 6)
0007 STANDBY TIME (SEE NOTES 7 & 8) 24 HOUR $______________ $_______________
0008 BIRD MONITORING (SEE NOTE 8) 45 DAY $______________ $_______________
TOTAL BASE (LINE ITEMS 0001 THROUGH 0008) $_______________
OPTION A
ALAFIA RIVER CHANNEL AND TURNING BASIN
STA. 173+50 TO STA. 181+13.21
0009 EXCAVATION, UNCLASSIFIED
(ESTIMATED QUANTITY - SEE NOTE 4) 54,000 CUBIC YARD $___________ $_______________
0010 TURBIDITY MONITORING 1 JOB $_______________
0011 ENVIRONMENTAL SPECIES OBSERVERS 1 JOB $_______________
0012 MOBILIZATION AND DEMOBILIZATION FOR 1 JOB $_______________
SEA TURTLE TRAWLING AND RELOCATION
(HOPPER DREDGES ONLY) (SEE NOTE 5)
0013 SEA TURTLE TRAWLING AND RELOCATION 1 DAY $______________ $_______________
(HOPPER DREDGES ONLY) (SEE NOTES 5 & 6)
0014 STANDBY TIME (SEE NOTES 7 & 8) 24 HOUR $______________ $_______________
0015 BIRD MONITORING (SEE NOTE 8) 25 DAY $______________ $_______________
TOTAL OPTION A (LINE ITEMS 0009 THROUGH 0015) $_______________
TOTAL BASE AND OPTION A (LINE ITEMS 0001 THROUGH 0015) $_______________
(CONTINUED ON NEXT PAGE)
TAMPA HARBOR MAINTENANCE DREDGING 32-FOOT PROJECT, ALAFIA RIVER CHANNEL AND TURNING BASIN, AND MANATEE HARBOR MAINTENANCE DREDGING 40-FOOT PROJECT, ENTRANCE CHANNEL AND TURNING BASIN
W912EP-17-B-0003 00010A-2 Amendment 0001
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
OPTION B
MANATEE HARBOR ENTRANCE CHANNEL
STA. 44+00 TO STA. 173+79
0016 INTERIM MOBILIZATION 1 JOB $_______________
0017 EXCAVATION, UNCLASSIFIED 23,000 CUBIC YARD $___________ $_______________
(ESTIMATED QUANTITY - SEE NOTE 4)
0018 TURBIDITY MONITORING 1 JOB $_______________
0019 ENVIRONMENTAL SPECIES OBSERVERS 1 JOB $_______________
0020 MOBILIZATION AND DEMOBILIZATION FOR 1 JOB $_______________
SEA TURTLE TRAWLING AND RELOCATION
(HOPPER DREDGES ONLY) (SEE NOTE 5)
0021 SEA TURTLE TRAWLING AND RELOCATION 1 DAY $______________ $_______________
(HOPPER DREDGES ONLY) (SEE NOTES 5 & 6)
0022 STANDBY TIME (SEE NOTES 7 & 8) 24 HOUR $______________ $_______________
0023 BIRD MONITORING (SEE NOTE 8) 30 DAY $______________ $_______________
TOTAL OPTION B (LINE ITEMS 0016 THROUGH 0023) $_______________
TOTAL BASE PLUS OPTIONS A AND B (LINE ITEMS 0001 THROUGH 0023) $_______________
OPTION C
MANATEE HARBOR ENTRANCE CHANNEL
STA. 32+81 TO STA. 44+00
0024 EXCAVATION, UNCLASSIFIED 22,000 CUBIC YARD $___________ $_______________
(ESTIMATED QUANTITY - SEE NOTE 4)
0025 TURBIDITY MONITORING 1 JOB $_______________
0026 ENVIRONMENTAL SPECIES OBSERVERS 1 JOB $_______________
0027 MOBILIZATION AND DEMOBILIZATION FOR 1 JOB $_______________
SEA TURTLE TRAWLING AND RELOCATION
(HOPPER DREDGES ONLY) (SEE NOTE 5)
0028 SEA TURTLE TRAWLING AND RELOCATION 1 DAY $______________ $_______________
(HOPPER DREDGES ONLY) (SEE NOTES 5 & 6)
0029 STANDBY TIME (SEE NOTES 7 & 8) 24 HOUR $______________ $_______________
0030 BIRD MONITORING (SEE NOTE 8) 9 DAY $______________ $_______________
TOTAL OPTION C (LINE ITEMS 0024 THROUGH 0030) $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0030) $_______________
TAMPA HARBOR MAINTENANCE DREDGING 32-FOOT PROJECT, ALAFIA RIVER CHANNEL AND TURNING BASIN, AND MANATEE HARBOR MAINTENANCE DREDGING 40-FOOT PROJECT, ENTRANCE CHANNEL AND TURNING BASIN
W912EP-17-B-0003 00010A-3 Amendment 0001
(CONTINUED ON NEXT PAGE)
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
OPTION D
MANATEE HARBOR TURNING BASIN
STA. 27+00 TO STA. 32+81
0031 EXCAVATION, UNCLASSIFIED 27,000 CUBIC YARD $___________ $_______________
(ESTIMATED QUANTITY - SEE NOTE 4)
0032 TURBIDITY MONITORING 1 JOB $_______________
0033 ENVIRONMENTAL SPECIES OBSERVERS 1 JOB $_______________
0034 MOBILIZATION AND DEMOBILIZATION FOR 1 JOB $_______________
SEA TURTLE TRAWLING AND RELOCATION
(HOPPER DREDGES ONLY) (SEE NOTE 5)
0035 SEA TURTLE TRAWLING AND RELOCATION 1 DAY $______________ $_______________
(HOPPER DREDGES ONLY) (SEE NOTES 5 & 6)
0036 STANDBY TIME (SEE NOTES 7 & 8) 24 HOUR $______________ $_______________
0037 BIRD MONITORING (SEE NOTE 8) 15 DAY $______________ $_______________
TOTAL OPTION D (LINE ITEMS 0031 THROUGH 0037) $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0037) $_______________
NOTES:
(1) SEE SECTION 00100: "INSTRUCTIONS TO OFFERORS".
(2) OFFERORS MUST PROVIDE PRICING FOR ALL ITEMS.
(3) ALL SPECIFICATION REFERENCES TO "LUMP SUM" SHALL APPLY TO THE LINE ITEMS INDICATING "JOB" AS THE UNIT.
(4) QUANTITY INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN DATES OF SURVEYS SHOWN ON DRAWINGS AND COMMENCEMENT OF DREDGING. ACTUAL QUANTITIES MAY DIFFER
FROM ESTIMATED QUANTITIES.
(5) THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTION ITEMS ANY TIME PRIOR TO DEMOBILIZATION OF EQUIPMENT. SEE CLAUSE 52.217-7 of SECTION 00700. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER, IN WRITING, A MINIMUM OF 7 DAYS PRIOR TO THE ANTICIPATED DATE OF THE DEMOBILIZATION OF A DREDGE PLANT.
(6) SEA TURTLE TRAWLING AND RELOCATION WILL ONLY BE PAID FOR IF THE CONTRACTOR IS REQUIRED TO PERFORM THE WORK UNDER THE PROVISIONS OF THIS CONTRACT. SEE SECTION 01 57 20: ENVIRONMENTAL PROTECTION FOR
PROVISIONS TO INITIATE SEA TURTLE TRAWLING AND RELOCATION.
(7) THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT AND SECTION 01 57 20 ENVIRONMENTAL PROTECTION.
(8) THIS LINE ITEM IS FOR BIDDING PURPOSES ONLY. ACTUAL QUANTITIES MAY DIFFER FROM ESTIMATED QUANTITIES. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITIES CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR
ACTUAL DAYS PERFORMED.
SECTION 00010A, Attachment A
INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS
Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) 22 August 2017, Close of Business. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.
All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and all answers are all finalized.
The Solicitation Number is: W912EP-17-B-0003, Amendment 0001
The Bidder Inquiry Key is: RY3NR6-Z2C34S
Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:
1. Identify the Agency. This should be marked as USACE.
2. Email. Enter the email address you would like to use for communication.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret
Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. Identify the Agency. This should be marked as USACE.
3. Email. Enter the email address you used to register previously in ProjNet.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
| 00010A_TampaManateeHbrs_Attachment_ 1.pdf |
| Bid Sheet |
File details come from the government source that posted it. Updated .