A22 - W912EK22B0001 Amendment 0002.pdf
PDF 3 MB Posted
- Solicitation number
- W912EK22B0001
About this file
This document outlines a federal contract solicitation for flood risk management projects along the Cedar River in Cedar Rapids, Iowa. The solicitation includes a base bid for construction work at the 12th Avenue road closure, including demolition, traffic control, installation of sheet piles and other flood protection structures, road and utility reconstruction, and site restoration. An optional bid is also specified for a similar closure project at the Crandic Railroad. Bids for the work are due by May 4, 2022. The awarding agency is identified as the Department of the Army Corps of Engineers, Rock Island District. The document provides relevant details on the scope of both the base bid and optional projects in clear, direct language suitable for business.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
22B0001
AMEND 0002
The following modifications are made to the PROJECT TITLE PAGE, SCHEDULE OF PRICES, PROJECT TABLE OF CONTENTS, Section 00 73 05, Section 01 11 00, Section 01 22 00, SUBMITTAL REGISTER, Section 01 50 02, Section 01 53 01, Section 01 57 19, Section 02 21 00, Section 02 41 00, Section 03 11 14, Section 03 31 00, Section 03 41 00, Section 03 41 20, Section 07 42 13, Section 09 97 02, Section 31 00 00, Section 31 41 16, Section 31 62 16, Section 32 11 23, Section 32 13 13, Section 32 31 13, Section 32 92 19, Section 33 40 00, Section 33 71 02, Section 35 20 16, and Section 35 31 19.
PROJECT TITLE PAGE
a. ALL PAGES. Delete the Project Title Page in its entirety, and substitute therefor revised Project Title Page, Amendment 0002, April 8, 2022.
SCHEDULE OF PRICES
b. ALL PAGES. Delete the Schedule of Prices in its entirety, and substitute therefor revised Schedule of Prices, Amendment 0002, April 8, 2022.
PROJECT TABLE OF CONTENTS
c. ALL PAGES. Delete the Project Table of Contents in its entirety, and substitute therefor revised Project Table of Contents, Amendment 0002, April 8, 2022.
SECTION 00 73 05
d. ALL PAGES. Delete Section 00 73 05 in its entirety, and substitute therefor revised Section 00 73 05, Amendment 0002, April 8, 2022.
e. ATTACHMENT C. Delete Section 00 73 05 ATTACHMENT C in its entirety.
f. ATTACHMENT D. Delete Section 00 73 05 ATTACHMENT D in its entirety, and substitute revised Section 00 73 05 ATTACHMENT D, Amendment 0002, dated April 8, 2022.
g. ATTACHMENT E. Delete Section 00 73 05 ATTACHMENT E in its entirety.
SECTION 01 11 00
h. ALL PAGES. Delete Section 01 11 00 in its entirety, and substitute therefor revised Section 01 11 00, Amendment 0002, April 8, 2022.
SECTION 01 22 00
i. ALL PAGES. Delete Section 01 22 00 in its entirety, and substitute therefor revised Section 01 22 00, Amendment 0002, April 8, 2022.
SUBMITTAL REGISTER
j. ALL PAGES. Delete the Submittal Register in its entirety, and substitute therefor revised Submittal Register, Amendment 0002, April 8, 2022.
SECTION 01 50 02
k. PAGES 1 AND 6. Delete Section 01 50 02 Pages 1 and 6 in their entirety, and substitute therefor revised Section 01 50 02 Pages 1 and 6, Amendment 0002, April 8, 2022.
SECTION 01 53 01
l. ALL PAGES. Delete Section 01 53 01 in its entirety.
SECTION 01 57 19
m. ALL PAGES. Delete Section 01 57 19 in its entirety, and substitute therefor revised Section 01 57 19, Amendment 0002, April 8, 2022.
SECTION 02 21 00
n. PAGES 1, 2, 4, AND 5. Delete Section 02 21 00 Pages 1, 2, 4, and 5 in their entirety, and substitute therefor revised Section 02 21 00 Pages 1, 2, 4, and 5, Amendment 0002, April 8, 2022.
SECTION 02 41 00
o. PAGES 1, 4, 5, AND 6. Delete Section 02 41 00 Pages 1, 4, 5, and 6 in their entirety, and substitute therefor revised Section 02 41 00 Pages 1, 4, 5, and 6, Amendment 0002, April 8, 2022.
SECTION 03 11 14
p. PAGES 1 AND 6. Delete Section 03 11 14 Pages 1 and 6 in their entirety, and substitute therefor revised Section 03 11 14 Pages 1 and 6, SECTION 03 31 00
q. ALL PAGES. Delete Section 03 31 00 in its entirety, and substitute therefor revised Section 03 31 00, Amendment 0002, April 8, 2022.
SECTION 03 41 00
r. PAGES 1 AND 9. Delete Section 03 41 00 Pages 1 and 9 in their entirety, and substitute therefor revised Section 03 41 00 Pages 1 and 9, SECTION 03 41 20
s. ALL PAGES. Delete Section 03 41 20 in its entirety.
SECTION 07 42 13
t. ALL PAGES. Delete Section 07 42 13 in its entirety, and substitute therefor revised Section 07 42 13, Amendment 0002, April 8, 2022.
SECTION 09 97 02
u. ALL PAGES. Delete Section 09 97 02 in its entirety, and substitute therefor revised Section 09 97 02, Amendment 0002, April 8, 2022.
SECTION 31 00 00
v. ALL PAGES. Delete Section 31 00 00 in its entirety, and substitute therefor revised Section 31 00 00, Amendment 0002, April 8, 2022.
SECTION 31 41 16
w. ALL PAGES. Delete Section 31 41 16 in its entirety, and substitute therefor revised Section 31 41 16, Amendment 0002, April 8, 2022.
SECTION 31 62 16
x. ALL PAGES. Delete Section 31 62 16 in its entirety, and substitute therefor revised Section 31 62 16, Amendment 0002, April 8, 2022.
SECTION 32 11 23
y. ALL PAGES. Delete Section 32 11 23 in its entirety, and substitute therefor revised Section 32 11 23, Amendment 0002, April 8, 2022.
SECTION 32 13 13
z. ALL PAGES. Delete Section 32 13 13 in its entirety, and substitute therefor revised Section 32 13 13, Amendment 0002, April 8, 2022.
SECTION 32 31 13
aa. ALL PAGES. Delete Section 32 31 13 in its entirety.
SECTION 32 92 19
ab. ALL PAGES. Delete Section 32 92 19 in its entirety, and substitute therefor revised Section 32 92 19, Amendment 0002, April 8, 2022.
SECTION 33 40 00
ac. ALL PAGES. Delete Section 33 40 00 in its entirety, and substitute therefor revised Section 33 40 00, Amendment 0002, April 8, 2022.
SECTION 33 71 02
ad. ALL PAGES. Delete Section 33 71 02 in its entirety, and substitute therefor revised Section 33 71 02, Amendment 0002, April 8, 2022.
SECTION 35 20 16
ae. ALL PAGES. Delete Section 35 20 16 in its entirety, and substitute therefor revised Section 35 20 16, Amendment 0002, April 8, 2022.
SECTION 35 31 19
af. PAGES 1 and 5. Delete Section 35 31 19 Pages 1 and 5 in their entirety, and substitute therefor revised Section 35 31 19 Pages 1 and 5, ATTACHMENTS: Project Title Page; Schedule of Prices;
Project Table of Contents; Section 00 73 05;
Section 00 73 05 ATTACHMENT D; Section 01 11 00;
Section 01 22 00; Submittal Register;
Section 01 50 02 Pages 1 and 6; Section 01 57 19;
Section 02 21 00 Pages 1, 2, 4, and 5;
Section 02 41 00 Pages 1, 4, 5, and 6;
Section 03 11 14 Pages 1 and 6; Section 03 31 00;
Section 03 41 00 Pages 1 and 9; Section 07 42 13;
Section 09 97 02; Section 31 00 00; Section 31 41 16;
Section 31 62 16; Section 32 11 23; Section 32 13 13;
Section 32 92 19; Section 33 40 00; Section 33 71 02;
Section 35 20 16; and Section 35 31 19 Pages 1 and 5
AMEND. 0002
08 APR 2022
Solicitation No. W912EK22B0001
IOWA RIVER BASIN
CEDAR RIVER
CEDAR RAPIDS, IA
CEDAR RAPIDS FLOOD RISK
MANAGEMENT PROJECT
12TH AVENUE SE ROLLER GATE
CLOSURE STRUCTURE
Construction Solicitation and Specifications
FEBRUARY 2022
US Army Corps of Engineers Rock Island District
96514720193260
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to extend the bid opening date to 04 May 2022 and remove Option A CRANDIC RR Roller Gate Closure Structure from the solictiation and resultant contract. Additional sections and clauses w ere revised or deleted as necessary. Plan Set VOL 302 is no longer applicable.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Apr-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK22B0001
X 9B. DATED (SEE ITEM 11)
22-Feb-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Apr-2022
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D
ROCK ISLAND IL 61201
W912EK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EK22B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 08-Apr-2022 02:00 PM to 04-May-2022 02:00 PM.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
MVR.13 INSTRUCTIONS TO BIDDERS
The Rock Island District has implemented the below procedures for all current bid openings.
Electronic Submission of Bids:
For this IFB Solicitation, the Rock Island District is requiring all electronic bids be submitted via email to the Contracting Officer and Contract Specialist.
Contracting Officer – Elizabeth A. Dennison, email at elizabeth.a.dennison@usace.army.mil Contract Specialist – Bradley J. Grothus, email at bradley.j.grothus@usace.army.mil
In the subject of the e-mail – the Solicitation and Project Name shall be provided. If the email submission is considered large please consider breaking it up into different emails. For example: W912EK22B0001 – Title – Email 1 of 2. If the email size exceeds 41 MB, the Bid shall be sent in more than one email to ensure delivery to the Government POC. The Contracting Officer or Contract Specialist will send an email acknowledging receipt. Please note, the Government Firewall can cause a delay in receipt of emails, so be sure to allow time for the delay.
The Bid Opening is currently scheduled for Wednesday, 04 May 2022 at 2:00 PM CST.
The Contracting Officer and Contract Specialist will begin downloading bids ONE HOUR BEFORE BID OPENING TIME, which is the bid receipt cutoff time.
All bids received after 1:00 PM CST on Wednesday, 04 May 2022 will be considered late.
Audio Teleconference Bid Opening Information:
Bid Opening will be held on Wednesday, 04 May 2022 at 2:00 PM CST. Please use the following call-in information to attend the meeting:
Toll-Free: 844-800-2712 Access Code: 1999 96 2853
Following the conclusion of the bid opening, the Bid Abstract will be uploaded to the SAM.gov website under this solicitation, within 24 hours.
Bid Bonds (Offer Guarantee) should be submitted electronically with the Bid Package.
Per Class Deviation 2020-O0016, Electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates. In addition, a Corporate Seal is not required, the SF 28 need not be sworn and notarized and a written authorization of the release signed by the surety is acceptable in lieu of the notarized authorization of release by the surety. Original Certified Bonds need not be mailto:elizabeth.a.dennison@usace.army.mil mailto:bradley.j.grothus@usace.army.mil submitted at time of bid. The Rock Island District reserves the right to request the Original Certified Bonds, if deemed necessary to verify their authenticity.
The following deviation clauses now apply, in lieu of the corresponding FAR clauses:
• 52.228-11, Pledges of Assets (DEVIATION 2020-O0016), which removes the requirement for the Standard Form 28 to be sworn and notarized.
• 52.228-15, Performance and Payment Bonds—Construction (DEVIATION 2020-O0016), which removes the requirements for seals on Standard Forms.
• 52.228-16, Performance and Payment Bonds—Other than Construction (DEVIATION 2020-O0016), which removes requirements for seals on Standard Forms.
For any Questions please contact:
Contracting Officer – Elizabeth A. Dennison, email elizabeth.a.dennison@usace.army.mil Phone: 309-794-5293
Contract Specialist – Bradley J. Grothus, email bradley.j.grothus@usace.army.mil Phone: 309-794-5021
The following have been modified:
SCHEDULE OF PRICES
ITEM
NO.
SUPPLIES/SERVICES
QUANTITY
UNI
T
UNIT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB XXXXXXXX
0002 Demolition 1 JOB XXXXXXXX $__________
0003 Temporary Traffic Control 1 JOB XXXXXXXX $__________
0004 Protection and Dewatering 1 JOB XXXXXXXX $__________
0005 Clearing, Grubbing, and Stripping 1 JOB XXXXXXXX $__________
0006 ACC Paving and Patching Work 1 JOB XXXXXXXX $__________
0007 PCC Paving and Patching Work 1 JOB XXXXXXXX $__________
0008 Closure Gate (Roller) 1 JOB XXXXXXXX $__________
0009 Seal Water Main Relocation and Casing Pipe Through Sheet Pile
1 JOB XXXXXXXX $__________
0010 Electrical/Communication Utility Work
1 JOB XXXXXXXX $__________
mailto:elizabeth.a.dennison@usace.army.mil mailto:bradley.j.grothus@usace.army.mil
0011 Gate Closure Monolith 1 JOB XXXXXXXX $__________
0012 Gate Storage Monolith 1 JOB XXXXXXXX $__________
0013 Flood Wall Construction 1 JOB XXXXXXXX $__________
0014 Concrete Stairs 1 JOB XXXXXXXX $__________
0015 Pavement Markings 1 JOB XXXXXXXX $__________
0016 Retaining Wall 1 JOB XXXXXXXX $__________
0017 Signage 1 JOB XXXXXXXX $__________
0018 Seeding and Site Restoration 1 JOB XXXXXXXX $__________
0019 Closure Gate Decorative Panels 1 JOB XXXXXXXX $__________
0020 Levee Embankment 850 CY $_________
0021 Structural Excavation 1,686
CY $_________
0022 Concrete Curb and Gutter 826 LF $_________
0023 Concrete Sidewalk 4,738
SF $_________
0024 Metal Sheet Piling 12,950
SF $_________
0025 Metal H-Piling 3,080
LF $_________
0026 Micro Piling 1,730
LF $_________
0027 RCP Storm Sewer 568 LF $_________
0028 Catch Basins 9 EA $_________
0029 Manhole 1 EA $_________
0030 Water Main Distribution 360 LF $_________
0031 Water Main Extended Performance Bond
1 JOB XXXXXXXX $__________
0032 Riprap
0032AA First 500 Tons 500 TN $_________
0032AB Over 500 Tons 228 TN $_________
0033 Bedding Stone
0033AA First 150 Tons 150 TN $_________
0033AB Over 150 Tons 62 TN $_________
0034 Railing 102 LF $_________
0035 River Trail 3,595
SF $_________
TOTAL OF ESTIMATED AMOUNTS
(ITEM NOS. 0001 THROUGH 0035, INCL.) $__________
CY = CUBIC YARD EA = EACH JOB = LUMP SUM
LF = LINEAR FOOT SF = SQUARE FOOT TN = TON
ENSURE UNIT PRICE AND AMOUNT LINES FOR ALL ITEMS ARE COMPLETED.
SECTION 00700 - CONTRACT CLAUSES
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 400 consecutive calendar days for Base Bid. The time stated for completion shall include final cleanup of the premises.
(End of clause)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
WAGE RATES
"General Decision Number: IA20220081 02/25/2022
Superseded General Decision Number: IA20210081
State: Iowa
Construction Types: Heavy and Highway
Counties: Adair, Adams, Allamakee, Appanoose, Audubon, Benton, Black Hawk, Boone, Bremer, Buchanan, Buena Vista, Butler, Calhoun, Carroll, Cass, Cedar, Cerro Gordo, Cherokee, Chickasaw, Clarke, Clay, Clayton, Clinton, Crawford, Dallas, Davis, Decatur, Delaware, Des Moines, Dickinson, Dubuque, Emmet, Fayette, Floyd, Franklin, Fremont, Greene, Grundy, Guthrie, Hamilton, Hancock, Hardin, Harrison, Henry, Howard, Humboldt, Ida, Iowa, Jackson, Jasper, Jefferson, Johnson, Jones, Keokuk, Kossuth, Lee, Linn, Louisa, Lucas, Lyon, Madison, Mahaska, Marion, Marshall, Mills, Mitchell, Monona, Monroe, Montgomery, Muscatine, O'Brien, Osceola, Page, Palo Alto, Plymouth, Pocahontas, Polk, Pottawattamie, Poweshiek, Ringgold, Sac, Shelby, Sioux, Story, Tama, Taylor, Union, Van Buren, Wapello, Warren, Washington, Wayne, Webster, Winnebago, Winneshiek, Woodbury, Worth and Wright Counties in Iowa.
HIGHWAY CONSTRUCTION PROJECTS and HEAVY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 02/25/2022
* SUIA2021-001 10/18/2017
Rates Fringes
Carpenter & Piledrivermen
ZONE 1......................$ 29.27 14.58
ZONE 2......................$ 27.48 14.73
ZONE 3......................$ 27.48 14.73
ZONE 4......................$ 26.85 12.30
ZONE 5**....................$ 25.75 10.70
CONCRETE FINISHER
ZONE 1......................$ 29.05 7.60
ZONE 2......................$ 29.05 7.60
ZONE 3......................$ 29.05 7.60
ZONE 4......................$ 25.95 6.95
ZONE 5......................$ 24.90 6.95
ELECTRICIAN (STREET AND
HIGHWAY LIGHTING AND TRAFFIC
SIGNALS)
ZONE 1, 2, AND 3............$ 30.40 9.80
ZONE 4......................$ 29.10 8.80
ZONE 5......................$ 26.95 7.80
IRONWORKER (SETTING OF
STRUCTURAL STEEL)
ZONE 1......................$ 32.25 11.60
ZONE 2......................$ 30.16 12.05
ZONE 3......................$ 30.16 12.05
ZONE 4......................$ 28.00 11.15
ZONE 5**....................$ 26.15 10.30
LABORER
ZONE 1, 2 AND 3
GROUP A....................$ 24.08 10.65
GROUP AA...................$ 26.46 10.65
GROUP B....................$ 22.23 10.65
GROUP C....................$ 19.15 10.65
ZONE 4
GROUP A....................$ 21.37 9.83
GROUP B....................$ 20.05 9.83
GROUP C....................$ 17.17 9.83
ZONE 5
GROUP A....................$ 21.77 8.38
GROUP B....................$ 19.27 8.38
GROUP C....................$ 18.42 8.38
POWER EQUIPMENT OPERATOR
ZONE 1
GROUP A....................$ 33.25 15.50
GROUP B....................$ 31.70 15.50
GROUP C....................$ 29.20 15.50
GROUP D....................$ 29.20 15.50
ZONE 2
GROUP A....................$ 32.55 15.50
GROUP B....................$ 30.95 15.50
GROUP C....................$ 28.40 15.50
GROUP D....................$ 28.40 15.50
ZONE 3
GROUP A....................$ 30.45 25.90
GROUP B....................$ 28.65 25.90
GROUP C....................$ 27.65 25.90
GROUP D....................$ 27.65 25.90
ZONE 4
GROUP A....................$ 31.35 13.85
GROUP B....................$ 30.21 13.85
GROUP C....................$ 28.13 13.85
GROUP D....................$ 28.13 13.85
ZONE 5
GROUP A....................$ 28.52 11.50
GROUP B....................$ 27.48 11.50
GROUP C....................$ 25.75 11.50
GROUP D....................$ 24.75 11.50
TRUCK DRIVER (AND PAVEMENT
MARKING DRIVER/SWITCHPERSON)
ZONE 1......................$ 25.25 11.45
ZONE 2
.................................$ 25.25 11.45
ZONE 3......................$ 25.25 11.45
ZONE 4......................$ 25.00 7.50
ZONE 5
.................................$ 23.05 7.50
ZONE DEFINITIONS
ZONE 1 The Counties of Polk, Warren, and Dallas for all Crafts, and Linn County Carpenters only.
ZONE 2 The Counties of Dubuque for all Crafts and Linn County for all Crafts except Carpenters.
ZONE 3 The Cities of Burlington (including West Burlington), Clinton, Fort Madison, Keokuk, and Middleton (including the Iowa Army Ammunition Plant) and Muscatine (and abutting municipalities of any such cities).
ZONE 4 Story, Black Hawk, Cedar, Jasper, Jones, Jackson, Louisa, Madison, and Marion Counties; Clinton County (except the City of Clinton), Johnson County, Muscatine County (except the City of Muscatine), the City of Council Bluffs, Lee County and Des Moines County.
ZONE 5 All areas of the state not listed above.
LABORER CLASSIFICATIONS - ALL ZONES
GROUP AA - {Skilled pipelayer (sewer, water and conduits) and tunnel laborers; asbestos abatement worker} (Zones 1, 2 and 3).
GROUP A - Carpenter tender on bridges and box culverts; curb machine (without a seat); deck hand; diamond & core drills;
drill operator on air tracs, wagon drills and similar drills; form setter/stringman on paving work; gunnite nozzleman; joint sealer kettleman; laser operator;
powderman tender; powderman/blaster; saw operator;
{pipelayer (sewer, water, and conduits); sign erector*;
tunnel laborer; asbestos abatement worker (Zones 4 and 5)}, sign erector.
GROUP B - Air, gas, electric tool operator; barco hammer;
carpenter tender; caulker; chain sawman; compressor (under 400 cfm); concrete finisher tender; concrete processing materials and monitors; cutting torch on demolition; drill tender; dumpmen; electric drills; fence erectors; form line expansion joint assembler; form tamper; general laborer;
grade checker; handling and placing metal mesh, dowel bars, reinforcing bars and chairs; hot asphalt laborer;
installing temporary traffic control devices;
jackhammerman; mechanical grouter; painter (all except stripers); paving breaker; planting trees, shrubs and flowers; power broom (not self-propelled); power buggyman;
rakers; rodman (tying reinforcing steel); sandblaster;
seeding and mulching; sewer utility topman/bottom man;
spaders; stressor or stretcherman on pre or post tensioned concrete; stringman on re/surfacing/no grade control;
swinging stage, tagline, or block and tackle; tampers;
timberman; tool room men and checkers; tree climber; tree groundman; underpinning and shoring caissons over twelve feet deep; vibrators; walk behind trencher; walk behind paint stripers; walk behind vibrating compactor; water pumps (under three inch); work from bosun chair.
GROUP C - Scale weigh person; traffic control/flagger, surveillance or monitor; water carrier.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS - ALL ZONES
GROUP A - All terrain (off road) forklift; asphalt breakdown roller (vibratory); asphalt laydown machine; asphalt plant;
asphalt screed; bulldozer (finish); central mix plant;
concrete pump; crane; crawler tractor pulling scraper;
directional drill (60,000 (lbs) pullback and above);
dragline and power shovel; dredge engineer; excavator (over � cu. yd.); front end loader (4 cy and over); horizontal boring machine; master mechanic; milling machine (over 350 hp); motor grader (finish); push cat; rubber tired backhoe (over � cu. yd.); scraper (12 cu. yd. and over or finish);
Self-propelled rotary mixer/road reclaimer; sidebroom tractor; slipform portland concrete paver; tow or push boat; trenching machine (Cleveland 80 or similar) GROUP B - Articulated off road hauler, asphalt heater/planer;
asphalt material transfer vehicle; asphalt roller; belt loader or similar loader; bulldozer (rough); churn or rotary drill; concrete curb machine; crawler tractor pulling ripper, disk or roller; deck hand/oiler;
directional drill (less than 60,000 (lbs) pullback);
distributor; excavator (1/2 cu. yd. and under); form riding concrete paver; front end loader (2 to less than 4 cu.
yd.); group equipment greaser; mechanic; milling machine (350 hp. and less); paving breaker; portland concrete dry batch plant; rubber tired backhoe (1/2 cu. yd. and under);
scraper (under 12 cu. yd.); screening, washing and crushing plant (mobile, portable or stationary); shoulder machine;
skid loader (l cu. yd. and over); subgrader or trimmer;
trenching machine; water wagon on compaction.
GROUP C - Boom & winch truck; concrete spreader/belt placer;
deep wells for dewatering; farm type tractor (over 75 hp.)
pulling disc or roller; forklift; front end loader (under 2
cu. yd.); motor grader (rough); pile hammer power unit;
pump (greater than three inch diameter); pumps on well points; safety boat; self-propelled roller (other than asphalt); self-propelled sand blaster or shot blaster, water blaster or striping grinder/remover; skid loader (under 1 cu. yd.); truck mounted post driver.
GROUP D - Boiler; compressor; cure and texture machine; dow box; farm type or utility tractor (under 75 hp.) pulling disk, roller or other attachments; group greaser tender;
light plants; mechanic tender; mechanical broom; mechanical heaters; oiler; pumps (under three inch diameter); tree chipping machine; truck crane driver/oiler.
** CARPENTERS AND PILEDRIVERMEN, or IRONWORKERS (ZONE 5) Setting of structural steel; any welding incidental to bridge or culvert construction; setting concrete beams.
* ADDED CRAFT - SIGN ERECTOR
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
(End of Summary of Changes)
B5CEDRPD202103 - Cedar Rapids FRM 12th Avenue Road Closure Cedar Rapids, IA SCHEDULE OF PRICES
Solicitation No. W912EK22B0001
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB XXXXXXXX $
0002 Demolition 1 JOB XXXXXXXX $
0003 Temporary Traffic Control 1 JOB XXXXXXXX $
0004 Protection and Dewatering 1 JOB XXXXXXXX $
0005 Clearing, Grubbing, and Stripping 1 JOB XXXXXXXX $
0006 ACC Paving and Patching Work 1 JOB XXXXXXXX $
0007 PCC Paving and Patching Work 1 JOB XXXXXXXX $
0008 Closure Gate (Roller) 1 JOB XXXXXXXX $
0009 Seal Water Main Relocation and Casing Pipe Through Sheet Pile
1 JOB XXXXXXXX $
0010 Electrical/Communication Utility Work 1 JOB XXXXXXXX $
0011 Gate Closure Monolith 1 JOB XXXXXXXX $
0012 Gate Storage Monolith 1 JOB XXXXXXXX $
0013 Flood Wall Construction 1 JOB XXXXXXXX $
0014 Concrete Stairs 1 JOB XXXXXXXX $
0015 Pavement Markings 1 JOB XXXXXXXX $
0016 Retaining Wall 1 JOB XXXXXXXX $
0017 Signage 1 JOB XXXXXXXX $
0018 Seeding and Site Restoration 1 JOB XXXXXXXX $
0019 Closure Gate Decorative Panels 1 JOB XXXXXXXX $
Cedar Rapids, IA SCHEDULE OF PRICES (continued)
Solicitation No. W912EK22B0001
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0020 Levee Embankment 850 CY $ $
0021 Structural Excavation 1,686 CY $ $
0022 Concrete Curb and Gutter 826 LF $ $
0023 Concrete Sidewalk 4,738 SF $ $
0024 Metal Sheet Piling 12,950 SF $ $
0025 Metal H-Piling 3,080 LF $ $
0026 Micro Piling 1,730 LF $ $
0027 RCP Storm Sewer 568 LF $ $
0028 Catch Basins 9 EA $ $
0029 Manhole 1 EA $ $
0030 Water Main Distribution 360 LF $ $
0031 Water Main Extended Performance Bond
1 JOB XXXXXXXX $
0032 Riprap
0032AA First 500 Tons 500 TN $ $
0032AB Over 500 Tons 228 TN $ $
0033 Bedding Stone
0033AA First 150 Tons 150 TN $ $
0033AB Over 150 Tons 62 TN $ $
Cedar Rapids, IA SCHEDULE OF PRICES (continued)
Solicitation No. W912EK22B0001
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0034 Railing 102 LF $ $
0035 River Trail 3,595 SF $ $
CY = CUBIC YARD EA = EACH JOB = LUMP SUM
LF = LINEAR FOOT SF = SQUARE FOOT TN = TON
ENSURE UNIT PRICE AND AMOUNT LINES FOR ALL ITEMS ARE COMPLETED.
TOTAL OF ESTIMATED AMOUNTS
(ITEM NOS. 0001 THROUGH 0035, INCL.)
Solicitation No. W912EK22B0001
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 73 05 SPECIAL CONTRACT REQUIREMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 22 00 PRICE AND PAYMENT PROCEDURES
01 32 16 CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 50 02 TEMPORARY CONSTRUCTION CONTROLS
01 53 00 TEMPORARY RETAINING STRUCTURES
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 21 00 SURVEYS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 11 14 CONCRETE FORMWORK
03 15 14 JOINTS IN CONCRETE
03 15 15 GROUT AND ANCHOR BOLTS
03 20 01 CONCRETE REINFORCEMENT
03 31 00 CAST-IN-PLACE STRUCTURAL CONCRETE
03 41 00 PLANT-PRECAST STRUCTURAL CONCRETE
DIVISION 04 - MASONRY
04 43 00 STONE MASONRY - 12TH AVENUE CLOSURE
DIVISION 05 - METALS
05 50 14 STRUCTURAL METAL FABRICATIONS
05 50 15 CIVIL WORKS FABRICATIONS - 12TH AVENUE CLOSURE
05 59 20 FRACTURE CRITICAL HYDRAULIC STEEL STRUCTURES FABRICATION
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 42 13 ALUMINUM COMPOSITE PANELS
DIVISION 09 - FINISHES
09 97 02 PAINTING: HYDRAULIC STRUCTURES
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 22 GEOTEXTILES - 12TH AVENUE CLOSURE
31 09 06 VIBRATION MONITORING
31 41 16 METAL SHEET PILING
31 62 16 STEEL H-PILES
PROJECT TABLE OF CONTENTS Page 1 AMEND. 0002
08 APR 2022
31 63 33 MICROPILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE BASE AND SURFACE COURSES
32 12 10 TACK COAT - 12TH AVENUE CLOSURE
32 12 16 HOT-MIX ASPHALT (HMA) PAVING - 12TH AVENUE CLOSURE
32 13 13 CONCRETE PAVEMENTS, SLABS, SIDEWALKS, AND CURB AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 31 19 DECORATIVE METAL FENCES AND GATES - 12TH AVENUE CLOSURE
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING - 12TH AVENUE CLOSURE
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING - 12TH AVENUE CLOSURE
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 16 CLOSURE GATES
35 31 19 STONE PROTECTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2 AMEND. 0002
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 73 05
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 ADDITIONAL COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
1.4 UNANTICIPATED HAZARDOUS MATERIAL
1.5 COORDINATION WITH OTHERS
1.6 ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
1.6.1 E-Verify Program
1.7 ACTIVITY REGULATIONS FOR CONTRACTOR ACCESS AND USE OF PREMISES
1.8 EVALUATION OF SUBDIVIDED ITEMS
1.9 VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS
1.10 SUSTAINABILITY
1.11 PERMITS
1.12 CONDITION OF EXISTING STRUCTURES, ROADWAYS, LEVEES, AND OTHER
FACILITIES
1.13 U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH MANUAL (EM 385-1-1)
1.14 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.15 PROGRESS MEETINGS
1.16 INSPECTION
1.17 DAMAGE TO WORK
1.18 SPECIAL SAFETY REQUIREMENTS
1.19 LOCATION OF PARKING, STAGING, AND STORAGE AREAS
1.20 ELECTRICAL POWER LINES
1.21 BARRICADES AND WARNING SIGNS
1.22 ONE CALL SYSTEMS FOR EXCAVATORS
1.23 ADDITIONAL PHYSICAL DATA CLAUSE INFORMATION
1.24 DELAYS DUE TO HIGH WATER
1.24.1 12th Avenue Closure
1.24.2 Deleted
1.25 HIGH WATER ACTION PLAN
1.25.1 12th Avenue Closure
1.25.2 Deleted
1.26 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.27 IOWA SALES AND USE TAX EXEMPTION CERTIFICATE
1.28 PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS
1.29 AVAILABILITY AND USE OF UTILITY SERVICES
1.30 WORKING IN THE VICINITY OF STRUCTURES AND UTILITY CROSSINGS
1.31 DELETED
1.32 ATTACHMENTS
PART 2 PRODUCTS
PART 3 EXECUTION
ATTACHMENTS:
DOCUMENT 00 73 05 Page 1 AMEND. 0002
08 APR 2022
ATTACHMENT A - Flood Contingency Plan Form
ATTACHMENT B - Cedar River Temporary Flood Mitigation System
ATTACHMENT C - Deleted
ATTACHMENT D - Iowa DNR Floodplain Development Permit and City of Cedar Rapids Floodplain Development Permit
ATTACHMENT E - Deleted
-- End of Section Table of Contents --
DOCUMENT 00 73 05 Page 2 AMEND. 0002
08 APR 2022
SECTION 00 73 05
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 1110-1-8 (2016) Construction Equipment Ownership and Operating Expense Schedule
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.106 Working Over or Near Water
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Company Enrollment in E-Verify; G, SO
Form I-9; G, SO
**NOTE: To protect the privacy of the Contractor, all Contractor employees, and all subcontractor employee's security information, submit with a cover page stating the Contract Number (e.g., W912EK21CXXXX), Contract Title, and the Contractor's point of contact information in a sealed envelope/container and mail to:
Security and Law Enforcement Office U.S. Army Corps of Engineers Rock Island District 1500 Rock Island Drive Rock Island, Illinois 61201
Permits; G
Pre-Construction Condition Survey; G
High Water Action Plan; G
Structures and Utility Crossings Plan; G
SD-11 Closeout Submittals
DOCUMENT 00 73 05 Page 3 AMEND. 0002
Post-Construction Condition Survey; G
1.3 ADDITIONAL COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
In addition to the requirements of Contract Clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, comply with the following requirements:
a. Complete Base Bid Phase 1 work no later than November 1, 2022. The closure of 12th Avenue to traffic as part of Base Bid Phase 2 work is prohibited prior to July 5, 2022. A maximum of five calendar days will be allowed for temporary adjustments to the City's trail detour to complete Phase 3 work, reference sheet GC100 in the Base Bid plan set for delineation of phases.
b. Clearing of trees or disturbance of areas where roosting occurs or is showing signs of or having nests occupied is prohibited when bald eagles or red-shouldered hawks are present in the area. There are active nest(s) near the Cedar Lake along the Cedar River. If any nesting activity is observed, construction activities within 660 feet of the nest will be prohibited. Nesting activity may be anticipated between 15 January and 01 July, however, these dates are not all inclusive. Coordinate with the U.S. Fish and Wildlife Service and Iowa Department of Natural Resources through the Contracting Officer prior to any tree cutting.
c. In accordance with the "Bald and Golden Eagle Protection Act" and "Migratory Bird Treaty Act," limit construction activity near bald eagle roosting sites during the winter months unless otherwise approved. Conduct operations in a manner that minimizes the disturbance to the bald eagles. The Bald Eagle Management Guidelines and Conservation Measures found at http://www.fws.gov/midwest/MidwestBird/EaglePermits/baeatakepermit.html may be used to determine what constitutes a disturbance and to find information on minimizing impact to bald eagles. May also contact the U.S. Fish and Wildlife Service or appropriate state Department of Natural Resources for assistance.
d. Clearing of trees equal to or greater than 3 inches with exfoliating bark, cracks, crevices, cavities, or peeling bark is prohibited between April 1 and September 30 inclusive (during the Northern Long-Eared Bat summer maternity season and during the Indiana Bat breeding and rearing season). Coordinate with the U.S. Fish and Wildlife Service and Iowa Department of Natural Resources through the Contracting Officer prior to any tree cutting.
1.4 UNANTICIPATED HAZARDOUS MATERIAL
If a hazardous material(s) is encountered where it was not indicated, stop work and immediately notify the Contracting Officer of the located potential hazardous material(s) found. Upon direction from the Contracting Officer, the Contractor may be required to conduct sampling and testing of these suspect material(s) in accordance with an Industrial Hygienist's recommended procedures and the Contract Specification Section(s) required that will be provided to the Contractor as a Modification to the Contract.
Payment for this additional work will be handled under the Contract Clause
52.243-4 CHANGES.
DOCUMENT 00 73 05 Page 4 AMEND. 0002
08 APR 2022
1.5 COORDINATION WITH OTHERS
Schedule and coordinate operations affecting other Contractors, Government Personnel, utilities, and/or property occurring within the work limits.
Accomplish with lead time sufficient for coordination of all involved parties as necessary for timely completion of each Contract feature. At a minimum, establish coordination with each of the following point(s) of contact, as required:
a. Area Engineer Central Area Office U.S. Army Corps of Engineers 1910 E. Kimberly Road, Suite 105 Davenport, IA 52807 Telephone No.: 563-386-0572 (Collect calls not accepted.)
b. Mediacom Telephone No.: 319-395-9699 (Collect calls not accepted.)
c. IMUA Telephone No.: 318-360-5122 (Collect calls not accepted.)
d. Century Link/TerraTech Telephone No.: 847-812-2247 (Collect calls not accepted.)
e. Fiber-Utilites/ICN Telephone No.: 319-558-7427 (Collect calls not accepted.)
f. MidAmerican Telephone No.: 319-289-5162 (Collect calls not accepted.)
g. Windstream Telephone No.: 319-538-1985 (Collect calls not accepted.)
h. Alliant Telephone No.: 319-786-1921 (Collect calls not accepted.)
i. ITC Midwest Telephone No.: 319-297-6762 Telephone No.: 319-297-6765 ITC-Field Supervisor Telephone No.: 641-328-9894 (Collect calls not accepted.)
j. Im On Telephone No.: 319-261-4689 (Collect calls not accepted.)
k. City of Cedar Rapids Telephone No.: 319-286-5027 (Collect calls not accepted.)
DOCUMENT 00 73 05 Page 5 AMEND. 0002
l. City of Cedar Rapids Water Department Telephone No.: 319-286-5999 Telephone No.: 319-286-5773 (Collect calls not accepted.)
m. City of Cedar Rapids Planning Engineer Department Telephone No.: 319-286-5745 (Collect calls not accepted.)
n. City of Cedar Rapids Development Services Department Telephone No.: 319-286-5363 (Collect calls not accepted.)
1.6 ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
1.6.1 E-Verify Program
Pre-screen candidates using the E-Verify Program website ( http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. Ensure that the candidate has two valid forms of Government-issued identification prior to enrollment to ensure the correct information is entered into the E-Verify system. Submit documentation of company enrollment in E-Verify, via a print screen of the company profile within the E-Verify system, to the Security Office no later than 3 business days after receiving the Notice to Proceed.
*When Contracts are with individuals, the individuals will be required to complete a Form I-9, give/coordinate Employment Eligibility Verification with the Contracting Officer. This Form will be provided to the Security Office after Notice to Proceed is received.
1.7 ACTIVITY REGULATIONS FOR CONTRACTOR ACCESS AND USE OF PREMISES
Follow all current Army Security Regulations concerning strict visitor control and preservation of all Government assets. Immediately report all security concerns to the Contracting Officer, who will notify the Security Office.
Work may be affected by the following Force Protection Conditions levels:
FPCON NORMAL
When there is no discernible terrorist activity. Routine security posture.
FPCON ALPHA
When there is a general threat of possible threat activity against personnel and the installation, or both. There will be a limited impact on normal operations.
FPCON BRAVO
When there is an increased or more predictable threat. There will be an impact on normal operations but it will not cause undue
DOCUMENT 00 73 05 Page 6 AMEND. 0002 hardship to personnel, substantially affect operational capabilities, or cause aggravated relations with local authorities and civilians.
FPCON CHARLIE
When an incident occurs or intelligence is received indicating imminent terrorist action. If this lasts for more than a short period it will probably create hardships for personnel and affect the peacetime activities of units and personnel.
FPCON DELTA
When a terrorist attack has occurred or intelligence indicates likely terrorist action against a specific location. This is normally declared as a localized warning and requires implementation of mandatory security measures. This cannot be sustained for an extended period without causing significant hardships for personnel and affecting the peacetime activities of units and personal.
FPCON NORMAL through FPCON BRAVO will not affect the work. FPCON CHARLIE and FPCON DELTA will affect work. FPCON CHARLIE will subject the Contractor to a higher degree of inspection and may not be able to work on-site for short periods of time as decreed by the District Security Officer. FPCON DELTA as determined by the District Security Officer will close the site down and the Contractor will not be able to work on the site.
1.8 EVALUATION OF SUBDIVIDED ITEMS
Bid Item Nos. 0032 and 0033 subdivided into two or more estimated quantities and separately priced. The Government will evaluate each of these items on the basis of total price of the subitems.
1.9 VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS
This variation in estimated quantities clause is applicable only to Bid Item Nos. 0032 and 0033.
a. Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in Contract unit price.
b. Where the actual quantity of work performed for Bid Item Nos. 0032 and 0033 is less than 85 percent of the quantity of the first sub-item listed under such item, it will be paid at the Contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment will be made in accordance with Contract Clause 52.211-18, VARIATION IN ESTIMATED QUANTITIES.
c. If the actual quantity of work performed under Bid Item Nos. 0032 and 0033 exceeds 115 percent or is less than 85 percent of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or…