Questions and Answers - 2.pdf

PDF 546 KB Posted

Attached to
Lake Red Rock Refuse Removal Services
Solicitation number
W912EK27QA006
Issued by

About this file

This is a Questions and Answers document (Amendment #2) for Solicitation W912EK27QA006, issued by the U.S. Army Corps of Engineers for waste collection and disposal services at Lake Red Rock recreational facilities. The solicitation addresses small business subcontracting rules, pricing structures, submission requirements, and service schedules for dumpster collection operations.

Key service requirements include collection from multiple campground locations with varying pickup schedules (ranging from two to three times weekly depending on location), using 20 cubic yard roll-off containers and standard dumpsters with capacities up to 15 tons. Pricing is structured on a per-haul basis for roll-off services, with contractors expected to plan for up to 10 hauls per year. Pricing for regular dumpster service should be adjusted based on the number of active service locations. Ivans Campground requires two pickups weekly (Mondays and Saturdays only, April through October), while other locations operate under different schedules referenced in Technical Exhibit #2 of the Performance Work Statement. For small business prime contractors, work subcontracted to similarly situated small business subcontractors under the same NAICS code does not count toward the 50 percent subcontracting limitation under FAR 52.219-14(e)(1). Submission deadlines are 2:00 PM Central on Friday, November 20, 2026 for questions and 12:00 PM Central on Monday, November 30, 2026 for quotes. All quoters must submit the RFQ cover page, SF 1449 Section B with bid CLINs, Sections C-7 and C-8 of the PWS, and the Abstract spreadsheet with base-year and four option-year pricing.

View the file

Other files

File Type Posted
ABSTRACT - 2.xls XLS spreadsheet
W912EK27QA006-0002.pdf PDF
Questions and Answers.pdf PDF
Solicitation Amendment W912EK27QA006-0001.pdf PDF
PWS.pdf PDF
Amendment 0001.pdf PDF
ABSTRACT.xls XLS spreadsheet
Lake Red Rock Dumpster Locations.pdf PDF
W912EK27QA006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers to Solicitation W912EK27QA006 #2

1. Subcontracting. Q&A 10 says a similarly situated small business subcontractor can perform the work, while Q&A 16 and 17 say the subcontractor may not perform more than 50 percent of the work. Please confirm that under FAR 52.219-14(e)(1), amounts paid to a first-tier subcontractor that is small under NAICS 562111 (a similarly situated entity) do not count toward the 50 percent limitation, so that subcontractor may perform the collection work. If you are a small business prime contractor, the limitation does not restrict you from subcontracting to other small businesses that meet the same criteria. Any work subcontracted to a first-tier subcontractor that is also a small business under the NAICS code assigned to that subcontract does not count as subcontracted work for the purpose of the 50% limit.

2. Roll-oƯ line 0001F (quantity "0-10"). How will this line be evaluated? Should quoters enter a per-haul unit price and an extended amount of the unit price times 10 for each period? Is the per-haul price all-inclusive (delivery, rental while on site, haul and disposal up to 15 tons)? Yes, quoters should enter a per-haul price for ten 20 cu. yd.

dumpsters that would include delivery, rental, haul and disposal.

3. ABSTRACT layout. The bid schedule has an unlabeled price-column pair (columns E- F) under "Closes 30 Nov 2026" and a pair labeled "Vendor 1" (columns G-H). Which pair should quoters complete? Is Section B of the SF 1449 also required, or only the ABSTRACT? It does not matter which pair of columns you put your numbers under. Please fill out Section B of the SF1449 as well. This amendment will have the correct Abstract and Section B as another line item will be put in (Ivans Campground).

4. The roll-oƯ line items (0005, 0010, 0015, 0020 and 0025) are each listed as 1 Job, and the answer to question 7 of the first set of Q&A says to price them per haul. Just to confirm, should the price on those lines be for a single haul, with the Corps paying for each haul as it's called? The roll-oƯ line item should be for 10 total hauls and priced for each haul. Yes, the corps would pay for each haul after its called.

5. Technical Exhibit 2 has Ivans on Mondays and Saturdays, but CLIN 0003 lists Mondays, Thursdays and Saturdays for the group that includes Ivans. Should we plan on two or three pickups a week at Ivans? Ivans should remain at two picks ups a week. It is not busy during week days like the other campgrounds are. A new Abstract and Line items in the SF1449 show the added line item for Ivans. Please fill these out instead of the previous ones.

6. The amended notice asks for the quote on the Abstract Excel sheet only, while the RFQ cover page asks for SF1449 blocks 17a and 30 and the PWS marks Sections C-7 and C-8 as oƯerors must complete. Should the quote include the RFQ cover page, the signed SF1449, the amendment acknowledgment and Sections C-7 and C-8 together with the Abstract? Please fill out and include the RFQ cover page, Sections C-7 and C-8, the signed SF1449, the bid CLINS in the SF1449 and the Abstract.

7. Pricing structure — is the price schedule per pickup, monthly, or a lump sum? How many pickups per week are required, and how many containers are serviced? Please look at the Amendment update first. Please see PWS Technical Exhibit #2. It shows the schedule of services, containers capacity and collection days.

8. Period of performance and required start date? Please see PWS Section C.1.2

9. Scope — could you confirm the services included and the locations serviced at Lake Red Rock? Please read the PWS in its entirety. See Section C.1.2, C.1.2.1, C.1.2.2, and C.1.2.3.

10. Could you confirm the Statement of Work and price schedule are the attachments on the SAM.gov notice? There are multiple attachments in the Sam.gov Notice. Reading every one, the directions, and all the Questions and Answers is required to fully understand the requirement.

11. Submission — please confirm quotes should be submitted on the Abstract Excel sheet only, with the solicitation cover sheet returned showing base-year and 4 option-year prices, and that oƯers are due by 12:00 PM CST on Monday, November 30, 2026. I note questions were due Friday, November 20 — please let me know if questions submitted with this email can still be answered. Please fill out and include the RFQ cover page, Sections C-7 and C-8, the signed SF1449, the bid CLINS in the SF1449 and the Abstract. The due date for prices is 12pm Central on Monday, 30 November 2026 and questions are due by Friday, November 20th.

12. Is there a deadline for questions, and may we ask you to confirm the container quantities in the table, since the cubic-yard total and the container counts read diƯerently to us? Deadline for questions is Friday, 20 November at 2pm Central. For container quantitites, please look at the updated PWS under Section C.1.2.3 and Technical Exhibit #2

13. Question 10 confirms that a similarly situated small-business subcontractor may perform the work and describes the 50% limitation as applying to payments to subcontractors that are not similarly situated.

Answers 16 and 17 state that a subcontractor cannot perform more than 50% of the work without that distinction.

May a vendor use a qualifying similarly situated small-business hauler to perform all physical collection and disposal, while the vendor retains contract management and quality-control responsibility, subject to the applicable clause and any further-subcontracting restrictions?

Please confirm whether answers 16 and 17 require correction through an amendment.

If you are a small business prime contractor, the limitation does not restrict you from subcontracting to other small businesses that meet the same criteria. Any work subcontracted to a first-tier subcontractor that is also a small business under the NAICS code assigned to that subcontract does not count as subcontracted work for the purpose of the 50% limit. Please read the Code of Federal Regulations under “What are the prime contractor’s limitation on subcontracting” https://www.ecfr.gov/current/title-13/chapter-I/part-125/section-125.6

14. Ivans collection schedule: Revised Section B, CLIN 0003 (page 3 of 62), includes Ivans in the Monday, Thursday and Saturday campground group, as do the corresponding option-year CLINs. The revised PWS Technical Exhibit 2 (last page) lists Ivans on Mondays and Saturdays only, April through October. Should we price two or three weekly collections at Ivans for the base and all option years? Please follow Technical Exhibit #2. It’s on Mondays & Saturdays only for Ivans. The CLINS in the SF1449 and Abstract were changed to reflect this.

15. Similarly situated subcontractor: Q&A 10 and 11 say the FAR 52.219-14 limit applies to amounts paid to subcontractors that are not similarly situated, with further subcontracting counted toward that limit. Answers 16 and 17 instead say the subcontractor may not perform more than 50 percent of the work. Please confirm whether a qualifying similarly situated small-business hauler may perform the on-site collection and disposal while the prime retains contract management and quality control, subject to the clause's limits on non-similarly-situated and further-subcontracted work, or whether a separate prime self-performance requirement is intended. See the Answers to Questions 1 and 13 of this sheet

16. Q&A 10 says 52.219-14 was added; could you also identify where it is incorporated in the amended solicitation? It was added in this Amendment 0002

17. Should the per-haul price for the 20 cubic yard roll-oƯ include rental and disposal fees for loads up to the 15-ton maximum, and is the quantity of 0 to 10 per year to be extended at 10 hauls on the Abstract? The Abstract was redone to reflect the roll-oƯ container CLIN. Vendors need to do the per-haul price for everything needed to make it happen. Rental, disposal fees and time. It could be up to 10 times per year.

18. May we ask you to confirm the container quantities in the table, since the cubic-yard total and the container counts read differently to us? Section C.1.2.3 and the TECHNICAL EXHIBIT #2 was redone to read better

19. From the price sheet are you looking for a flat amount every month? Adjust the price based on how many locations have service.

20. From the roll-oƯ perspective are you wanting to have this bill on a per time basis or do you want the contractor to figure in 10 hauls per year in their bid? Contractors should plan on there being 10 hauls a year.