W912EK21R0030 Drawings.pdf
PDF 9 MB Posted
- Attached to
- Mississippi River Basin, Lock 19, Keokuk, Iowa, PLC Repairs and Hydraulic Cylinder Replacement
- Solicitation number
- W912EK21R0030
About this file
This solicitation package includes drawings and specifications for repairs and replacements at Lock 19 on the Mississippi River in Keokuk, Iowa. The work includes replacing the programmable logic controller system, hydraulic cylinders for the miter gates and Tainter valves, and site restoration. The U.S. Army Corps of Engineers Rock Island District is the contracting agency. Drawings show existing conditions, demolition plans, and details for new hydraulic and electrical systems. Specifications describe requirements for fabrication and installation of hydraulic cylinders, programmable logic controller programming, control panel interfaces, security access, and communications infrastructure. The contractor must provide all equipment, wiring, programming and commissioning for a fully functional lock control system, with coordination of outages and a commissioning plan.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
APPROVAL RECOMMENDED BY:
DATE
DATE
DATE
DATE
DATE
GEOTECHNICAL BRANCHCHIEF,
DESIGN BRANCHCHIEF,
TECHNICAL SERVICES BRANCHCHIEF,
ENGINEERING & CONSTRUCTION DIVISIONCHIEF,
HYDROLOGY & HYDRAULICS BRANCHCHIEF, OF ALL DRAWINGS IN THIS SET.
SIGNATURES INDICATE OFFICIAL RECOMMENDATION
EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
DOCUMENTS WITHIN THE SCOPE OF THEIR
INDIVIDUALS APPEAR ON THESE PROJECT
SIGNATURES AND REGISTRATION DESIGNATIONS OF
DISTRICT CORPS OF ENGINEERS. THE INITIALS OR
THIS PROJECT WAS DESIGNED BY THE ROCK ISLAND
of Engineers
US Army Corps
A N
S I
X
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
W E
K
R
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
IC
T
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
PLC REPAIRS AND HYDRAULIC CYLINDER REPLACEMENT
KEOKUK, IA
LOCK 19
MISSISSIPPI RIVER BASIN
W912EK21R0030
ROCK ISLAND DISTRICT
J .B
A R
T E
K
C
V E
R S
H E
E T
G-001
M .B
R O
W N
J
B A
R T
B
M R
L D
A .U
N E
R
L
®of Engineers
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
S
N
S I
D
S O
L
IC
IT
A
T
IO
N
P L
C R
E P
A
IR
S A
N D
H Y
D R
A U
L
IC
C Y
L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
/2
R O
C K
I S
L A
N D
IL
L
IN
IS
C K
I S
L A
N D
D
IS
T R
.B
A R
T
IN
D
E X
A N
D G
E N
E R
A L
N O
T E
S
G-002
M .B
R O
W N
J B
A R
T
M
R L
D
A .U
N E
R
W
E K
R
MATERIAL SECHEDULEE-602
DIAGRAM - LOCK CONTROLS FLOW CHARTE-601
SITE PLAN - CONTROL SYSTEM & FIBER OPTIC COMMUNICATIONE-101
GENERAL ELECTRICAL NOTESE-001
ELECTRICAL
DETAILSM-515
DETAILSM-512
DETAILSM-511
DETAILSM-510
DETAILSM-507
DETAILSM-506
DETAILSM-505
DETAILSM-503
DETAILSM-502
DETAILSM-501
SECTION - CARDANIC RINGM-301
PLAN - CARDANIC RINGM-101
PLAN - TAINTER VAVLE CYLINDERM-105
PLAN - MITER GATER CYLINDERM-101
MECHNICAL
SITE PLAN - EXISTING TAINTER VAVLE WELLG-106
SITE PLAN - EXISTING MITER GATE MACHINERY ROOMG-105
SITE PLAN - TAINTER VAVLE - UPSTREAMG-104
SITE PLAN - MITER GATE AND TAINTER VAVLE - DOWNSTREAMG-103
SITE PLAN G-102
LOCATION PLAN AND VICINITY MAPG-101
INDEX AND GENERAL NOTES G-002
COVER SHEETG-001
GENERAL
SHEET TITLESHEET ID
SHEET INDEX
L O
C K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
GENERAL NOTES
CORRESPONDING REPLACEMENT HYDRAULIC EQUIPMENT IS ON-SITE.
DO NOT TAKE ANY EXISTING HYDRAULIC EQUIPMENT OUT OF SERVICE UNTIL 15.
NOT ALL EXISTING UTILITIES ARE SHOWN ON THE DRAWINGS.14.
SHALL BE REPAIRED TO PRE-CONSTRUCTION CONDITIONS.
WATERLINES, SANITARY SEWER LINES AND ANY OTHER UTILITIES & FACILITIES
CONTRACTOR CAUSED DAMAGE TO STRUCTURES, ROADWAYS, PARKING LOTS, 13.
TO REUSE EXISTING.
"REPLACE" INDICATES REMOVE AND NOT REUSE EXISTING. "REINSTALL" INDICATES 12.
CONDUCTORS SHALL BE AT THE CONTRACTOR'S EXPENSE.
THE REFERENCE DRAWINGS. IMMEDIATE RESTORATION OF DAMAGED ELECTRICAL
BANKS. EXISTING ELECTRICAL LINES MAY VARY FROM THE LOCATIONS SHOWN ON
ELECTRICAL CONDUITS BEFORE REPLACEMENT WITH NEW CONDUCTORS IN DUCT
THE CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE THE EXISTING EMBEDDED 11.
PERIOD. SEE SPECIFICATION SECTION 00 73 05 FOR CLOSURE DATES.
OR PLC SYSTEM FROM SERVICE IF PERFORMING WORK OUTSIDE OF CLOSURE
NOTIFY CONTRACTING OFFICER 15 DAYS PRIOR TO REMOVING ANY TAINTER VALVE 10.
TO BE DISPOSED OF AFTER CONSTRUCTION COMPLETION.
NEW HYDRAULIC CYLINDERS AFTER RECIEVING NOTICE TO PROCEED. SPARES ARE
VALVE CYLINDER FROM LOCK 19 TO ASSIST WITH DESIGN AND FABRICATION OF
CONTRACTOR MAY ACQUIRE SPARE MITER GATE CYLINDER AND SPARE TAINTER 10.
PLACE DURING THE CLOSURE PERIOD.
TAKE PLACE OUTSIDE OF THE LOCK CLOSURE PERIOD AND WHICH MUST TAKE
SEE SPECIFICATION SECTION 00 73 05 FOR WHICH CONSTRUCTION ACTIVITIES MAY 9.
SUCH UTILITIES AS REQUIRED AND APPROVED BY THE CONTRACTING OFFICER.
CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL RELOCATE AND RESTORE
UTILITIES NOT SHOWN IN THESE PLANS MAY BE ENCOUNTERED DURING 8.
METHOD AND TYPE OF TOUCH UP PAINTING AS NECESSARY.
OTHERWISE INDICATED IN THE CONTRACT DRAWINGS, INCLUDING AN APPROVED
REINSTALLMENT MADE TO ITS ORIGINAL LOCATION AND CONDITION, UNLESS
CONSTRUCTION AS LONG AS SAFETY AND SECURITY IS MAINTAINED AND
SECURITY FENCING AND HANDRAILING MAY BE REMOVED IN WORK AREAS DURING 7.
1912 DATUM.
ALL ELEVATIONS SHOWN IN THESE DRAWINGS REFER TO MEAN SEA LEVEL (M.S.L.), 6.
IS REQUIRED UNLESS OTHERWISE PERMITTED BY THE LOCKMASTER.
LOCKAGES THROUGH LOCK 19. OBSERVATION OF NORMAL QUEUING PROCEDURES
CONTRACTOR WILL NOT BE GIVEN PRIORITY OVER OTHER WATERWAY USERS FOR 5.
TAILWATER DROP EFFECTED.
REGULATED SUCH THAT WATER IS STORED IN THE POOL AND A CORRESPONDING
GENERATE ELECTRICAL POWER, AND PASS FLOWS FROM DAM 18. IT CANNOT BE
FACILITY, FUNCTIONING ONLY TO MAINTAIN A DESIGNATED 9-FOOT CHANNEL,
DAM NO.19, OWNED AND OPERATED BY AMEREN/UE, IS A RUN-OF-THE-RIVER 4.
PRIOR TO SHOP DRAWING PREPARATION AND MATERIAL FABRICATION.
BEGINS. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING ALL DIMENSIONS
ALL ELEVATIONS AND DIMENSIONS SHALL BE VERIFIED IN THE FIELD BEFORE WORK 3.
DRAWINGS ARE NOT PRINTED TO SCALE.
THEY DO NOT NECESSARILY REPRESENT ACTUAL FIELD CONDITIONS. REFERENCE
ON THE REFERENCE DRAWINGS. BECAUSE THE DRAWINGS ARE NOT "AS BUILT",
CONTRACTOR'S BENEFIT. NO REQUIRED WORK UNDER THIS CONTRACT IS SHOWN
REFERENCE DRAWINGS ARE DRAWINGS OF RECORD, INCLUDED SOLELY FOR THE 2.
CONTRACTOR
LIGHTING DURING NON-DAYLIGHT HOURS, SHALL BE PROVIDED BY THE
CONTRACTOR. UTILITIES, INCLUDING TEMPORARY CONSTRUCTION POWER AND
EQUIPMENT (CRANE, FLOATING PLANT) WILL NOT BE MADE AVAILABLE TO THE
GOVERNMENT UTILITIES (INCLUDING WATER, ELECTRICITY, FUEL, ETC.) AND 1.
GENERAL MECHANICAL NOTES
TO CYLINDER ASSEMBLY. HOSING TO UV PROTECTION.
PROVIDE NEW 300 GRADE STAINLESS STEEL FLEXIBLE HOSING FROM HARD PIPING 16.
PIPING OF THE MITER GATE AND TAINTER VALVE HYDRAULIC POWER UNITS.
PROVIDE AND INSTALL ELECTRONIC HYDRAULIC OIL PARTICLE MONITOR IN RETURN 15.
OF THE ASSEMBLY.
STANDS MUST ALLOW THE CYLINDERS TO BE EXERCISED TO MAINTAIN INTEGRITY
STORAGE OF SPARE CYLINDERS IN THE STORAGE BUILDING ON I-WALL. STORAGE
MODIFY EXISTING OR PROVIDE NEW HYDRAULIC CYLINDER STANDS TO ALLOW 14.
HYDRAULIC OIL.
SEVEN TAINTER VALVE CYLINDER ASSEMBLIES, AND PROPERLY DISPOSE OF
CONTRACTOR IS TO DISPOSE OF THREE MITER GATE CYLINDER ASSEMBLIES, 13.
VALVING IS TO BE REUSED, UNLESS FOUND TO HAVE DAMAGE.
PAINTED. PAINTING IS TO BE IN ACCORDANCE WITH SPECIFICATIONS. MANIFOLD
EXISTING CYLINDER MANIFOLDS TO BE DRAINED, SANDBLASTED, CLEANED, AND 12.
WITH POSITION SENSOR. ROUTE VENT TO A TANK FOR OIL COLLECTION.
PROVIDE VENT/OIL SEEPAGE CONTAINMENT FOR MITER GATE CYLINDER ROD CAP 11.
DIRECTED BY COR.
HYDRAULIC OIL. DRUMS ARE TO BE PLACED IN I-WALL STORAGE BUILDING OR AS
PROVIDE 4 ADDITIONAL 55 GALLON DRUMS OF CHEVRON RANDO HZD ISO 15 10.
AND A MINIMUM BETA RATIO OF 400.
FLUID WITH A VISCOSITY OF 389 SSU AT 100°F. FILTRATION TO BE 10µM OR BETTER
GPM AT A PRESSURE DROP NOT EXCEEDING 10 PSI WHEN FILTERING HYDRAULIC
SPARE FILTERS FOR EACH HPU. EACH FILTER TO HAVE A MINIMUM CAPACITY OF 140
DOWNSTREAM MITER GATES AND TAINTER VALVES AND PROVIDE ONE SET OF
INSTALLATION OF NEW CYLINDERS, CHANGE FILTERS ON HPUS SERVING
UNITS. HYDRAULIC OIL MUST HAVE A CLEANLINESS OF 17/15/12 OR BETTER. AFTER
CYLINDERS, TAINTER VALVE CYLINDERS, AND ASSOCIATED HYDRAULIC POWER
HYDRAULIC OIL IS TO BE CHEVRON RANDO HDZ ISO 15 FOR MITER GATE 9.
LOCK TO CONTRACTOR’S FACILITY IF NEEDED.
DIMENSIONS AND LAYOUTS. SPARE CYLINDER ASSEMBLIES MAY BE MOVED FROM
SPARE CYLINDERS AND MANIFOLDS ARE AVAILABLE FOR CONTRACTOR TO VERIFY 8.
FIELD VERIFY DIMENSIONS PRIOR TO CONSTRUCTION.7.
REINSTALLED. PAINTING IS TO BE IN ACCORDANCE WITH SPECIFICATIONS.
THE EXISTING PILLOW BLOCKS ARE TO BE SANDBLASTED, CLEAN, PAINTED, AND 6.
SPECIFICATIONS.
DEMONSTRATE THE DESIGNS MEET OR EXCEED THE REQUIREMENTS IN THE
WITH SELF-LUBRICATED MATERIAL. PROVIDE DESIGN AND CALCULATIONS THAT
MITER GATE AND TAINTER VALVE ROD CLEVIS’ ARE TO HAVE SPHERICAL BEARING 5.
FINISH.
PLATING, OR ALLOY STEEL WITH WELDED OVERLAY/LASER CLADDING SURFACE
TAINTER VALVE RODS ARE TO BE EITHER ASTM A564 TYPE 630 WITH CHROME 4.
SENSOR.
TAINTER VALVE CYLINDERS ARE TO UTILIZE A NON-CONTACT LINEAR POSITION 3.
INDICATION.
SURFACE FINISH, WITH PROFILE BENEATH SURFACE FINISH FOR POSITION
MITER GATE CYLINDER RODS ARE TO HAVE WELDED OVERLAY/LASER CLADDING 2.
EXCEEDS THE REQUIREMENTS IN THE SPECIFICATIONS.
ROD ASSEMBLY. CALCULATIONS MUST DEMONSTRATE THE DESIGN MEETS OR
ROD. PROVIDE CALCULATIONS AND DRAWINGS FOR TWO-PIECE TAINTER VALVE
CYLINDER MANUFACTURER IS TO DESIGN TWO-PIECE TAINTER VALVE CYLINDER 1.
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
WISCONSIN
IOWA
LAKE
MICHIGAN
F L
O W
IOWA
M
IS
S
IS
S
IP
P I
R
IV
E R
LOCATION
PROJECT
ILLINOIS
IN
D
IA
N A
MISSOURI
KENTUCKY
SPRINGFIELD
QUINCY
DAVENPORT
BURLINGTON
ROCK ISLAND
CHICAGO
OHI
O
R
W A
B A
S H
R
MISSOURI R.
R
IL
L
R
R O
C K
R
M
ISSISSIPPI
IN
O
IS
ILLINOIS
KEOKUK
(KEOKUK, IA.)
HAMILTON
WARSAW
LEE COUNTY
HANCOCK COUNTY
LOCK NO. 19
PROJECT LOCATION
LOCK NO.19
AMEREN/UE POWER DAM
A N
S I
B A
R T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
J .B
A R
T
C A
T
IO
N P
L A
N A
N D V
IC
IN
IT
Y M
A P
G-101
M .F
R A
N C
E S
C
1A
LOCATION PLAN
1"=3000'SCALE:
H15
VICINITY MAP
SCALE: NTS
0 6000'3000'
NORTH
PLAN
T R
U E N
2. AMEREN/UE, A PRIVATE COMPANY, OWNS, OPERATES, AND MAINTAINS THE DAM FROM WHICH IT GENERATES HYDRO-ELECTRIC POWER.
1. THE US ARMY CORPS OF ENGINEERS OWNS, OPERATES AND MAINTAINS THE MAIN LOCK, OLD LOCK (ABANDONED), AND THE OLD DRY DOCK (ALSO ABANDONED).
NOTES:
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
W E
K
R
/0
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
IT
E P
L A
N
G-102
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
SCALE: 1" = 100'-0"
SITE PLAN
0 2000'1000'
NORTH
PLAN
TRUE N
TIMES TO THE POWER HOUSE AND DAM.
THE CONTRACTOR WILL ALLOW ACCESS FOR AMEREN/UE EMPLOYEES AT ALL 4.
THE VISITOR CENTER WILL BE CLOSED TO CONTRACTOR PERSONNEL.3.
CONTRACTOR'S EXPENSE.
SHRUB DAMAGED BE THE CONTRACTOR WILL BE REPLACED IN KIND AT THE
THE CONTRACTOR SHALL PROTECT ALL TREES AND SHRUBS. ANY TREE OR 2.
RESTRICTIONS, AND OTHER CHARACTERISTICS OF THE SITE.
BECOME FAMILIAR WITH POSSIBLE ROUTES, HEIGHT AND WIDTH
THE CONTRACTOR IS ADVISED TO VISIT THE SITE PRIOR TO BIDDING AND 1.
GENERAL SHEET NOTES
FLOW
MISSISSIPPI RIVER
N. W
ATER STREET
(ABANDONED)
(ABANDONED)
FIRST AVE.
SECO
ND AVE.
LOCK CHAMBER
AREA
STAGING
PARKING AND
PLC SYSTEM
UPDATE LOCK
CONTROL HOUSE
CONTROL HOUSE
MAINTENANCE BUILDING
VISITORS CENTER
STATION
CONTROL
CENTRAL
AND MATERIALS WITHIN THE STAGING AREA.
RESPONSIBLE FOR SECURITY OF THEIR EQUIPMENT
STAGING AREA WITH THE KO. CONTRACTOR IS
COORDINATE THE LOCATION AND SIZE OF THE
WORK AREA LIMITS
SCREENING BUILDING
WATER COMPANY
ACCESS GATE
AMEREN/UE EMPLOYEE
MACHINERY
MITER GATE
INSTALL NEW
MACHINERY
TAINTER VALVE
INSTALL NEW
MACHINERY
TAINTER VAVLE
INSTALL NEW
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
B A
R T
E K
D O
W N
S T
E A
M
M
IT
E R G
A T
E A
N D T
A
IN
T E
R V
A L V
E
S
IT
E P
L A
N
G-103
M F
R A
N C
E S
C O
N
J
B A
R T
M R
L D
A
U N
E R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
WEIGHT = APPROX. 2000 LBS EACH
REMOVABLE ACCESS PANELS
MITER GATE MACHINERY RECESS
WEIGHT = APPROX. 2000 LBS EACH
REMOVABLE ACCESS PANELS
MITER GATE MACHINERY RECESS
LOCK CHAMBER
LOCK CHAMBER
LANDSIDE LOCK WALL
RIVERSIDE LOCK WALL
STAIRS
STAIRS
CONTROL HOUSE
CONTROL HOUSE
1 2
1 2
BULKHEAD SLOT
TAINTER VALVE
HYDRAULIC MACHINERY ROOM
HYDRAULIC MACHINERY ROOM
HYDRAULIC MACHINERY ROOM
H1
DOWNSTREAM LANDWALL WORK LOCATIONS
1/2"=1'-0"SCALE:
A1
DOWNSTREAM RIVERWALL WORK LOCATIONS-1
1/2"=1'-0"SCALE: 0 2' 4'1'
0 2' 4'1'
SHEET KEYNOTES
SPECIFICATIONS SECTION 01 53 11.
HYDRAULIC ROD AND INSTALLATION OF NEW HYDRAULIC ROD. SEE
TAINTER VALVE RECESS DURING DISCONNECTION OF EXISTING
TAINTER VALVE BULKHEAD SLOT. INSTALL BULKHEADS TO DEWATER5.
SEE ELECTRICAL SHEETS.
REPLACE VARIOUS PLC COMPONENTS THROUGHOUT LOCK.4.
CARDANIC RING. SEE SHEET M-105.
REPLACE TAINTER VALVE HYDRAULIC CYLINDER. REUSE EXISTING3.
CARDANIC RING. SEE SHEET M-101.
REPLACE MITER GATE HYDRAULIC CYLINDERS. REUSE EXISTING2.
ACCESS PANELS.
REMOVE AND REINSTALL MITER GATE MACHINERY RECESS1.
FLOW
FLOW
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
B A
R T
E K
U P
S T
R E
A M
T A
IN
T E
R V
A L V
E
S
IT
E P
L A
N
G-104
M F
R A
N C
E S
C O
N
J
B A
R T
M R
L D
A
U N
E R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
LOCK CHAMBER
CONTROL HOUSE
CONTROL HOUSE
LAND SIDE LOCK WALL
RIVER SIDE LOCK WALL
ROOM
HYDRAULIC MACHINERY
ROOM
HYDRAULIC MACHINERY
0 2' 4'1'
0 2' 4'1'
SHEET KEYNOTES
SPECIFICATIONS SECTION 01 53 11.
HYDRAULIC ROD AND INSTALLATION OF NEW HYDRAULIC ROD. SEE
TAINTER VALVE RECESS DURING DISCONNECTION OF EXISTING
TAINTER VALVE BULKHEAD SLOT. INSTALL BULKHEADS TO DEWATER3.
SEE ELECTRICAL SHEETS.
REPLACE VARIOUS PLC COMPONENTS THROUGHOUT LOCK.2.
CARDANIC RING. SEE SHEET M-105.
REPLACE TAINTER VALVE HYDRAULIC CYLINDER. REUSE EXISTING1.
H1
UPSTREAM LANDWALL WORK LOCATIONS
1/2"=1'-0"SCALE:
A1
UPSTREAM RIVERWALL WORK LOCATIONS-1
1/2"=1'-0"SCALE:
FLOW
FLOW
LOCK CHAMBER
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
B A
R T
X
IS
T
IN
G M
IT
E
R G
A T
E M
A C
H
IN
E R
Y R
O O
M
P L
A N A
N D E
L E
V A
T
IO
N
G-105
M F
R A
N C
E S
C O
N
J
B A
R T
M R
L D
A
U N
E R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L O
C K C
H A
M B
E R
LOCK CHAMBER
TOP OF LOCK WALL EL. 525.75
EL. 518.125
EL. 519.26
EL. 520.85
TOP OF PARAPET WALL
EL. 516.125
EL. 521.68
CENTERLINE GATE CONNECTION
SEE SHEET G-102
MACHINERY COVER
TO REMAIN
EXISTING MACHINERY RECESS
SEE SHEET M-101
TO BE REMOVED AND REPLACED
EXISTING HYDRAULIC CYLINDER
TO REMAIN
EXISTING MACHINERY PEDESTAL
TO REMAIN
EXISTING PARAPET WALL
SEE SHEET M-101
TO BE REMOVED AND REPLACED
EXISTING HYDRAULIC CYLINDER
A1
SCALE: 1/2" = 1'-0"
ELEVATION - EXISTING MITER GATE MACHINERY
0 2' 4'1'
0 2' 4'1'
F1
SCALE: 1/2" = 1'-0"
PLAN - EXISTING MITER GATE MACHINERY
WHERE DAMAGED OR OTHERWISE NOT POSSIBLE TO REUSE.
CYLINDER MANIFOLDS ARE TO BE REUSED. PIPING TO BE REUSED WHERE POSSIBLE AND REPLACED2.
LAND WALL SHOWN. RIVER WALL OPPOSITE HAND.1.
NOTE:
F L
O W
WHERE DAMAGED OR OTHERWISE NOT POSSIBLE TO REUSE.
CYLINDER MANIFOLDS ARE TO BE REUSED. PIPING TO BE REUSED WHERE POSSIBLE AND REPLACED2.
LAND WALL SHOWN. RIVER WALL OPPOSITE HAND.1.
NOTE:
A R
T
TO REMAIN
PILLOW BLOCK BEARING ASSEMBLY
TO REMAIN
CYLINDER SUPPORT BASE
SEE SHEET M-105
TO BE REMOVED AND REINSTALLED
CYLINDER CARDANIC RING
PLATFORM FRAMING TO REMAIN
HYDRAULIC CYLINDER STRUCTURAL
AND REPLACED
TO BE REMOVED
HYDRAULIC CYLINDER
SEE SHEET M-105
AND REPLACED
TO BE REMOVED
HYDRAULIC CYLINDER
TO BE REMOVED AND REINSTALLED
SEE SHEET M-110
CARDANIC RING ASSEMBLY
TO REMAIN
HYDRAULIC CYLINDER PLATFORM FRAMING
TO REMAIN
TAINTER VALVE
SEE SHEET M-515
PICKUP CONNECTION
SEE SHEET M-105
OR CHROME PLATED ROD
WELDED OVERLAY/LASER CLAD
TWO-PIECE CONNECTION
A1
SCALE: 1/4" - 1'-0"
ELEVATION - EXISTING TAINTER VALVE MACHINERY
F13
SCALE: 1/4" = 1'-0"
EXISTING TAINTER VALVE MACHINERY PLAN
X
IS
T
IN
G
T A
IN
T
E R
V A
L V
E W
E L
L
P L
A N
A N
D E
L E
V A
T
IO
N
G-106
M .F
R A
N C
E S
C O
N
J .B
A R
T
M
R L
D
A .U
N E
R
S I
X
S O
L
IC
IT
A
T
IO
N
P L
C R
E P
A
IR
S A
N D
H Y
D R
A U
L
IC
C Y
L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
W
E K
R
/0
C K
I S
L A
N D
IL
L
IN
C K
I S
L A
N D
D
IS
T R
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET IDWHERE DAMAGED OR OTHERWISE NOT POSSIBLE TO REUSE.
CYLINDER MANIFOLDS ARE TO BE REUSED. PIPING TO BE REUSED WHERE POSSIBLE AND REPLACED2.
LANDWALL TAINTER VALVE SHOWN. OTHERS SIMILAR.1.
NOTES:
0 4' 8'2'
0 4' 8'2'
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
E R G
A T
E C
Y L
IN
D E
R
P L
A N
M-101
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
SCALE: 1"- 1'-0"
SECTION - MITER GATE CYLINDER
H1
SCALE: 1"- 1'-0"
PLAN - MITER GATE CYLINDER
0 1' 2'6"
0 1' 2'6"
1.575" TYP
PIPE SUPPORT, TYP
A1
M-501-A8
M-510-A15
M-510-A1
1.64" 5.556" 2.297" 2.363" .361"
.3
.5
.0
TYP
T Y
P
T Y
P
T Y
P
2'-9.581"
148.851"165.44"
DESIGN STROKE 255.625"
M-502-A17
M-501-A1
M-502-A9
M-502-A1
M-503-A1
275.952"
PIPE SUPPORTPIPE SUPPORTLIFTING LUG LIFTING LUG
3/4" - 10 UNC DEEP 30/1.18" (4x)
2" CODE 62 SAE FLANGE
MINIMESS CONNECTOR/AIR BLEED 9/16" - 18 UNF
POSITION INDICAITON SENSOR
MINIMESS CONNECTOR/AIR BLEED 9/16" - 18 UNF
M230x6
GENERAL SHEET NOTES
3/4" - 10 UNC DEEP 30/1.18" (4x)
2" CODE 62 SAE FLANGE
L O
C K
FIELD VERIFY DIMENSIONS PRIOR TO CONSTRUCTION.5.
LOCATED IN THE I-WALL STORAGE BUILDING.
MODIFY EXISTING CYLINDER STAND AS REQUIRED. SPARE CYLINDER STANDS ARE
ASSEMBLIES AND PLACE 1 COMPLETE ASSEMBLY ON SPARE CYLINDER STAND.
PROVIDE 3 COMPLETE MITER GATE CYLINDER ASSEMBLIES. INSTALL 2 COMPLETE 4.
THE SURFACE FINISH.
MG CYLINDER TO UTILIZE MEASUREMENT SYSTEM WITH PROFILE ON ROD BELOW 3.
THE REQUIREMENTS IN THE SPECIFICATIONS.
PROVIDE DRAWINGS AND CALCULATIONS TO VERIFY DESIGN MEETS OR EXCEEDS
MG ROD CLEVIS IS TO HAVE SPHERICAL BEARING FOR PIN CONNECTION TO MG. 2.
SPECIFICATIONS.
MG RODS ARE TO HAVE WELDED OVERLAY/LASER CLADDING APPLIED PER 1.
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
K E
O K
U K
IA
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
IN
T E
R V
A L V
E C
Y L
IN
D E
R
P L
A N
M-105
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
SCALE: 1"- 1'-0"
SECTION - TAINTER VALVE CYLINDER
H1
SCALE: 1"- 1'-0"
PLAN - TAINTER VALVE CYLINDER
0 1' 2'6"
0 1' 2'6"
A1
M-510-A15
M-510-A1
.9
.1
T Y
P
T Y
P
19.685" 29.327" 28.346"
2'-10.386"2'-3.87"
521.977" UPSTREAM
570.056" DOWNSTREAM
M-505-A8
GENERAL SHEET NOTES
M130x4
TWO PIECE ROD CONNECTION
LIFTING LUG LIFTING LUGPIPE SUPPORTPIPE SUPPORT2" CODE 62 SAE FLANGE
3/4" - 10 UNC DEEP 30/1.18" (4x)
SAE FLANGE
2" CODE 62
30/1.18" (4x)
DEEP
3/4" - 10 UNC
MINIMESS CONNECTOR/AIR BLEED 9/16" - 18 UNF
208.776"
DESIGN STROKE 192.00"
M-506-A17
M-505-A1
NON-CONTACT LPS HOUSING
ELECTRICAL SHEETS
ALSO SPECIFICATIONS AND
POSITION SENSOR PDS: SEE
NON-CONTACT LINEAR
M-506-A1
M-507-A1
M-506-A9
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
L O
C K
FIELD VERIFY DIMENSIONS PRIOR TO CONSTRUCTION.5.
STANDS ARE LOCATED IN THE I-WALL STORAGE BUILDING.
MODIFIED FOR NEW TWO-PIECE ROD DESIGN CYLINDER. SPARE CYLINDER
CYLINDER STAND. EXISTING SPARE CYLINDER STAND MAY NEED TO BE
COMPLETE ASSEMBLIES AND PLACE 1 COMPLETE ASSEMBLY ON SPARE
PROVIDE 6 COMPLETE TAINTER VALVE CYLINDER ASSEMBLIES. INSTALL 5 4.
CYLINDER SHELL WITH THE ROD FULLY RETRACTED.
TWO-PIECE ROD SHOULD BE APPROXIMATELY 2 FT FROM THE ROD END OF
LOWER ROD OF THE TWO-PIECE ROD DESIGN. CONNECTION POINT FOR
UPSTREAM AND DOWNSTREAM GATES IS TO BE ACCOUNTED FOR IN THE
INSTALLED AT ANY LOCATION. DIFFERENCE IN ROD LENGTH BETWEEN
SAME UPPER ROD LENGTH, ALLOWING TAINTER VALVE CYLINDERS TO BE
UPSTREAM AND DOWNSTREAM TAINTER VALVE CYLINDERS ARE TO HAVE THE
DESIGN MEETS OR EXCEEDS THE REQUIREMENTS IN THE SPECIFICATIONS.
TAINTER VALVE ROD ASSEMBLY. CALCULATIONS MUST DEMONSTRATE THE
CYLINDER ROD. PROVIDE CALCULATIONS AND DRAWINGS FOR TWO-PIECE
CYLINDER MANUFACTURER IS TO DESIGN TWO-PIECE TAINTER VALVE 3.
SURFACE FINISH.
PLATING, OR ALLOY STEEL WITH WELDED OVERLAY/LASER CLADDING
TAINTER VALVE RODS ARE TO BE EITHER ASTM A564 TYPE 630 WITH CHROME 2.
SENSOR.
TAINTER VALVE CYLINDERS ARE TO UTILIZE A NON-CONTACT LINEAR POSITION 1.
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
R D
A N
IC
R
IN
G
P L
A N
M-110
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
SCALE: 3" = 1'-0"
PLAN - CARDANICE RING
6"0 3" 1'
3'-11 1/2 "
/8
L O
C K
SELF-LUBRICATED MATERIAL.
NEW PILLOW BLOCK BUSHINGS AND NEW TRUNNION PIN BUSHINGS TO UTILIZE 3.
NICKEL PLATED FOR CORROSION RESISTANCE.
NEW CARDANIC RING PINS THAT RIDE IN PILLOW BLOCK BUSHING TO BE 2.
PAINT ACCORDING TO SPECIFICATIONS.
EXISTING CARDANIC RINGS ARE TO BE REUSED. SANDBLAST, CLEAN, AND 1.
GENERAL SHEET NOTES
H1
M-310
A1
M-310
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
R D
A N
IC
R
IN
G
S E
C T
IO
N
M-310
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
SCALE: 3" = 1'-0"
SECTION
H1
SCALE: 3" = 1'-0"
SECTION
6"0 3" 1'
6"0 3" 1'
M-510-A1
M-510-A1
M-510-A1
M-511-A1
M-510-A1
M-510-A13
M-511-A1
M-510-A9
M-510-A15 M-510-A1
M-510-A13
M-511-A1
M-510-A9
M-510-A15
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A
T
IO
N
P L
C R
E P
A
IR
S A
N D
H Y
D R
A U
L
IC
C Y
L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
/2
R O
C K
I S
L A
N D
IL
L
IN
C K
I S
L A
N D
D
IS
T R
A R
T
T A
IL
S
M-501
M .B
R O
W N
J B
A R
T
M
R L
D
A .U
N E
R
E K
R
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A1
SCALE: 3" = 1'-0"
M-501-A1 - MG ROD END CAP
6"0 3" 1'
M-501-A8 - MG BLIND CAP
SCALE: 3" = 1'-0"
A8
6"0 3" 1' A15
SCALE: 6" = 1'-0"
ENLARGED VIEW
G15
.4
.4
.81
1"
11.654"
2.4 8"
1.9
1.969"
.75
.75"
.86 6"
5.439"
.814" .814"
2.719"
.4
.7
.2
.729" .729"
2.634"
5.269"
.7
.4
.3
.3
.9
.1
1' -4 .4
9.528
.81
1"
.7 T Y P
.6 5" T
Y P
1'- 0.6
.3
.3
1'- 2.9
.3
1.734"
1.732"
1'-3.175"
1'-1.386"
.5
"5 .7
6"0 3" 1'
6"0 3" 1'
A15 G15
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
T A
IL
S
M-502
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
SCALE: 3" = 1'-0"
M-502-A1 - MG CLEVIS LOCK NUT
A9
SCALE: 3" = 1'-0"
M-502-A9 - MG ROD THREAD PROTECTOR
6"0 3" 1' 6"0 3" 1' A17
M-502-A17 - MG CYLIINDER ICE SCRAPER
.4
.8
.1
1'-2.291"
.6 6"
1' -1 .1
30°
9.488"
1'-0.972"
.374" TYP
.1
.6
30°
TYP
TYP
11.3 39"
9.055"
1'-2.291"
11.3 39"
1.
4" T
YP
.7 T
Y P
.787"
.8
1'-1.937"
.354" TYP
ASTM A564, TYPE 630MG CYLINDER ICE SCRAPER31M-502-A17
ASTM A564, TYPE 630MG ROD THREAD PROTECTOR31M-502-A9
ASTM A564, TYPE 630MG CLEVIS LOCK NUT31M-502-A1
MATERIALDESCRIPTIONTOTAL QTYUNIT QTY.MARK NO.
MATERIAL SCHEDULE
A17
.3
.6
J17
SECTION
25.71°
TYP
.0
D E
L
IN
G C
U T
.5
.1
3"0 6"1-1/2"
6"0 3" 1'
.2
9.613"
.6
10.236"
45°
.835"R
TYP
9.843"
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
T A
IL
S
M-503
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
SCALE: 1 1/2" = 1'-0"
M-503-A1 - MG CLEVIS W/ SPHERICAL BEARING
5.571"
.9
.3
.4
.1
1'-10"
7.5
.6
30°
TYP
11.339"
1'-2.291"
1'-.598"
.0
9.055" Ø
8.268"
.3
1' 2'0 6"
ASTM A564, TYPE 630MG CLEVIS PIN31M-503-A9
LUBRICATED SPHERICAL BEARING
ASTM A564, TYPE 630 WITH SELF-
MG CLEVIS W/ SPHERICAL BEARING31M-503-A1
MATERIALDESCRIPTIONTOTAL QTYUNIT QTY.MARK NO.
MATERIAL SCHEDULE
M-503-A9 - MG CLEVIS PIN
A9
.5
.9
7.008"
.5
.217"
45°
TYP
.1
.2
T Y
P
6"0 3" 1'
SELECTION FOR APPROVAL.
MG CLEVIS TO BE DESIGNED AND FITTED FOR SPHERICAL SELF-LUBRICATED BEARING. SUBMIT BEARING DESIGN CALCULATIONS AND SIZE NOTE: SUBMIT BEARING DESIGN CALCULATIONS AND SIZE SELECTION FOR APPROVAL.
FINAL PIN DIAMETER TO BE DESIGNED AND FITTED FOR SPHERICAL SELF-LUBRICATED BEARING. NOTE:
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
T A
IL
S
M-505
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
SCALE: 3" = 1'-0"
M-505-A1 - TV ROD END CAP
6"0 3" 1'
M-505-A8 - TV BLIND END CAP
6"0 3" 1' A15
G15
.8
.7
.5
.1
.2
.1
6"0 3" 1'
6"0 3" 1'
.7
.9
1'- 1.
1'
2"
2.
.7
.0
1.732"
5.984"
.1
.2
.9
5.591"
1.732"
.2
9.213"
11.89"
11.102"
.70 9" T
YP
.472" TYP
.709" TYP
25.72°
12°
12°
.7
.4
.3
.731" .731"
2.637"
5.273"
.7
.7
.6
.818"
2.723"
5.447"
.818"
.5
.9
.75" TYP
.75" TYP
A15 G15
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A
T
IO
N
P L
C R
E P
A
IR
S A
N D
H Y
D R
A U
L
IC
C Y
L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
/2
R O
C K
I S
L A
N D
IL
L
IN
C K
I S
L A
N D
D
IS
T R
A R
T
T A
IL
S
M-506
M .B
R O
W N
J B
A R
T
M
R L
D
A .U
N E
R
E K
R
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A1
SCALE: 3" = 1'-0"
M-502-A1 - TV CLEVIS LOCK NUT
A9
SCALE: 3" = 1'-0"
M-502-A9 - TV ROD THREAD PROTECTOR
6"0 3" 1' 6"0 3" 1' A17
M-502-A17 - TV CYLINDER ICE SCRAPER
ASTM A564, TYPE 630TV CYLINDER ICE SCRAPER61M-506-A17
ASTM A564, TYPE 630TV ROD THREAD PROTECTOR61M-506-A9
ASTM A564, TYPE 630TV CLEVIS LOCK NUT61M-506-A1
MATERIALDESCRIPTIONTOTAL QTYUNIT QTY.MARK NO.
MATERIAL SCHEDULE
J17
SCALE: 6" = 1'-0"
SECTION
25.71°
TYP
.0
D
E L
IN
G
C U
T
3"0 6"1-1/2"
6"0 3" 1'
9.646
5.
4"
.256" TYP
9.173"
60°
.6
.2
.1
.8
7.
5"
.492"
TYP
45° 22.5°
.3 " T
Y P
10.
9.213"
J17
9.488"
5.1 38"
8.465"
6.428"
6.598"
6.89" .1
.5
.2
.7
45°
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
T A
IL
S
M-507
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
ASTM A564, TYPE 630TV CLEVIS PIN61M-507-A9
LUBRICATED SPHERICAL BEARING
ASTM A564, TYPE 630 WITH SELF-
TV CLEVIS61M-507-A1
MATERIALDESCRIPTIONTOTAL QTYUNIT QTY.MARK NO.
MATERIAL SCHEDULE
A1
SCALE: 3" = 1'-0"
M-507-A1 - TV CLEVIS
6"0 3" 1'
.6
9.843"
8.46 5"
5.138"
9.646" Ø
.1
.9
.1
.8
.1
.63"
.6
.472" TYP
7.2 05"
22.5°
TYP
TYP
M-507-A9 - TV CEVIS PIN
SCALE:
A9
SELECTION FOR APPROVAL.
TV CLEVIS TO BE DESIGNED AND FITTED FOR SPHERICAL SELF-LUBRICATED BEARING. SUBMIT BEARING DESIGN CALCULATIONS AND SIZE NOTE:
SUBMIT BEARING DESIGN CALCULATIONS AND SIZE SELECTION FOR APPROVAL.
FINAL PIN DIAMETER TO BE DESIGNED AND FITTED FOR SPHERICAL SELF-LUBRICATED BEARING. NOTE:
.6
5.
6"
4.
4"
8.25" 1.125"
.148"
T Y P
.6
6.2
4.432"
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A
T
IO
N
P L
C R
E P
A
IR
S A
N D
H Y
D R
A U
L
IC
C Y
L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
/2
R O
C K
I S
L A
N D
IL
L
IN
C K
I S
L A
N D
D
IS
T R
A R
T
T A
IL
S
M-510
M .B
R O
W N
J B
A R
T
M
R L
D
A .U
N E
R
E K
R
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A1
SCALE: 1 1/2" = 1'-0"
M-510-A1 - TRUNNION M-510-A9 - TRUNNION PIN
6"0 3" 1'1' 2'0 6"
.5
2'-4.25"
DIMENSION BY
.7 Ø
.6
SCALE: 3" = 1'-0"
A15 6"0 3" 1'
.3
.6
11.0 24"
7.874"
8.858"
.3
.5
.7
.5
.7
" 1' -1 .5
1.
4"
TYP
0.779"5.354"0.748"
.8
Ø
.8
Ø 10.827"
45° TYP
7.953" Ø
7.874" Ø
LUBRICATED MATERIAL
ASTM B584, ALLOY C86300 WITH SELF-
PILLOW BLOCK BUSHING141M-510-H15
LUBRICATED MATERIAL
ASTM B584, ALLOY C86300 WITH SELF-
TRUNNION BUSHING141M-510-A15
ASTM A322, GR 4340, WITH NICKEL PLATINGTRUNNION PIN141M-510-A8
ASTM A29, GR 1049TV CYLINDER TRUNNION91M-510-A1
MATERIALDESCRIPTIONTOTAL QTYUNIT QTY.MARK NO.
MATERIAL SCHEDULE
ALL OVER
FIT AND FINISH PER SELF-LUBRICATED MATERIAL MANUFACTURER.
PIN SURFACE TO BE NICKEL PLATED.NOTE:
FIT AND FINISH PER SELF-LUBRICATED MATERIAL MANUFACTURER.NOTE:
FIT AND FINISH PER SELF-LUBRICATED MATERIAL MANUFACTURER.NOTE:
M-501-H15 - PILLOW BLOCK BUSHING
SCALE: 3" - 1'-0"
H15
1'-1.976"
.3
.8
9.764"
11.378"
L O
C K
M-510-A15 - TRUNNION BUSHING
MANUFACTURER
CYLINDER
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
O K
U K
IA
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
/2
R O
C K
I S
L A
N D
IL
L
IN
C K
I S
L A
N D
D
IS
T R
A R
T
T A
IL
S
M-511
M .B
R O
W N
J B
A R
T
M
R L
D
A .U
N E
R
E K
R
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A1
SCALE: 1 1/2" = 1'-0"
M-510-A1 - CARDANIC RING
1' 2'0 6"
.6
8.
7"7 .8
.5
1.115"3'-8.488"
.5
.0
2'-6.625"
A13
SCALE: 3" = 1"-1'-0"
M-511-A13 -CARDANIC RING BUSHING
9.173"
8.937"
T Y P
.1
.2
.9
9.764"
LUBRICATED MATERIAL
ASTM B584, ALLOY C86300 WITH SELF-
CARDANIC RING BUSHING142M-511-A13
EXISTINGCARDANIC RING71M-511-A1
MATERIALDESCRIPTIONTOTAL QTYUNIT QTY.MARK NO.
MATERIAL SCHEDULE
10.827"
CARDANIC RING PINS TO BE NICKEL PLATED FOR CORROSION RESISTANCE.
EXISTING CARDANIC RINGS TO BE REUSED, SANDBLASTED, CLEAN AND PAINT ACCORDING TO SPECIFICATIONS. NOTE:
FIT AND FINISH PER SELF-LUBRICATED MATERIAL MANUFACTURER.NOTE:
0.188"x45°
SELF-LUBRICATED MATERIAL
P L
C R
E P
A
IR
S A
N D
H Y
D R
A U
L
IC
C Y
L
IN
D E
R R
E P
L A
C E
M E
N T
L O
C K
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
K E
O K
U K
IA
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
T A
IL
S
M-515
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
ASTM A709, GR 50, F2BACKER PLATE102M-515-F15
ASTM A709, GR 50, F2BASE PLATE51M-515-F9
ASTM B584, ALLOY C86300BUSHING102M-515-A15
ASTM A709, GR 50, F2PIN PLATE102M-515-A9
MATERIALDESCRIPTIONTOTAL QTYUNIT QTY.MARK NO.
MATERIAL SCHEDULE
8"
11"
1A
M-515-A1 - TAINTER VAVLE PICKUP
3"=1'-0"SCALE:
/8
/4
M-515-F9
M-515-A9
M-515-A15
M-515-A9
M-515-A15
1'-3"
/8
/2
R
6 1 /2
1 1/2" PL
7 1/2 "
1'-3 1/2 "
/8
1 1/4 " 1 1/4 "
/1
13/16" Ø HOLE, TYP
1 1/4 "
/4
3 3/4 "
1/2" PL
13/16" Ø HOLE, TYP
1 1/2 "
A9
- PIN PLATEM-515-A9
3"=1'-0"SCALE:
A15
- BUSHINGM-515-A15
3"=1'-0"SCALE:
F9
- BASE PLATEM-515-F9
3"=1'-0"SCALE:
F15
- BACKER PLATEM-515-F15
3"=1'-0"SCALE:
6"0 3" 1'
6"0 3" 1'6"0 3" 1'
6"0 3" 1'6"0 3" 1'
/1
/1
6 1/2 "
4 1/2 "
+0.012
+0.019
-0.000
+0.002
FCM
/8
1/4TYP
100% MPI,
2 1/4 "
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
L O
C K
PICKUP CONNECTION TO BE PAINTED ACCORDING TO SPECIFICATIONS.4.
PROPER FIT.
COORDINATE DESIGN WITH CLEVIS MANUFACTURER TO ENSURE 3.
METAL.
ARC WELDING THAT EXCLUDES THE ATMOSPHERE FROM THE MOLTEN
STRUCTURAL WELDING CODE AWS D1.5. USE A METHOD OF ELECTRIC
CONFORM WELDING TO THE AMERICAN WELDING SOCIETY 2.
AND PRIME ALL DRILLED HOLES PIROR TO ASSEMBLY.
EXCLUDED FROM THE SHEAR PLANES (MIN. 40 KIPS TENSION). PREP
ASSEMBLY. FULLY PRETENSION ALL CONNECTIONS WITH THREADS
PROVIDE (8) 3/4" Ø ASTM F3125 GR A325 HEVY HEX BOLTS PER 1.
GENERAL SHEET NOTES
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
E R G
A T
E
S C
H E
D U
L E
S
M-601
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
SCALE: NTS
SCHEDULES
WELL AS THIS ONE, ARE GIVEN IN THE TABLES SHOWN ON THIS SHEET
THE VARIABLE DIMENSIONS FOR SEVERAL OTHER POSITIONS, AS
THIS DETAILS HOWS THE CONFIGURATION FOR GATE POSITION #10.
*FIXED LENGTH, TYPICAL FOR ALL CONFIGURATIONS
GATE POSITION #10
17.
.9
'-6 /1
STANDARD BARGE WIDTH 35'-0"
20.46'
.4
IM
P A
C T C
L E
A R
A N
C E T
O R
O D
.2
L P
INTLE
C
ᶬ ʎ
Ƿ
Ȣ θ ß
Ȏ e ff
L
L CARDANIC RINGC
A13
SCALE: NTS
KINEMATICS
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
IN
T E
R V
A L V
E
S C
H E
D U
L E
S
M-605
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
SCALE: NTS
SCHEDULES
WELL AS THIS ONE, ARE GIVEN IN THE TABLES SHOWN ON THIS SHEET
THE VARIABLE DIMENSIONS FOR SEVERAL OTHER POSITIONS, AS
THIS DETAILS HOWS THE CONFIGURATION FOR VALVE POSITION #1.
*FIXED LENGTH, TYPICAL FOR ALL CONFIGURATIONS
VALVE POSITION #1
KINEMATICS, NEW LINKAGE
A14
TOP OF LOCK WALL
L TRUNNION
C CL CARDANIC RING
L PICKUP PT.C
L TRUNNIONC
H
X
16'-8"
X" θ
L
27'-11 1/16 "
H
GATE OPENING
DEGREE OF
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T E
K
D O
W N
S T
R E
A M R
IV
E R
W A
L L P
O W
E R U
N
IT
H Y
D R
A U
L
IC
S
C H
E M
A T
IC
D
IA
G R
A M
M-610
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
DIAGRAM - HYDRAULIC SCHEMATIC DOWNSTREAM RIVERWALL POWER UNIT
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T E
K
D O
W N
S T
R E
A M L
A N
D W
A L L P
O W
E R U
N
IT
H Y
D R
A L
IC
S
C H
E M
A T
IC
D
IA
G R
A M
M-611
M .B
R O
W N
J
B A
R T
M R
L D
A .U
N E
R
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A1
DIAGRAM - HYDRAULIC SCHEMATIC DOWNSTREAM LANDWALL POWER UNIT
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
S O
L
IC
IT
A T
IO
N
K E
O K
U K
IA
L O
C K
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
A R
T
G
N E
R A
L E
L E
C T
R
IC
A L N
O T
E S
E-001
M .B
R O
W N
D T
E P
M R
L D
K .R
O C
K
E
K
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
ETHERNET SWITCHES IN EACH MCC.
CONNECT THE CONTROLLER TO EACH MCC ‘BUCKET’ CONTACTOR. THIS WOULD ELIMINATE THE NEED FOR LARGER
PREFER USING THE DLR (RING TOPOLOGY, WITH AUTO DEVICE RECOVERY /PLUG N PLAY) ‘DAISY-CHAIN’ METHOD TO
NEW LC CONNECTORS.
(2) MEDIA CONVERTERS: SINGLE ETHERNET COPPER TO FIBER (1 PR) CONVERTER, FOR THE NEW MM 50 MICRON FIBER WITH
- ALLOW READ /WRITE ACCESS TO ALL.
LOCKMASTER AND ASSISTANT (RED-FOB):
- ALLOW READ /WRITE ACCESS TO ALL ACCEPT THE PROGRAM LOGIC, WHICH IS READ-ONLY.
LOCK MECHANIC /ELECTRICIAN (YELLOW-FOB):
- ALLOW OPERATOR ACCESS TO STANDARD OPERATIONAL LOCKING AND ALL LIGHTING CONTROLS FEATURES
- ALLOW READ ONLY ACCESS TO TRENDING DATA
LOCKMAN (BLUE FOB):
COMMISSIONING REQUIREMENTS
ELECTRICAL CONSTRUCTION NOTES
SUBMITTED COMMISSIONING PROCEDURE. SEE ADDITIONAL COMMISSIONING REQUIREMENT IN SPECIFICATION SECTION 35 08 40.
THE FOLLOWING TESTS HELP TO VERIFY SAFETY INTERLOCKS AND A COMPLETE OPERATIONAL PRODUCT, AND SHALL BE INCLUDED AS PART OF THE
GENERAL ELECTRICAL NOTES ELECTRICAL SCOPE OF WORK (IN NO PATICULAR ORDER) ELECTRICAL SCOPE OF WORK (CON'T)
ALL NEW WORK SHALL BE DONE IN ACCORANCE WITH THE LATEST VERSION OF NFPA 70.6.
LABELS SHALL BE ENGRAVED PLASTIC AND ATTACHED USING
AT EACH END, AND WHERE IT ENTERS AND EXITS CABLE TRAY, TO INDICATE ITS PURPOSE AND SOURCE AND FINAL CONNECTION LOCATION.
ALL NEW CABLING SHALL BE INSTALLED AS CONTINUOUS RUNS (NO SPLICES), UNLESS OTHERWISE NOTED. ALL NEW CABLES SHALL BE LABELED 5.
ACTIVE, HISTORICAL, OR EQUIPMENT LOCATION).
CORRECTED THAT IT WILL BECOME AN ACTIVE ALARM AGAIN. PROVIDE "SORTABLE" ROWS BY COLUMN HEADING SELECTED (e.g. SORT BY DATE, SILENCE ANY NON-CRITICAL "STOP" ALARMS FOR A FIXED (ADJUSTABLE) PERIOD OF TIME, AFTER WHICH IF THE ALARM CONDITION HAS NOT BEEN
INCLUDE AN ALARM SCREEN THAT DISPLAYS ACTIVE AND HISTORICAL ALARMS- AND ALLOWS THE LOCK OPERATOR TO ACKNOWLEDGE AND
SCREENS SHALL BE A MENU ITEM TO ALLOW MODIFICATION OF ALARM TEXT THAT WILL BE DISPLAYED ON NORMAL OPERATION SCREENS. ALSO
MODE", AS WELL AS ALL OTHER PARAMETERS THAT CURRENTLY ALLOW CHANGES BY THE LOCKMASTER. INCLUDED IN THESE PARAMETER
PERSONNEL (LOCK ELECTRICIAN OR LOCKMASTER, AS COORDINATED) TO MAKE EDITS TO PARAMETERS SUCH AS "SUMMER MODE" OR "WINTER
ALREADY HAS ON IT WITH THE ADDITION OF PARAMETER-EDIT SCREENS WITH PROPER ACCESS AS COORDINATED WITH COR TO ALLOW OD
ALL LOGGED OPERATIONS DATA. AT A MINIMUM, NEW HMI SCREENS MUST PROVIDE SIMILAR MENU AND TRENDING SCREENS THAT THE LAPTOP
(TRAFFIC LIGHTS, GATE AND VALVE POSITIONS, AND INTERLOCK AND SENSOR INDICATORS), AND TRENDING SCREENS FOR EASY GRAPHING OF
PANELVIEW INDUSTRIAL TOUCH-SCREENS, AS WELL AS DESIGN OF THE HMI SCREENS TO INCLUDE BASIC LOCK OPERATIONS INDICATORS
COORDINATION IS REQUIRED BETWEEN THE CONTRACTOR AND THE COR AND OD PERSONNEL FOR BEST LOCATION AND MOUNTING OF NEW 4.
ANY NEW PLC HMI AND PROGRAM CHANGES.
GOVERNMENT WISHES TO KEEP AN OPEN DIALOG AS NECESSARY WITH THE CONTRACTOR TO ASSIST IN PROVIDING THE CLEAREST INTENT FOR
DRAWING NOTES. THE CONTRACTOR WILL BE REQUIRED TO PROVIDE PLC PROGRAMMING TO ACHIEVE REQUIRED ACTIONS OR CONTROL. THE
APPROVED AND DESCRIBED HEREIN. SPECIFIC PROCEDURAL REQUIREMENTS ARE NOTED IN PERFORMANCE-DESCRIPTION FORMAT IN THE
THE BASIC LOCK OPERATION PLC LOGIC WILL BE PROVIDED AND SHALL BE UTILITZED FOR BASIC LOCK OPERATION EXCEPT AS OTHERWISE 3.
OPERATIONAL AND /OR POWER OUTAGES SHALL BE COORDINATED WITH COR 14 DAYS PRIOR TO PROPOSED OUTAGE(S). 2.
SYSTEM AT THE END OF THE CONTRACT.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL EQUIPMENT, WIRING, PROGRAMMING, ETC. TO PROVIDE A COMPLETE AND FUNCTIONAL 1.
120VAC POWER TB’s: REPLACE (8) TERMINAL BLOCKS WITH FUSE BLOCK TYPE; INSTALL ADDITIONAL (4) SPARE FUSABLE TB’s. (12 TOTAL). 10.
LIFT GATE PUMP ROOMS (2 LOCATIONS, 1 JUNCTION BOX PER PUMP ROOM):
120VAC POWER TB’s: INSTALL MINIMUM OF (4) SPARE FUSED TB’s IN EACH JUNCTION BOX. 12.
HAVING TO KILL POWER TO ALL ‘DAISY-CHAINED’ 120V POWER.
120VAC POWER TB’s: REPLACE ALL TB’s SUCH THAT NEW TB’s HAVE REMOVABLE FUSE TO ALLOW TROUBLE SHOOTING INDIVIDUAL SENSORS WITHOUT 11.
MITER GATE (MG) CYLINDER ROOM JUNCTION BOX (2 LOCATIONS, 1 JUNCTION BOX PER PUMP ROOM):
COR. INSTALL WIRING FROM WAGO TERMINAL BLOCKS TO ALLEN BRADLEY ANALOG TERMINAL MODULE.
PLAN TO INSTALL NEW NEMA 12 BOX MOUNTED TO SIDE OR BACK OF MCC’s. COORDINATE FINAL SIZE AND LOCATION WITH
ALLEN BRADLEY ANALOG TERMINAL MODULE, https://www.wago.com/us/rail-chassis-terminal-blocks/diode-plug/p/280-801_281-420
AND WAGO RECOVERY DIODE PLUG WITH RED LED, PART NO. 280-801/281-420, AND WIRED FROM WAGO TERMINAL BLOCKS TO
TERMINAL BLOCKS, WITH TEST PORTS AND LOOP POWER LED INDICATORS. DESIGN BASIS IS WAGO DISCONNECT TERMINALS
ANALOG TB’s: INSTALL ADDITIONAL RAIL-MOUNT TERMINAL BLOCKS WITH LEVER, PUSH-BUTTON OR OPEN TOOL SLOT 13.
LOWER MCC’s (2 LOCATIONS, LOWER LEVEL DOWN STAIRS FROM MITER GATE CYLINDER ROOM):
REPLACE (8) TB’s WITH FUSED STYLE FOR ALL 120VAC POWER (CURRENTLY DAISY-CHAINED). ADD (4) SPARE FUSED TB’s. 14.
TV/MG HPU ROOM’s (4 LOCATIONS, 1 JUNCTION BOX PER PUMP ROOM):
ALL ANALOG I/O: REPLACE EXISTING TB’s WITH NEW TB’s THAT CONTAIN TEST PORTS AND ‘LOOP POWER’ LED.4.
DISCREET OUTPUT: REPLACE ALL EXISTING DISCRETE OUTPUT TERMINAL BLOCK SYSTEMS WITH 1492-IFM20F-F120A-2.3.
DISCREET INPUT: MAINTAIN ALL EXISTING DISCRETE INPUT TERMINAL BLOCK SYSTEMS. 2.
CONTROL CONSOLES:
DISCRETE OUTPUT: REPLACE ALL EXISTING DISCRETE OUTPUT TERMINAL BLOCK SYSTEMS WITH 1492-IFM20F-F120A-2.9.
TERMINAL MODULE.
MCC’s. COORDINATE FINAL SIZE AND LOCATION WITH COR. INSTALL WIRING FROM WAGO TERMINAL BLOCKS TO ALLEN BRADLEY ANALOG https://www.wago.com/us/rail-chassis-terminal-blocks/diode-plug/p/280-801_281-420 PLAN TO INSTALL NEW NEMA 12 BOX MOUNTED TO SIDE OR BACK OF
RED LED, PART NO. 280-801/281-420, AND WIRED FROM WAGO TERMINAL BLOCKS TO ALLEN BRADLEY ANALOG TERMINAL MODULE, TEST PORTS AND LOOP POWER LED INDICATORS. DESIGN BASIS IS WAGO DISCONNECT TERMINALS AND WAGO RECOVERY DIODE PLUG WITH
ANALOG I/O TB’s: INSTALL ADDITIONAL RAIL-MOUNT TERMINAL BLOCKS WITH LEVER, PUSH-BUTTON OR OPEN TOOL SLOT TERMINAL BLOCKS, WITH 8.
THERMOCOUPLE TB’s: MAINTAIN EXISTING AS IS.7.
120VAC FUSED BLOCKS: INSTALL 36 NEW FUSED BLOCKS (INCLUDES APPROX. 12 SPARE). 6.
CONTACTORS WILL REQUIRE MINOR RELOCATION WITHIN THE SAME CABINET. COORDINATE EXACT LOCATION WITH COR PRIOR TO WORK.
NEW TB’s MAY REQUIRE MORE ROOM THAN IS AVAILABLE; AS NECESSARY, ASSUME EXISTING TRAFFIC LIGHT FLASHER AND ELECTRONIC 5.
UPPER MCC’s (2 LOCATIONS):
781-607.
CONDUCTOR TERMINAL BLOCK 280-616 WITH LED PLUG 280-801/281-420. GROUND FOR EACH ANALOG I/O POINT: 2 CONDUCTOR TERMINAL BLOCK
WITH FUSED PLUG 281-512/281-418 WHICH HAS A BLOWN FUSE INDICATOR. ANALOG: 2 CONDUCTOR DISCONNECT TERMINAL 280-627. 2
SYSTEMS. FOR CONVENIENCE, HERE IS A DESIGN BASIS LIST OF WAGO PART NUMBERS: DISCRETE INPUTS: 3 CONDUCTOR TERMINAL 281-627
BASIS ONLY. PRIOR TO ACQUIRING, CONTRACTOR IS MUST VERIFY SPACE REQUIREMENTS AND INSTALLABILITY OF NEW TERMINAL BLOCK
LOOP-POWER LED INDICATORS, AND FUSED TERMINAL BLOCKS FOR 120VAC SENSOR POWER. THE INDICATED MODEL NUMBERS ARE DESIGN
THAT ASSIST IN TROUBLE SHOOTING AND MEASURING REMOTE SENSOR SIGNALS (DISCREET AND ANALOG) INCLUDING OPIONS LIKE TEST PORTS, THE GENERAL INTENT FOR THIS WORK IS TO REPLACE SELECT TERMINAL BLOCKS AT LOCATIONS AROUND THE LOCK TO PROVIDE SYSTEMS 1.
TERMINAL BLOCK (TB) WORK:
P L
C R
E P
A
IR
S A
N D H
Y D
R A
U L
IC
C
Y L
IN
D E
R R
E P
L A
C E
M E
N T
THE TIME REQUIRED FROM WHEN THE UTILITY POWER RETURNS UNTIL LOCK CONTROLS ARE FULLY FUNCTIONAL AGAIN.
DEMONSTRATE SUCCESSFUL CONTROLS SYSTEM RECOVERY AFTER (2) POWER OUTAGES AND RECORD ANY ANOMALIES AS WELL AS RECORD 11.
EQUIPMENT FROM BOTH THE LANDWALL AND THE IWALL HYDRAULIC CONTROLS LOCATIONS.
HPU TO BE APPROXIMATELY THE SAME AS “SLOW”GATE MOTION. DEMONSTRATE FUNCTIONALITY OF "MANUAL" HAND-VALVE OPERATED LOCK
ADJUSTABLE SIGNAL TO MOVE THE HYDRAULIC PUMP SWASH-PLATE TO A SLOW-FLOW RATE. FIELD SET THIS FLOW RATE SIGNAL AT EACH
10. DEMONSTRATE OPERATION OF THE PUMPS INDEPENDENT OF THE PLC USING LOCAL-OFF-REMOTE SELECTOR SWITCHES, AND PROVIDING
DEMONSTRATE THAT THE HPU OIL LEVEL ALARMS (LOW AND SHUT-DOWN) ARE FUNCTIONING. 9.
DEMONSTRATE THAT THE HPU OIL TEMPERATURES AND AMBIENT TEMPERATURES ARE BEING LOGGED AND FUNCTIONING PROPERLY. 8.
DEMONSTRATE THAT ALL OF THE OIL FILTER PRESSURE DIFFERENTIAL SWITCHES (AND FILTER-ALARMS) ARE FUNCTIONING PROPERLY. 7.
ANY OF THE LOCK-SITE ETHERNET CONNECTIONS.
DEMONSTRATE HOW ALL ADJUSTABLE SET-POINTS CAN BE EASILY CHANGED FROM THE NEW HMI SCREENS AND THE PORTABLE LAPTOP FROM 6.
BEING LOGGED AND AVAILABLE FOR REVIEW AND GRAPHING. DEMONSTRATE HOW TO ACCESS AND PLOT ALL LOGGED DATA.
POSITION SENSORS AND PRESSURE AND FLOW TRANSDUCERS ARE COLLECTING EVENT-LOGGED DATA FROM EACH HPU SYSTEM AND ARE
DEMONSTRATE THAT ALL OF THE CONTROL STAND JOYSTICK AND PUSHBUTTON INPUTS, BOTH HMI AND HARD-WIRED, AND EQUIPMENT 5.
NOTE: IF MOTORS ARE CONNECTED TO REXROTH E3 OVERLOADS, THIS DATA MAY ALREADY BE ACCESSIBLE VIA DEVICENET.
AND PERCENT THERMAL CAPACITY UTILIZED DURING MOTOR RUN EVENTS.
RETRIEVAL AND GRAPHING. AT A MINIMUM, LOGGED DATA SHOULD INCLUDE ALARM-TRIP INDICATION, MEASURED INDIVIDUAL PHASE CURRENT, DEMONSTRATE ALL OF THE VOLTAGE, CURRENT, AND POWER DATA FOR EACH MOTOR BEING MONITORED AND LOGGED FOR SIMPLE 4.
WILL THE UPPER VALVES BE ALLOWED TO OPEN BY JOYSTICK-COMMAND.
AND LOWER MITER GATES ARE CONFIRMED COMPLETELY IN RECESS POSITION; ONLY AFTER GATES ARE CONFIRMED IN THESE POSITIONS
INITIALLY MOVE TO CLOSED POSITION AND WAIT AT THIS POSITION UNTIL UPPER LIFT GATES ARE CONFIRMED RESTING ON DOGGING BEAMS
DEMONSTRATE “VALVE-BYPASS”INTERLOCKS: WHEN THE VALVE-BYPASS SELECTOR SWITCH IS ACTUATED, ALL TAINTER VALVES SHOULD 3.
ALLOWED TO OPEN IF UPPER LIFT GATES AND UPPER TAINTER VALVES ARE NOT CONFIRMED TO BE COMPLETELY CLOSED.
DEMONSTRATE THE NORMAL OPERATION INTERLOCKS WITH THE MITER GATES AND TAINTER VALVES; LOWER GATES SHOULD NOT BE 2.
(BOTH) PROVIDED THE MOTORS HAVE NOT ALREADY BEEN STARTED PRIOR TO MOVING JOYSTICK.
AT START OF PROCEDURE, DEMONSTRATE PUMP MOTORS WILL STAGGER-START IF THE JOYSTICK IS MOVED DIRECTLY TO "MOVE GATE" 1.
PROVIDE NEW (2) 1756 REDUNDANCY MODULES WITH LATEST FIRMWARE VERSION
PROVIDE NEW (2) 1756-L73 CPU MODULES WITH NEWER FIRMWARE VERSION
SUBMITTALS.
ALL CONTRACT REQUIREMENTS SHALL BE ANNOTATED ON THE AS-BUILT DRAWINGS- IN THE PLC PROGRAM, AND ELECTRONIC AND HARD-COPY
USEFUL NOMENCLATURE OF EXISTING EQUIPMENT AND SENSOR LOCATIONS. THE WORK INCLUDED IN THESE PERFORMANCE DESCRIPTIONS AND
CALCULATION LINE OF THE PLC PROGRAM FOR EASE OF FUTURE EDITING AND TROUBLE SHOOTING. COORDINATE WITH GOVERNMENT FOR
PLC PROGRAM LOGIC DESCRIPTORS: CONTRACTOR SHALL PROVIDE BRIEF DESCRIPTION AT EACH LOGICAL INPUT LINE, OUTPUT LINE, AND 9.
BASELINE TRENDING OF OIL CONDITION OVER LONG PERIODS OF TIME.
OIL-PARTICLE-MONITOR READINGS AND WATER-CONTENT-MONITOR READINGS FOR LANDWALL HPU AND I-WALL HPU EACH, ONCE DAILY FOR
EQUIPMENT POSITION OR HYDRAULIC STATUS. ONE EXCEPTION TO EVENT-TRIGGERED DATA LOGGING, THE SYSTEM SHALL RECORD
ACTUATED. EXAMPLES OF “EVENT (TRIGGERED) LOGGING” INCLUDE DURING LOCK OPERATION, OR WHEN THE PLC MONITORS A CHANGE IN
TRIGGERED. EXCEPT WHERE OTHERWISE NOTED, DO NOT RECORD DATA WHEN NO EQUIPMENT IS BEING MOVED AND NO ALARMS HAVE
COMMISSIONING AND TROUBLE-SHOOTING PROCEDURES. UNLESS OTHERWISE NOTED OR COORDINATED, LOGGED DATA SHALL BE EVENT
GRAPHING WITH THE X-AXIS AS TIME, AND THE ABILITY TO OVERLAY (TURN ON AND OFF) THE DIFFERENT RECORDED SENSOR INPUTS, FOR EASE IN
JOYSTICK OPERATORS, WITH COMMAND “NAME”(i.e. OPEN BOTH LMG NORMAL), SHALL BE LOGGED WITH TIME-STAMPS AND PREPARED FOR
(CALCULATED), PRESSURE, FLOW RATE MEASUREMENTS, AND ALL MANUAL INPUTS, INCLUDING BUT NOT LIMITED TO, ALL PUSHBUTTONS, EQUIPMENT OPERATIONS AND MANUAL-INPUT DATA-LOGGING INCLUDING BUT NOT LIMITED TO: ALL HYDRAULIC EQUIPMENT POSITION, SPEED 8.
SCREENS AND MUST BE INITIATED NO LESS THAN 20 CALENDAR DAYS PRIOR TO THE END OF CLOSURE PERIOD.
(PRE-FINAL, BEFORE PLC COMMISSIONING) WILL BE USED TO SUCCESSFULLY DEMONSTRATE ALL FEATURES AND FUNCTIONS OF THE HMI
ON THE NEW PANELVIEW SCREENS AT ALL NEW PANELVIEW LOCATIONS, INCLUDING PROXIMITY PERMISSIONS HIGHERARCHY. MEETING NO.3
INITIATED WITHIN 30 DAYS OF THE FIRST MEETING. ALL LAPTOP-SCREENS SHOULD BE NEARLY COMPLETELY DUPLICATED AND 65% FUNCTIONAL
PROXIMITY PERMISSIONS AND SETTINGS/ADJUSTMENT SCREEN(S). MEETING NO.2 (DRAFT HMI) IS TO REVIEW MID-WAY PROGRESS, TO BE
LAPTOP SCREENS AND DISCUSS DUPLICATION TO THE NEW PANELVIEW SCREENS, AND ANY MINOR AMENDMENTS AND ADDITIONS INCLUDING FOB
NOTE 8 BELOW). CONTRACTOR MUST DETERMINE AGENDA AND ASSUME 4HRS EACH MEETING. MEETING NO.1 (INITIAL HMI) IS TO REVIEW EXISTING
CONDUCTED IN PERSON IN THE LOCKHOUSE, WITH THE GOVERNMENT TO ASSURE FINAL HMI SCREENS MEET GOVERNMENT NEEDS (SEE ALSO
CLEAREST INTENT FOR PLC HMI AND PROGRAM OPERATION. CONTRACTOR MUST COORDINATE AND SCHEDULE NOT LESS THAN (3) MEETINGS
HMI SCREENS: THE GOVERNMENT WISHES TO KEEP AN OPEN DIALOG AS NECESSARY WITH THE CONTRACTOR TO ASSIST IN PROVIDING THE 7.
DESCRIBING REQUIRED ORDER OF OPERATIONS.
INCLUDED 2006 AS-BUILD DRAWINGS IS REPRESENTED DIAGRAMMATICALLY, DESCRIPTIVELY, USING ELEMENTARY DIAGRAMS, FLOW CHARTS, AND
SEE ATTACHMENT TO SPECIFICATIONS SECTION 40 60 00 FOR ANALOG /DIGITAL OR DISCRETE INPUT AND OUTPUT LISTINGS. THE PLC LOGIC IN THE 6.
TO +110 PERCENT, WHERE 0 TO 100 PERCENT IS THE NORMAL MITER GATE OR TAINTER VALVE OPERATING LIMITS.
THE CONTROL PANEL PERCENT-OPEN DISPLAYS SHALL BE PROGRAMMED TO OPERATE UNDER NORMAL OPERATING CONDITIONS TO DISPLAY -10 5.
"STAND ALONE" FUNCTIONAL WITHOUT THE LAPTOP CONNECTED.
PLUGGED IN WHEN LAPTOP COMPUTER IS PLUGGED IN ANYWHERE ACCEPT WHEN IT IS PLUGGED IN AT THE LWCS. THE PLC SYSTEM SHALL BE
LAPTOP. PROGRAM SHALL CONTAIN REQUIRED PROGRAMMING TO DISPLAY INVIEW MESSAGE INDICATING THE LOCATION THAT LAPTOP IS
EACH PLC RACK LOCATION SHALL CONTAIN A RJ45 STYLE NETWORK ACCESS CONTROLNET AND/OR ETHERNET PORT FOR CONNECTION TO THE 4.
GENERAL ALARM DISPLAY MESSAGES, AND PROGRAMMING REQUIREMENTS.
(SILENCE) AFTER 5 MINUTES IF THEY HAD NOT ALREADY BEEN SILENCED BY ACTIVATING THE "PUSH-TO-SILENCE" BUTTON. SEE SHEETS FOR
OTHERWISE SPECIFIED IN THE CONTRACT DOCUMENTS HEREIN. UNLESS OTHERWISE NOTED, AUDIBLE ALARMS SHALL AUTOMATICALLY TIME-OUT
AND THE DISPLAY MESSAGE SHALL AUTOMATICALLY "TIME-OUT" AFTER 2 MINUTES, UNLESS EITHER THE ALARM CONDITION STILL REMAINS, OR IF
THE COMPRESSOR BUILDING, SHALL HAVE A "PUSH TO SILENCE" BUTTON THAT WILL SILENCE THE ALARM LOCATED AT EACH OF THE DISPLAYS, ALL "DISPLAY MESSAGES" THAT ARE TO BE SCROLLED ON THE MESSAGE DISPLAYS ON EACH OF THE CONTROL STANDS, THE LOCKHOUSE, AND 3.
INCLUDED SET OF AS-BUILT REFERENCE DRAWINGS FOR MORE INFORMATION.
INDICATE PLC INTERNAL CONTACTS OR FIELD STATE DATA (i.e. ON, OFF, POSITION, PRESSURE, ETC.), ONLY IN LADDER LOGIC FORMAT. SEE
ELEMENTARY WIRING DIAGRAMS INDICATE LADDER LOGIC AND CAN BE FOUND ON SHEETS IN PLC SET. DEVICES SHOWN ON THESE SHEETS 2.
BASIS POC IS VAN METER INDUSTRIAL, INC.
THE PLC PROGRAMMING CONTRACTOR SHALL BE RESPONSIBLE FOR A COMPLETE AND OPERATIONAL SYSTEM AS INDICATED HEREIN. DESIGN 1.
DRAWINGS AND SPECIFICATIONS.
NEW OIL-PARTICLE MONITOR SENSOR AT EACH HYDRAULIC POWER UNIT (HPU). SEE ALSO GENERAL NOTES THIS SHEET AND MECHANICAL
17 OIL-PARTICLE MONITOR: PROVIDE PROGRAMMING, WIRING, RACEWAY, AND INPUT MODULE AS-REQUIRED FOR FUNCTIONAL OPERATION OF EACH https://www.powerpartspro.com/hydraulics/hydraulic-pumps/rexroth?start=243200 COORDINATE ACTUAL PART NUMBERS WITH CYLINDER MANUFACTURER.
CYLINDER. (3) PART NUMBERS: R905031324, R900012472 RING SEAL, R987174515 SUBCONN CONNECTOR.
16. PROVIDE NEW WET-MATABLE MULTI-PIN PLUG WITH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .