Justification and Approval for Other Than Full and Open Competition
Document Type: This is a Justification and Approval (J&A) for other than full and open competition, used to justify a sole-source contract modification.
Contracting Activity: U.S. Army Corps of Engineers (USACE), Rock Island District, Contracting Division, Rock Island, Illinois.
Contract Action: The document supports an out-of-scope modification to extend the ordering period of a Firm-Fixed-Price (FFP) Single Award Task Order Contract (SATOC) W912EK22D0001 with AshBritt, Inc. The contract provides debris management services under the Advanced Contract Initiative, Regional Contract for Debris Management Services (ACI–RCDMS) for Region 2 – Mississippi Valley Division (MVD), covering Minnesota, Wisconsin, Iowa, Illinois, Louisiana, and Mississippi. The original SATOC was awarded November 10, 2021, through full and open competition and expires November 9, 2026. The modification extends the existing contract without adding new capacity.
Supplies/Services: ACI–RCDMS SATOCs provide rapid deployment of task orders for emergency debris management when requested by the Federal Emergency Management Agency (FEMA) within 24 hours of a FEMA Mission Assignment. Services include separating debris, locating or creating temporary and final disposal sites, loading debris, hauling debris to approved disposal sites, and dumping debris at approved or directed sites. Debris categories include construction debris, vegetative debris, regulated asbestos-containing materials, household hazardous wastes, and electronics. Work is funded through the Disaster Relief Fund to support FEMA mission assignments.
Authority: 10 USC § 3204(a)(1), implemented by RFO 6.103-1, Only One Responsible Source. The justification cites unacceptable delays that would result from alternative procurement methods during an active emergency.
Key Justification Points: The requirement for specialized emergency response capability is highly specialized, requiring rapid mobilization within 24 hours, ability to operate under disrupted infrastructure, obtain and manage large equipment quantities, coordinate multiple subcontractors and disposal resources, and respond across geographically dispersed disaster areas. The document emphasizes that USACE lacks pre-positioned equipment and personnel for disaster response. AshBritt, Inc. possesses specialized, readily available expertise and a proven operational track record. Without continuity of this established capability during the transition to a competitive follow-on contract, a disaster occurring during the procurement gap could prevent immediate debris removal initiation, exacerbating disaster impacts.
Competitive Status: A presolicitation notice was posted to SAM.gov and PIEE on September 30, 2026, with a response deadline of October 15, 2026 (Notice ID W912EK22D0001-NOI-01). A full and open competitive follow-on acquisition is currently underway.
Alternatives Considered and Rejected: (1) Allow existing contract to expire without coverage—rejected because it would leave the MVD area without ACI capability; (2) Conduct separate competitive interim procurement—rejected because it would require duplicate resources and extended lead time incompatible with emergency response timelines; (3) Use another existing contract vehicle—rejected because other vehicles lack the specialized emergency debris management structure and rapid-response capability.
Impacts of Non-Approval: Failure to extend would result in expiration on November 9, 2026, without assured continuity. A disaster during the procurement transition could force USACE to establish an alternative procurement solution after the emergency occurs, precluding immediate commencement of debris removal and directly affecting removal of debris from public roads, restoration of access to affected communities, removal of critical infrastructure debris, public health and safety, governmental and emergency services, environmental impacts, and overall disaster recovery timelines.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .