A22_-_W912EK17T0058-0001.pdf

PDF 190 KB Posted

Attached to
W912EK-17-T-0058 Sandbags and Poly IDIQ - National Flood Fight Materiel Center (NFFMC)
Solicitation number
W912EKT0058
Issued by

About this file

Amendment 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is incorporate the Revised Scope of Work, provide answ ers to questions submitted, and provide Attachment 0002 and 0003.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK17T0058

X 9B. DATED (SEE ITEM 11)

14-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Aug-2017

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK17T0058

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SECTION SF 1449 - CONTINUATION SHEET

SPECIFICATION

TYPICAL SANDBAGS AND SHIPPING CONTAINERS

PART 1 GENERAL

1.1 SCOPE

This specification covers sandbags and shipping containers.

1.1.1 Classification

Sandbags covered by this specification shall be of the woven bag type.

1.2 REFERENCES

None.

1.3 CERTIFICATES

SANDBAGS

Upon delivery, provide a certificate to the Contracting Officer that the products delivered under the resulting contract/delivery orders conform to the specifications listed herein.

SHIPPING CONTAINERS FOR SHIPMENT OF SANDBAGS

Upon delivery, provide a certificate to the Contracting Officer that the products delivered under the resulting contract/delivery orders conform to the specifications listed herein.

1.4. DEFINITIONS

For the purpose of this specification, the following definitions apply.

1.4.1 Shipping Container

A shipping container is a six sided, wooden box, built to industry standards, that is used for the storage and transportation of materiel. Shipping containers have the nominal dimensions of 4 ft. in length, 4 ft. in width, and 4

ft. in height.

1.4.2 Denier.

Denier is a unit of measure for the linear mass density of fibers; typically defined as the mass in grams per 9,000 meters.

PART 2 PRODUCTS

2.1 SANDBAGS

Sandbags shall be constructed in accordance with the following specifications.

2.1.1 Sandbag Dimensions.

The sandbags shall be constructed with the nominal dimensions of 26 (± ½”) inches long by 14 (± ½”) inches wide.

2.1.2 Sandbag Material.

The sandbags shall be constructed from coated polypropylene fabric. The sandbags shall be constructed with a minimum denier of 700, and be a minimum of 10x10 woven pattern.

2.1.3 Sandbag Tie String.

The length of the tie string shall not be less than 24 inches. The ends of the tie string shall be heat-sealed or knotted to prevent unraveling. The tie string shall be located on one side of the bag (at seam or folded bag edge), not less than 4 inches nor more than 5 inches from the top edge of the bag. Tie strings shall be located on the outside of the bag.

2.1.4 Sandbag Color.

The sandbags shall be white in color.

2.1.5 Sandbags UV Resistance Coating

The sandbags shall contain ultraviolet resistance to retain 70% strength after 200 hours of exposure to accelerated weathering testing.

2.2 SHIPPING CONTAINERS. Lumber components shall be the industries’ commonly accepted practice for nominal dimensions and wood type and shall conform to commercial practice standards. Plywood shall be performance-rated paneling and all panels shall be bonded with moisture resistant adhesive that meets commercial standard. Plywood shall have no defects (knot holes, worm holes, etc.) extending through the panel. Water repellent wood sealant conforming to commercial standards shall be used on all wood material.

All 1×4 joists shall be fastened to the side, top, and end panels with weather resistant screws or ring nails spaced not more than 3 inches apart in a staggered fashion. All joists shall be bonded with moisture resistant adhesive, as well as with weather resistant screws or ring nails. The skidded load bearing base shall be fastened with weather resistant screws or ring nails, through the plywood from the inside into the cleats, with a minimum of 80% depth penetration, with no through penetration. All skidded load bearing bases shall be bonded with moisture resistant adhesive, as well as using weather resistant screw or ring nails. The sides, ends, and bottom panels shall be bonded with moisture resistant adhesive and nailed together with 2½” nails, with no through penetration. The top (lid) is screwed on with 2½” wood screws, with no through penetration. All shipping containers shall be built to the specifications provided in the attached Shipping Container Shop Drawing (attachment 4.2).

PART 3 EXECUTION

3.1 QUALITY ASSURANCE PROVISIONS

3.1.1 Workmanship

The sandbags shall be uniform in size and color, clean, unstained, and free of any extraneous material.

Workmanship shall insure serviceability of the sandbags.

The contractor shall submit three sandbag samples to the Contracting Officer within 48 hours after award.

Upon delivery, the Contractor shall submit certification that the sandbags meet all the specifications, including the drop test (below) to the Contracting Officer.

3.1.2 Drop Test

Fill the sandbag with 44 pounds (± ½lb) (approximately 760 cubic inches) of clean, dry sand and knot the tie string firmly about the choke. Adjust the contents of the bag to form a shape about 4 inches by 10 inches by 20 inches before each drop. Drop the bag (free fall) from a height of 48 inches on one face, on one side seam or the folded area where the seam would normally be located on a tubular bag, and on the butt onto a hard, unyielding surface such as stone or concrete of sufficient mass to absorb the shock without deflection. Every fourth sandbag tested shall be dropped (free fall) on the tied (choke) end in lieu of the butt drop. After each drop, the sandbag shall be examined for visible evidence of damage such as tears, punctures, broken yarns or thread, or exposure of the contents by any means other than sifting. Slight slippage or yawning in the seams shall not be considered damage.

Visible evidence of damage shall constitute failure of this test.

3.2. PREPARATION FOR DELIVERY AND DELIVERY METHODS

a. Sandbags shall be packed 500 per bundle for those shipped in shipping containers and 1,000 per bundle for those shipped on pallets.

b. Emergency Conditions. Items shipped on pallets can be ordered to be delivered anywhere in CONUS within 48 hours. The Contracting Officer may issue a series of orders at any time up to the maximum order limit for items shipped on pallets. This process can be repeated every 48 hours from issuance of the (maximum order) delivery order.

c. Urgent Conditions. Items shipped on pallets can be ordered to be delivered anywhere in CONUS within 5 business days. Business days excludes weekends and federal holidays. The Contracting Officer may issue a series of orders at any time up to the maximum order limit for items shipped on pallets. This process can be repeated every 48 hours from issuance of the (maximum order) delivery order.

d. Non-emergency Conditions. Items shipped in containers can be ordered to be delivered anywhere in CONUS within 45 days. The Contracting Officer may issue a series of orders at any time up to the maximum order limit for items shipped in containers. This process can be repeated every seven days from issuance of the (maximum order) delivery order.

e. All deliveries shall be made on side access trailers capable of being unloaded with a forklift without access to a ramp or dock. Requests for closed bed trucks must be approved by the Contracting Officer or Contracting Officer’s Representative before shipment.

f. Transportation costs will be a separate contract line item. Transportation costs will be reimbursed based on the actual cost of transportation. The Contractor shall provide documentation with their invoice.

g. The Contractor shall give 48 hour notice to the Contracting Officer’s Representative and the delivery point of contact (listed in the specific delivery order) before delivery. The contractor shall contact the delivery point of contact three hours and one hour prior to arrival.

h. Deliveries required within 5 days and 45 days shall be Monday through Friday from 7:00 am to 4:00 pm, except for Federal Holidays. Emergency deliveries (required within 48 hours) shall be anytime, 24 hours per day and 365 days per year including holidays.

i. If a significant delay occurs that will prohibit the delivery of the product by the due date, the contractor shall immediately report the delay by phone call and email to the Contracting Officer and Contracting Officer’s Representative. An equitable adjustment may be deducted from the contract price relative to the delay. In each case, the price deducted shall be dependent upon the reason for the delay. The delay report shall include current location, cause of delay and anticipated delivery time.

3.3. PACKAGING AND MARKING

Preservation, packaging, packing, unitization and marking furnished by the Contractor shall provide protection for a minimum of one year and meet or exceed the following requirements:

a. Preservation - Commercial.

b. Level of Packing - Commercial.

c. Quantity of bundles per Shipping Container: - 25 bundles per 4 ft. long, 4 ft. wide, and 4 ft. high container

- 12,500 sandbags per shipping container

d. Quantity of bundles per pallet: - 16 bundles per 4 ft. long, 4 ft. wide pallet

- 16,000 sandbags per pallet

3.3.1 Bundle

A bundle shall contain 500 sandbags per shipping container or 1,000 sandbags per pallet. Sandbags shall be stacked flat-wise, compressed and banded. A bundle shall be so constructed that it will allow subsequent handling.

3.3.2 Shipping Containers

A 4 ft. wide, 4 ft. long, and 4 ft. high shipping container shall contain 12,500 sandbags (or 25 bundles of 500 count sandbags, compressed and banded bundles).

3.3.3 Packaging.

a. Bundles shall be packed in shipping containers or on pallets. Shipping containers and pallets shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest tariff cost. Shipping containers shall be capable of multiple handling, stacking and storage under favorable conditions (such as enclosed facilities) for a minimum of one year.

b. All shipping containers shall be the most cost effective and shall be of minimum cube to contain and protect the bags. Shipping containers shall be closed on all sides, ends, bottom and top. Tops shall be easily removable/replaceable. Rough, sharp, or dangerous edges, corners or fasteners will not be permitted. Marking materials creating hazardous conditions shall not be used.

3.3.4 Unitization

a. Shipping Containers. The shipping containers shall be constructed with the nominal (no more than ±½”) outside dimensions of 4 feet in length, 4 feet in width, and 4 feet in height. The load shall be contained in a manner that will permit safe handling during shipment and storage.

b. Palletization. The pallets shall contain sixteen (16) bundles of one-thousand (1,000) count sandbags per bundle.

The bundles shall be triple shrink-wrapped with transparent plastic film and secured to the pallet according to manufacturer recommended industry standards, allowing for safe transportation, including vertical stacking. Pallets shall be new construction, treated lumber or hardwood, capable of multiple handlings.

3.3.5 Marking

The exterior of all shipping containers shall be marked with the container quantity (number of bags contained in the shipping container) on all four sides in four inch number/letters, the weight of the filled container, and the contractual delivery date in two inch numbers/letters. Letters shall be capitals without serifs and numerals shall be Arabic per industry specifications and standards. The top (lid) of all shipping containers shall be marked with a stenciled arrow indicating the location of the wood screws used to secure the top (lid) to the container. The exterior of all shipping containers shall also be marked, on all four sides, in the upper, left-hand corner with the full colored, 6 × 6 inch, Corps signature (logo and text), as indicated on the attached sheet.

3.3.6 Drawings of Shipping Containers

Shop drawings of the shipping containers, including a list of materials and material dimensions shall be submitted for acceptance within (ten) 10 calendar days of the contract award date.

3.7 PAYMENT AND INVOICING

Payment for supplies ordered under this contract will be made upon receipt of the invoice. Invoices shall be submitted within 14 days of services rendered. Invoices shall include contract number, delivery order number and Contract Line Item Number (CLIN) when multiple CLIN’s are issued on a contract. The invoices shall also include copies of the BOL (please see clause 52.212-4(g) for further information).

All invoices shall be submitted to the COR appointed on the delivery order.

PART 4 ATTACHMENTS

4.1 Corps Signature

4.2 4’×4’×4’ Shipping Container Shop Drawing

LARGE SANDBAGS AND SHIPPING CONTAINERS

PART 1 GENERAL

1.1 SCOPE

This specification covers large sandbags and shipping containers.

1.1.1 Classification

Sandbags covered by this specification shall be of the woven bag type.

1.2 REFERENCES

None.

1.3 CERTIFICATES

SANDBAGS

Upon delivery, provide a certificate that the products delivered under the resulting contract/delivery orders conform to the specifications listed herein.

SHIPPING CONTAINERS FOR SHIPMENT OF SANDBAGS

Upon delivery, provide a certificate that the products delivered under the resulting contract/delivery orders conform to the specifications listed herein.

1.4 DEFINITIONS.

1.4.1 Shipping Container.

A shipping container is a six sided, wooden box, built to industry standards, that is used for the storage and transportation of materiel. Shipping containers have the nominal dimensions of 4 ft. in length, 4 ft. in width, and 4

ft. in height.

1.4.2 Denier.

Denier is a unit of measure for the linear mass density of fibers; typically defined as the mass in grams per 9,000 meters.

1.4.3 Safety Factor

The Safety Factor, depending on the ratio, in this case 5:1, means that the large sandbag is specified to hold 5 times the amount of the bags safe working load.

PART 2 PRODUCTS

2.1 LARGE SANDBAGS

Sandbags shall be constructed in accordance with the following specifications.

2.1.1 Sandbag Dimensions

The sandbags shall be constructed with the nominal dimension of 36 (±3”) inches wide, by 36 (±3”) inches deep, by 48 (±3”) tall.

2.1.2 Sandbag Material.

The sandbags shall be constructed from coated polypropylene fabric. The sandbags shall be constructed with a minimum denier of 1,600, be a minimum of 11x11 woven pattern, and have a safety factor of 5:1. Sandbags must be suitable for the containment of sand or similar material.

2.1.4 Sandbag Lifting Straps.

The sandbags harness system shall run along the entire perimeter of the sandbag and end in four lifting loops on each top corner of the bag. Lifting straps shall run vertically along the four corners of the bag and crisscross on the bottom of the bag. The loops must be of sufficient length to ensure that they can be joined together and lifted from a center point.

2.1.5 Sandbag Duffel Tops

The sandbags shall contain duffle tops, or the equivalent, to ensure that the entire bag is completely enclosed.

2.1.6 Sandbag Color

The sandbags shall be white in color.

2.1.7 Sandbag Strength.

The sandbags shall be constructed with the strength to be able to support loads ranging from 2,400 – 3,000 lbs. All straps, loops, and the bag, itself, shall be constructed of sufficient strength and durability to allow for helicopter airlift and drop operations.

2.1.8 Sandbag UV Resistance Coating

The sandbags shall contain ultraviolet resistance to retain 70% strength after 200 hours of exposure to accelerated weathering testing.

2.2 SHIPPING CONTAINERS. Lumber components shall be the industries’ commonly accepted practice for nominal dimensions and wood type and shall conform to commercial practice standards. Plywood shall be performance-rated paneling and all panels shall be bonded with moisture resistant adhesive. Plywood shall have no defects (knot holes, worm holes, etc.) extending through the panel. Water repellant wood preservatives conforming to commercial standards shall be used on all wood materials. All plywood used shall be oriented so that the grain direction of face plies are perpendicular to the box length, ends shall be oriented the same as all other sides.

All 1×4 joists shall be fastened to the side, top, and end panels weather resistant screws or ring nails spaced not more than 3 inches apart in a staggered fashion. All joists shall be bonded with moisture resistant adhesive, as well as with weather resistant screws or ring nails. The skidded load bearing base shall be screwed or ring nailed together, through the plywood from the inside into the cleats, with a minimum of 80% depth penetration, with no through penetration. All skidded load bearing bases shall be bonded with moisture resistant adhesive, as well as using weather resistant screw or ring nails. The sides, ends, and bottom panels shall be bonded with moisture resistant adhesive and nailed together with 2½” nails, with no through penetration. The top (lid) shall be screwed on with 2½” wood screws, with no through penetration. All shipping containers shall be built to the specification provided in the attached Shipping Container Shop Drawing (attachment 4.2).

PART 3 EXECUTION

3.1 QUALITY ASSURANCE PROVISIONS

3.1.1 Workmanship

The sandbags shall be uniform in size and color, clean, unstained, and free of any extraneous material.

Workmanship shall insure serviceability of the sandbags.

Upon delivery, the Contractor shall submit certification that the sandbags meet the above requirements to the Contracting Officer.

3.2 PREPARATION FOR DELIVERY AND DELIVERY METHODS

a. Large Sandbags shall be packed 25 per bundle. Each bundle shall be the nominal dimensions of 20” wide, 20” high and 40” long for large sandbags in shipping containers. For pallets, large sandbags shall be bundled flat wise in a 100 count bundle and secured to a pallet.

b. Emergency Conditions. Items shipped on pallets can be ordered to be delivered anywhere in CONUS within 48 hours. The Contracting Officer may issue a series of orders at any time up to the maximum order limit for items shipped on pallets. This process can be repeated every 48 hours from issuance of the (maximum order) delivery order.

c. Urgent Conditions. Items shipped on pallets can be ordered to be delivered anywhere in CONUS within 5 business days. Business days excludes weekends and federal holidays. The Contracting Officer may issue a series of orders at any time up to the maximum order limit for items shipped on pallets. This process can be repeated every 48 hours from issuance of the (maximum order) delivery order.

d. Non-emergency Conditions. Items shipped in containers can be ordered to be delivered anywhere in CONUS within 45 days. The Contracting Officer may issue a series of orders at any time up to the maximum order limit for items shipped in containers. This process can be repeated every seven days from issuance of the (maximum order) delivery order.

e. All deliveries shall be made on side access trailers capable of being unloaded with a forklift without access to a ramp or dock. Requests for closed bed trucks must be approved by the Contracting Officer or Contracting Officer’s Representative (COR) before shipment.

f. The Contractor shall give 48 hour notice to the Contracting Officer’s Representative and the delivery point of contact (listed in the specific delivery order) before delivery. The contractor shall contact the delivery point of contact three hours and one hour prior to arrival.

g. Deliveries required within 45 days shall be Monday through Friday from 7:00 am to 4:00 pm, except for Federal Holidays. Emergency deliveries (required within 48 hours) shall be anytime, 24 hours per day and 365 days per year including holidays.

h. If a significant delay occurs that will prohibit the delivery of the product by the due date, the contractor shall immediately report the delay by phone call and email to the Contracting Officer and Contracting Officer’s Representative. An equitable adjustment may be deducted from the contract price relative to the delay. In each case, the price deducted shall be dependent upon the reason for the delay. The delay report shall include current location, cause of delay and anticipated delivery time.

3.3 PACKAGING AND MARKING

Preservation, packaging, packing, unitization and marking furnished by the Contractor shall provide protection for a minimum of one year and meet or exceed the following requirements:

a. Preservation: Commercial

b. Level of Packing: Commercial

c. Quantity of Bundles per Shipping Container: four (4) – twenty five (25) count bundle per 4 ft. long, 4 ft. wide, and 4 ft. high container.

d. Quantity of Bundles per Pallet: one (1) – one-hundred (100) count bundle per 4 ft. long, 4ft. wide pallet.

3.3.1 Packaging

a. Large Sandbags shall be packed in shipping containers or on pallets. Shipping containers and pallets shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest tariff cost.

Shipping Containers shall be capable of multiple handling and storage under favorable conditions (such as enclosed facilities) for a minimum of one year.

b. All shipping containers shall be the most cost effective and shall be of minimum cube to contain and protect the bags. Shipping containers shall be closed on all sides, ends, bottom and top. Tops shall be easily removable/replaceable. Rough, sharp or dangerous edges, corners or fasteners will not be permitted. Marking materials creating hazardous conditions shall not be used.

3.3.2 Unitization

a. Shipping Containers. The shipping containers shall be constructed with the nominal (no more than ±½”) outside dimensions of 4 feet in length, 4 feet in width, and 4 feet in height (measurements exclude the skid). The load shall be contained in a manner that will permit safe handling during shipment and storage.

a. Palletization. The bundles shall be tripled shrink-wrapped with transparent plastic film and secured to the pallet according to manufacturer recommended industry standards, allowing for safe transportation, including vertical stacking. Pallets shall be new construction, treated lumber or hardwood, capable of multiple handling.

3.3.3 Marking

The exterior of all shipping containers shall be marked with the container quantity (number of bags contained in the shipping container) and the words “Large Sandbags” on all four sides in four inch number/letters, the weight of the filled container, and the contractual delivery date in two inch numbers/letters. Letters shall be capitals without serifs and numerals shall be Arabic per industry specifications and standards. The top (lid) of all shipping containers shall be marked with a stenciled arrow indicating the location of the wood screws used to security the top (lid) to the container. The exterior of all shipping container shall also be marked, on all four sides, in the upper left-hand corner, with the full colored, 6×6 inch, Corps signature (logo and text), as indicated on the attached sheet.

3.3.4 Drawings of Shipping Containers

Shop drawings of the shipping containers, including a list of materials and material dimensions shall be submitted for acceptance within 10 calendar days of the contract award date.

3.4 PAYMENT AND INVOICING

Payment for supplies ordered under this contract will be made upon receipt of the invoice. Invoices shall be submitted within 14 days of services rendered. Invoices shall include contract number, delivery order number and Contract Line Item Number (CLIN) when multiple CLIN’s are issued on a contract. The invoices shall also include copies of the BOL (please see clause 52.212-4(g) for further information).

All invoices shall be submitted to the COR appointed on the delivery order.

PART 4 ATTACHMENTS

4.1 Corps Signature

4.2 4’×4’×4’ Shipping Container Shop Drawing

POLYETHYLENE SHEETING

PART 1 GENERAL

1.1 SCOPE.

This specification covers polyethylene sheeting.

1.2 REFERENCES.

The publication listed below forms all or a part of this specification.

ASTM INTERNATIONAL (ASTM)

ASTM D 4397 Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural applications.

1.3 CERTIFICATES

POLYETHYLENE SHEETING

Upon delivery, provide a certificate to the Contracting Officer that the products delivered under the resulting contract/delivery orders conform to the specifications listed herein.

PALLETS FOR SHIPMENT OF POLYETHYLENE SHEETING

Upon delivery, provide a certificate that the products delivered under the resulting contract/delivery orders conform to the specifications listed herein.

PART 2 PRODUCTS

2.1 POLYETHYLENE SHEETING

Polyethylene sheeting shall be constructed in accordance with the following specification.

2.1.1 Polyethylene Sheeting Dimensions.

The polyethylene sheeting shall be shipped in rolls and be constructed with the nominal dimensions of 20 ft. in width and 100 ft. in length.

2.1.2 Polyethylene Strength

The polyethylene sheeting shall be constructed 6 mils in thickness.

2.1.3 Polyethylene Color

The polyethylene sheeting shall be black in color.

PART 3 EXECUTION

3.1 QUALITY ASSURANCE PROVISIONS

3.1.1 Workmanship

The polyethylene sheeting shall be uniform in size and color, clean, unstained, and free of any extraneous material.

Upon delivery, the Contractor shall submit certification to the Contracting Officer, that the polyethylene sheeting meet all the specifications.

3.2 PACKAGING AND MARKING

Preservation, packaging, packing, and unitization furnished by the Contractor shall provide protection for a minimum of one year and meet or exceed the following requirements.

a. Preservation: Commercial

b. Level of Packing: Commercial

c. Quantity of Rolls per Box – Each box shall contain one (1) – 20 ft. x 100 ft. roll of poly.

d. Quantity of Boxes per Pallet – Each pallet shall contain 25 boxes of poly.

3.2.1 Palletization.

The boxes shall be triple shrink-wrapped with transparent plastic film and secured to a 4 ft. wide, 4 ft. long pallet according to manufacturer recommended industry standards, allowing safe transportation. Pallets shall be new construction, treated lumber or hardwood, capable of multiple handlings.

3.2.2 Marking.

A sticker shall be affixed to the end of each box containing the following information:

- 20 ft X 100 ft

- 6 MIL

- Weight (lbs)

- Black Poly Sheeting

The boxes shall be packaged such that the sticker is facing outward.

3.3 PREPARATION FOR DELIVERY AND DELIVERY METHODS

a. Emergency Conditions. Items shipped on pallets can be ordered to be delivered anywhere in CONUS within 48 hours. The Contracting Officer may issue a series of orders at any time up to the maximum order limit for items shipped on pallets. This process can be repeated every 48 hours from issuance of the (maximum order) delivery order.

b. Urgent Conditions. Items shipped on pallets can be ordered to be delivered anywhere in CONUS within 5 business days. Business days exclude weekends and federal holidays. The Contracting Officer may issue a series of orders at any time up to the maximum order limit for items shipped on pallets. This process can be repeated every 48 hours from issuance of the (maximum order) delivery order.

c. Non-emergency Conditions. Items shipped on pallets can be ordered to be delivered anywhere in CONUS within 45 days. The Contracting Officer may issue a series of orders at any time up to the maximum order limit for items shipped in pallets. This process can be repeated every seven days from issuance of the (maximum order) delivery order.

d. All deliveries shall be made on side access trailers capable of being loaded with a forklift without access to a ramp or dock. Requests for closed bed trucks must be approved by the Contracting Officer or Contracting Officer’s Representative (COR) before shipment.

e. The Contractor shall give 48 hour notice to the Contracting Officer’s Representative and the delivery point of contact (listed in the specific delivery order) before delivery. The contractor shall contact the delivery point of contact three hours and one hour prior to arrival.

f. Deliveries required within 45 days shall be Monday through Friday from 7:00 am to 4:00 pm, except for Federal Holidays. Emergency deliveries (required within 48 hours) shall be anytime, 24 hours per day and 365 days per year including holidays.

g. If a significant delay occurs that will prohibit the delivery of the product by the due date, the contractor shall immediately report the delay by phone call and email to the Contracting Officer and Contracting Officer’s Representative. An equitable adjustment may be deducted from the contract price relative to the delay. In each case, the price deducted shall be dependent upon the reason for the delay. The delay report shall include current location, cause of delay and anticipated delivery time.

3.4 PAYMENT AND INVOICING

Payment for supplies ordered under this contract will be made upon receipt of the invoice. Invoices shall be submitted within 14 days of services rendered. Invoices shall include contract number, delivery order number and Contract Line Item Number (CLIN) when multiple CLIN’s are issued on a contract. The invoices shall also include copies of the BOL (please see clause 52.212-4(g) for further information).

All invoices shall be submitted to the COR appointed on the delivery order.

File details come from the government source that posted it. Updated .