W912EK25R0023 - Amendment 0001.pdf

PDF 756 KB Posted

Attached to
ILWW Wire Rope Supply
Solicitation number
W912EK25R0023
Issued by

About this file

This document is an Amendment (0001) to Solicitation W912EK25R0023 issued by the U.S. Army Corps of Engineers Rock Island District for a wire rope supply contract. The amendment includes five key questions and answers clarifying solicitation details, specifically addressing wire rope specifications and bidding requirements. Noteworthy clarifications include: 1) contractors can quote the minimal amount of wire rope possible, with quantities over 500 ft considered but potentially deemed too costly, 2) a sample certificate of conformance is acceptable during quote submission, 3) there is no incumbent contract, 4) wire rope with 6/36 construction meeting or exceeding specified minimum breaking strength (MBS) is acceptable, and 5) bidders can choose not to offer an optional product while still being considered for a technically acceptable bid.

The solicitation appears to be for a firm-fixed-price contract to supply wire rope for the Illinois Waterway Project, with flexibility in manufacturing run quantities and technical specifications. The amendment provides potential vendors with additional guidance on submission requirements and technical parameters, helping to clarify expectations and potentially streamline the bidding process.

View the file

Other files

File Type Posted
W912EK25R0023.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

96514751279914

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to update the Solicitation w ith answ ers to questions.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Jun-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EK25R0023

X 9B. DATED (SEE ITEM 11)

05-Jun-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Jun-2025

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK25R0023

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

Questions and Answers:

1. For the Option (Stainless steel), will you consider a quantity greater than the 500 ft required?

Minimum manufacturing run is more than 500 ft.

ANSWER: We ask that you quote the minimal amount you can offer. More than 500 ft will be considered but will likely be too costly and more than we need.

2. Is a sample of the certificate of conformance acceptable at time of quote submission? The actual certificate will accompany the ropes at the time of delivery.

ANSWER: Yes, that is acceptable.

3. Is there an incumbent and could you provide the contract number?

ANSWER: No

4. Is a wire rope with 6/36 construction acceptable, if it has a higher MBS than what is requested?

ANSWER: Yes, that is acceptable.

5. Can a prospective contractor choose not to offer a product for the optional bid and still be considered to have submitted a technically acceptable bid, that is competitive with the rest of the potential bidders?

ANSWER: Yes

(End of Summary of Changes)