This document is an amendment to Solicitation W912EK24R0033 for the procurement of FRP Tainter Valves for Lock 16 on the Mississippi River in Illinois.
The key changes made in this amendment include modifications to Sections 01 33 16 and 06 90 00 of the specifications, as well as the revision of drawing S-003. The amendment also deletes Clause 52.232-18 Availability of Funds. All other terms and conditions of the solicitation remain unchanged. The revised specification sections provide additional details on the design requirements, analysis, and material properties for the FRP composite structures. The amendment is dated August 20, 2024 and the original solicitation was issued on August 12, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0001 on Solicitation W912EK24R0033 is as follow s: Modif ications made to Section 01 33 16, Section 06 90 00, and the Draw ings, and Clause 52.232-18 Availability of Funds has been deleted. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EK24R0033
X 9B. DATED (SEE ITEM 11)
12-Aug-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Aug-2024
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D
ROCK ISLAND IL 61201
W912EK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
1 AMD 0001
20 AUG 2024
The following modifications are made to SECTION 01 33 16, SECTION 06 90 00, and the DRAWINGS.
SECTION 01 33 16
a. PAGES 16 and 22. Delete Section 01 33 16 Pages 16 and 22 in their entirety, and substitute therefor revised Section 01 33 16 Pages 16 and 22, Amendment 0001, dated 20 August 2024.
SECTION 06 90 00
b. PAGES 12, 13, and 18. Delete Section 06 90 00 Pages 12, 13, and 18, in its entirety, and substitute therefor revised Section 06 90 00 Pages 12, 13, and 18, Amendment 0001, dated 20 August 2024.
DRAWINGS (SUPERSEDE)
c. Revised drawing listed below is being issued with this Amendment. Such revised drawing supersede those of the same sheet identification number listed in the INDEX OF DRAWINGS provided with Solicitation No. W912EK24R0033:
S-003.
ATTACHMENTS: Section 01 33 16 Pages 16 and 22;
Section 06 90 00 Pages 12, 13, and 18;
and S-003.
SOLICITATION NO: W912EK24R0033
B5MRLD16202401
c. Identify all applicable codes and criteria and highlight specific requirements within these codes and criteria for critical issues in the design.
d. Required calculations as specified and as needed to support the design.
1) Stress
2) Deflection
e. Proposed load cases and load combinations including all adjustment factors.
2.4.1 Design Requirements and Provisions
Include subparts for each major design discipline and basic project design requirements for each discipline that justify and validate design decisions.
2.4.2 Operations and Maintenance (O&M) Provisions
Identify design provisions made to enhance and to reduce the cost of operating and maintaining the gate when completed. Identify any special safety considerations or occupational health related considerations that may affect operation and maintenance activities as a result of the final design.
2.4.3 Design Analysis Packaging
2.4.3.1 Assembly and Identification
Assemble design analysis in a single volume with a table of contents if possible. Include a cover page in the basis of design for each discipline indicating the project title and locations, contract number, table of contents, and tabbed separations or bookmarks for quick reference. At a minimum tab or bookmark for each discipline.
2.4.4 Calculations
Place the signature and seal of the designer of record responsible for the work on the cover page of the calculations for the respective design discipline.
2.4.4.1 Structural
a. Identify all loads to be used for design. Submit proposed load cases and load combinations including all adjustment factors for approval before design commences. Describe the method of providing lateral stability for the structural system to meet applicable hydraulic and impact forces. Include sufficient calculations to verify the adequacy of the method.
b. Provide calculations for all principal structural members and bracing and secondary members.
SECTION 01 33 16 Page 16 AMD 0001
20 AUG 2024
b. U.S. Army Corps of Engineers (USACE)
Publications may be found at the following web address:
https://www.publications.usace.army.mil/
EM 1110-2-1604 Hydraulic Design of Navigation Locks
EM 1110-2-1610 Hydraulic Design of Lock Culvert Valves
EM 1110-2-2107 Design of Hydraulic Steel Structures
EM 1110-2-2602 Planning and Design of Navigation Locks
EM 1110-2-2610 Mechanical and Electrical Design for Lock and Dam Operating Equipment
3.4.1.3 Design Life
Design in accordance with 06 90 00 FIBERGLASS REINFORCED POLYMER (FRP)
COMPOSITE STRUCTURE.
3.4.2 Loads and Load Combinations
The design requirements must be developed using relevant USACE Engineer Manuals (EMs) identified within Paragraph CRITERIA above. Sound engineering judgment may be required in areas where there is not clear guidance. Refer to Section 06 90 00 FIBER-REINFORCED POLYMER (FRP) COMPOSITE STRUCTURE for material requirements. The design methodology is
ASD.
A summary of the hydraulic loads in accordance with EM 1110-2-2107 are as indicated.
Submit proposed load cases and load combinations including all adjustment factors for approval before design commences. This information must be included within the Design Analysis as well. Loads and load combinations in accordance with EM 1110-2-2107 DESIGN OF HYDRAULIC STEEL STRUCTURES are shown on the Loading Diagram sheet S-003.
a. Dead Load: D values represent total dry-weight of structure. Values provided are estimated values applied at the existing center of gravity. Use actual calculated value in design applied at the calculated center of gravity.
b. Gravity Load: G consist of mud, including silt, debris, and atmospheric ice. At a minimum, 1-inch thick layer of silt acting in all areas where mud may accumulate must be assumed regardless of drainage. Consider a minimum unit weight of 125 pcf for silt in accordance with EM 1110-2-2610 Section 7-6.e.2. Values provided are estimated values for the entire structure based on existing steel fabrication and is a minimum requirement. Use actual calculated value in design applied at the calculated center of gravity.
c. Hydrostatic Load: Hs consists of a differential head as specified.
The hydrostatic load acts normal to the skin plate radius centered between the bottom seal and top seal.
SECTION 01 33 16 Page 22 AMD 0001
20 AUG 2024
Property Test Method Polyiso (2 lbs.)
Units Limits
Water Absorption ASTM C272/C272M 0.7 percent by volume
Maximum
Closed Cell Content
ASTM D6226 95 percent Minimum
Embedded steel may be used to meet the specified weight, stiffness, and center of gravity requirements, but must be submitted to the Contracting Officer or other approved representative for approval and must be completely encased in a minimum of 1/2 inch thick FRP. Steel must meet ASME/ASTM standards, be chemically treated to interface with the FRP, be fully encapsulated in the FRP structure, and design submittals must account for the potential for the FRP to delaminate from the embedded steel. If the embedded steel is used for structural connections, the embedded fastener inserts must be stainless steel, with grade/type appropriate for a salt water marine environment. Reference paragraph EMBEDDED STEEL when embedded metals are used in conjunction with the composite structures.
2.1.1 Design Requirements
Unless otherwise approved by the Contracting Officer, the following design requirements must be met:
a. The structures must be designed in accordance with this Specification to achieve the objectives of constructability, safety, serviceability, with due regard to issues of inspectability, and economy.
b. Maximum allowable axial and bending strain in the FRP structures must be limited to 20 percent of strain to failure. Failure will be taken as the design property determined by the ASTMs listed in paragraphs DESIGN PROPERTIES OF FRP LAMINATES and MATERIAL PROPERTIES OF FOAM CORE, reduced statistically to the 80 percent lower confidence bound on the 5th-percentile value of the tested population per ASTM D7290.
c. The nominal strength must be determined by multiplying the reference strength by environmental reduction factors such as time effect factor, moisture condition factor (CM) (use lower limit regardless of material), and temperature factor (CT), T=100F, as specified in ASCE 74-23 Load Resistance Factor Design (LRFD) for Pultruded Fiber Reinforced Polymer (FRP). Adjustment factors (strength and stiffness) for structural assemblies are not permitted.
SECTION 06 90 00 Page 12 AMD 0001
20 AUG 2024
d. Submit documentation showing the structures are capable of meeting the maximum allowable bending strain and shear strain prior to commencement of work.
e. Design calculations must show that the major structural elements and connections have a HSS service life of a minimum 100 years and show a similar stiffness to steel.
f. All design computations must be stamped by a registered Professional Engineer who will be identified as the Engineer of Record. All design computations must also be initialed by an additional registered Professional Engineer who will be identified in the design documents as having provided design quality control. See Section 01 78 02 CLOSEOUT SUBMITTALS for additional requirements.
g. Thermal effects must be considered when designing the FRP tainter valves to ensure that any contraction or expansion is accommodated.
Similarly, seals must also be designed to allow for thermal expansion and contraction. Design the FRP structures to account for thermal expansion such that the structures operate properly and do not bind on the rails or slots during use. Use the historic high and low temperatures at the project sites to determine the thermal range.
Submit the thermal expansion design with the FRP structure design calculations.
2.1.2 Performance Requirements
Submit documentation that the structure meets the weight and center of gravity requirements, as specified.
2.2 MATERIALS
Miscellaneous materials and standard articles must conform to the respective standards or specifications below when that type of material is furnished. Where material requirements are not specified, materials furnished must be suitable for the intended use and are subject to approval.
2.2.1 FRP Composites
Submit documentation showing that epoxy vinyl ester resins suitable for long-term salt-water exposure were used for fabrications of the structures for maximum resistance to environmental and operational conditions.
Comply with ASTM E84 Class II at a minimum for the vinyl ester resin flame retardness. Materials such as additives, UV inhibitors, fillers and pigments that are appropriate with the vinyl ester resin are permitted to meet requirements such as color and environmental protection. All pigments are to be polydispersion liquid pigments.
Submit documentation showing that FRP laminates are assembled using commercial grade E-CR Glass fiber reinforcement meeting ASTM D578 and ASTM D4029/D4029M . Fiber reinforcement is to be woven or stitched into unidirectional and multi-directional fabrics prior to assembly.
Non-structural fiber mats may be used to meet exterior finish and environmental requirements. Random reinforcement such as chopped glass is prohibited as a structural member.
Submit documentation showing FRP composites meet the material properties used in the design as per the applicable ASTM test requirements.
SECTION 06 90 00 Page 13 AMD 0001
20 AUG 2024
Laminates shall retain a minimum of 80 percent of their base values.
Exposure Condition
Specification Test Condition Test Duration
Water ASTM D2247 100% RH at 100 +/-3 deg F (38 +/- 2 deg C)
3000 hours
Saltwater ASTM C581
ASTM D1141
Immersed at 73 +/- 2 deg F (23 +/- 1 deg C)
3000 hours
Alkali ASTM C581 Immersed in a solution of calcium hydroxide (pH ~12) at 73 +/- 3 deg F (23 +/- 2 deg
C)
3000 hours
Dry Heat ASTM D3045 140 +/- 5 deg F (60 +/- 3 deg C)
3000 hours
Ultraviolet Ligh t
ASTM G154 Cycle 1 (UVA-340 lamp): 8 hr UV at 140 +/- 5 deg F (60 +/-
3 deg C) with 4 hr condensation at 122 +/- 5 deg
F (50 +/- 3 de g C)
3000 hours
Cyclic Weatherin g
ASTM G153 Cycle 5: 4 hr light at 145 +/- 5 d eg F (63 +/- 3 deg C) with 4 hr light and water spray
375 cycles
Freeze-thaw ASTM C666/C666M Lower temperature of specimens fro m 40 to 0 deg F (4 to -18 deg C) and raise it from 0 to 40 deg F (-18 to 4 deg C) in not less than 2 hr and no more than 5 hr
300 cycles
2.2.4 Embedded Steel
Embedded steel must be stainless steel in accordance with Section 35 20 16
TAINTER VALVES.
SECTION 06 90 00 Page 18 AMD 0001
20 AUG 2024
W912EK24R0033
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION I - CONTRACT CLAUSES
The following have been deleted:
52.232-18 Availability Of Funds APR 1984
(End of Summary of Changes)
| A22 Specification Amendment 0001.pdf |
| NARRATIVE |
| 01 33 16 |
| DESIGN DATA DESIGN AFTER AWARD |
| PART 2 PRODUCTS |
| 2.4 DESIGN ANALYSIS |
| 2.4.1 Design Requirements and Provisions |
| 2.4.2 Operations and Maintenance O&M Provisions |
| 2.4.3 Design Analysis Packaging |
| 2.4.3.1 Assembly and Identification |
| 2.4.4 Calculations |
| 2.4.4.1 Structural |
| PART 3 EXECUTION |
| 3.4 DISCIPLINE DESIGN REQUIREMENTS |
| 3.4.1 Criteria |
| 3.4.1.3 Design Life |
3.4.2 Loads and Load Combinations
| 06 90 00 |
| FIBER-REINFORCED POLYMER FRP COMPOSITE STRUCTURE |
| PART 2 PRODUCTS |
| 2.1 SYSTEM DESCRIPTION |
| 2.1.1 Design Requirements |
| 2.1.2 Performance Requirements |
| 2.2 MATERIALS |
| 2.2.1 FRP Composites |
| 2.2.4 Embedded Steel |