W912EK23B0001 Amendment 0003.pdf
PDF 566 KB Posted
- Solicitation number
- W912EK23B0001
About this file
This is a solicitation for construction services for the Iowa River Basin, Cedar River, Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Middle Reach Channel, Trail Bridge, Floodwall, and 10th St NE Road Raise in Cedar Rapids, Iowa.
The solicitation includes a schedule of prices listing estimated quantities and unit prices for various construction items across five volumes of work. Items include mobilization, demolition, clearing and grubbing, excavation and fill, concrete work, fencing, sheet piling, H-piling, drainage structures, utilities and piping. The response due date is September 7, 2023 at 10:00 AM. Evaluation will be based on the total price for line items that are subdivided into multiple quantities. Variations in estimated quantities may result in price adjustments. The solicitation also specifies requirements for permits, sustainability, force protection conditions, qualifications for testing laboratories, and a stream diversion plan.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page 2 and follow ing.
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EK23B0001
X 9B. DATED (SEE ITEM 11)
08-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2023
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D
ROCK ISLAND IL 61201
W912EK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EK23B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 07-Sep-2023 02:00 PM to 07-Sep-2023 10:00 AM.
(End of Summary of Changes)
23B0001
AMEND 0003
The following modifications are made to the SCHEDULE OF PRICES, SECTION 00 73 05, SECTION 01 22 00, and SECTION 31 00 00.
SCHEDULE OF PRICES
a. ALL PAGES. Delete the Schedule of Prices in its entirety, and substitute therefor revised Schedule of Prices, Amendment 0003, dated August 24, 2023.
SECTION 00 73 05
b. PAGES 7 AND 8. Delete Section 00 73 05 Pages 7 and 8 in their entirety, and substitute therefor revised Section 00 73 05 Pages 7 and 8, Amendment 0003, dated August 24, 2023.
SECTION 01 22 00
c. PAGE 15. Delete Section 01 22 00 Page 15 in its entirety, and substitute therefor revised Section 01 22 00 Page 15, Amendment 0003, dated August 24, 2023.
SECTION 31 00 00
d. PAGES 1, 6, AND 9. Delete Section 31 00 00 Pages 1, 6, and 9 in their entirety, and substitute therefor revised Section 31 00 00 Pages 1, 6, and 9, Amendment 0003, dated August 24, 2023.
ATTACHMENTS: Schedule of Prices; Section 00 73 05 Pages 7 and 8;
Section 01 22 00 Page 15; Section 31 00 00 Pages 1, 6, and 9.
B5CEDRPD202002 - Cedar Rapids FRM Reach 1 McLoud Run Middle Channel Cedar Rapids, IA SCHEDULE OF PRICES
Solicitation No. W912EK23B0001
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
All Volumes 0001 Mobilization and Demobilization 1 JOB XXXXXXXX $
0002 Topsoil
0002AA First 1,590 Cubic Yards 1,590 CY $ $
0002AB Over 1,590 Cubic Yards 280 CY $ $
0003 Site Restoration and Seeding 1 JOB XXXXXXXX $
Volume 101 - 10th Street Road Raise 0101 Not Used XXXXXXXX XXX XXXXXXXX XXXXXXXX
0102 Demolition 1 JOB XXXXXXXX $
0103 Temporary Traffic Controls 1 JOB XXXXXXXX $
0104 Clearing, Grubbing, and Stripping 1 JOB XXXXXXXX $
0105 PCC Paving and Patching Work 1 JOB XXXXXXXX $
0106 Concrete Sidewalk 785 SF $ $
0107 Pedestrian Ramp 2 EA $ $
0108 Concrete Curb and Gutter 1,200 LF $ $
0109 Chain Link Fence 525 LF $ $
0110 Metal Sheet Piling
0110AA First 618 Square Feet 618 SF $ $
0110AB Over 618 Square Feet 109 SF $ $
AMEND. 0003
24 AUG 2023
Cedar Rapids, IA SCHEDULE OF PRICES (continued)
Solicitation No. W912EK23B0001
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0111 Roadway Fill
0111AA First 2,078 Cubic Yards 2,078 CY $ $
0111AB Over 2,078 Cubic Yards 367 CY $ $
Volume 102 - 10th Street Utilities 0201 Not Used XXXXXXXX XXX XXXXXXXX XXXXXXXX
0202 Demolition 1 JOB XXXXXXXX $
0203 Temporary Traffic Controls 1 JOB XXXXXXXX $
0204 Concrete Curb and Gutter 181 LF $ $
0205 Structural Concrete 1 JOB XXXXXXXX $
0206 Sanitary Sewer Gravity Main 480 LF $ $
0207 Storm Sewer 601 LF $ $
0208 Manhole, 60 Inch 2 EA $ $
0209 Manhole, 48 Inch 1 EA $ $
0210 Intake, Single Open-Throat 5 EA $ $
0211 Intake, Double Open-Throat 3 EA $ $
0212 Intake, 4 Foot x 3 Foot 2 EA $ $
0213 Chain Link Fence 175 LF $ $
Volume 104 - Middle Reach Channel 0401 Not Used XXXXXXXX XXX XXXXXXXX XXXXXXXX
0402 Clearing, Grubbing, and Stripping 1 JOB XXXXXXXX $
0403 Demolition 1 JOB XXXXXXXX $
Cedar Rapids, IA SCHEDULE OF PRICES (continued)
Solicitation No. W912EK23B0001
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0404 Channel Fill
0404AA First 3,490 Cubic Yards 3,490 CY $ $
0404AB Over 3,490 Cubic Yards 620 CY $ $
0405 Bedding Stone
0405AA First 1,770 Tons 1,770 TN $ $
0405AB Over 1,770 Tons 320 TN $ $
0406 Riprap (Class C)
0406AA First 5,150 Tons 5,150 TN $ $
0406AB Over 5,150 Tons 910 TN $ $
Volume 105E - Trail Bridge 0501 Not Used XXXXXXXX XXX XXXXXXXX XXXXXXXX
0502 Demolition 1 JOB XXXXXXXX $
0503 Temporary Traffic Controls 1 JOB XXXXXXXX $
0504 Clearing, Grubbing, and Stripping 1 JOB XXXXXXXX $
0505 Concrete for Trail, Shared Use Paths, and Sidewalk
1,921 SY $ $
0506 Structural Concrete 1 JOB XXXXXXXX $
0507 Pre-Engineered Steel Truss Trail Bridge 1 JOB XXXXXXXX $
0508 Steel H-Pile 525 LF $ $
0509 Handrails and Safety Rail 362 LF $ $
0510 Segmental Block Wall 293 SF $ $
0511 Subbase, Modified (IADOT No. 14) 641 TN $ $
Cedar Rapids, IA SCHEDULE OF PRICES (continued)
Solicitation No. W912EK23B0001
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0512 Trail Fill
0512AA First 2,831 Cubic Yards 2,831 CY $ $
0512AB Over 2,831 Cubic Yards 537 CY $ $
0513 Aggregate Surfacing
0513AA First 110 Tons 110 TN $ $
0513AB Over 110 Tons 20 TN $ $
Volume 107 - Flood Wall 0701 Not Used XXXXXXXX XXX XXXXXXXX XXXXXXXX
0702 Demolition 1 JOB XXXXXXXX $
0703 Clearing, Grubbing, and Stripping 1 JOB XXXXXXXX $
0704 Concrete Curb and Gutter 538 LF $ $
0705 Metal Sheet Piling
0705AA First 28,832 Square Feet 28,832 SF $ $
0705AB Over 28,832 Square Feet 5,088 SF $ $
0706 Steel H-Pile
0706AA HP 12x53 2,649 LF $ $
0706AB HP 14x73 4,298 LF $ $
0707 Micropiles
0707AA First 3,200 Linear Feet 3,200 LF $ $
0707AB Over 3,200 Linear Feet 584 LF $ $
0708 Floodwall Excavation
0708AA First 1,324 Cubic Yards 1,324 CY $ $
0708AB Over 1,324 Cubic Yards 234 CY $ $
AMEND. 0003
24 AUG 2023
Cedar Rapids, IA SCHEDULE OF PRICES (continued)
Solicitation No. W912EK23B0001
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0709 Floodwall Backfill
0709AA First 2,334 Cubic Yards 2,334 CY $ $
0709AB Over 2,334 Cubic Yards 412 CY $ $
0710 Granular Fill
0710AA First 366 Tons 366 TN $ $
0710AB Over 366 Tons 65 TN $ $
0711 Toe Drain 1,060 LF $ $
0712 Floodwall Construction 1 JOB XXXXXXXX $
0713 Aggregate Surfacing
0713AA First 487 Tons 487 TN $ $
0713AB Over 487 Tons 86 TN $ $
0714 Flood Barrier Maintenance
0714AA First 12 Months 12 MO $ $
0714AB Over 12 Months 5 MO $ $
0715 Safety Rail, 54 Inch 250 LF $ $
0716 Safety Rail, 42 Inch 90 LF $ $
CY = CUBIC YARD EA = EACH JOB = LUMP SUM
LF = LINEAR FOOT MO = MONTH SF = SQUARE FOOT
SY = SQUARE YARD TN = TON
ENSURE UNIT PRICE AND AMOUNT LINES FOR ALL ITEMS ARE COMPLETED.
TOTAL OF ESTIMATED AMOUNTS - VOLUMES 101, 102, 104, 105E, AND 107
(ITEM NOS. 0001 THROUGH 0716, INCL.)
Solicitation No. W912EK23B0001
Work may be affected by the following Force Protection Conditions levels:
FPCON NORMAL
When there is no discernible terrorist activity. Routine security posture.
FPCON ALPHA
When there is a general threat of possible threat activity against personnel and the installation, or both. There will be a limited impact on normal operations.
FPCON BRAVO
When there is an increased or more predictable threat. There will be an impact on normal operations but it will not cause undue hardship to personnel, substantially affect operational capabilities, or cause aggravated relations with local authorities and civilians.
FPCON CHARLIE
When an incident occurs or intelligence is received indicating imminent terrorist action. If this lasts for more than a short period it will probably create hardships for personnel and affect the peacetime activities of units and personnel.
FPCON DELTA
When a terrorist attack has occurred or intelligence indicates likely terrorist action against a specific location. This is normally declared as a localized warning and requires implementation of mandatory security measures. This cannot be sustained for an extended period without causing significant hardships for personnel and affecting the peacetime activities of units and personal.
FPCON NORMAL through FPCON BRAVO will not affect the work. FPCON CHARLIE and FPCON DELTA will affect work. FPCON CHARLIE will subject the Contractor to a higher degree of inspection and may not be able to work on-site for short periods of time as decreed by the District Security Officer. FPCON DELTA as determined by the District Security Officer will close the site down and the Contractor will not be able to work on the site.
1.8 EVALUATION OF SUBDIVIDED ITEMS
Bid Item Nos. 0002, 0110, 0111, 0404, 0405, 0406, 0512, 0705, 0707, 0708, 0709, 0710, 0713, and 0714 are subdivided into two or more estimated quantities and separately priced. The Government will evaluate each of these items on the basis of total price of the subitems.
1.9 VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS
This variation in estimated quantities clause is applicable only to Bid Item Nos. 0002, 0110, 0111, 0404, 0405, 0406, 0512, 0705, 0707, 0708, 0709, 0710, 0713, and 0714.
DOCUMENT 00 73 05 Page 7 AMEND. 0003
24 AUG 2023
a. Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in Contract unit price.
b. Where the actual quantity of work performed for Bid Item Nos. 0002, 0110, 0111, 0404, 0405, 0406, 0512, 0705, 0707, 0708, 0709, 0710, 0713, and 0714 is less than 85 percent of the quantity of the first sub-item listed under such item, it will be paid at the Contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment will be made in accordance with
FAR 52.211-18, VARIATION IN ESTIMATED QUANTITIES.
c. If the actual quantity of work performed under Bid Item Nos. 0002, 0110, 0111, 0404, 0405, 0406, 0512, 0705, 0707, 0708, 0709, 0710, 0713, and 0714 exceeds 115 percent or is less than 85 percent of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Bid Item Nos. 0002, 0110, 0111, 0404, 0405, 0406, 0512, 0705, 0707, 0708, 0709, 0710, 0713, and 0714 exceeds 115 percent or is less than 85 percent of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this Contract, the Contract completion time will be adjusted in accordance with FAR 52.211-18, VARIATION IN ESTIMATED QUANTITIES.
1.10 SUSTAINABILITY
a. Meet USEPA recycled content requirements. Ensure all Contractor-furnished supplies contain recycled content (e.g., insulation, restroom dividers, roofing materials). The list of USEPA-Designated Recovered Material Products is available online at:
http://bit.ly/2ak11jp
b. Meet USDA BioPreferred Program requirements. Ensure all Contractor-furnished supplies contain biobased content (e.g., interior wall panels, plastic insulating foam, plastic lumber). The list of USDA-Designated BioPreferred Program Product Categories is available online at:
http://bit.ly/2ajZE3V)
c. Use energy- and water-efficient building-related products and equipment as applicable. Ensure all Contractor-furnished equipment meets energy efficiency requirements (e.g., light fixtures, gas water heaters, central air conditioners, windows, doors), and water efficient requirements (e.g., faucets, showerheads, toilets) (when applicable to the work to be performed). The list of USDOE Product Categories Covered by Efficiency Programs is available online at:
http://bit.ly/2ajZJ7S
d. Print all deliverables double-sided on paper that contains post-consumer fiber.
1.11 PERMITS
In accordance with FAR 52.236-7 PERMITS AND RESPONSIBILITIES, obtain all
DOCUMENT 00 73 05 Page 8 AMEND. 0003
24 AUG 2023
addition or removal of adjustment rings or adjustable casting, removing existing casting and existing adjustment rings, furnishing and installing adjustment rings, furnishing and installing new casting; PCC gutter for drop curb at sidewalk, PVC Subdrain, trench excavation, furnishing and placing bedding and backfill material, connectors, and elbows and tees;
subdrain cleanout, including PVC riser pipe and subdrain connection; and Subdrain Outlets to ditch and structures including pipe, non-shrink grout, coupling bands, and rodent guards; and subdrain outlets to structure including pipe, non-shrink grout, coupling bands, and rodent guards for pipes; and incidentals; concrete steps, formwork, epoxy reinforcing steel, concrete, preparation of subgrade, expansion joint material and incidentals; and Type 3 object markers, shared-use path signs and posts will be made for Item No. 0505, "Volume 105E - Trail Bridge, Concrete for Trail, Shared Use Paths, and Sidewalk."
1.4.15.2 Measurement
The quantity of materials will be paid for by the square yard, placed in the completed and accepted construction. Concrete will be measured in place in the field by the Contractor and approved by the Contracting Officer.
1.4.15.3 Unit of Measure
Unit of measure: square yard.
1.4.16 Steel H-Piling
1.4.16.1 Payment
Payment for all costs associated with providing metal H-piling for construction, including, but not limited to, predrilling and grouting when required; vibration monitoring; construction survey and incidentals will be made for:
Item No. 0508, "Volume 105E - Trail Bridge, Steel H-Pile;" and
Item No. 0706AA, "Volume 107 - Flood Wall, Steel H-Pile, HP 12x53;" and
Item No. 0706AB, "Volume 107 - Flood Wall, Steel H-Pile, HP 14x73;" as applicable.
1.4.16.2 Measurement
Measurement of metal H-piling will be by the lineal foot of metal H-piling installed as measured by the lineal feet driven in the field, rounded up to the nearest foot. The number of piles is not to exceed the number of piles indicated on the approved shop drawings. Any portion of any pile driven below the tip elevation indicated on the approved shop drawings will not be measured for payment unless over driving is directed by the Contracting Officer.
1.4.16.3 Unit of Measure
Unit of measure: linear foot.
SECTION 01 22 00 Page 15 AMEND. 0003
24 AUG 2023
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DEFINITIONS
1.3.1 Deleted
1.3.2 Granular Fill and Backfill
1.3.3 Trail or Channel Impervious or Levee Embankment Fill
1.3.4 Structural Fill and Backfill
1.3.5 General Fill
1.3.6 Pipe and Utility Bedding
1.3.7 Porous Backfill
1.3.8 Pollinators Area Media
1.3.9 Flowable Fill
1.3.10 Pavement Subgrade
1.3.11 Unsatisfactory Materials
1.3.12 Obstruction
1.3.13 Bedrock
1.3.14 Weathered Bedrock
1.3.15 Unstable Material
1.3.16 Unyielding Material
1.3.17 Classification of Soils
1.3.18 Degree of Compaction (Proctor)
1.3.19 Degree of Compaction (Relative Density)
1.4 SUBSURFACE DATA
1.5 PROTECTION OF EXISTING FACILITIES
1.6 QUALIFICATIONS FOR GEOTECHNICAL TESTING LABORATORY
1.7 QUALIFICATIONS FOR ENVIRONMENTAL TESTING LABORATORY
1.8 STREAM DIVERSION PLAN
PART 2 PRODUCTS
2.1 TOPSOIL
2.2 FILLS
2.2.1 Deleted
2.2.2 Trail or Channel Impervious or Levee Embankment
2.2.3 Granular Backfill
2.2.4 Structural Fill and Backfill
2.2.5 General
2.2.6 Pipe and Utility Bedding
2.2.7 Porous Backfill
2.2.8 Flowable Fill
2.2.9 Controlled Low Strength Material (CLSM)
2.3 BURIED WARNING AND IDENTIFICATION TAPE
2.3.1 Warning Tape for Metallic Piping
2.3.2 Detectable Warning Tape for Non-Metallic Piping
2.4 DETECTION WIRE FOR NONMETALLIC PIPING
SECTION 31 00 00 Page 1 AMEND. 0003
24 AUG 2023
1.3 DEFINITIONS
1.3.1 Deleted
1.3.2 Granular Fill and Backfill
Crushed or natural sand and gravel used for backfill in trenches and roadbed subgrade.
1.3.3 Trail or Channel Impervious or Levee Embankment Fill
Low permeability fill placed as an earthen barrier for flood protection or to limit seepage. Refer to paragraph "Levee Embankment."
1.3.4 Structural Fill and Backfill
Fill placed to support buildings, walls, pads, columns, monoliths, and other similar facilities.
1.3.5 General Fill
Permanent fill placed for construction as shown on the plans.
1.3.6 Pipe and Utility Bedding
Fill placed to directly support pipes, conduits, cables, and appurtenant structures. Bedding may also be used to provide a cushion between utilities and bedrock, obstacles, and other unyielding materials.
1.3.7 Porous Backfill
Free-draining material placed for subsurface drainage, as a capillary break, or another specific purpose.
1.3.8 Pollinators Area Media
Fill placed to support growth of vegetation for pollinators.
1.3.9 Flowable Fill
Fill placed in a plastic or liquid form that flows to near its final placement location with limited assistance and subsequently cures or solidifies to provide a stable or impermeable barrier, depending on the mix design.
1.3.10 Pavement Subgrade
Granular fill or native soils that provides support to aggregate base and surface materials.
1.3.11 Unsatisfactory Materials
Materials which do not comply with the requirements for materials otherwise as defined will be ruled as unsatisfactory. Unsatisfactory materials also include trash; refuse; and material that contains root matter or frozen
SECTION 31 00 00 Page 6 AMEND. 0003
24 AUG 2023
PART 2 PRODUCTS
2.1 TOPSOIL
Provide in accordance with Section 32 92 19 SEEDING. Material suitable for topsoils obtained from offsite areas and stripping operations are defined as: Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.
2.2 FILLS
2.2.1 Deleted
2.2.2 Trail or Channel Impervious or Levee Embankment
Cohesive materials classified as CL in accordance with ASTM D2487, with less than 35 percent larger than the No. 4 sieve, less than 50 percent larger than the No. 200 sieve, a plasticity index greater than 15, a liquid limit less than 45, and less than 2 percent organic content. Levee embankment fill to be free of any rocks with dimensions greater than 3 inches. Hydraulic conductivity (ASTM D5084) must be less than or equal to 1 x 10^-7 cm/s.
2.2.3 Granular Backfill
GW, SW, SP, GP, GC, or SP-SM material complying with IADOT Specification 4133 Granular Backfill Material, Gradation 32 in the Aggregate Gradation Table.
2.2.4 Structural Fill and Backfill
Materials classified as GW, GP, SW, SP, SM, SW-SM, SC, SW-SC, SP-SM, SP-SC, or CL, in accordance with ASTM D2487. Select material type appropriate for the intended purpose or as indicated.
2.2.5 General
Materials classified as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SW-SM, SC, SW-SC, SP-SM, SP-SC, CL, CL-ML, or CH, in accordance with ASTM D2487. Select material type appropriate for the intended purpose or as indicated.
2.2.6 Pipe and Utility Bedding
Comply with the recommendations of the manufacturer of the pipe or utility being bedded, except use levee embankment fill within levee embankments, in foundation soils within the projected levee prism, and within 15 feet of floodwall sheet pile. Option to use flowable fill in place of levee embankment fill where compaction would be impractical. Where no bedding material is specified outside of the previous exceptions, use IADOT
SECTION 31 00 00 Page 9 AMEND. 0003
24 AUG 2023
| B5CEDRPD202002-SPEC_AMND-2023-08-24-0003.pdf |
| NARRATIVE PAGE |
| SCHEDULE OF PRICES |
| SECTION 00 73 05 |
| Page 7 |
| Page 8 |
| SECTION 01 22 00 |
| Page 15 |
| SECTION 31 00 00 |
| Page 1 |
| Page 6 |
| Page 9 |
File details come from the government source that posted it. Updated .