E01 - USACE ACI Debris Justification and Approval (POD)_Redacted.pdf
PDF 3 MB Posted
- Solicitation number
- W912EK22D0004-P00004
About this file
This is a Justification and Approval (J&A) document for other than full and open competition supporting a contract modification for the Advanced Contract Initiative (ACI) Regional Contract for Debris Management Services.
The document justifies a noncompetitive out-of-scope modification to extend the ordering period and increase contract capacity for Firm-Fixed-Price Single Award Task Order Contract (SATOC) W912EK22D0004 with ECC Constructors, LLC, covering Region 8 – Pacific Ocean Division (POD). The contract covers Alaska, Hawaii, Northern Mariana Islands, American Samoa, Guam, and other U.S. Outlying Areas. The original SATOC was competitively awarded on November 10, 2021, with an expiration date of November 9, 2026. The modification is justified under 10 USC § 3204(a)(1), as implemented by RFO 6.103-1, citing "Only One Responsible Source" authority. The contracting activity is U.S. Army Corps of Engineers (USACE), Rock Island District (MVR), Contracting Division (CEMVR-CT).
The requirement provides emergency debris management services including debris separation, temporary site location creation, debris loading and hauling, and final disposal at approved sites, executed within 24 hours of FEMA Mission Assignment receipt. The services are essential for executing Emergency Support Function (ESF) #3 Public Works and Engineering missions under the National Response Framework and Stafford Act. The noncompetitive action is justified because a contract coverage gap would create unacceptable delays in executing emergent disaster debris removal missions during the transition to a planned competitive follow-on acquisition. The government certified that continued access to ECC Constructors' specialized emergency response capabilities, proven operational track record, and readily available expertise are necessary to maintain mission readiness and avoid operational delays that could impact public safety, infrastructure restoration, and disaster recovery timelines.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Control Number: MVR-27-003
JUSTIFICATION REVIEW DOCUMENT
Justification and Approval
For Other than Full and Open Competition (RFO Part 6)
Program/Equipment: This Justification and Approval (J&A) for Other than Full and Open Competition supports an out-of-scope modification to extend the ordering period and increase the contract capacity of Firm-Fixed-Price (FFP), Single Award Task Order Contract (SATOC) W912EK22D0004 with ECC Constructors, LCC. This Advanced Contract Initiative (ACI), Regional Contract for Debris Management Services covers Region 8 – Pacific Ocean Division (POD) (POD SATOC), which covers the states of AK and HI and also covers the Northern Mariana Islands, American Samoa, Guam, and other U.S. Outlying Areas.
Authority: 10 USC § 3204(a)(1), as implemented by RFO 6.103-1, Only One Responsible Source
Amount: Increase of
Prepared by:
Contracting Officer:
Contracting Chief:
Technical:
Requirements:
RFO 6.103-1(c)(2)(ii), services may be deemed to be available only from the original source in the case of follow-on contracts for the continued provision of highly specialized services when it is likely that award would result in unacceptable delays in fulfilling the agency’s requirements.
5. Reason for Authority Cited: In accordance with RFO 6.103-1(c)(2)(ii), the Government has deemed that continued access to critical emergency response capabilities from ECC Constructors, LLC through the ACI Region 8 POD SATOC is essential to avoid unacceptable delays in executing emergent debris removal missions, pending award of a competitive replacement tool. This noncompetitive action is justified because if there is a gap in contract coverage, relying on an alternative source during an active emergency would introduce unacceptable delays and jeopardize mission readiness. ECC Constructors, LLC, has specialized, readily available expertise, and a proven operational track record.
a. Background:
i. USACE Emergency Support Functions (ESFs): As required by Homeland
Security Presidential Directive (HSPD) - 5, the National Response Framework (NRF) establishes a single, comprehensive approach to domestic incident management to prevent, prepare for, respond to, and recover from terrorist attacks, major disasters, and other emergencies.
FEMA is authorized to respond to disasters under Public Law 93-288, Robert T.
Stafford Disaster Relief and Emergency Assistance Act, as amended. ESFs are the primary means through which the Federal Government provides assistance to state, local, and tribal governments or to Federal departments and agencies conducting missions of primary Federal responsibility. The NRF identifies joint leadership roles between the Department of Defense (DoD) and FEMA for executing the ESF #3, Public Works and Engineering mission. DoD has delegated ESF #3 mission execution to USACE.
USACE accomplishes ESF #3 MAs using ACI contract vehicles or stand-alone contracting actions to local firms in accordance with 42 USC 5150, Use of local firms and individuals. ACI Debris Contract services include, but are not limited to, the following: Debris management services may be provided within the geographical boundaries of the U.S. (CONUS), its territories and commonwealths. The contractor shall, unless otherwise directed by the KO, manage disaster generated debris from the point of origin to final disposal. All actions and processes used shall be in full compliance with all applicable local, state, and Federal policies, regulations, and laws. All debris management work shall be accomplished in the most efficient and effective manner appropriate for the applicable waste stream(s) in accordance with the performance work statement. Other debris related mission specific requirements and/or tasks not specifically covered in the Schedule of Prices can be negotiated at the task order level. As previously stated, the current ACI Region 8 SATOC was awarded with a $ capacity on 10 November 2021 and expires on 9 November 2026.
iii. Recompete Status: The Government is currently conducting a full and open competitive acquisition for the follow-on ACI Debris Management requirement.
b. Justification:
i. Highly Specialized Nature of the Requirement: The ACI Debris Management requirement constitutes a highly specialized emergency response capability for purposes of RFO 6.103-1(c)(2)(ii). The specialized nature of the requirement is not based merely on the physical activity of debris removal. Rather, unlike standard commercial debris services provided to the general public, this requirement integrates specialized federal regulatory compliance, real-time USACE and FEMA compatible automated tracking systems, and a continuous state of standby readiness specificity configured to interface with USACE command structures. The historical ACI acquisition strategy identified several characteristics that distinguish this requirement from ordinary debris removal:
Rapid mobilization following a FEMA mission assignment;
Ability to begin performance within approximately 24 hours;
Ability to operate under disrupted infrastructure conditions;
Ability to obtain and manage large quantities of equipment and labor;
Ability to coordinate multiple subcontractors and disposal resources;
Ability to respond to unknown and changing mission requirements;
Ability to operate across geographically dispersed disaster areas; and Ability to perform at the size and scale required for major disasters.
USACE does not maintain large quantities of equipment and human resources in anticipation of a disaster. Accordingly, the existing contract provides a mechanism for accessing this specialized capability within 24 hours of when a disaster occurs.
Because disaster-related debris requirements are inherently disaster specific, the timing, location, severity, and magnitude of future requirements cannot be reliably predicted. The requested capacity provides the Government with the flexibility to respond to unforeseen emergency requirements and is anticipated to provide coverage during the extension period.
The Government will use the additional capacity only as supported by actual requirements, applicable authorities, and available funding. The Government is would require the Government to conduct a second procurement while simultaneously completing the planned full and open follow-on acquisition. The additional acquisition would compete for the same acquisition, legal, technical, and program resources needed to complete the follow-on contract, potentially extending the period before the long-term solution is available. Additionally, a new contractor would also need to establish the personnel, equipment, subcontractor relationships, management structure, transportation resources, and other infrastructure necessary to respond to an emergency mission on short notice. For a temporary and uncertain period, those mobilization requirements would not provide a realistic mechanism for maintaining uninterrupted emergency readiness.
Use Another Existing Contract Vehicle The Government considered whether another existing contract vehicle could provide the required emergency debris capability. This alternative was rejected because the ACI contract is specifically structured to provide the specialized services associated with emergency debris management, including rapid response, regional coverage, management of large-scale debris operations, and the ability to respond to unknown disaster requirements. While other existing contract vehicles may include general debris removal capability, they do not address the need for work to commence immediately after a disaster and could result in unacceptable delay following a mission assignment.
vi. Impacts: Failure to approve this J&A would result in expiration of the current ACI Debris Management contract on 9 November 2026 without assured contractual continuity through completion of the competitive follow-on acquisition. The most significant risk is that a disaster could occur during the procurement transition and result in a FEMA mission assignment requiring USACE to perform debris management without the pre-positioned ACI contract capability. Such an event could require USACE to establish an alternative procurement solution after the disaster occurs, which would preclude immediate commencement of debris removal. The resulting delay could directly affect:
Removal of debris from public roads and rights-of-way;
Restoration of access to affected communities;
Removal of debris from critical public infrastructure;
capacity is intended to reduce the likelihood that significant disaster events will require subsequent contract capacity increases or additional J&As solely to support large-scale debris-removal missions. The proposed interim action is not intended to replace or extend the competitive acquisition beyond the period necessary to address the Government’s interim requirement.
8. Market Research: The Government's historical market research supports the existence of a competitive industrial base for the follow-on requirement. The Government's intent remains to maximize competition through the follow-on full and open acquisition. The proposed bridge therefore does not represent a determination that competition is unavailable for the underlying requirement. Rather, it represents a temporary continuation of the incumbent's specialized emergency response capability while the competitive procurement is completed.
10: Other Facts:
Procurement History: The ACI Debris Removal Emergency Services contract suite consists of eight contracts, each supporting designated FEMA regions across the United States, including U.S. Territories. Contract No. W912EK22D0004 supports Region 8— POD. The contract was competitively awarded to ECC Constructors, LLC., on 10 November 2021, as a firm-fixed-price (FFP) contract with a ceiling amount of