The key details are:
- This solicitation is a 100% Woman-Owned Small Business Set-Aside Invitation for Bid contract with an estimated value between $500,000 and $1,000,000.
- The scope of work includes site preparation, clearing and stripping, and providing pervious fill, with the estimated amount of pervious fill needed not to exceed 200 Cubic Yards.
- The contract completion period is 150 Calendar Days from Notice to Proceed.
- Payment will be made for specific items of work as described, including site preparation, clearing and stripping, and pervious fill.
- All costs for work not specifically mentioned are to be included in the listed pay items.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The following modifications are made to the Section 01 22 00.
SECTION 01 22 00
a. PAGE 2. Delete SECTION 01 22 00 Page 2 in its entirety, and substitute therefor revised and new SECTION 01 22 00 Page 2.
SOLICITATION NO.: W912EK24B0012
B5SABULA202301
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
Payment items for the costs of this Contract for which Contract job payments will be made are listed in the SCHEDULE OF PRICES and as described. All costs for items of work, which are not specifically mentioned to be included in a particular job payment item, to be included in the listed job item most closely associated with the work involved.
The job price and payment made for each item listed will constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Site Preparation
1.1.1.1 Payment
Payment for all costs associated with, but not limited to, site preparation and mobilization including any incidentals will be made for Item No. 0001, "Site Preparation."
1.1.1.2 Unit of Measure
Unit of measure: job.
1.1.2 Clearing and Stripping
1.1.2.1 Payment
Payment for all costs associated with, but not limited to, tree clearing, saplings, brush, miscellaneous vegetation, and stripping topsoil, stockpiling material, spreading material, and debris removal including any incidentals will be made for Item No. 0002, "Clearing and Stripping."
1.1.2.2 Unit of Measure
Unit of measure: job.
1.1.3 Pervious Fill
1.1.3.1 Payment
Payment for all costs associated with repairing work includes, but is not limited to, loading, hauling, offloading, and placement will be made for Item No. 0004 " Pervious Fill." The amount of pervious fill needed from the borrow site is estimated to be no more than 200 Cubic Yards.
SECTION 01 22 00 Page 2
AMEND 0002
25 APR 2024