A22. W912EK24Q0010_AMD0001.pdf

PDF 798 KB Posted

Attached to
Lindsay Harbor Loading and Hauling Federal contract opportunity
Solicitation number
W912EK24Q0010
Issued by
Department of the Army Corps of Engineers Engineering District Rock Island

About this file

This document provides questions and answers regarding solicitation number W912EK24Q0010 for the Lindsay Harbor Loading and Hauling opportunity through the Department of the Army Corps of Engineers Engineering District Rock Island. The scope of work involves loading and hauling dredged materials from three locations near Lindsay Harbor to designated placement sites within specified timeframes. Questions addressed include confirmation that jersey barriers can be set up ahead of time, clarification that dredged materials will be distributed between the three sites, and confirmation that the contractor is only responsible for surface cleanup and restoration to pre-existing conditions if damage occurs. No additional permits or site restrictions are required. Cleanup must be completed within 10 days of dredging completion, which is expected to begin on October 31, 2023 and be conducted by Legacy Corporation. Pricing will be paid as lump sums for the two line items upon total job completion.

View the file

Other files for this federal contract opportunity

Other files attached to Lindsay Harbor Loading and Hauling, newest first.
File Type Posted
A22. W912EK24Q0010_AMD0003.pdf PDF
A22. W912EK24Q0010_AMD0002.pdf PDF
A22. W912EK24Q0010.pdf PDF
A22. W912EK24Q0010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

96514732898419

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for the amendment to the solicitation is to provide the questions and answ ers.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Oct-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EK24Q0010

X 9B. DATED (SEE ITEM 11)

23-Oct-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Oct-2023

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK24Q0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

1) Can we setup the barriers at all 3 sites ahead of time upon award of contract/notification?

Answer: Yes, that is what is expected. It should start in number sequencing order of pictures.

2) I want to confirm dredge material is only being dropped at figured location 3, 4 & 5? Do we know how much cubic yards of dredge is going to each figured location?

Answer: Please see the statement of work figured that provides the area. The dredging material will be closely distributed between the sites. The expectation is that once one site is filled with dredging material, the dredging contractor will move to the next location.

3) If we are removing dredge from 3 locations, why are there only 2 line items in the solicitation that request pricing by the cubic yard for 15,000 & 6,500 respectively?

Answer: The separate line items was based on the way the funding was provided to the Government. It is not related to the different sites. Min and max quantities expected.

4) I want to confirm the Corp of Engineers/ Subcontracted dredging company will be staging the material within the jersey barrier perimeter that we provide?

Answer: Subcontractor will place material and jersey barrier will be manipulated by loading party to load as/if needed.

5) It states contractor must provide a method to stage/contain? Does this mean the expectation is the contracted party must provide a method of erosion control beyond just the jersey barriers?

Answer: No erosion control will take place, just cleanup of dredge material that could escape.

6) What is the difference in scope of site cleanup and site restoration?

Answer: The purpose of each location is just to provide an area to dump the dredging material.

7) The surface that dredge material is being stages on in figures 3-5 appears to be asphalt. In my experience heavy equipment and scraping/loading operations can damage the surface. We can use rubber tired loading equipment instead of tracked equipment, however there is still potential for damage. It appears to be aged and deteriorated asphalt parking lots, therefore the chances of damage are considerably higher. Does my scope of restoration need to account for resurfacing of asphalt in the event of damage? What is the acceptable tolerance of damage to the already deteriorated surface? This is considering the use of heavy equipment by our party as well as the offloading subcontracted or governmental dredging team.

Answer: The condition will be documented beforehand and it will be restored to existing or better condition if damage occurs. It will be addressed amongst the contracting officer representative (COR) and awardee prior to work. Normal wear will be accepted by machinery taking place as a loading effort.

8) We are dropping the dredge onto what appears to be a dirt field. With the current amount of precipitation, access to the placement location may be difficult to access. Does the road/path to the placement location have aggregate to make access easier? If not, can we change the scope of the removal timeline to allow for improved conditions to placement location?

Answer: Final location conditions will be addressed if/when it becomes an issue and agreed upon. The COR will be able to discuss with awardee if differing site conditions happen.

9) The solicitation states the dredging contract is 60 days but final cleanup has to occur in 10 days. Are we expected to haul during that time or are we notified when dredging is complete and then we have 10 days to complete the haul off and cleanup?

Answer: Dredging has to be complete with 60 days. no two containments can be completely full at once. So you will have 10 days to clean up and move last remaining material within that time.

10) At the placement location, is the contracted party responsible for spreading or movement of the dredge?

Answer: No

11) Are we allowed to just dump the first truck at the far end of the placement location and then continue to dump in a linear fashion with each load.

Answer: Yes and other side of property if needed.

12) Is there a pay schedule for this job or is it lump sum upon completion? LS on each line item, Answer: The Government will pay once the entire job is complete.

13) Would the hauler be able to unload directly from the hopper into their trucks?

Answer: No

14) What company is doing the dredging?

Answer: Legacy Corporation is the current dredging contractor.

15) Are there any additional permits required?

Answer: No.

16) Are there any specific restrictions/requirements at the dump site?

Answer: No

17) Is clean up required, correct?

Answer: Yes, clean up is required.

18) Can you provide the expected start date hauling will begin?

Answer: 10/31/23

19) When the dredging contractor is planning to offload the barges to the staging area? This year? early next year?

Answer: 10-31-23, contractor will need to start setup and dredging contractor should be loading the 6th.

(End of Summary of Changes)