US Army Corps of Engineers
BUILDING STRONG®
JACKSONVILLE MOBILE SAVANNAHCHARLESTON WILMINGTON
Trusted Partners Delivering Value, Today and Tomorrow
Water Control Structure S-291 (IP-3)
Pre-Proposal Conference
Stephen Meyer, P.E.
Project Manager
US Army Corps of Engineers
Jacksonville District
12 May 2016
HERBERT HOOVER DIKE
REHABILITATION PROJECT
BUILDING STRONG
Trusted Partners Delivering Value, Today and Tomorrow
Agenda
Purpose Brief interested members of industry on the S-291 (IP-3) Contract and assist them in preparing their bid/proposal on the project, if they choose to do so.
Agenda HHD video
Project overview / background and history
Engineering overview S-291 (IP-3) – project implementation
Contracting requirements – solicitation information
Small business overview
Construction considerations
Site visit information
Lake Okeechobee is approximately 730 square miles
Basin is over 5,600 square miles Average water depth is 9 feet One foot of rainfall runoff from the basin can result in a three to four foot rise of the lake
During large flood events, water can flow into the lake much faster than it can be released
Lake Okeechobee
Herbert Hoover Dike Overview
North Shore - 16 miles South Shore - 68 miles
Over 3,000 lives were lost by the 1926 and 1928 hurricanes
Significant economic impacts HHD first authorized in 1930 Multiple authorizations
Congress Authorizes Herbert Hoover Dike in 1930
143 miles of embankment around Lake Okeechobee 32 federal culverts 5 spillway inlets 5 spillway outlets 9 navigation locks 9 pump stations
No overflow capability
Built by hydraulic dredge and fill methods Not acceptable to today’s construction standards
Herbert Hoover Dike Today
Culvert deterioration
Piping
Sinkhole
Internal erosion (seepage and piping) Through embankment
Through foundation
Culvert structures Soil erosion into conduit
Erosion/Piping around conduit
Overwash/Overtopping Erosion of downstream slope
Dam Safety Action Classification (DSAC) Level 1- Assigned 2006
HHD Problems (Failure Modes)
SAND CUT
N
Reach Boundary
Town/City
Port Mayaca
Okeechobee
Canal Point
Pahokee
Belle Glade Lake Harbor
Clewiston
Lake Okeechobee
Moore Haven
South Bay
Sand Cut
FISHEATING
CREEK
Major Rehabilitation Report (MRR) 2000 Reach 1 initial phase Cutoff wall constructed Federal Water Control Structure Culverts 2011 32 Federal Culverts within the entire HHD system Replacement or Removal
Dam Safety Modification Study (DSMS) 2016 System-wide approach Risk reduction measures below tolerable guidelines Prioritize Implementation
Herbert Hoover Dike Solutions
HHD Reach 1 Cutoff Wall
Approval from 2000 HHD Major Rehabilitation Report
Completed – 21.4 miles of cutoff wall installed between 2007 and 2013
Planned – Cutoff wall tie-ins to 3 existing structures and 1 bridge with contract award in FY16
Complete the continuous seepage barrier through Reach 1 providing the risk reduction benefits to the adjacent communities
Reach 1 Cutoff Wall Status
Cutoff Wall Installation Complete
Cutoff Wall Gap Closures Planned
Reach 1 Cutoff Wall Extension
Approval from 2015 HHD Major Rehabilitation Report Supplement
Planned – 6.6 miles of cutoff wall installed with contract award in FY17 and completion in 2020
Impact – Final embankment remediation project to complete repairs reducing risks to inundation Zone A
Complete the continuous seepage barrier through Inundation Zone A providing the risk reduction benefits to the adjacent communities and allow a recommendation for accreditation to FEMA for this area of HHD
Cutoff Wall Extension
Cutoff Wall Construction
Trench Remix Deep (TRD)Cutter Soil Mixer (CSM)Hydromill
Three different contractor methods achieved the same performance criteria for completed cutoff wall in Reach 1
HHD Culvert Replacements
Approval from 2011 HHD Culvert Letter Report
Water Control Structure (Culvert ) Status
Construction Contract Complete
Construction Contract Ongoing
Construction Contract Planned
Completed – 1 removal and 2 replacements
Ongoing – 10 contracts with 18 replacements completed by 2020
Planned – 6 contracts with 8 replacements; 3 contracts with 3 abandonments to be scheduled and completed by 2022
Complete repairs at the highest points of failure through the HHD system
KEY
FY 2011
FY 2012
FY 2013
FY 2014
FY 2015
FY 2016
FY 2017
FY 2018C-2 C-12A
C-8
C-13
C-5
C-5A
C-12
C-10
Water Control Structure (Culvert) Replacements - Construction
Contract Awards
KI-2
KI-1
HP-6
HP-2
HP-3
C-10A
C-6
IP-3
IP-2
IP-1
C-1A
C-16
C-11
C-1
C-4A
C-3
HP-5
HP-1
Culvert Replacement Phases
Culvert 5A (S-281) - FoundationCulvert 12 (S-275) - Excavation
Culvert 11 (S-269) - CompletionCulvert 13 (S-272) - Reconstruction
OKEECHOBEE
BRIGHTON
SEMINOLE INDIAN
RESERVATION
CLEWISTON
LAKE HARBOR
SOUTH BAY
BELLE GLADE
LAKE
OKEECHOBEELAKEPORT
BUCKHEAD
RIDGE
PORT MAYACA
PAHOKEE
Fisheating Creek
MOORE HAVEN
Calooshatchee River
Risk Assessment – Analysis performed on 32 dam segments within the 7 common inundation zones to identify and prioritize remediation
Modification Report – DSMR is being reviewed with report approval in August 2016
Impact – Final measures to reduce the risks for the entire system around the lake Recommendation for FEMA accreditation by inundation zone to begin in 2016
Construction project implementation in 2019
Opportunity to begin regulation schedule study
Dam Safety Modification Study
Dam Safety Modification Report
Draft DSMR Tentatively Selected Plan
Cutoff Wall Locations Embankment Armoring Locations Embankment Flood Wall Locations
Common Inundation Zone B
24.5 miles of cutoff wall
Common Inundation Zone C
4.1 miles of cutoff wall HP bridge abutment armoring
Common Inundation Zone D S-71 embankment flood wall S-72 embankment flood wall
Tentatively Selected Plan
(TSP)
Approval by USACE Dam Safety Officer Required
Cutoff Wall Armoring
Flood Wall
Water Control Structures (Culverts) Southern part of HHD completed by 2020 Northern part of HHD completed by 2022
Reach 1 Cutoff Wall Gap Closure Construction from 2016 to 2018
Reach 1 Cutoff Wall Extension Construction from 2017 to 2020
Dam Safety Modification Report (DSMR) Final EIS public review scheduled for July 2016 DSMR approval scheduled for August 2016 Construction start in 2019 with expected completion by 2025 (prioritization and funding dependent)
Implementation Timeline
Trusted Partners Delivering Value, Today and Tomorrow 17
Questions?
JACKSONVILLE MOBILE SAVANNAHCHARLESTON WILMINGTON
Trusted Partners Delivering Value, Today and Tomorrow
Eduardo Marin, P.E.
U.S. Army Corps of Engineers
Jacksonville District
May 2016
Vicinity Map
IP-3
Current Configuration Completed in 1959 Purpose: Flood damage reduction & irrigation.
Two 8 ft CMP Slipped line with 6 ft CMP in 2002 Flap gate control Lakeside Slide gate Control Landside Invert: 5.8 ft NAVD88
Proposed Configuration Two 7ft by 7 ft Concrete
Box Culvert Slide flap comb gate on lakeside Dual leaf gates on landside Invert: 7 ft NAVD88
IP-3 Existing Conditions
IP-3 Cofferdam
IP-3 Excavation Pit
IP-3 Structures X-sections
IP-3 Site Plan Part 1
IP-3 Site Plan Part 2
IP-3 Demo & Abandonment Plan
IP-3 Demo & Abandonment Details
IP-3 Demo & Abandonment Details
IP-3 Final Site Plan
IP-3 Structural Plan & Profile
IP-3 Headwall Details
Trusted Partners Delivering Value, Today and Tomorrow 16
Questions?
Herbert Hoover Dike Rehabilitation Structure IP-3
Contracting Overview
Claurice Dingle Contract Specialist
Contracting Process
Solicitation issued (typically 30 Calendar days) Proposals received Evaluations conducted Award (typically within 60 calendar days after receipt of proposals) Debriefings conducted
Procurement Strategy
Best Value Continuum ►Award will be made based on the best overall
(best value) proposal that is deemed the most beneficial to the Government, with appropriate consideration given to the evaluation factors
►To receive consideration for award, a rating of no less that “Acceptable” must be achieved for the technical merit factor.
Best Value Continuum
Permits tradeoffs between cost/price and non-cost factors
Allows the Government to award to other than the lowest priced proposal
Be aware, award may not necessarily be made to the lowest price offeror or the most highly rated offeror
Technical Factors
Examples:
►Technical Approach of the offeror ►Management capabilities of the offeror ►Key personnel qualifications ►Specialized Experience
Note: Technical Factors and sub-factors are listed within each solicitation as well as the importance of each.
Other Factors
Past Performance ►Evaluated for relevancy and performance, ending with a confidence assigned Small Business Participation Price
►Evaluated to be fair and reasonable
Note: Each Factor is listed in each solicitation as well as the level of importance of each.
SMALL BUSINESS PARTICIPATION
Beth Myers, Deputy Small Business
SMALL BUSINESS OPPORTUNITIES
FAR 19.201 – Government policy
(a) It is the policy of the Government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns. Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance.
Small Business Participation Subcontracting Plan (Large Business concerns only)
FAR 19.701 “Subcontract” Any agreement (other than one involving an employer-employee relationship) entered into by a Government prime contractor or subcontractor calling for supplies and/or services required for performance of the contract/or subcontract.
Factor 3: Small Business Participation
• All offerors both other than small and small businesses will be evaluated on the extent of the planned participation of U.S. Small businesses in the performance of this acquisition and past performance of the offeror in complying with the requirements of the clauses FAR 52.219-8, Utilization of Small Business Concerns and 52.219-9, Small Business Subcontracting Plan.
• Small participation goals shall be incorporated into the proposal for other than small and small business concerns.
• There are two subfactors under this factor and they are not rated separately:
1. Proposed Small Business Participation Plan
2. Past Utilization of Small Business Concerns
NEW
SMALL BUSINESS/SUB-CONTRACTING
BUILDING STRONG®
SUBCONTRACTING PLAN SMALL BUSINESS
PARTICIPATION
Plan is pass/fail based on the criteria IAW the solicitation
Evaluates overall SB(all categories) participation and is a rated evaluation factor
Requires 11 items in accordance with FAR 19.704 and 52.219-9
Requires evaluation of extent to which offerors identify & commit to SB and is separate from the subcontracting plan
Based on total subcontracted dollars
Based on total value of the acquisition
Does not apply to Small Business concerns
Applies to Small Business concerns
SUBFACTOR 1 - Proposed Small Business Participation Plan
• All offerors (both other than small and small) shall submit a Small Business Participation Plan(SBPP) using the template found at Attachment (4). A minimum Small Business Participation goal of 20% of Total Contract Value has been assigned to this procurement.
- Large businesses primes may achieve the small business participation goals through subcontracting to small businesses.
- Small business primes may achieve small business participation goals through their own performance/participation as a prime and also through subcontracting to other small businesses.
SUBFACTOR 1 - Proposed Small Business Participation Plan Small Business Participation Plans (from other than small and small businesses) will be evaluated on the basis of:
• The extent to which such firms, as defined in FAR Part 19, are specifically identified in the proposal;
• Identification of the complexity and variety of the work small business firms are to perform;
• The extent (ie. length of and formality considerations) of demonstrated commitment to use such firms (enforceable commitments (JV, MP or written teaming agreements) will be considered more favorably than non-enforceable ones; refer to Attachment 4;
• The extent of participation of Prime offerors(both large and small) and small business subcontractors in terms of the total value of the acquisition vs the large business participation percentage;
• The extent to which the offeror meets or exceeds the suggested socioeconomic category goals. These goals are a percentage of the value of the total acquisition. A minimum Total Small Business Participation goal of 20% of the total contract value is assigned to this acquisition.
In addition to the minimum Small Business Participation goal of 20% of the TOTAL contract value, the following goals are SUGGESTED for the individual socioeconomic categories and determined to be reasonable based on market research for this requirement. Goals are based on % of TOTAL contract value:
{3%} Small Disadvantaged Business {3%} Woman-Owned Small Business (WOSB) {3%} Historically Underutilized Zone (HUB Zone) Small Business {2%} Veteran Owned Small Business (VOSB) {1%} Service Disabled Veteran Owned Small Business (SDVOSB)
(1) Check the applicable size and categories for the PRIME offeror -- Check all applicable boxes:
{ } Large Prime
OR
{ } Small Business Prime; also categorized as a { } Small Disadvantaged Business { } Woman-Owned Small Business { } HUB Zone Small Business { } Veteran Owned Small Business { } Service Disabled Veteran Owned Small Business
(2) Percentage of Total Contract Dollars/Price
(a) Total Contract Value: (Include options, etc) $___________
(b) Dollar Value of your participation as a Prime Contractor: $__________
(c) Submit the total combined percentage (must equal 100%) and dollars(must equal total contract value( 2(a)) of work to be performed by both large and small businesses (include the percentage of work to be performed both by Prime and Subcontractors): Example: If Prime proposes a price of $1,000,000 (including all options), and small business(es) will provide $250,000 in services/supplies as a prime or subcontractor, the % planned for small businesses is 25%; and 75% for large business equaling 100%.
Total percentage planned for Large Business(es) _______% = $ _________ Total Percentage planned for Small Business(es) _______ % = $__________ Total of both large and small business 100% = $ __________
(3) Indicate the total percentage of participation to be performed by each type of small business. The percentage of work performed by Small Businesses that qualify in multiple small business categories may be counted in each category:
NOTE! SDVOSBs are automatically VOSBs; however VOSBs are not automatically SDVOSBs.
Dollar Value and Percentage of Total Contract Value of Subcontracts Planned For:
Dollar Percentage of Total Value Contract Value
Small Disadvantaged $________ %_________ Woman-Owned Small $________ %_________ HUB Zone Small $________ %_________ Veteran Owned Small $________ %_________ Service Disabled Veteran $________ %_________ Owned Small
(4) List principle supplies/services to be performed by Small Businesses:
Example: If a Small Business qualifies also as a WOSB and a SDVOSB, and you can add them to each category below in which they qualify.
Name of Company Identify Type of Service/Supply Large:
Small:
Small Disadvantage:
Women-Owned Small:
HUB Zone Small:
Veteran Owned Small:
Service Disabled Veteran Owned Small:
(5) Describe the extent of commitment to use each of the identified small business. Offerors do not need to submit copies of commitment instruments in their proposals. Rather, identify what types of commitments are in place with each company — i.e. a written contract, letter of commitment, verbal agreement, joint venture, mentor-protégé agreement, including how long agreement in place.
ADDITIONAL IMPORTANT NOTE FOR LARGE BUSINESSES ONLY
Small Business Sub-Contracting Plans (FAR 52.219-9)
Separate from the Small Business Participation Plan, large business offerors must also submit a Subcontracting Plan (Individual Contract Plan) meeting the requirements of FAR 52.219-9 and DFARS 252.219-7003. Large businesses will not be eligible for award if they fail to submit an acceptable Subcontracting Plan. Subcontracting Plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan. In accordance with DFARS 215.304(c), when an evaluation assesses the extent that small businesses are specifically identified in proposals, the small businesses considered in the evaluation shall be listed in any subcontracting plan submitted.
Subcontracting plans must be submitted in Volume 4 Pricing with Price Related Information.
SUBFACTOR 2 - Past Utilization of Small Business Concerns
• Applies to all offerors regardless of size
• Evaluated by assessing its records/information complying with FAR 52.219-8, Utilization of Small Business Concerns (see attachment 6)
• All large business offerors, previous compliance with FAR 52.219-9, Small Business Subcontracting Plan. (ISRs, PIPRS, etc)
• The extent the offeror documented obstacles in meeting goals or shows evidence of good faith effort.
• No contract w/FAR 52.219-8, Evaluation of Small Business Participation based solely on the offeror’s proposed small business participation plan for this contract.
• The Government may use information supplied by the offeror and information obtained from other sources to evaluate past utilization of small business concerns.
Top 6 Mistakes •Past utilization information(ISR) is not marked final or 80% complete details provided.
•Submits HUBzone firms that are not SBA certified HUBzone.
•Verification of firm size.
•Lack of documentation regarding obstacles in meeting goals or evidence of good faith effort on ISR Reports.
•Does not support proposed goals.
•No statement if never held Federal Contract w/FAR 52.219-8
SMALL BUSINESS/SUB-CONTRACTING
Potential Opportunities exist for:
– General earthwork
– Site work
– Material hauling and handling
– Finishing work
– Surveying
– Electrical
– Grassing
– Environmental Monitoring
– Material Testing
– Supplies (armoring stone, concrete, steel, concrete)
– Road work
– Dewatering
LOOKING FOR OPPORTUNITIES
IN ALL THE RIGHT PLACES
System for Award Management www.sam.gov
Dynamic Small Business Search http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm SB firms keep profile current w/bonding, past performance, and capabilities
LB/prime contractors can use many filters to locate SDB, HUBZone, WOSB, SDVOSB specific firms and their location
FEDBIZOpps www.fbo.gov SB firms register as an interested party for the solicitation
BUILDING STRONG®13
Dynamic Small Business Systems(DSBS)
ALERT!
• DSBS Link from SAM is down for 6 weeks
• Will take 6 weeks for fix to be implemented
• In the meantime…………………….
• SB firms update your SBA Supplemental Pages(profile) via SBA's general log in system(GLS)
• Go to https://eweb.sba.gov/gls/dsp_login.cfm
Register and set up an account in GLS system if not registered.
In GLS, request access to PRO-NET/DSBS and click SBA Supplemental Pages. Once you are granted access to PRO-NET/DSBS you can then click this link to update your SBA Supplemental Pages in DSBS.
CONTACT INFORMATION
Beth Myers, Deputy for Small Business
(904) 232-1150 elizabeth.r.myers@usace.army.mil
Florida Procurement Technical Assistance Center http://www.fptac.org/contactus.htm
Jacksonville District WebPages www.saj.usace.army.mil
How do I contact Small Business?
FY2016 Forecast
Frequently Asked Questions
JACKSONVILLE MOBILE SAVANNAHCHARLESTON WILMINGTON
Trusted Partners Delivering Value, Today and Tomorrow
Nolan B. Eusebio, P.E.
Chief, Quality Assurance
IP-3 Pre-Proposal Conference
May 12, 2016
Content
Typical General Requirements Typical Safety Requirements Typical Quality Control Requirements Typical Schedule Requirements Typical Regulatory Requirements Typical challenges
The objective of this presentation is to provide an overview of typical contract requirements not to establish them. Contractors are always encouraged to read contract documents.
Typical General Requirements
Read and understand your Contract Documents (Plans, Specs, Safety Manual, Codes, and Standards)
Contractors should normally anticipate submission of preconstruction submittals after Notice to proceed (NTP)
Regularly, the contract defines required meetings
Typical Safety Requirements
Contractors are typically required to submit for Government approval an Accident Prevention Plan “APP” prior to commencement of work
APP is a living document and usually needs to be updated periodically
Contractors are typically required to follow the EM-385-1-1 Safety Manual or OSHA Standards, whichever is more stringent
Normally, the EM-385-1-1 Safety manual is a contract document.
Typical Safety Requirements
Contractors are normally required to develop and submit for Government approval Activity Hazard Analyses (AHA) for each Definable Feature of Work (DFOW) as minimum
The contract usually defines key personnel that need to be incorporated into the Safety team
Safety personnel typically need to be submitted for Government approval
Cranes normally require specific documentation before they can be utilized.
Typical Quality Control Requirements
Contractors are typically required to submit for Government approval a Contractor Quality Control Plan “CQC Plan” prior to commencement of work
Contractors are usually required by contract to implement the 3 Phase Quality Control System to all Definable Features of Work (DFOWs) as a minimum
Typical Quality Control Requirements
Typically, the work cannot begin for a DFOW until the preparatory phase has been completed and all required documents to include submittals and AHA for that DFOW are approved
Usually, QC personnel need to be submitted for Government approval
Typical Schedule Requirements
The schedule is normally required to comply with specific requirements as identified in the contract specifications
The schedule is typically required to be uploaded into the Resident Management System (RMS)
Contractors are usually required to submit an Initial Project Schedule (IPS) in Primavera Software (P6)
The Schedule of Values (SOV) submittal is typically required to be submitted along with the
IPS
Typical Regulatory Requirements
Contractors are normally required to submit for Government approval an Environmental Protection Plan “EPP” prior to commencement of work
Generally, the contract defines key personnel that need to be incorporated into EPP
Usually, EP personnel need to be submitted for Government approval
Typically, the contract defines monitoring frequencies for different species
Usually, the contract requires summary reports and weekly reports for turbidity monitoring
Typical Challenges
Dewatering System Bypass Pumping System Long lead items Off-site fabrications Quality Control of specialized DFOWs that require substantial Subcontractor involvement Managing Construction Schedule including
3-phase system and submittals
| PPMD 1 2016-05-12_HHD IP-3_Pre-Proposal Conference PM Brief |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| EN 2 HHD IP-3 Pre Bid Site Visit Brief |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| CT Presentation 3 |
| CT 3 Title Page |
| Contracting Overview |
| CT 4 Presentation |
| Contracting Process |
| Procurement Strategy |
| Best Value Continuum |
| Technical Factors |
| Other Factors |
| SB 4 HHD_IP3_Preproposal_Conference |
| Slide Number 1 |
| SMALL BUSINESS OPPORTUNITIES |
| SMALL BUSINESS PARTICIPATION |
| SMALL BUSINESS/SUB-CONTRACTING |
| SMALL BUSINESS PARTICIPATION |
| SMALL BUSINESS PARTICIPATION |
| SMALL BUSINESS PARTICIPATION |
| SMALL BUSINESS PARTICIPATION |
| SMALL BUSINESS PARTICIPATION |
| SMALL BUSINESS PARTICIPATION |
| SMALL BUSINESS PARTICIPATION |
| SMALL BUSINESS/SUB-CONTRACTING |
| LOOKING FOR OPPORTUNITIES �IN ALL THE RIGHT PLACES |
| Dynamic Small Business Systems(DSBS) �ALERT! |
| CONTACT INFORMATION |
| Field 5 Pre-proposal conference IP3 |
| Slide Number 1 |
| Content |
| Typical General Requirements |
| Typical Safety Requirements |
| Typical Safety Requirements |
| Typical Quality Control Requirements |
| Typical Quality Control Requirements |
| Typical Schedule Requirements |
| Typical Regulatory Requirements |
| Typical Challenges |