C04 - Bid Abstract - W912EK26BA014.pdf
PDF 409 KB Posted
- Attached to
- W912EK26BA014 - MISSISSIPPI RIVER BASIN LOCK AND DAM 21 QUINCY, IL BOLTED TAINTER GATE FABRICATION
- Solicitation number
- W912EK26BA014
About this file
This is an Abstract of Offers document from the U.S. Army Corps of Engineers, Rock Island District, for Solicitation No. W912EK26BA014, titled "LD21 Bolted Tainter Gates." The solicitation was issued on August 18, 2026, with a bid opening date of September 17, 2026. Six bidders submitted offers: G&G Steel, Inc. (Russellville, AL); Johnson Machine Works, Inc. (Chariton, IA); OCCI, Inc. DBA Missouri Fabricators (Fulton, MO); Reagent World, Inc. (Irvine, CA); Sealevel Construction, Inc. (Thibodaux, LA); and Steward Machine Company, Inc. (Birmingham, AL). Five of the six bidders provided the required 20% bid security; Reagent World, Inc. did not provide bid security.
The contract requires the fabrication and delivery of tainter gates along with barge demurrage services. The base bid includes three tainter gates (quantity 3, each as a separate item) at unit prices ranging from approximately $2.99 million to $4.53 million per gate, with extended amounts totaling between $8.996 billion and $13.59 billion. Gate delivery is priced as a job lot, ranging from zero to $863,057. Barge demurrage is itemized separately for the first 30 days and over 30 days, at daily rates ranging from $150 to $30,000 per day. The contract includes six options (Options A through F), each for one additional tainter gate with associated delivery and demurrage costs. The government estimate totaled $35.84 million for the base and all options combined, while total bid proposals ranged from approximately $27.65 million to $43.51 million.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY CORPS OF ENGINEERS, ROCK ISLAND DISTRICT
Bid Opening Officer:
Abstract of Offers
Project Title: LD21 Bolted Tainter Gates
Solicitation No: W912EK26BA014
Item # Description QTY UOM Unit Price Extended Amount Unit Price
Extended Amount Unit Price
Extended Amount Unit Price Extended Amount Unit Price
Extended Amount Unit Price
Extended Amount Unit Price Extended Amount
Base Bid
0001 Tainter Gate Fabrication 3 EA $ 4,530,145.85 $ 13,590,437.55 $ 4,289,107.00 $ 12,867,321.00 $ 3,869,150.00 $ 11,607,450.00 $ 4,528,954.00 $ 13,586,862.00 $ 2,998,760.00 $ 8,996,280.00 $ 3,950,225.00 $ 11,850,675.00 $ 3,264,054.00 $ 9,792,162.00
0002 Tainter Gate Delivery 1 JOB
XXXX $ 288,134.99 XXXX $ 444,620.00 XXX $ 57,600.00 XXXX $ 400,000.00 XXXX $ - XXXX $ 815,000.00 XXXX $ 863,057.00
0003 Barge Demurrage
0003AA First 30 Days 30 DY
$ 1,838.55 $ 55,156.50 $ 150.00 $ 4,500.00 $ 580.00 $ 17,400.00 $ 1,500.00 $ 45,000.00 $ 30,000.00 $ 2,900.00 $ 87,000.00 $ 3,250.00 $ 97,500.00
0003AA Over 30 Days 60 DY
$ 1,838.55 $ 110,313.00 $ 150.00 $ 9,000.00 $ 580.00 $ 34,800.00 $ 1,500.00 $ 90,000.00 $ 50,000.00 $ 2,900.00 $ 174,000.00 $ 3,250.00 $ 195,000.00
Total
$ 14,044,042.04 $ 13,325,441.00 $ 11,717,250.00 $ 14,121,862.00 $ 9,176,280.00 $ 12,926,675.00 $ 10,947,719.00
Option A
0101 Tainer Gate Fabrication 1 EA 4,511,432.51$ 4,511,432.51$ 3,617,351.00$ 3,617,351.00$ 2,707,700.00$ 2,707,700.00$ 2,006,976.00$ 2,006,976.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$
0102 Tainter Gate Delivery 1 JOB
XXXX 242,413.50$ XXXX 380,000.00$ XXXX 19,200.00$ XXXX 151,908.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$
0103 Barge Demurrage
0103AA First 30 Days 30 DY
612.85$ 18,385.50$ 150.00$ 4,500.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$
0103AB Over 30 Days 60 DY 612.85$ 36,771.00$ 150.00$ 9,000.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$
Total
4,809,002.51$ 4,010,851.00$ 2,741,300.00$ 2,293,884.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$
Option B
0201 Tainer Gate Fabrication 1 EA 4,550,270.16$ 4,550,270.16$ 3,617,351.00$ 3,617,351.00$ 2,711,600.00$ 2,711,600.00$ 2,010,736.00$ 2,010,736.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$
0202 Tainter Gate Delivery 1 JOB
XXXX 244,500.00$ XXXX 5,000.00$ XXXX 19,200.00$ XXXX 142,308.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$
0203 Barge Demurrage
0203AA First 30 Days 30 DY
618.13$ 18,543.90$ 10.00$ 300.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$
Government Estimate Bidder #1 Bidder #2 Bidder #3
I certify that I have opened, read, and recorded on this abstract all offers received in response to this soliciation.
Bidder #4 Bidder #5
G&G Steel, INC Johnson Machine Works, Inc OCCI, INC DBA Missouri Fabricators Reagent World, Inc. Sealevel Construction, Inc.
P.O. Box 1037
Date Opened: 9/17/2026 Russelville, AL 35653 Chariton, IA 50049 Fulton, MO 65251 Irvine, CA 92612 Thibodaux, LA 70302
Date Issued: 8/18/2026 15825 Hwy 243 Industrial Park 318 N. 11th Street 3226 County Road 257 18401 Von Karman AVE
NA
Bid Security 20% 20% 20% Not provided 20%
Amendments Acknowledged: NA NA NA NA
20%
Bidder #6
Steward Machine Company, Inc.
3911 13th Ave N
Birmingham, AL 35234
NA
0203AB Over 30 Days 60 DY 618.13$ 37,087.80$ 10.00$ 600.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$
Total
4,850,401.86$ 3,623,251.00$ 2,745,200.00$ 2,288,044.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$
Option C
0301 Tainer Gate Fabrication 1 EA 4,589,107.82$ 4,589,107.82$ 3,617,351.00$ 3,617,351.00$ 2,711,600.00$ 2,711,600.00$ 2,010,683.00$ 2,010,683.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$
0302 Tainter Gate Delivery 1 JOB
XXXX 246,587.40$ XXXX 5,000.00$ XXXX 19,200.00$ XXXX 142,308.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$
0303 Barge Demurrage
0303AA First 30 Days 30 DY
623.40$ 18,702.00$ 10.00$ 300.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$
0303AB Over 30 Days 60 DY 623.40$ 37,404.00$ 10.00$ 600.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$
Total
4,891,801.22$ 3,623,251.00$ 2,745,200.00$ 2,287,991.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$
Option D
0401 Tainer Gate Fabrication 1 EA 4,620,147.44$ 4,620,147.44$ 3,617,351.00$ 3,617,351.00$ 2,734,500.00$ 2,734,500.00$ 2,014,693.00$ 2,014,693.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$
0402 Tainter Gate Delivery 1 JOB
XXXX 248,673.89$ XXXX 380,000.00$ XXXX 19,200.00$ XXXX 180,558.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$
0403 Barge Demurrage
0403AA First 30 Days 30 DY
628.68$ 18,860.40$ 150.00$ 4,500.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$
0403AB Over 30 Days 60 DY 628.68$ 37,720.80$ 150.00$ 9,000.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$
Total
4,925,402.53$ 4,010,851.00$ 2,768,100.00$ 2,330,251.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$
Option E
0501 Tainer Gate Fabrication 1 EA 4,664,695.09$ 4,664,695.09$ 3,617,351.00$ 3,617,351.00$ 2,734,500.00$ 2,734,500.00$ 2,014,693.00$ 2,014,693.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$
0502 Tainter Gate Delivery 1 JOB
XXXX 250,648.77$ XXXX 5,000.00$ XXXX 19,200.00$ XXXX 143,958.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$
0503 Barge Demurrage
0503AA First 30 Days 30 DY
633.67$ 19,010.10$ 10.00$ 300.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$
0503AB Over 30 Days 60 DY 633.67$ 38,020.20$ 10.00$ 600.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$
Total
4,972,374.16$ 3,623,251.00$ 2,768,100.00$ 2,293,651.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$
Option F
0601 Tainer Gate Fabrication 1 EA 4,705,203.19$ 4,705,203.19$ 3,617,351.00$ 3,617,351.00$ 2,734,500.00$ 2,734,500.00$ 2,014,693.00$ 2,014,693.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$
0602 Tainter Gate Delivery 1 JOB
XXXX 252,825.64$ XXXX 5,000.00$ XXXX 19,200.00$ XXXX 153,558.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$
0603 Barge Demurrage
0603AA First 30 Days 30 DY
639.17$ 19,175.10$ 10.00$ 300.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$
0603AB Over 30 Days 60 DY 639.17$ 38,350.20$ 10.00$ 600.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$
Total
5,015,554.13$ 3,623,251.00$ 2,768,100.00$ 2,303,251.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$
Base and All Options
43,508,578.45$ 35,840,147.00$ 28,253,250.00$ 27,918,934.00$ 27,648,840.00$ 41,128,025.00$ 35,087,957.00$