C04 - Bid Abstract - W912EK26BA014.pdf

PDF 409 KB Posted

Attached to
W912EK26BA014 - MISSISSIPPI RIVER BASIN LOCK AND DAM 21 QUINCY, IL BOLTED TAINTER GATE FABRICATION
Solicitation number
W912EK26BA014
Issued by

About this file

This is an Abstract of Offers document from the U.S. Army Corps of Engineers, Rock Island District, for Solicitation No. W912EK26BA014, titled "LD21 Bolted Tainter Gates." The solicitation was issued on August 18, 2026, with a bid opening date of September 17, 2026. Six bidders submitted offers: G&G Steel, Inc. (Russellville, AL); Johnson Machine Works, Inc. (Chariton, IA); OCCI, Inc. DBA Missouri Fabricators (Fulton, MO); Reagent World, Inc. (Irvine, CA); Sealevel Construction, Inc. (Thibodaux, LA); and Steward Machine Company, Inc. (Birmingham, AL). Five of the six bidders provided the required 20% bid security; Reagent World, Inc. did not provide bid security.

The contract requires the fabrication and delivery of tainter gates along with barge demurrage services. The base bid includes three tainter gates (quantity 3, each as a separate item) at unit prices ranging from approximately $2.99 million to $4.53 million per gate, with extended amounts totaling between $8.996 billion and $13.59 billion. Gate delivery is priced as a job lot, ranging from zero to $863,057. Barge demurrage is itemized separately for the first 30 days and over 30 days, at daily rates ranging from $150 to $30,000 per day. The contract includes six options (Options A through F), each for one additional tainter gate with associated delivery and demurrage costs. The government estimate totaled $35.84 million for the base and all options combined, while total bid proposals ranged from approximately $27.65 million to $43.51 million.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY CORPS OF ENGINEERS, ROCK ISLAND DISTRICT

Bid Opening Officer:

Abstract of Offers

Project Title: LD21 Bolted Tainter Gates

Solicitation No: W912EK26BA014

Item # Description QTY UOM Unit Price Extended Amount Unit Price

Extended Amount Unit Price

Extended Amount Unit Price Extended Amount Unit Price

Extended Amount Unit Price

Extended Amount Unit Price Extended Amount

Base Bid

0001 Tainter Gate Fabrication 3 EA $ 4,530,145.85 $ 13,590,437.55 $ 4,289,107.00 $ 12,867,321.00 $ 3,869,150.00 $ 11,607,450.00 $ 4,528,954.00 $ 13,586,862.00 $ 2,998,760.00 $ 8,996,280.00 $ 3,950,225.00 $ 11,850,675.00 $ 3,264,054.00 $ 9,792,162.00

0002 Tainter Gate Delivery 1 JOB

XXXX $ 288,134.99 XXXX $ 444,620.00 XXX $ 57,600.00 XXXX $ 400,000.00 XXXX $ - XXXX $ 815,000.00 XXXX $ 863,057.00

0003 Barge Demurrage

0003AA First 30 Days 30 DY

$ 1,838.55 $ 55,156.50 $ 150.00 $ 4,500.00 $ 580.00 $ 17,400.00 $ 1,500.00 $ 45,000.00 $ 30,000.00 $ 2,900.00 $ 87,000.00 $ 3,250.00 $ 97,500.00

0003AA Over 30 Days 60 DY

$ 1,838.55 $ 110,313.00 $ 150.00 $ 9,000.00 $ 580.00 $ 34,800.00 $ 1,500.00 $ 90,000.00 $ 50,000.00 $ 2,900.00 $ 174,000.00 $ 3,250.00 $ 195,000.00

Total

$ 14,044,042.04 $ 13,325,441.00 $ 11,717,250.00 $ 14,121,862.00 $ 9,176,280.00 $ 12,926,675.00 $ 10,947,719.00

Option A

0101 Tainer Gate Fabrication 1 EA 4,511,432.51$ 4,511,432.51$ 3,617,351.00$ 3,617,351.00$ 2,707,700.00$ 2,707,700.00$ 2,006,976.00$ 2,006,976.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$

0102 Tainter Gate Delivery 1 JOB

XXXX 242,413.50$ XXXX 380,000.00$ XXXX 19,200.00$ XXXX 151,908.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$

0103 Barge Demurrage

0103AA First 30 Days 30 DY

612.85$ 18,385.50$ 150.00$ 4,500.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$

0103AB Over 30 Days 60 DY 612.85$ 36,771.00$ 150.00$ 9,000.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$

Total

4,809,002.51$ 4,010,851.00$ 2,741,300.00$ 2,293,884.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$

Option B

0201 Tainer Gate Fabrication 1 EA 4,550,270.16$ 4,550,270.16$ 3,617,351.00$ 3,617,351.00$ 2,711,600.00$ 2,711,600.00$ 2,010,736.00$ 2,010,736.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$

0202 Tainter Gate Delivery 1 JOB

XXXX 244,500.00$ XXXX 5,000.00$ XXXX 19,200.00$ XXXX 142,308.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$

0203 Barge Demurrage

0203AA First 30 Days 30 DY

618.13$ 18,543.90$ 10.00$ 300.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$

Government Estimate Bidder #1 Bidder #2 Bidder #3

I certify that I have opened, read, and recorded on this abstract all offers received in response to this soliciation.

Bidder #4 Bidder #5

G&G Steel, INC Johnson Machine Works, Inc OCCI, INC DBA Missouri Fabricators Reagent World, Inc. Sealevel Construction, Inc.

P.O. Box 1037

Date Opened: 9/17/2026 Russelville, AL 35653 Chariton, IA 50049 Fulton, MO 65251 Irvine, CA 92612 Thibodaux, LA 70302

Date Issued: 8/18/2026 15825 Hwy 243 Industrial Park 318 N. 11th Street 3226 County Road 257 18401 Von Karman AVE

NA

Bid Security 20% 20% 20% Not provided 20%

Amendments Acknowledged: NA NA NA NA

20%

Bidder #6

Steward Machine Company, Inc.

3911 13th Ave N

Birmingham, AL 35234

NA

0203AB Over 30 Days 60 DY 618.13$ 37,087.80$ 10.00$ 600.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$

Total

4,850,401.86$ 3,623,251.00$ 2,745,200.00$ 2,288,044.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$

Option C

0301 Tainer Gate Fabrication 1 EA 4,589,107.82$ 4,589,107.82$ 3,617,351.00$ 3,617,351.00$ 2,711,600.00$ 2,711,600.00$ 2,010,683.00$ 2,010,683.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$

0302 Tainter Gate Delivery 1 JOB

XXXX 246,587.40$ XXXX 5,000.00$ XXXX 19,200.00$ XXXX 142,308.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$

0303 Barge Demurrage

0303AA First 30 Days 30 DY

623.40$ 18,702.00$ 10.00$ 300.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$

0303AB Over 30 Days 60 DY 623.40$ 37,404.00$ 10.00$ 600.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$

Total

4,891,801.22$ 3,623,251.00$ 2,745,200.00$ 2,287,991.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$

Option D

0401 Tainer Gate Fabrication 1 EA 4,620,147.44$ 4,620,147.44$ 3,617,351.00$ 3,617,351.00$ 2,734,500.00$ 2,734,500.00$ 2,014,693.00$ 2,014,693.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$

0402 Tainter Gate Delivery 1 JOB

XXXX 248,673.89$ XXXX 380,000.00$ XXXX 19,200.00$ XXXX 180,558.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$

0403 Barge Demurrage

0403AA First 30 Days 30 DY

628.68$ 18,860.40$ 150.00$ 4,500.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$

0403AB Over 30 Days 60 DY 628.68$ 37,720.80$ 150.00$ 9,000.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$

Total

4,925,402.53$ 4,010,851.00$ 2,768,100.00$ 2,330,251.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$

Option E

0501 Tainer Gate Fabrication 1 EA 4,664,695.09$ 4,664,695.09$ 3,617,351.00$ 3,617,351.00$ 2,734,500.00$ 2,734,500.00$ 2,014,693.00$ 2,014,693.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$

0502 Tainter Gate Delivery 1 JOB

XXXX 250,648.77$ XXXX 5,000.00$ XXXX 19,200.00$ XXXX 143,958.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$

0503 Barge Demurrage

0503AA First 30 Days 30 DY

633.67$ 19,010.10$ 10.00$ 300.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$

0503AB Over 30 Days 60 DY 633.67$ 38,020.20$ 10.00$ 600.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$

Total

4,972,374.16$ 3,623,251.00$ 2,768,100.00$ 2,293,651.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$

Option F

0601 Tainer Gate Fabrication 1 EA 4,705,203.19$ 4,705,203.19$ 3,617,351.00$ 3,617,351.00$ 2,734,500.00$ 2,734,500.00$ 2,014,693.00$ 2,014,693.00$ 2,998,760.00$ 2,998,760.00$ 3,950,225.00$ 3,950,225.00$ 3,239,753.00$ 3,239,753.00$

0602 Tainter Gate Delivery 1 JOB

XXXX 252,825.64$ XXXX 5,000.00$ XXXX 19,200.00$ XXXX 153,558.00$ XXXX -$ XXXX 615,000.00$ XXXX 608,120.00$

0603 Barge Demurrage

0603AA First 30 Days 30 DY

639.17$ 19,175.10$ 10.00$ 300.00$ 160.00$ 4,800.00$ 1,500.00$ 45,000.00$ 30,000.00$ 1,500.00$ 45,000.00$ 1,950.00$ 58,500.00$

0603AB Over 30 Days 60 DY 639.17$ 38,350.20$ 10.00$ 600.00$ 160.00$ 9,600.00$ 1,500.00$ 90,000.00$ 50,000.00$ 1,500.00$ 90,000.00$ 1,950.00$ 117,000.00$

Total

5,015,554.13$ 3,623,251.00$ 2,768,100.00$ 2,303,251.00$ 3,078,760.00$ 4,700,225.00$ 4,023,373.00$

Base and All Options

43,508,578.45$ 35,840,147.00$ 28,253,250.00$ 27,918,934.00$ 27,648,840.00$ 41,128,025.00$ 35,087,957.00$