A22 - W912EK21T0013 Amendment 0003.pdf
PDF 202 KB Posted
- Attached to
- Heavy Duty Freestanding Jib Cranes to Include Electric Chain Hoists with Motorized Trolley
- Solicitation number
- W912EK21T0013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22 - W912EK21T0013 Amendment 0002.pdf | ||
| A22 - W912EK21T0013 Amendment 0001.pdf | ||
| A22 - Solicitation W912EK21T0013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0003 to solicitation W912EK21T0013 is to
1. Provide additional answ ers to contractor questions
2. Update the Statement of Work.
3. All other terms and conditions of solicitation W912EK21T0013 remain applicable and unchanged. The due date for receipt of quotes remains February 16, 2021 a 2:00 PM Central Time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK21T0013
X 9B. DATED (SEE ITEM 11)
03-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Feb-2021
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D
ROCK ISLAND IL 61201
W912EK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EK21T0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
CONTRACTOR Q&A
Contractor question and answers:
Q1: What is the definition of “perfect coat chain”?
A1: A coating that has a sleeve or something else to prevent corrosion due to the outside elements.
Q2: What is the application description that this jib crane will be used in?
A2: To Hoist Rescue Boats in and out of water on the Mississippi River
Q3: Will this jib crane be used to lift objects from water?
A3: Yes, please see question two.
Q4: Will lifted items be moved by waves?
A4: Due to the environment the cranes will be used in, it is possible that items being listed or lowered will be moved by waves.
Q5: Will lifted items be subjected to currents?
A5: Being in the Mississippi River, it is possible that the lifted items may be subjected to river currents.
Q6: Will jib crane be dragging items over the ground or literally through the water?
A6: The cranes will not be dragging items over the ground or through the water.
Q7: Is there a requirement for a “boom lock” to prevent the boom from moving with wind?
A7: Yes, a boom lock is required.
Q8: The lifting speed of 40 FPM is not available. It is suspected that the 40 FPM requirement is for the “trolley” travel speed?
A8: 40 FPM was a misprint. It should be 14 FPM. The Statement of Work has been corrected to address this error.
Q9: The hoist lifting speed available is either 7 FPM, 14 FPM or 28 FPM.
A9: Please see question eight and the revised Statement of Work.
Q10: Are both the hoist and trolley speeds to be “single-speed” or “two-speed”?
A10: A single speed trolley is sufficient.
Q11: We recommend that the pushbutton pendant station provided be attached to an independent festooned system installed along the jib crane boom and not the hoist/trolly unit………is this acceptable?
A11: Yes, this is acceptable.
Q12: Does it need a step down transformer if rated for 460v-3-60 power? Is the supplied voltage not 460v-3-60?
A12: A step down transformer is not required. The supplied voltage at the Lock and Dam sites is typically 480 V/ 800 amp service.
Q13: Since the “suspender T” is mentioned, I know that they are looking for a Harrington Hoist. With that information, it causes a couple of concerns with the specifications. See below:
A13: Suspender T has been removed from the requirement. There is no brand name requirement.
Q14: The jib has 16’ HUB. This would only require 15’ of lift unless the jib is mounted on a platform, roughly 15’ above the ground.
A14: This Is height under the boom (HUB) which will be lifting life rescue boats out of the water 15 ft from Lock wall to the water or more depending on pool level. The Government requires a 30 ft lift.
Q15: Lifting speed: 40 fpm. 40 FPM is not a lifting speed option. Choose 7,14, or 28. 40 FPM will be the TROLLEY speed option.
A15: That is correct Lifting speed shall be 14 and the trolley speed will be 40 FPM
Q16: With 30’ of lift, this requires a steel chain container. At 15’ (see above), we can do canvas.
A16: Canvas requirement has been removed from the specifications
Q17: Standard pendant L-=15 ft. Just verify. This can be whatever it take to get to the operator.
A17: Correct.
Q18: 30 ft Power supply. This will be included in the “C-Track” festoon in paragraph b. There’s no need for the extra cord.
A18: The Government is not removing this requirement.
Q19: Do we need to include installation of the jib cranes?
A19: The Government will handle installation.
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
STATEMENT OF WORK
1. Description of Purchase: The contractor is to provide three (3) each, heavy duty freestanding jib cranes to include three (3) each 2 ton electric chain hoists with motorized trolley.
One (1) each to be delivered to Lock and Dam 18, Gladstone, IL Two (2) each to be delivered to Lock and Dam 21, Quincy, IL.
All specifications listed below are the minimum requirements unless otherwise listed with a range or maximum limit. The offeror is to quote the latest and most current model.
Units are to be inspected prior to delivery, crated and ready to be installed.
Each unit is to include (2) sets of Printed Operator, Repair, and Parts Manuals.
Heavy Duty Freestanding Jib Crane
a. Basic Specifications:
• 2 Ton Capacity.
• Span: 14 Ft
• Overall Height: 17 Ft.-4 In.
• Height Under Boom: 16 Ft.
• Outdoor Epoxy Paint
• Festooning and Tagline Kit
• Include all Necessary Bearing Enclosures for Outdoor use with Zinc Plated hardware.
• Provide steel mounted Baseplate template for install on 7’X7’X 4’ foundation.
• Anchor Bolts for installation.
b. Motorized Boom
• Outdoor Rated Gear Motor
• Perfect Coat Chain
• Chain Driven with Reducer
• Controls with NEMA 4 enclosure w/ mainline contactor
• VFD Crane Control
• Through the door disconnect
• Step down voltage transformer
• Complete system fuse protection
• Bottom entry collector assembly
• Galvanized `C’ track flat cable festooning for hoist power and control
c. 2 Ton Electric Chain Hoist with Motorized Trolley:
• 2-ton capacity
• 30 ft lift
• 460V-3ph-60Hz power supply
• Lifting speed: 14 fpm
• Suspender T
• 6.03-7.02 in flange range
• Canvas chain container
• Standard pendant L-=15 ft.
• 30 ft Power supply
• UL listed
2. Inspection. Units are to be inspected upon delivery for flaws and/or defects that may have occurred from the manufacture or during shipping. Units will be evaluated to ensure they meet all the specifications within this contract.
Mississippi River Project Office reserves the right to decline any product that doesn’t meet the specification herein or if flaws and/or defects are observed when delivered.
All requirements are to be delivered 30 days after award. Actual date will be set at time of award.
Lock and Dam 18 2044 Township, RD 900 East Gladstone, IL 61437
Lock and Dam 21 909 W. Lock and Dam Road Quincy, IL 62305
Offeror is to complete the schedule of prices and include technical information on the products in which they are offering.