A02 - PHOTO-2022-01-14-EXISTING_CONDITIONS.pdf
PDF 37 MB Posted
- Attached to
- SOLICITATION - Phase One of Two-Phase Design-Build - Mississippi River Lock & Dam 14 Bascule Bridge
- Solicitation number
- W912EK23R0018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22 - W912EK23R0018 Amendment 0001.pdf | ||
| W912EK23R0018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX C
Existing Conditions
CIVIL | Exterior - Photo 1 Auxiliary Lock Viewed from Upper Miter Gate (facing southwest, taken in Nov. 2020)
CIVIL | Exterior - Photo 2 Auxiliary Lock Chamber View of Existing Bridge from Upstream End (facing southwest, taken in Nov. 2020)
CIVIL | Exterior - Photo 3 Smith Island Recreation Area as Viewed from Auxiliary Lock Chamber (facing south, taken in Nov. 2020)
CIVIL | Exterior - Photo 4 View from Upper Miter Gate Catwalk (facing east, taken in Nov. 2020)
CIVIL | Exterior - Photo 5 View from Upper Miter Gate Catwalk (facing southeast, taken in Nov. 2020)
CIVIL | Exterior - Photo 6 Smith Island Viewed from Upper Miter Gate Catwalk (facing south, taken in Nov. 2020)
CIVIL | Exterior - Photo 7 View Across Auxiliary Lock Chamber near Existing Bridge (facing southeast, taken in Nov. 2020)
CIVIL | Exterior - Photo 8 View of Recently Constructed Guidewall Upstream of Auxiliary Lock Chamber (facing northeast, taken in Nov. 2020)
CIVIL | Exterior - Photo 9 Existing Bridge (facing southeast, taken in Nov. 2020)
CIVIL | Exterior - Photo 10 Boardwalk Downstream of Auxiliary Lock (facing southwest, taken in Nov. 2020)
CIVIL | Exterior - Photo 11 Upstream View from Boardwalk (facing northeast, taken in Nov. 2020)
CIVIL | Exterior - Photo 12 Smith Island as Viewed from Boardwalk Downstream of Auxiliary Lock (facing east, taken in Nov. 2020)
Appendix C - Existing Conditions
File details come from the government source that posted it. Updated .