A22 - W912EKXXXXX - Amendment 0001.pdf

PDF 926 KB Posted

Attached to
Castings HORSE BOXES, QUOIN BLOCKS, QUOIN STAYS
Solicitation number
W912EK24Q0026
Issued by

About this file

This document is an Amendment to Solicitation W912EK24Q0026 for Castings - Horse Boxes, Quoin Blocks, and Quoin Stays. The U.S. Army Corps of Engineers, Rock Island District, Illinois Waterway Project requires the manufacturing and delivery of these steel casting components to replace end-of-life wicket dam parts at the Peoria and LaGrange Lock and Dams.

The amendment provides clarification on the technical requirements, updates the bid schedule, and extends the proposal due date from March 29 to April 5, 2024. Key details include: 40 horse boxes, 80 quoin blocks, and 40 quoin stays to be delivered within 52 weeks of contract award. The contractor is responsible for manufacturing per the technical specifications and drawings provided. Contractors must be registered in the System for Award Management (SAM). Invoices will be accepted for completed assemblies. No 3D models or pattern drawings are available, and the government will not provide patterns or additional funding for pattern repairs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR ADDITIONAL INFORMATION, CONTACT:

Jubbar J. Arshad - Phone: 309-794-5023 or Email: jubbar.j.arshad@usace.army.mil

REQUESTFOR QUOTATION

US Army Corps of Engineers

W912EK24Q0026

Castings Horse Boxes, Quoin Blocks & Stays

PLEASE RETURN TO:

US Army Corps of Engineers Attn: Jubbar Joseph Arshad 1500 Rock Island Drive Rock Island, Illinois 61201 Email: jubbar.j.arshad@usace.army.mil

PLEASE INCLUDE THE FOLLOWING INFORMATION:

1. Complete Block 17a on the SF1449 - Enter Name, Address, and Current Phone Number of Person to Contact Regarding Proposal

2. Complete and sign Blocks 30a, 30b, and 30c on the SF1449

3. Complete Offeror Representations and Certifications (Clause 52.212-3) if your company has not completed the Representations and Certifications located with your company’s SAM record (https://www.sam.gov).

4. Complete and submit the SF1449, Bid Schedule.

5. Please fill out the information below completely and include this cover page with your offer, along with the above items that need to be filled out.

6. Include the Solicitation Number on the outside of your envelope, cover sheet, or as subject line if submitting by email pdf format. It is the responsibility of the offeror to verify that their offer has been received and is legible when using a method other than electronic format to submit an offer.

7. Technical questions must be submitted directly to the Contract Specialist listed above.

Contractors must be current in their registration in the System for Award Management (SAM) Database before a Government Contract award can be made. https://www.sam.gov/

Please provide: CAGE Code (SAM):

Point of Contact:

Phone & Email:

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update the solicitation to provide clarity regarding the requirement:

-Scope of Work updated -Questions recieved and corresponding answ ers document added -Cover Sheet to solicitation revised to remove Security Clause requirement -Attachment 2 - "Example Photos of aged assemblies that require replacement" is hereby removed -DFARS 252.211-7003 added by reference

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Mar-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EK24Q0026

X 9B. DATED (SEE ITEM 11)

14-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Mar-2024

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK24Q0026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

Consolidated Questions and Answers for Solicitation Amendment Q1: Are 3D models or other technical data files available? If not, is there a visual difference in the wicket quoin stay between the drawing and photos?

A: No, 3D models or other technical data files are not currently available. The blueprints are correct and should be used for fabrication purposes. The photos are inaccurate and will be hereby removed from the solicitation.

Q2: Will there be an option for added funds if patterns have to be repaired or new patterns created?

A: No, USACE will not be providing patterns to the Contractor. Contractor shall be responsible for repairing or creating new patterns.

Q3: Do we have pattern drawings or as-cast drawings to reference expected machining and material removal?

A: No.

Q4: The latest drawings for the Quoin Stay (Sheet ID S-503), some of the surface finishes along with the tolerance on the 1" hole are removed. Is that correct?

A: Sheet S-503 does not include those details. The SOW has been revised to address these details.

Note: Quoin Stay – The 1” Dia. Hole is to be drilled and shall have a 125 finish around the hole and on the entirety of both faces of the hole. Hole tolerance is 1 + 1/32”.

Q5: Why was the RFP deadline extended?

A: The RFP deadline was initially extended due to an administrative error in the initial posting on SAM.gov. The initial closing date was always March 29th, 2024. This amendment is extending the due date to April 5th, 2024 at

2:00 PM CT.

Q6: Is the correct quantity of Quoin Stays 40 or 80?

A: The correct quantity of Quoin Stays is 40. The Bid Schedule Section in the Scope of Work is correct. Do not use the Quantities in the Blueprints as one of the quantities is labeled incorrectly.

Q7: Are current pattern equipment available?

A: No. There are various materials and methods to cast and finish products. USACE is looking to the industry to provide modern materials and methods available to effectively and efficiently produce the specified end products.

Q8: How soon will parts be required?

A: All deliverables must be received at the FOB destination no later than 52 weeks after contract award.

Q9: Could this be a recurring job? If so, what is the potential volume?

A: No, this will be a one-time purchase.

Q10: Can you provide estimated rough cast weights or solid models?

A: The approximate casting weights are: 152lbs. (each) Horse Box; 21.5lbs (each) Quoin Block, and 10.5lbs. (each) Quoin Stay.

Q11: Can you clarify what is meant by "security clause 2(b) and 15 of the PWS"?

A: Disregard this requirement, it will be removed from the solicitation.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 29-Mar-2024 02:00 PM to 05-Apr-2024 02:00 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

HORSE BOX - PEORIA & LAGRANGE L&D

To:

HORSE BOX - PEORIA & LAGRANGE L&D

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent..

CLIN 0002

QUOIN BLOCK - PEORIA & LAGRANGE LOCK

QUOIN BLOCK - PEORIA & LAGRANGE LOCK

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent..

CLIN 0003

HORSE BOX CASTINGS - PEORIA & LAGRANGE LOCK

HORSE BOX CASTINGS - PEORIA & LAGRANGE LOCK

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent..

The following have been added by reference:

252.211-7003 Item Unique Identification and Valuation JAN 2023

The following have been modified:

DESCRIPTION SPECIFICATIONS

SCOPE OF WORK (SOW) - Steel Castings and Finishing Manufacturing:

PURPOSE -

The US Army Corps of Engineers (USACE), Rock Island District, Illinois Waterway Project (ILWW), requires the following products: The supply and manufacture of steel castings, further manufacturing the steel castings to create the final deliverables required, per contract specifications and drawings.

Peoria Lock & Dam’s wicket dam consists of 108 wickets and LaGrange Lock and Dam’s wicket dam consists of 109 Wickets. USACE ILWW Maintenance Section personnel will utilize the completed parts supplied by the Contractor to replace end of life submerged and near river bottom wicket gate structural components at both locks and dams on the Illinois River.

USACE will not supply any steel, personnel, equipment, or components to complete the supply requirement. The contract deliverables shall be ready for instant assembly with other wicket components, not provided by the Contractor, upon receiving by USACE. Coatings such as paint will be applied by USACE personnel.

SPECIFICATIONS -

Supply the required Steel Castings finished to specifications and drawings:

(40) EACH HORSE BOX – Cast Steel: ASTM 148, GRADE 80-50

(80) EACH QUOIN BLOCK – Cast Steel: ASTM 148, GRADE 80-50

(40) EACH QUOIN STAY – Cast Steel: ASTM 148, GRADE 80-50 OR CLASS 2 OR BETTER WITHIN ASTM A27, GRADE 65-35 for Quoin Stay ONLY.

Note: Required parts are universal for Peoria and LaGrange Lock and Dam.

Note: The SOW shall take precedence over the Blueprints if there is a conflict.

Note: Quoin Stay – The 1” Dia. Hole shall be drilled and shall have a 125 finish around the hole and on the entirety of both faces of the hole. Hole diameter tolerance is +/- 1/32”.

Note: Estimated weight of final product deliverables, per blueprint dimensions:

152lbs. (each) for the Horse Box, 21lbs.(each) for the Quoin Box, and 10lbs.

(each) for the Quoin Stay. All weights reflect using ASTM 148, GRADE 80-50.

(1) JOB - FOB DESTINATION:

USACE - Illinois Waterway Project Office

257 Grant Street

Peoria, IL 61603

Provide Steel Certification(s) for castings such as, but not limited to, country of origin, heat numbers, test results, etc.

Each casting shall have the heat number stamped or cast upon it.

Incorporated by reference: The castings shall be made of steel conforming to ASTM A27 “Steel Castings, Carbon, for General Application” dated August 28, 1987, and last updated May 06, 2020, and ASTM A148 “Steel Castings, High Strength, for Structural Purposes” dated December 15, 1993, and last update Last May 15, 2020. Clarification of which specification is provided in the blueprints.

COMPLIANCE DOCUMENTATION:

The Contractor must supply all certification of compliance documentation for steel components supplied. The purpose of the certification of compliance documentation is to ensure the deliverables meet requirements.

TIMELINE:

USACE must receive all deliverables no later than 52-weeks after award. USACE may have a kickoff meeting with the awardee after contract award.

Provide Steel Certification(s) such as, but not limited to, country of origin, heat numbers, test results, etc. for all steel deliverables.

ATTACHMENTS:

Attachment 1 - Wicket Horse Box, Quoin Block, and Quoin Stay Blueprints Attachment 2 - Example PHOTOS of aged assemblies that require replacement.

FOB DESTINATION RECEIVING COORDINATION:

The Contractor shall coordinate acceptable delivery times with the SPOC and POC. This will ensure access to the facility, and the proper personnel and equipment are in place to help with offloading and may speed up the quality assurance review of deliverables. Additionally, the Contractor shall give no less than two-weeks’ notice prior to the receiving date. If the Contractor does not give notice, prior to delivery, and we are unable to allow entrance or have the correct personnel and equipment to help with offloading, redelivery shall be at the Contractor’s cost.

NOTE: General acceptable hours of delivery are Monday through Thursday, excluding Federal Holidays, 7:00 AM – 3:30 PM, Chicago Time.

POINTS OF CONTACTs (POCs) and Site Point of Contacts (SPOCs):

Provided at time of Award -

INVOICES:

Upon Acceptance, USACE will pay for partial deliveries only for completed assemblies.

Email Invoices to the following POCs: Provided at time of award -

BID SCHEDULE:

ITEM NO SUPPLIES QUANTITY UNIT Unit Price Total

BASE CONTRACT

0001 HORSE BOX

- PEORIA &

LAGRANGE

L&D

40 EACH $ $

0002 QUOIN

BLOCK -

PEORIA &

80 EACH $ $

0003 QUOIN STAY

- PEORIA &

40 EACH $ $

0004 FOB

Destination:

USACE -

Illinois Waterway Project Office

257 Grant Street

Peoria, IL 61603

1 JOB $ $

TIMELINE NTP/ARO to receive at FOB Destination

Maximum number of weeks:

GRAND TOTAL: $

The following have been deleted:

MVR.03 Question & Answer via email DEC 2016