W912EK24R0008 DRAFT PWS Lake Red Rock Recreation Area Mowing.pdf

PDF 13 MB Posted

Attached to
Lake Red Rock Recreation Mowing
Solicitation number
W912EK24R0008
Issued by

About this file

This document outlines a pre-solicitation for mowing services at Lake Red Rock Recreation Area. The Army Corps of Engineers Engineering District Rock Island is seeking a contractor to provide all labor, materials, equipment, and supplies specified in the Performance Work Statement to perform mowing and trimming services at Lake Red Rock. The solicitation number is W912EK24R0008 and the contractor shall mow in accordance with the draft PWS. Bidders should be aware this pre-solicitation may be delayed, cancelled, or revised at any time during the pre-solicitation, solicitation, selection, evaluation, negotiation or award process.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C

PERFORMANCE WORK STATEMENT

Mowing and Trimming Services

Lake Red Rock Project

Knoxville, Iowa

SECTION TITLE

C-1 GENERAL INFORMATION

C-2 SPECIFIC TASKS

TECHNICAL EXHIBIT #1 “MOWING SCHEDULES AND LOCATIONS”

TECHNICAL EXHIBIT #2 “MOWING AREA MAPS”

TECHNICAL EXHIBIT #2 “QUALITY ASSURANCE SURVEILLANCE PLAN” (QASP)

TECHNICAL EXHIBIT #3 “TECHNICAL CAPABILITY STATEMENT”

TECHNICAL EXHIBIT #4 “USACE PAST PERFORMANCE QUESTIONAIRE” (PPQ)

C-1

GENERAL INFORMATION

C.1.1 BACKGROUND. Lake Red Rock is Iowa’s Largest Lake, with numerous parks and lake access areas managed by or leased from the U.S. Army Corps of Engineers. Recreational areas at Lake Red Rock Project offer a wide variety of facilities including boat launching ramps, campgrounds, a full service marina, picnic areas, and sand swimming beaches. Mowing, refuse collection, park attendant services, and facility cleanup are just a few of the activities that are performed by private contractors for the Corps of Engineers at Lake Red Rock Project. Award will be a Firm-Fixed-Price (FFP), performance-based service contract.

C.1.2 SCOPE OF WORK. The Contractor shall provide all manpower, labor, equipment, materials/supplies, transportation, fuel, tools, supervision and other items and services necessary to provide mowing and trimming services for designated public use and administrative areas at the Lake Red Rock Project, near Knoxville, Iowa, as described in the attached performance work statement (PWS) and elsewhere within the solicitation. The

Contractor shall perform to the standards in the contract. Services also consist of attending a pre-work conference, meetings as necessary, and preparing invoices. A map Lake Red Rock can be found on the Internet at: https://www.mvr.usace.army.mil/Missions/Recreation/Lake-

Red-Rock/Maps/. See Technical Exhibit #2 for mowing/trimming locations.

C.1.3 PERIOD OF PERFORMANCE. The resulting contract will be for a base period with four

(4) option periods. The option periods are priced and may be exercised by contract modification. See Clause 52.217-9, Option to Extend Term of the Contract, for information regarding option periods.

BASE PERIOD OF PERFORMANCE: April 01, 2024 thru November 30, 2024

OPTION ONE PERIOD OF PERFORMANCE: April 01, 2025 thru November 30, 2025

OPTION TWO PERIOD OF PERFORMANCE: April 01, 2026 thru November 30, 2026

OPTION THREE PERIOD OF PERFORMANCE: April 01, 2027 thru November 30, 2027

OPTION FOUR PERIOD OF PERFORMANCE: April 01, 2028 thru November 30, 2028

C.1.4 REQUIRED INSURANCE. In accordance with the FAR Clause 52.228-5, “Insurance-Work on a Government Installation,” the Contractor shall obtain and maintain, during the period of performance under this contract, the following types and minimum amounts of insurance*:

Workmen’s Compensation . . . . . . Coverage complying with applicable State statute**

Employer’s Liability . . . . . . . . . . . Minimum $100,000

General Liability/Bodily Injury. . . Minimum $500,000 per occurrence

Automobile Liability . . . . . . . . . . . Minimum $200,000 per person

$500,000 per occurrence

$ 20,000 property per occurrence

* Reference FAR 28.307-2 Liability, subparagraphs (a), (b), and (c).

** Iowa Division of Insurance, telephone # (515) 281-5705

Division of Workers Compensation, telephone # (800) 775-2667 https://www.mvr.usace.army.mil/Missions/Recreation/Lake-Red-Rock/Maps/ https://www.mvr.usace.army.mil/Missions/Recreation/Lake-Red-Rock/Maps/

C.1.5 PRE-WORK CONFERENCE. Prior to start of services, the Contracting Officers

Representative (COR) will arrange a Pre-Work conference to be held at the Lake Red Rock

Project Office. The purpose of the conference is to discuss contract requirements and details of contract performance, in order to develop a mutual understanding of both. The Government reserves the right to schedule meetings with the contractor. Meetings shall be scheduled to take place at the Project Office as necessary to ensure strict compliance with the terms of the contract.

C.1.6 DOCUMENTS AND CORRESPONDENCE. After award, all documents and related correspondence shall be routed through the Contracting Officer’s Representative (COR) located at the Lake Red Rock Project Office.

C.1.7 CONTRACTOR PERSONNEL.

C.1.7.1 MANPOWER REQUIREMENT: The contractor and employees/staff shall personally perform, or provide personal superintendence of the performance of, duties under this contract. The contractor shall maintain a sufficient number of staff/employees to perform the required services.

C.1.7.2 SECURITY REQUIREMENTS:

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer

Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the

Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition

(FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health

Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the

FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Antiterrorism (AT) Level I training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

For Access and General Protection Policy and Procedures. All Contractors and sub-contractor employees shall comply with installation and facility access guidelines and rules as stated herein.

Contractor workforce must comply with all personal identity verification requirements as directed by

Department of Defense, Department of the Army Headquarters, Rock Island District and/or local policy. In addition to the changes otherwise authorized by the Changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the Contractor shall submit background checks that have been conducted by a bonded third party within the last 6 months of Notice to Proceed date and authorize reports to be provided to the Rock Island District Security and Law Enforcement Office by the third party. The background check will cover, at a minimum, the ten years covering states the employee has lived in, national criminal records check which includes felony and misdemeanor offenses, Department of Motor Vehicles records, and a national sex offender registry check, submitted 14 days prior to accessing the project site.

Identification Badges: The Contractor shall be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge shall have the following items shown, the employee’s picture, employee’s name, and company name working for. The badge will be prominently displayed unless restricted for safety concerns, in which case it will be available for immediate display upon request (carried on person).

As employees are added or deleted from the submitted and approved Access Control List (ACL), this information will be reported immediately to the Contracting Officer (KO). Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.

Disqualifying factors include, but are not limited to:

(1) Criminal conduct, in particular violent crime and sex offenders;

(2) Habitual use of intoxicating beverages to excess as evidenced by Driving under the influence or public intoxication records; or

(3) Any illegal activity or other disqualification which makes the individual unfit for service (e.g. drug trafficking or procurement fraud).

In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the Contract. The Rock Island District retains the right to deny any Contractor and sub-contractor employee from working on a contract awarded by the Rock Island District based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor shall immediately contact the Contracting Officer to coordinate obtaining written approval from the Security Office for new/additional personnel to be brought on site prior to background check acceptance. Contractor shall submit Personnel Change

Request Form and will receive written authorization from the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security

Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

In the event of an unforeseen change in work site conditions which may require a contract modification, and the contractor is required to immediately add personnel, a Personnel Change

Request Form will be submitted to and approved by the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security

Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

Subcontractor personnel not expected to be on the worksite for more than 15 days may be allowed on site with the following conditions:

1) Employee will be on site a total of 15 days or less, for the duration of the project.

2) Employee is added to the ACL as a short term employee.

3) Employee is escorted while on site. This is defined as being in the line of sight of an identified contractor employee who has a background check on file with the Rock Island

District (as noted on the ACL).

4) Each contractor employee can sponsor only five short term employees at a time.

Foreign National employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the

Rock Island District Security Office NLT 30 days prior to arrival on site. Short term foreign national employees (e.g. specialists with a two week period of performance) may work on site with the following conditions:

1) Foreign national employee will be on site a total of 15 days or less, for the duration of the project.

2) Foreign national employee will comply with E-verify requirements E-verify paragraph).

3) Approved and identified contractor employee shall escort the foreign national employee at ALL times while on site.

4) Each contractor employee can sponsor only one short term foreign national at a time.

Personnel Change Request Form

Contract #_______________ Date___________

We, _____________________, respectfully request to add/replace (circle one) personnel to the jobsite due to the following situation:

Personnel to be conditionally added to the ACL (escorted by):

Background checks (if required for a long term employee) shall be submitted by close of business on

(insert proposed date): ________________

(Insert signature block)

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say

Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

Training requirements for the protection of sensitive information: All contract personnel with access to critical information (as identified in the RA's OPSEC Program) shall complete initial and annual refresher OPSEC Level I Awareness training, which is available at the following websites:

https://www.iad.gov/ioss/, or http://www.cdse.edu/catalog/operations-security.html (websites subject to change). All contract personnel with access to Controlled Unclassified Information (CUI) shall complete initial and annual refresher CUI training in accordance with applicable Army policy.

Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.

Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under

United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, background checks, OPSEC SOPs, E-verify, and I-9 forms shall be submitted with a coversheet stating the contract number (e.g. W912EK-15-C-XXXX), title of project, and the company's point of contact information, in a sealed envelope/container and mailed to:

U.S. Army Corps of Engineers

Rock Island District

Security Office

1500 Rock Island Drive

Rock Island, IL 61201

C.1.8 SUSTAINABILITY

EPA DESIGNATED (CPG)

Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection

Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program.

Visit http://www.epa.gov/epawaste/conserve/tools/cpg/products for a complete list of designated products and the associated recommended content levels. Offerors must be able to demonstrate that each offered product meets minimum content levels upon request.

BIO-BASED

The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA Bio-Preferred’ s minimum bio-based content level. Visit the Bio-Preferred web site for the complete list of designated products and the associated minimum bio-based content level requirements.

http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml

C.1.9 SAFETY

C.1.9.1 Appropriate measures shall be taken to protect the general public, Government and contractor employees from accidental injury. All services shall be performed in accordance with applicable safety requirements set forth in Corps of Engineers

Manual EM-385-1-1, “Safety and Health Requirements Manual” and supplements thereto (copies are available from the Project Office or http://www.usace.army.mil/publications/eng-manuals/em385-1-1/entire.pdf). ANY

EQUIPMENT OR MATERIALS NOT IN CONFORMITY WITH THE SAFETY

MANUAL SHALL BE REMOVED FROM GOVERNMENT PROPERTY

IMMEDIATELY.

C.1.9.2 Prior to beginning work on this contract, the contractor Safety/Accident Prevention

Plan must be submitted and approved. This plan shall be in accordance with the most recent EM 385-1-1. The plan shall address policies and procedures that will be used to maintain a safe environment for contractor personnel, Government employees, and facility users during contractor performance. The Contractor will be expected to take a vital interest in safety, hazard, and educate their employees to work and plan their work safely. Proper driving techniques and defensive driving will be practiced to prevent vehicle accidents and property damage.

C.1.9.3 Any injury, property damage or safety hazard observed by the contractor shall be immediately reported to the COR.

C.1.10 ENVIRONMENTAL CONTROLS.

C.1.10.1 COMPLIANCE WITH LAWS AND REGULATIONS: The contractor shall be knowledgeable of, and shall comply with, all applicable Federal, State, and Local laws, environmental requirements, and instructions. The contractor shall ensure policies and procedures are established that protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.

C.1.10.2 HAZARDOUS MATERIALS: The contractor is responsible for advising his/her employees of all Environmental and Hazardous Materials Handling, and is also required to provide to the COR the Material Safety Data Sheets (MSDS) for all materials used by the contractor in accordance with Federal and State laws and/or regulations.

C.1.10.3 NOTIFICATION OF ENVIRONMENTAL SPILLS: If the contractor or employee(s) of the contractor spills or releases any substance into the environment, the contractor shall immediately report the incident to the Contracting Officer’s Representative

(COR), or in his or her absence the Contracting Officer. The contractor shall be liable for containment and environmental cleanup of the spill or release of such substance.

http://www.usace.army.mil/publications/eng-manuals/em385-1-1/entire.pdf

C.1.11 CONTRACTOR MOWING SCHEDULES:

C.1.11.1 The contractor shall commence mowing according to the attached mowing schedules listed in Technical Exhibit 1. The contractor must complete the mowing and trimming; to include final inspection and acceptance, within four (4) workdays, including the day work is scheduled to begin for each mowing. In the event adverse weather or ground conditions occur during the service that would create unsafe working conditions or result in damage to vegetation or turf, the contractor shall cease operations. Additional time will be allowed equivalent to inclement weather delays. Work is not permitted on weekends or holidays, and shall not begin prior to

7:00 a.m. nor continue past 8:00 p.m. Mowing or trimming in camping areas shall be delayed until 8:30 a.m.

C.1.11.2 UNSCHEDULED MOWING AND TRIMMING. Upon notification by the COR via phone call, the contractor shall perform unscheduled mowing and trimming in the areas covered under this contract. These services would occur before or after the scheduled mowing rounds and is dependent on weather and public use patterns.

C-2

SPECIFIC TASKS

C.2.1 GENERAL

C.2.1.1 Mowing and trimming operations around buildings and roadsides shall be performed so grass clippings are thrown away from buildings and away from the road whenever possible. All areas will be cleaned of ground litter and debris prior to any mowing or trimming. Downed branches and sticks may be placed inside fire pits or nearby wooded areas. The contractor may use dumpsters for disposal of any refuse collected in the mowing operations under this contract. Mowing with power mowers, either push or riding, and trimming will not be performed closer than twenty (20) feet from an inhabited picnic or campsite without the permission of the camper or picnicker. Mowing and trimming equipment shall be equipped with manufactures safety guards to avoid objects from being propelled and striking nearby objects or visitors.

C.2.1.2 STORAGE OF EQUIPMENT AND SUPPLIES. When storage of contractor's equipment and supplies is necessary on U S Government property, they will be stored only in the areas designated by the Contracting Officer's Representative. The

Government will assume no responsibility or liability for contractor equipment or supplies stored on Government property. The contractor will ensure that all fence gates are locked and secured when property is stored within such enclosures.

C.2.2 MOWING

C.2.2.1 WET CONDITIONS: Mowing operations shall not be performed when the ground is so wet that mowing would cause rutting or would otherwise disturb existing turf; or when grass is so wet it will not cut. Tractors shall be operated in such a manner as to protect against the sod being torn by the tractor wheels on turns.

C.2.2.2 MOWERS: All mowers (large and small) shall be compatible with each other in mowing height and appearance of cut grass. After mowing, areas serviced under this contract shall present a neat, well-cared-for, and evenly mowed appearance, free from ruts or any un-mowed strips.

C.2.2.3 Minimum grass height after mowing will be two (2) inches. Maximum grass height after mowing will be three and one-half (3 1/2) inches.

C.2.3 TRIMMING

C.2.3.1 AREAS: Trimming is required in all designated areas. Grass and weeds shall be trimmed around trees, shrubs, buildings, fences, poles, posts, fire hydrants, signposts, benches, picnic tables, electrical pedestals, parking lots, curbs, parking lot bumper blocks (both sides), sidewalks, boulders, playgrounds (inside as well), beaches, boat ramps and other fixed obstacles.

C.2.3.2 HEIGHT: Trimming height shall match surrounding area grass heights. All areas shall be trimmed simultaneously, or immediately following mowing, and in all instances shall be completed no later than forty-eight (48) consecutive hours after mowing.

C.2.3.3 CLIPPING REMOVAL: Immediately following trimming, the contractor shall remove grass clippings or debris deposited as a result of mowing and trimming operations from all sidewalks, entrances into buildings, and building interiors. If trimming is not completed in the same day as the mowing, the contractor shall remove grass clippings or debris deposited as a result of mowing operations from all sidewalks, entrances into buildings, and building interiors. Grass clippings and debris shall not be left on sidewalks, etc. overnight, even if the trimming operations are not completed.

C.2.3.4 DEAD/SPRAYED VEGETATION: Occasionally recreation area features are sprayed for vegetation control. The contractor shall trim all dead vegetation and any grass and/or weeds growing along or within the maintained recreation feature.

C.2.3.5 TREES/SHRUBS/OBJECTS: Extreme care shall be exercised when mowing and trimming around trees, bushes, shrubs, buildings, and other objects to insure that equipment does not come in contact with the object. Trees or other objects shall

NOT be bumped or scraped by equipment. Trimming around buildings and inanimate objects shall be accomplished to the last blade of grass. Moveable objects such as picnic tables shall be moved and the area around and under such objects shall be mowed and/or trimmed. Immediately following mowing/trimming, such objects shall be returned to their original position.

C.2.4 PAYMENT PROCEDURES

C.2.4.1 The Contractor shall submit an invoice within 2 business days following the completion of each mowing round to the COR. Invoices can be emailed or delivered to Lake Red Rock Office 1105 N. Highway T15, Knoxville, Iowa 50138. Payment will be made from the finance and accounting office for the Rock Island District in accordance with contract provisions and the Prompt Payment Act.

TECHNICAL EXHIBIT #1

2024 BASE PERIOD PERFORMANCE MOWING & TRIMMING SCHEDULE (Inclusive – all recreation areas, including the visitor center, bid item 0001AA).

1. Monday, April 15

2. Monday, April 29

3. Monday, May 13

4. Monday, May 20

5. Monday, June 3

6. Monday, June 17

7. Monday, June 24

8. Monday, July 08

9. Monday, July 29

10. Monday, August 12

11. Monday, August 26

12. Monday, September 9

13. Monday, September 23

NOTE: The four (4) additional mowings listed below are for unscheduled mowing & trimming of all recreation areas, including the visitor center (bid item 0001AB).

1. Date to be determined by COR on an as-needed basis.

2. Date to be determined by COR on an as-needed basis.

3. Date to be determined by COR on an as-needed basis.

4. Date to be determined by COR on an as-needed basis.

TECHNICAL EXHIBIT #1 Continued

2025 OPTION PERIOD ONE PERFORMANCE MOWING & TRIMMING SCHEDULE

(Inclusive – all recreation areas, including the visitor center, bid item 0002AA).

1. Monday, April 14

2. Monday, April 28

3. Monday, May 5

4. Monday, May 19

5. Monday, June 2

6. Monday, June 16

7. Monday, June 30

8. Monday, July 07

9. Monday, July 21

10. Monday, July 28

11. Monday, August 11

12. Monday, August 25

13. Monday, September 15

NOTE: The four (4) additional mowings listed below are for unscheduled mowing & trimming of all recreation areas, including the visitor center (bid item 0002AB).

1. Date to be determined by COR on an as-needed basis.

2. Date to be determined by COR on an as-needed basis.

2026 OPTION PERIOD TWO PERFORMANCE MOWING & TRIMMING SCHEDULE

(Inclusive – all recreation areas, including the visitor center, bid item 0003AA).

1. Monday, April 13

2. Monday, April 27

3. Monday, May 11

4. Monday, May 18

5. Monday, June 1

6. Monday, June 15

7. Tuesday, June 29

8. Monday, July 13

9. Monday, July 27

10. Monday, Aug 17

11. Monday, August 31

12. Monday, Sept 14

13. Monday, Sept 28

NOTE: The four (4) additional mowings listed below are for unscheduled mowing & trimming of all recreation areas, including the visitor center (bid item 0003AB).

1. Date to be determined by COR on an as-needed basis.

2. Date to be determined by COR on an as-needed basis.

2027 OPTION PERIOD THREE PERFORMANCE MOWING & TRIMMING SCHEDULE

(Inclusive – all recreation areas, including the visitor center, bid item 0004AA).

1. Monday, April 12

2. Monday, April 26

3. Monday, May 10

4. Monday, May 24

5. Monday, June 7

6. Monday, June 21

7. Tuesday, June 28

8. Monday, July 12

9. Monday, July 26

10. Monday, August 2

11. Monday, August 16

12. Monday, August 30

13. Monday, September 13

NOTE: The four (4) additional mowings listed below are for unscheduled mowing & trimming of all recreation areas, including the visitor center (bid item 0004AB).

1. Date to be determined by COR on an as-needed basis.

2. Date to be determined by COR on an as-needed basis.

2028 OPTION PERIOD FOUR PERFORMANCE MOWING & TRIMMING SCHEDULE

(Inclusive – all recreation areas, including the visitor center, bid item 0005AA).

1. Monday, April 17

2. Monday, May 1

3. Monday, May 15

4. Monday, May 22

5. Monday, June 5

6. Monday, June 19

7. Monday, June 26

8. Monday, July 10

9. Monday, July 24

10. Monday, July 31

11. Monday, August 14

12. Monday, August 28

13. Monday, September 11

NOTE: The four (4) additional mowings listed below are for unscheduled mowing & trimming of all recreation areas, including the visitor center (bid item 0005AB).

1. Date to be determined by COR on an as-needed basis.

2. Date to be determined by COR on an as-needed basis.

TECHNICAL EXHIBIT #2

MOWING AREA MAPS

¯ 0 300 600 Feet

Marina Cove Mowed Area

Volksweg Trail Mowing Path

Marina Cove Mowing Area

¯ 0 300 600 Feet

Archery Range Mowed Area

Archery Range Mowing Path

Archery Range Mowing Area

¯ 0 250 500 Feet

Hickory Ridge Mowed Area

Hickory Ridge Mowing Area

2024-2028 Lake Red Rock Recreation Area Mowing PWS_Draft.pdf
Recreation Area Mowing Maps.pdf
Archery Range.pdf
Eagle Lair Trail.pdf
Fifield Recreation Area.pdf
Hickory Ridge.pdf
Howell Station Recreation Area.pdf
Ivan's Recreation Area.pdf
Marina Cove.pdf
North Overlook Recreation Area.pdf
North Tailwater Recreation Area.pdf
South Overlook and Visitor Center.pdf
South Tailwater and Maintence Shop.pdf
Volksweg Trail.pdf
Wallashuck Recreation Area.pdf
Whitebreast Recreation Area.pdf

File details come from the government source that posted it. Updated .