W912EP-16-R-0025_Specifications_Volume_2_of_2_CERTIFIED.pdf

PDF 1 MB Posted

Attached to
HURRICANE AND STORM DAMAGE REDUCTION PROJECT, BREVARD COUNTY, FLORIDA, MID-REACH SEGMENT - MITIGATION FEATURE
Solicitation number
W912EP-16-R-0025
Issued by

About this file

Solicitation Volume 2

View the file

Other files

File Type Posted
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
W912EP-16-R-0025_PLANS-CERTIFIED.pdf PDF
W912EP-16-R-0025_Specifications_Volume_1_of_2_CERTIFIED_REvised.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. W912EP-16-R-0025

Jacksonville District

Hurricane and Storm Damage Reduction Project, Mid-Reach Segment – Mitigation Feature

BREVARD COUNTY, FLORIDA

Construction Solicitation and Specifications Volume 2 of 2

SEE VOLUME 1 OF 2 FOR ISSUE DATE

Hurricane and Storm Damage Reduction Project, Mid-Reach Segment - Mitigation Feature, Brevard County, Florida

PROJECT TABLE OF CONTENTS

DIVISION 00 - TECHNICAL INFORMATION

00 31 21 CONTROL MONUMENT DESCRIPTIONS

00 33 50 WEATHER, WATER STAGE AND TIDE DATA

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 25 OWNER SAFETY REQUIREMENTS - DIVING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 04 CONTRACTOR QUALITY CONTROL

01 50 02 TEMPORARY CONSTRUCTION FACILITIES

01 57 20 ENVIRONMENTAL PROTECTION

01 78 02 CLOSEOUT SUBMITTALS

DIVISION 02 - EXISTING CONDITIONS

02 22 13 VIBRATION MONITORING

DIVISION 03 - CONCRETE

03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 20 00 CONCRETE REINFORCING

03 31 01 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS

03 35 00 CONCRETE FINISHING

03 39 00 CONCRETE CURING

DIVISION 31 - EARTHWORK

31 05 19 GEOTEXTILE

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 31 19 COQUINA ROCK FOR REEF MITIGATION

35 32 30 ARTICULATED CONCRETE - COQUINA EMBEDDED REEF MATS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

Section 00 31 21

CONTROL MONUMENT DESCRIPTIONS

W912EP-16-R-0025

DESIGNATION - 872 1608 F TIDAL

PID - AK6999

TIDAL BM - This is a Tidal Bench Mark.

STATE/COUNTY- FL/BREVARD

MARKER: TIDAL STATION DISK

SETTING: STAINLESS STEEL ROD W/O SLEEVE (10 FT.+)

STAMPING: 1608 F 1986

MARK LOGO: NOS

PROJECTION: FLUSH

MAGNETIC: MARKER EQUIPPED WITH BAR MAGNET

STABILITY: PROBABLY HOLD POSITION/ELEVATION WELL

SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE

OBSERVATIONS - January 20, 2010 ROD/PIPE-DEPTH: 12.2 meters

HISTORY - Date Condition Report By

HISTORY - 1986 MONUMENTED FLDNR

HISTORY - 20060331 GOOD FLDEP

HISTORY - 20100120 GOOD GEOCAC

STATION DESCRIPTION (2006)

THE MARK IS IN CAPE CANAVERAL.

TO REACH THE MARK FROM THE JUNCTION OF STATE HIGHWAY 520 (COCOA BEACH

CAUSEWAY) AND STATE HIGHWAY A1A (ATLANTIC AVENUE) IN COCOA BEACH, GO

NORTH ON STATE HIGHWAY A1A (ATLANTIC AVENUE) FOR 2.1 MI TO THE Y-JUNCTION

OF NORTH ATLANTIC AVENUE (COUNTY ROAD 401) ON THE RIGHT, TURN RIGHT ON

NORTH ATLANTIC AVENUE (COUNTY ROAD 401) AND GO NORTH FOR 1.25 MI TO THE

INTERSECTION OF GEORGE J. KING BOULEVARD ON THE LEFT AND PARK ROAD ON THE

RIGHT, TURN RIGHT ON PARK ROAD AND GO NORTHEAST FOR 0.1 MI TO THE

JUNCTION OF A PAVED ROAD EAST, CONTINUE NORTHERLY ON PARK ROAD FOR 0.1 MI

TO THE JUNCTION OF JETTY DRIVE ON THE RIGHT AND THE MARK ON THE RIGHT, AN

NOS DISK CRIMPED TO A STAINLESS STEEL ROD DRIVEN TO THE GROUND AND IS

INCASED IN A 5-INCH PVC PIPE THAT PROJECTS 0.7 ABOVE THE LEVEL OF THE

GROUND AND ABOUT LEVEL WITH JETTY DRIVE.

LOCATED 142.0 FT EAST OF THE APPROXIMATE CENTERLINE OF JETTY PARK

ROAD, 72.5 FT EAST OF THE SOUTHWEST CORNER OF A CHAINLINK FENCE, 23.8

FT NORTH OF THE APPROXIMATE CENTERLINE OF JETTY DRIVE, 1.4 FT SOUTH

OF THE CHAINLINK FENCE AND 1.3 FT SOUTH OF A CARSONITE WITNESS POST.

NOTE A MAGNET WAS IMBEDDED IN THE GROUND ON THE SOUTH SIDE OF THE

MONUMENT.

STATION RECOVERY (2010)

RECOVERY NOTE BY GEOCACHING 2010 (EP)

RECOVERED AT LOCATION DESCRIBED.

DESIGNATION - 70 80 A 35

PID - AK7477

STATE/COUNTY- FL/BREVARD

MARKER: SURVEY DISK

SETTING: SET IN TOP OF CONCRETE MONUMENT

STAMPING: 70 80 A 35

MARK LOGO: FLDT

PROJECTION: FLUSH

MAGNETIC: MARKER EQUIPPED WITH BAR MAGNET

STABILITY: MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE MOTION

SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE

OBSERVATIONS - March 01, 2006

HISTORY - Date Condition Report By

HISTORY - UNK MONUMENTED FLDNR

HISTORY - 19930810 GOOD GEOBAS

HISTORY - 20060301 GOOD FLDEP

STATION DESCRIPTION (2006)

THE MARK IS ABOUT 4.6 MI NORTHEAST OF MELBOURNE, 1.5 MI NORTHWEST OF

INDIALANTIC, IN SECTION 25, TOWNSHIP 27 SOUTH, RANGE 37 EAST.

TO REACH THE MARK FROM THE JUNCTION OF U.S. HIGHWAY 192 (MELBOURNE

CAUSEWAY, FIFTH AVENUE) AND STATE HIGHWAY A1A (MIRAMAR AVENUE) IN

INDIALANTIC, GO NORTHWEST ON STATE HIGHWAY A1A (MIRAMAR AVENUE) FOR 1.55

MI TO THE MARK ON THE LEFT, SET IN THE TOP OF A ROUND CONCRETE MONUMENT

RECESSED 0.4 FT BELOW THE LEVEL OF THE GROUND AND ABOUT 1.0 FT BELOW THE

LEVEL OF STATE HIGHWAY A1A.

LOCATED 227.0 FT SOUTH OF THE APPROXIMATE CENTERLINE OF PINETREE DRIVE,

125.0 FT SOUTH OF POWER POLE NUMBER 48724475808, 108.0 FT NORTH OF A

WOODEN POWER POLE WITH TWO GUY WIRES ATTACHED, 14.3 FT EAST OF THE EAST

SIDE OF THE SIDEWALK AND 1.5 FT WEST OF THE WEST EDGE OF STATE HIGHWAY

A1A.

NOTE A MAGNET WAS IMBEDDED IN THE GROUND ON THE SOUTH SIDE OF THE

MONUMENT.

HISTORIC REFERENCES--

PK NAIL AND ---REF. PT. LB 3639--- DISK SET IN THE WEST EDGE OF PAVEMENT

OF STATE ROAD A1A ON A MAGNETIC AZIMUTH OF 75 DEGREES AT 6.15 FT.

PK NAIL AND ---REF. PT. LB 3639--- DISK SET IN THE WEST FACE OF A POWER

POLE ON A MAGNETIC AZIMUTH OF 174 DEGREES AT 108.43 FT.

X-CUT SET IN EAST SIDE OF A CONCRETE SIDEWALK ON A MAGNETIC AZIMUTH OF

330 DEGREES AT 29.56 FT.

Section 00 33 50

WEATHER AND WATER STAGE DATA

00 33 50 - i

1. The following water stage, wave, wind, and weather data are provided for inclusion into the subject Plans and Specifications. The following water level datums are provided for information only and are not to be utilized in conjunction with any contract related hydrographic surveying.

2. A technical review has been performed on the following data and this memo, signed by Chief, Water Resources Engineering Branch. This signifies EN-W Branch Quality Control Certification.

a) Water Stages. Water levels in the project area are mainly affected by semi-diurnal tidal fluctuations in the Atlantic Ocean. The project area is also subject to storm surges from hurricanes and tropical storms from June through November. Surges from extratropical storms may affect the area during any time of the year.

Elevations of tidal datums in the vicinity of the project area are provided in the following table.

All datum elevations in this table are referred to mean lower low water (MLLW) and reference the 1983-2001 tidal epoch. These datums are based on values from tide station 8721604 located at the south end of the Trident pier at Port Canaveral from the analysis periods of 01/01/1997 to 12/31/2006 and 03/01/2008 to 02/28/2011. Tidal datums from the Canova, FL station (8721804) are also provided for activities closer to the mitigation reef. The Canova tide station provides tidal datums based on the analysis period of 6/1/1970 to 8/31/1970. These tide stations were established by the National Oceanic and Atmospheric Administration (NOAA), National Ocean Service (NOS). Additional information on these and other nearby tide stations is available at this NOAA website: http://tidesandcurrents.noaa.gov/stations.html

Trident Pier, FL (8721604) Highest Observed Water Level (26 Sep 2004) = 7.93 Feet Mean Higher High Water (MHHW) = 3.91 Feet Mean High Water (MHW) = 3.56 Feet NAVD88 = 2.86 Feet Mean Sea Level (MSL) = 1.88 Feet Mean Tide Level (MTL) = 1.87 Feet Mean Low Water (MLW) = 0.17 Feet Mean Lower Low Water (MLLW) = 0.00 Feet Lowest Observed Water Level (12 Jan 2009) = -1.86 Feet

Canova, FL (8721604) Mean Higher High Water (MHHW) = 3.98 Feet Mean High Water (MHW) = 3.57 Feet NAVD88 = 2.94 Feet Mean Sea Level (MSL) = 1.90 Feet Mean Tide Level (MTL) = 1.89 Feet Mean Low Water (MLW) = 0.20 Feet Mean Lower Low Water (MLLW) = 0.00 Feet

00 33 50-1W912EP-16-R-0025

http://tidesandcurrents.noaa.gov/stations.html

Daily tidal predictions at locations along the coastline of North and South America, including locations in the vicinity of the project area can be found in the publication East Coast of North and South America Tide Tables, U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Ocean Service. In addition to daily tidal predictions, this publication provides mean and spring tide ranges and mean tide levels. Some astronomical data is also included, such as time of sunrise, sunset, moonrise, and moonset. This publication is available through NOAA. Tidal data provided in this publication can also be found at the following NOAA website: http://tidesandcurrents.noaa.gov/

b) Wind and Wave Data. The following publications include wind and wave information in the vicinity of the project area. These publications are available for review at the following websites, or they may be ordered directly from the agencies indicated.

1. U.S. Coast Pilot Volume 4, Atlantic Coast: Cape Henry to Key West, U.S.

Department of Commerce, National Oceanic and Atmospheric Administration, National Ocean Service. This publication supplements the navigational information shown on the NOAA/NOS nautical charts, and also provides miscellaneous meteorological data. This publication can be purchased through NOAA, and is available for review at the following website:

http://nauticalcharts.noaa.gov/nsd/cpdownload.htm .

2. U. S. Army Corps of Engineers’ Coastal & Hydraulics Laboratory, Wave Information Study (WIS) Database. This Internet webpage presents wave hindcast data for various stations located along the Atlantic and Gulf of Mexico coastlines within the United States. The closest of these stations (63442) lies approximately 10 miles east of the project area. Available data includes a hindcast time series of wave heights, periods, and directions taken at 1-hour intervals for the 32-year period extending from 1980-2012, at a station located in 21 meters (69 feet) of water. This webpage also provides links to WIS summary tables and plots, as well as other sources of wave data. These data products are available at the following website:

http://wis.usace.army.mil/wis.shtml.

3. National Data Buoy Center (NDBC) Website. This Internet website provides a wide range of real-time and archived meteorological and oceanographic data collected at offshore and nearshore stations worldwide. Data provided on this website includes wind speed, wind gusts, atmospheric pressure, air temperature, sea temperature, wave height, wave direction, and wave period. Gage readings are updated hourly, and archived data is available for most stations. The website address for data relevant to this project site is:

http://www.ndbc.noaa.gov/maps/Florida.shtml.

4. Florida Institute of Technology Coastal Processes Research Group Website. This Internet webpage provides real-time meteorological and oceanographic data collected at Sebastian Inlet, FL. Data provided on this website includes wind speed, wind direction, atmospheric pressure, air temperature, sea temperature, water level, wave height, wave period, and wave direction. Gage readings are regular, and archived data is available upon request. The website address for data relevant to this project site is: http://research.fit.edu/wave-data/index.php

00 33 50-2W912EP-16-R-0025

http://tidesandcurrents.noaa.gov/ http://nauticalcharts.noaa.gov/nsd/cpdownload.htm http://wis.usace.army.mil/wis.shtml http://www.ndbc.noaa.gov/maps/Florida.shtml http://research.fit.edu/wave-data/index.php http://research.fit.edu/wave-data/index.php

c) Weather Conditions. The project area is subject to tropical storms and hurricanes from June through November, and to windy and/or rainy weather during any time of the year.

The climate of the area is subtropical, and temperatures below freezing occur rarely. The wet season in the project area is from May through October. Rainfall during these months is closely associated with convective activity. These rainfall events are normally of short duration and amounts are spatially variable. In general, the winter months constitute the dry season. Rainfall during the winter months is usually associated with mid-latitude systems (fronts and low pressure systems) and is distributed in a more spatially uniform pattern. Occasionally, daily rainfall in the dry season can be quite heavy as mid-latitude systems penetrate into central Florida. Dangerous thunderstorms can occur in this area at any time of the year.

It shall be the contractor's responsibility to obtain information concerning weather conditions in the project area. The publication Local Climatological Data - Monthly Summary published by NOAA’s National Climatic Center in Asheville, North Carolina contains climatological and meteorological observations and data relevant to this region. The Annual Summary gives a synopsis of these observations for the period of record. This publication is available for review at the following website: http://www.ncdc.noaa.gov/.

3. The average number of days in each calendar month with rain equal to, or greater than, 0.1 inches is provided for the project area in the following table. This information is based on data obtained from the NOAA rain gage located closest to the project area, in Titusville, Florida, at latitude 28.624° N, 80.816° W. The data were obtained from Climatography of the United States No. 20, Climatic Summaries for Selected Sites in Florida publications by the National Climatic Center, NOAA, for the period of record from 1981 through 2010.

Average Number of Days Per Month With Rainfall > 0.1 Inches

Gage Name Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Melbourne Intl Airport, FL 4.2 4.5 4.5 3.5 4.7 9.2 8.7 10.4 9.3 6.8 4.1 3.6

00 33 50-3W912EP-16-R-0025

http://www.ncdc.noaa.gov/

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.3 WORK COVERED BY CONTRACT DOCUMENTS

1.3.1 Project Description

1.3.2 Project Description Legend

1.3.3 Location

1.3.4 Safety Requirements

1.3.5 Measurement and Payment

1.3.6 Project Administration

1.3.7 Diving Safety Requirements

1.3.8 Accident Prevention

1.3.9 Quality Control Requirements

1.3.10 Temporary Construction Facilities

1.3.11 Environmental Protection

1.3.12 Work Performed by Others

1.4 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

1.5 LIQUIDATED DAMAGES - CONSTRUCTION

1.6 PHYSICAL DATA

1.6.1 Weather, Water Stage and Tide Data

1.6.2 Contractor Investigation

1.6.3 Maritime Traffic

1.6.4 Obstruction of Channel

1.6.5 Hydrographic Surveys

1.7 LAYOUT OF WORK

1.7.1 Established Project Control

1.7.2 Layout

1.7.3 Survey

1.8 DAMAGE TO WORK

1.9 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)

1.9.1 Contractor Responsibility

1.10 UNITS OF MEASURE

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section Table of Contents --

W912EP-16-R-0025 SECTION 01 11 00 Page 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 Safety and Health Requirements Manual

Survey Hydrographic Survey 15-039

1.2 DEFINITIONS

a. "Adverse weather" occurs when atmospheric conditions at a definite time and place that are unfavorable to construction activities and is based on climatological and meteorological observations and data sources provided in Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA.

b. "Unusually severe weather" is weather that is more severe than the adverse weather anticipated by the Contractor for the season or location involved. Adverse weather delays are considered unusually severe weather if adverse weather delay days prevent work for 50 percent or more of the Contractor's scheduled work day.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

1.3.1 Project Description

The Contractor shall manufacture, transport, and install articulated concrete mats with coquina-rock surface in the ocean offshore of Brevard County, Florida in water depths of 14 to 16 feet Mean Low Water (MLW) for the purpose of establishing a 4.8 acre artificial reef. The Contractor shall fabricate the reef mats of approximately 2.6 feet by 2.6 feet by 1 foot high reef blocks with coquina rock densely embedded into the top surface with each reef mat having sufficient exposed rock to create a high surface rugosity and coverage. The Contractor will interconnect eighteen

(18) reef blocks using longitudinal and lateral cabling in a three reef block by six reef block pattern, to form an articulated reef mat measuring approximately 8 feet by 16 feet. The Contractor shall place forty-two (42) reef mats arranged in a six by seven running bound brick pattern with an additional column of three (3) reef mats placed on top of the landward edge of the 42 reef mats placed to form an offshore artificial reef ledge. The 45 placed mats are known herein as a reef set. A single reef set is approximately 0.14 acres. The project includes thirty-six (36) reef sets with three (3) to four (4) reef sets placed in proximity to one another in ten (10) offshore reef sites within the project placement area.

W912EP-16-R-0025 SECTION 01 11 00 Page 2

1.3.2 Project Description Legend

a) Reef block = Individual 2.6'x2.6'x1' concrete/coquina

b) Reef mat = Interconnected 18 reef blocks

c) Reef set = 45 reef mats = 0.135 Ac

d) Reef site = 3 or 4 reef sets within a reef site work area = 0.41 to

0.54 acres respectively per reef site.

1.3.3 Location

Project work is located in Brevard County, Florida. The offshore placement area begins approximately 16 miles south of Cape Canaveral and extends 5 miles southward. The five mile placement area is 1,000 feet offshore of two coastal municipalities: Satellite Beach (R82 -R97) & Indian Harbor Beach (R97 - R105) and unincorporated Brevard County (R105 to R119).

1.3.4 Safety Requirements

See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1.

1.3.5 Measurement and Payment

The Government will pay the Contractor for the services performed by the Contractor, as set forth in SECTION 00010A LINE ITEMS AND PRICING SCHEDULE.

Section 01 22 00 MEASUREMENT AND PAYMENT describes how line items will be measured and paid for when making progress payments.

1.3.6 Project Administration

The Contractor shall prepare and submit to the Contracting Officer a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the features of the work as indicated in the specifications and plans. Schedule shall also indicate allowance for adverse weather delays. Specific schedule details are provided in Section

01 32 01 PROJECT SCHEDULE.

1.3.7 Diving Safety Requirements

The Contractor will be required to submit a Dive Plan when work is performed on or over water. Please refer to Section 01 35 25 OWNER SAFETY

REQUIREMENTS - DIVING.

1.3.8 Accident Prevention

Safety is a requirement on all phases of this contract where the Contractor shall provide a safe and healthy working environment and safety procedures to direct all their activities in such a manner to safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to the Contractor's operations and activities. The Contractor is expected to outline their safety plan in Accident Prevention Plan (APP) specifically geared for the project work about to be commenced. For further details on submitting an APP and other safety requirements, please refer to Section 01 35 26 GOVERNMENT SAFETY REQUIREMENTS and EM 385-1-1.

W912EP-16-R-0025 SECTION 01 11 00 Page 3

1.3.9 Quality Control Requirements

The Contractor is responsible for quality control for the project and shall use Government-furnished "Quality Control System (QCS)" software. The QCS software is the means by which the Contractor assures the Contracting Officer the work performed by the Contractor complies with the requirements of the specifications, plans, and all project permits, with respect to the quality of placed sediment, materials, workmanship, construction, finish, and functional performance. Refer to Section 01 45 04 CONTRACTOR QUALITY CONTROL for further details on QCS system and implementation requirements.

1.3.10 Temporary Construction Facilities

The Contractor's use of premises during the course of contract work shall attempt to fully minimize the physical, visual and operational impact to the project area, vicinity, and surrounding public. To accomplish this, refer to Section 01 50 02 TEMPORARY CONSTRUCTION FACILITIES.

1.3.11 Environmental Protection

The Contractor shall protect the environment during all phases of the project. See Section 01 57 20 ENVIRONMENTAL PROTECTION.

1.3.12 Work Performed by Others

See paragraph PROJECT COORDINATION of Section 01 30 00 ADMINISTRATIVE

PROCEDURES.

1.4 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

Refer to Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.5 LIQUIDATED DAMAGES - CONSTRUCTION

Refer to the Clause LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.6 PHYSICAL DATA

Read this paragraph in conjunction with the Clause PHYSICAL DATA (FAR 52.236-4) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.6.1 Weather, Water Stage and Tide Data

See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA for applicable data links and information to where the Contractor can ascertain the weather conditions that could be encountered at the project location. The information provided does not preclude the Contractor from assessing and scheduling for adverse weather.

1.6.2 Contractor Investigation

Refer to the Clause SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (FAR 52.236-3) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.6.3 Maritime Traffic

Marine Traffic in the project area consists of Naval, cruise ships, W912EP-16-R-0025 SECTION 01 11 00 Page 4 commercial, pleasure, and small recreational vessels of all types and sizes which can be accommodated by existing depths.

1.6.4 Obstruction of Channel

The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor will be required to conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's equipment so obstructs the channel as to make difficult or endanger the passage of any vessels, said equipment shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work the Contractor shall promptly remove his equipment, including ranges, buoys, piles, and other marks placed by him under the contract in navigable waters or on shore.

1.6.5 Hydrographic Surveys

Survey indicated in paragraph REFERENCES above are provided as separate electronic files.

1.7 LAYOUT OF WORK

Read this paragraph in conjunction with the Clause LAYOUT OF WORK (FAR 52.236-17) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.7.1 Established Project Control

The Government has established monuments along the work site(s). Each monument is represented in the contract drawings by a Designation and in most cases, an alphanumeric Permanent Identifier (PID). Information concerning the location and elevations can be found within the Survey Notes on the plan sheets. The Survey Notes for each included field survey will cite a particular survey number, and specify the control used to conduct that survey. Additional information is included in the Survey Notes that must be duplicated if an attempt to recreate the subject survey is desired.

See Section 00 31 21 CONTROL MONUMENT DESCRIPTIONS.

1.7.2 Layout

From the monuments, control data and elevations established by the Government, the Contractor shall complete the layout of the work and shall be responsible for all measurements that may be required for the execution of the work to the location and limit marks prescribed in the specifications or on the contract drawings, subject to such modifications as the Contracting Officer may require to meet changed conditions or as a result of necessary modifications to the contract work.

1.7.3 Survey

The Contractor shall furnish, at his own expense, such stakes, templates, platforms, equipment, tools and material, and all labor as may be required in laying out any part of the work from the monuments, control data and elevations established by the Government. It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks

W912EP-16-R-0025 SECTION 01 11 00 Page 5 established by the Contracting Officer until authorized to remove them, and if such marks are destroyed by the Contractor or through his negligence, prior to their authorized removal, they may be replaced by the Contracting Officer, at his discretion, and the expense of replacement will be deducted from any amounts due or to become due the Contractor. The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking of the work.

1.8 DAMAGE TO WORK

The responsibility for damage to any part of the permanent work shall be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume 1 will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and equipment shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.

1.9 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)

This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the Clause DEFAULT (FIXED-PRICE CONSTRUCTION) of Section 00700 CONTRACT CLAUSES in Volume 1. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

a. The weather experienced at the project site during the contract period must be found to be unusually severe; that is, more severe than the adverse weather anticipated for the project location during any given month.

b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

1.9.1 Contractor Responsibility

The project area may be affected by stormy, windy and/or rainy weather, including thunderstorms, during any time of the year. A list of potential sources providing climatological and meteorological observations and data for the project area is provided in SECTION 00 33 50 WEATHER, WATER STAGE

AND TIDE DATA.

a. The Contractor shall be responsible for obtaining information concerning rain, wind and wave conditions that could influence safety, dredging and disposal operations prior to submitting a proposal or bid.

W912EP-16-R-0025 SECTION 01 11 00 Page 6

The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

b. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report the occurrence of adverse weather and unusually severe weather with the purpose to note impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's schedule to be considered "unusually severe weather"

c. The number of actual adverse weather delay days shall include days impacted by actual adverse weather, be calculated chronologically from the first to the last day of each month, and be recorded as full days.

If the number of actual adverse weather delay days exceeds the number of days anticipated for adverse weather by the Contractor, the Contracting Officer may convert any qualifying delays to calendar days giving full consideration for equivalent fair weather work days that should have been anticipated for the conditions at the project location.

1.10 UNITS OF MEASURE

The standard U.S. system of measure may be utilized by the Contractor in the performance of his work. All survey records, official documentation, engineering data, and all correspondence, including any submittals and shop drawings, shall clearly denote which system of measure is being utilized, referenced or discussed. Any omission, unprofessional or inaccurate use of a unit of measure on the part of the Contractor shall not relieve him of his responsibilities under the contract terms. The unit of measure used in this specification is the standard U.S. system. The contract drawings denote both standard U.S. system where appropriate. If no unit of measure is indicated on the drawing such as on ranges, stations, slope elevations, and distance numbers, then they are to be considered the standard U.S.

system.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section --

W912EP-16-R-0025 SECTION 01 11 00 Page 7

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 SUMMARY

1.2 QUALITY CONTROL SYSTEM (QCS)

1.2.1 Definition

1.2.2 Instructions

1.3 SUBMITTALS

1.4 LUMP SUM PAYMENT ITEMS

1.4.1 Mobilization and Demobilization (First Season) (Base Line Item

0001)

1.4.2 Vibration Monitoring (Base Line Item 0002)

1.4.3 Reef Block and Mat Test Samples and Stone Stockpile

Demonstration (Base Line Item 0004)

1.4.4 Mobilization and Demobilization (Second Season) (Line Item

0015)

1.5 UNIT PRICE PAYMENT ITEMS

1.5.1 Standby Time (Base Line Item 0003)

1.5.1.1 Payment

1.5.1.2 Measurement

1.5.1.3 Unit of Measure

1.5.2 Reef Site Number 1, Reef Site Number 2, Reef Site Number 3, Reef Site Number 4, Reef Site Number 5, Reef Site Number 6, Reef Site Number 7, Reef Site Number 8, Reef Site Number 9 and Reef Site Number 10 (Base Line Items 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013 and 0014)

1.5.2.1 Payment

1.5.2.2 Measurement

1.5.2.3 Unit of Measure

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 PAYMENT PROCEDURES

3.1.1 Requesting Progress Payment

3.1.2 Options and Modification CLINS

W912EP-16-R-0025 SECTION 01 22 00 Page 1

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 SUMMARY

This section describes how Line Items will be measured and paid for when making progress payments. Work to be measured is described in specification sections listed for each Line Item. Measurement procedures for payment, required quantity survey or procurement documentation and payment restrictions are described in applicable specification sections.

Allocate costs for work not specifically mentioned to the Line Item most closely associated with work involved. Unless there is a specific Line Item for administrative costs, such as Quality Control and Safety, allocate such costs proportionally across all Line Items.

1.2 QUALITY CONTROL SYSTEM (QCS)

1.2.1 Definition

The terms "Contract Line Item Number (CLIN)" and "Line Item" are interchangeable herein (e.g.: CLIN 0001 is Line Item 0001). The term "CLIN" is a contracting term used in the Quality Control System (QCS) payment data base.

1.2.2 Instructions

See Section 01 45 04 C0NTRACTOR QUALITY CONTROL for instructions on linking a CLIN to a schedule of values of pay activities and construction schedule, and in-depth payment procedure.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Transmit submittal items in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the following preconstruction submittal items no later than 20 calendar days after award or 5 calendar days after Notice to Proceed, whichever is later:

SD-01 Preconstruction Submittals

Schedule of Values ; G, RO

Provide a breakdown of lump sum items into proposed pay activities as part of the initial project schedule. Schedule of Values will become basis for CLIN and Pay Activity data in the QCS payment data base.

W912EP-16-R-0025 SECTION 01 22 00 Page 2

1.4 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

Progress payments for lump sum CLINs will be made in accordance with the Payments Under Fixed-Price Construction Contracts clause of Section 00700 CONTRACT CLAUSES in Volume 1. Submit a list of pay activities, (Schedule of Values) to breakdown bid for each lump sum CLIN. The Schedule of Values shall be submitted for Government approval with the baseline schedule submittal (see Section 01 32 01 PROJECT SCHEDULE). An unbalanced Schedule of Values and Pay Activity Schedule will be returned for revision. If this contract contains either the Continuing Contracts clause or the Continuing Contracts (Alternate) clause, the Contractor should take into account the amount reserved for contract payments when preparing the construction schedule.

1.4.1 Mobilization and Demobilization (First Season) (Base Line Item 0001)

Payment will be made for costs associated with or incidental to marine mobilization and demobilization and establishment of initial project management and coordination. See Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION of Section 00700 CONTRACT CLAUSES in Volume 1.

1.4.2 Vibration Monitoring (Base Line Item 0002)

Payment will be made for costs associated with or incidental to the inspection of existing structures within 200 feet contractor's upland operations and vibration monitoring. See Section 02 22 13 VIBRATION

ANALYSIS AND MONITORING.

1.4.3 Reef Block and Mat Test Samples and Stone Stockpile Demonstration (Base Line Item 0004)

Payment will be made for costs associated with or incidental to demonstrating stone stockpiling and producing Reef Block and Reef Mat test samples. See Section 35 31 19 COQUINA ROCK FOR REEF MITIGATION, Section 03 35 00 CONCRETE FINISHING and Section 35 32 30 ARTICULATED CONCRETE -

COQUINA EMBEDDED REEF MATS.

1.4.4 Mobilization and Demobilization (Second Season) (Line Item 0015)

Payment will be made for costs associated with or incidental to second marine mobilization and demobilization conducted in a separate season and not less than 3 months after conclusion of the prior marine mattress placement operations. See Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION of Section 00700 CONTRACT CLAUSES in Volume 1.

W912EP-16-R-0025 SECTION 01 22 00 Page 3

1.5 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

Each Unit Price CLIN may be a single pay activity item or may be broken down into pay activities with smaller quantities equal to CLIN total.

Contract unit price multiplied by agreed quantity is full compensation.

1.5.1 Standby Time (Base Line Item 0003)

1.5.1.1 Payment

Standby time, when exercised by the Contracting Officer, will be paid for each hour or part thereof that the placement operations are not in operation. Standby time shall be utilized due to the presence of endangered species in the immediate area of the placement operations, and may also be utilized for security operations, or other conditions as determined by the Contracting Officer. Standby time is not afforded for delays caused by adverse weather conditions or if the Contracting Officer determines the delay is caused by the contractor operating in a negligent manner. Standby time will not be provided for the initial 24 hour period following each endangered species take. Payment will be made for costs associated with or incidental to standby of placement operations only upon implementation of this line item.

1.5.1.2 Measurement

Standby Time, if required and implemented as described in Payment above, will be measured and paid for each hour or part thereof in 1/6 hour increments, or 10 minute intervals, that the plant is not in operation by request of the Contracting Officer or the Contracting Officer's Representative.

1.5.1.3 Unit of Measure

Hour.

1.5.2 Reef Site Number 1, Reef Site Number 2, Reef Site Number 3, Reef Site Number 4, Reef Site Number 5, Reef Site Number 6, Reef Site Number 7, Reef Site Number 8, Reef Site Number 9 and Reef Site Number 10 (Base Line Items 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013 and 0014)

1.5.2.1 Payment

a. Payment will be made for costs associated with or incidental to pre/post construction surveys, reef mat fabrication, upland hauling and stockpiling, maintaining access to the work site(s); noise control; traffic control, temporary navigation aids and, debris removal.

b. In addition to the above, payment will be made for costs associated with or incidental to transportation and placement of Reef

W912EP-16-R-0025 SECTION 01 22 00 Page 4

Mats as indicated on the drawings, and to tolerances indicated herein.

The quality and appearance of each reef mat shall be subject to the approval of the Contracting Officer, and if rejected by the Contracting Officer, construct additional reef mats until approval is attained.

c. Monthly progress payments shall be based on the number of reef mats successfully fabricated and ready for placement. The Contractor will be eligible for progress payments of up to 45% of the total cost per reef site when all mats for a reef site have been fabricated.

Payments may begin when a minimum of 45 reef mats have been completed and approved by the Contracting Officer. Progress payments will also include the costs for temporary storage and will not be made for partially completed reef sets. Any mats damaged during the storage process shall be repaired or replaced at no cost to the Government.

1.5.2.2 Measurement

The total number of reef mats placed, in accordance with plans and specifications. No payment will be made for defective reef mats.

Disposal of defective reef mats will be at the Contractor's expense.

1.5.2.3 Unit of Measure

Each.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 PAYMENT PROCEDURES

Upon receiving initial Resident Management System import file, go to "Pay Activities" and establish a link between bid breakdown schedule of values of "Pay Activities" to contract CLINs using "Schedule Activities" data entry page.

3.1.1 Requesting Progress Payment

For progress payments, ensure "Activity Schedule", "Feature Schedule", submittal register, and punchlists are all up to date. Use "Progress Payments" to "request Activity Earnings" for both "Activity Earnings" data entry page and "Other Earning". Provide hard copies of supporting invoices and quantity measurements to support all requested earnings.

Ensure that sum of payment activities do not exceed contract award CLIN funding amounts, or "unbalanced" CLINs error will prevent processing the payment.

3.1.2 Options and Modification CLINS

When additional work is added by modification, existing CLINs funding amounts must be updated, or new CLINs for modification will be created.

If contract has option CLINs not yet awarded, option CLINs will appear as zero dollar CLINs until option is awarded by modification. No payment may be requested for Options or Modification CLINs until contract modification has been funded and signed.

W912EP-16-R-0025 SECTION 01 22 00 Page 5

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 30 00

ADMINISTRATIVE PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

1.2 SUBMITTALS

1.3 PROJECT COORDINATION

1.3.1 Resident Management System (RMS)

1.3.2 Access by Others

1.3.3 Inspections by Others

1.4 PROJECT MEETINGS

1.5 PRECONSTRUCTION CONFERENCE

1.5.1 Preconstruction Conference Minutes

1.5.2 Preconstruction Conference Submittals

1.5.2.1 Other Division 01 Submittals

1.5.2.2 Divisions 02 through 48 Submittals

1.6 PARTNERING

1.6.1 Initial Partnering Meeting

1.6.2 Partnering Regroups

1.7 NOTICE TO PROCEED

1.8 COORDINATION MEETING

1.9 PROGRESS MEETINGS

1.9.1 Progress Meeting Participants

1.10 CONTRACTOR PERFORMANCE EVALUATIONS

1.10.1 Training

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 GENERAL MEETING REQUIREMENTS

3.2 PROGRESS MEETING AGENDA

W912EP-16-R-0025 SECTION 01 30 00 Page 1

SECTION 01 30 00

ADMINISTRATIVE PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

Manage project and coordinate activities of own employees, subcontractors, suppliers and offsite fabricators. Contractor shall use computers, E-mail, and Internet resources for administrative work. Notify Contracting Officer of important meetings, schedule events and activities. Furnish labor and materials and equipment required to plan and execute project management functions and coordination. Coordinate activities and manage resources to construct project conforming to contract, on time and within budget.

Related Sections are 01 32 01 PROJECT SCHEDULE, and 01 45 04 CONTRACTOR

QUALITY CONTROL.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Transmit submittal items in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the following preconstruction submittal items no later than 20 calendar days after award or 5 calendar days after Notice to Proceed, whichever is later:

SD-01 Preconstruction Submittals

List of Subcontractors

Documentation of compliance with Clauses SUBCONTRACTS (LABOR STANDARDS) and LIMITATIONS ON SUBCONTRACTING of Section 00700 CONTRACT CLAUSES in Volume 1, and, if included, paragraph

LIMITATIONS ON SUBSTITUTIONS FOR CERTAIN POSITIONS AND/OR

SUBCONTRACTORS of Section 00800 SPECIAL REQUIREMENTS in Volume 1.

As part of the initial project schedule, submit a list of proposed subcontractors with company name, person to contact, street address, mail address, phone number, type of specialty and estimated subcontract quote.

SD-07 Certificates

Signature Authority

Furnish a power of attorney or a notarized letter of authority from Contractor identifying local representatives authorized to sign contract documents.

Drug-Free Work Place Record

Documentation of compliance with Clause DRUG-FREE WORKPLACE of Section 00700 CONTRACT CLAUSES in Volume 1 (see subparagraphs

W912EP-16-R-0025 SECTION 01 30 00 Page 2

(b)(1) through (b)(7)).

1.3 PROJECT COORDINATION

1.3.1 Resident Management System (RMS)

Contractor shall use Corps of Engineers' Resident Management System, referred to as Quality Control System (QCS), for construction information management. See Section 01 45 04 CONTRACTOR QUALITY CONTROL.

1.3.2 Access by Others

Maintain access to power poles and other items owned or operated by utility companies. Coordinate with utility companies as required for line marking, hookups, and relocations as needed to perform work. Incoming electrical utilities become the responsibility of Contractor at transformers.

Coordinate emergency incident response with local law enforcement and fire rescue authorities. Notify Contracting Officer in writing of coordination problems encountered affecting work.

1.3.3 Inspections by Others

During construction period, inspection or maintenance work will be performed by others within the construction limits. The Contractor will be responsible for neatly mowing all grass and vegetation (not to include established trees or other protected vegetation designated as wetland areas) within the construction limits for the duration of the contract.

Areas not accessible to mowers shall be edged or trimmed neatly. Mowing or trimming shall be performed every three weeks or when vegetation exceeds twelve inches in height.

1.4 PROJECT MEETINGS

Contracting Officer requires following types of project meetings:

-- Preconstruction Conference -- Partnering Meeting -- Partnering Regroup Meetings -- Coordination Meeting -- Preparatory and Initial Phase meeting for each feature of work -- Project Progress Meetings

Project meetings are described in detail in subparts below.

1.5 PRECONSTRUCTION CONFERENCE

Contracting Officer will conduct a Preconstruction Conference for this project in accordance with Clause PRECONSTRUCTION CONFERENCE of Section 00700 CONTRACT CLAUSES in Volume 1. Preconstruction Conference will be 30 calendar days after Notice of Award (NOA) or 15 calendar days after Notice to Proceed (NTP), whichever is later. (Refer to subparagraph "Preconstruction Conference Submittals" below.) Contracting Officer will notify Contractor of time, place, and agenda. Contractor shall notify key subcontractors and suppliers to attend. Contracting Officer will discuss contract "ground rules" and general issues including:

-- Lines of Contracting Officer authority -- Lines of Contractor authority -- 00700 Contract Clauses

W912EP-16-R-0025 SECTION 01 30 00 Page 3

-- 00800 Special Contract Requirements -- Contract Administration -- Progress Payment -- Correspondence Procedures -- Project Schedule -- Submittal Register -- Labor requirements -- General Site Safety

1.5.1 Preconstruction Conference Minutes

Contracting Officer will take detailed minutes of Preconstruction Conference discussions and may use an audio or video tape. Copies of typed minutes will be provided to the Contractor to review for accuracy, sign and return. Signed minutes become part of the contract file. Audio or video tapes if used will be made available for Contractor to review or copy at Area Office.

1.5.2 Preconstruction Conference Submittals

The timing of submission of submittals and completion of the Preconstruction Conference is intended to allow the Contractor and the Government adequate time to prepare for commencement of work. However, should the Contractor fail to submit required items and receive acceptance and/or approval within the times stated, the Contractor will not be permitted to commence work until these requirements have been satisfied.

Any delays attributable to the Contractor's failure to comply with these pre-work requirements shall be at the Contractor's expense and may be cause for remedial action by the Contracting Officer. Submittals required by this Section are described in paragraph SUBMITTALS above.

1.5.2.1 Other Division 01 Submittals

The Contracting Officer reviews submitted draft plans to prepare Coordination Meeting agenda and understand Contractor procedures. Submit the following, as indicated in their respective sections, 20 calendar days after award or 5 calendar days after Notice to Proceed, whichever is later:

-- Project Schedule - See Section 01 32 01 PROJECT SCHEDULE -- Diving Plan - See Section 01 35 25 OWNER SAFETY REQUIREMENTS -

DIVING

-- Accident Prevention Plan - See Section 01 35 26 GOVERNMENTAL

SAFETY REQUIREMENTS

-- Quality Control Plan - See Section 01 45 04 CONTRACTOR QUALITY

CONTROL

-- Temporary Facilities Plan - See Section 01 50 02 TEMPORARY

CONSTRUCTION FACILITIES

-- Environmental Protection Plan - See Section 01 57 20

ENVIRONMENTAL PROTECTION

1.5.2.2 Divisions 02 through 48 Submittals

In addition to the above, bring submittal items for materials, workmanship, plans or events required early in project schedule which are ready for transmittal to Contracting Officer. Prepare transmittal of submittal items in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

W912EP-16-R-0025 SECTION 01 30 00 Page 4

1.6 PARTNERING

Contracting Officer wants to have a bilateral project partnership with Contractor that draws on strengths of both organizations to identify and achieve common goals. Typical partnering goals include:

-- Effective and efficient contract performance -- Project completion on time and within budget -- Construction completed according to plans and specifications -- Development of cooperative management teams -- Project success with customer (stakeholders) satisfaction -- Improved Project communication

1.6.1 Initial Partnering Meeting

Contractor, key subcontractors and suppliers shall attend a one-day project "Partnering Meeting". The Partnering Meeting is a project team building workshop facilitated by qualified persons. Contracting Officer attendees and invited persons may include: