This is a Questions and Answers document for solicitation W912EK25R0008 regarding electric supply for Sugar Bottom Campgrounds, issued by the US Army Corps of Engineers Rock Island District. The document addresses four contractor questions about technical specifications and delivery details.
Key clarifications include: weatherproof pull boxes must be painted steel mounted on above-ground frames; contractors must provide design configurations for Square D panels and power distribution boxes (with no requirement for all six boxes to be identical); and delivery location specifications for 2192 Mehaffey Bridge Road NE, Solon, IA 52333, which is identified as a two-story pole building with a large overhead door for material delivery.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912EK25R0008 Sugar Bottom Campgrounds Electric Supply Solicitation
Contractor Questions Government Answers 1.
2.
3.
4.
5.
6.
7.
| Contractor Questions1: On the weatherproof pull boxes. Are those supposed to be quazite box to bury in the ground? I would assume they want them for under underground pull boxes. Or are they supposed to be PVC, stainless, or painted steel so they can be mounted on a wall or frame? |
| Government Answers1: The weatherproof pull boxes need to be painted steel to be mounted on an above ground frame. |
| Contractor Questions2: With the Square D panels, they need a panel schedule to build these panels. Do you happen to have the schedule or each panel? |
| Government Answers2: Contractor’s needs to provide the design for the box and will need to let the Government know how they have configured the boxes when they are delivered. |
| Contractor Questions3: Does the Government want six power distribution panel panels built the exact same? |
| Government Answers3: There is not a requirement to build all six boxes the same, however the contractor is required to provide the design configurations for each box. |
| Contractor Questions4: Is the delivery location at Sugar Bottom Maintenance Facility located at 2192 Mehaffey Bridge Road NE, Solon, IA 52333 is a 1-story building? |
| Government Answers4: No, the building at the delivery address is not a one story building. The building that the materials are to be delivered to is a large pole building, approximately 2 story with a large overhead door that contractor's can utilize. |
| Contractor Questions5: |
| Government Answers5: |
| Contractor Questions6: |
| Government Answers6: |
| Contractor Questions7: |
| Government Answers7: |