REQUEST FOR QUOTATION

PLEASE RETURN TO:

US Army Corps of Engineers

US Army Corps of Engineers Saylorville Lake Mowing

W912EK20T0013

Attn: Natalie Werthmann/Anne Fleischman 1500 Rock Island Drive Rock Island, Illinois 61201 Email: Natalie.E.Werthmann@usace.army.mil or Anne.M.Fleischman@usace.army.mil

PLEASE INCLUDE THE FOLLOWING INFORMATION:

1. Complete Block 17a on the SF1449 - Enter Name, Address, and Current Phone Number of Person to

Contact Regarding Proposal

2. Complete and sign Blocks 30a, 30b, and 30c on the SF1449

3. Complete Offeror Representations and Certifications (Clause 52.212-3) if your company has not completed the Representations and Certifications located with your company’s SAM record (https://www.sam.gov).

4. Please fill out the the below information completely and include this cover page with your offer, along with the above items that need to be filled out.

5. Include the Solicitation Number on the outside of your envelope or as subject line if submitting by email pdf format. It is the responsibility of the offeror to verify that their offer has been received and is legible when using a method other than electronic format to submit an offer.

Contractors must be current in their registration in the System for Award Management (SAM) Database before a Government Contract award can be made.https://www.sam.gov/

Please provide: CAGE Code (SAM):_______________________________ Point of Contact: _________________________________ Phone & Email: __________________________________

FOR ADDITIONAL INFORMATION, CONTACT:

Natalie Werthmann - Phone: 309-794-5473 Email: Natalie.E.Werthmann@usace.army.mil or Anne Fleischman- Phone: 309-794-5519

Email: Anne.M.Fleischman@usace.army.mil mailto:Natalie.E.Werthmann@usace.army.mil mailto:Anne.M.Fleischman@usace.army.mil

SEE ADDENDUM

(No Collect Calls)

W912EK20T0013 10-Dec-2019

b. TELEPHONE NUMBER

3097945473

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 23 Dec 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EK9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

NATALIE E WERTHMANN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

96514792947681

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 966109 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

SAYLORVILLE LAKE PROJECT OFC

CEMVR-OD-S

US ARMY CORPS OF ENGINEERS

5600 NW 78TH AVE

JOHNSTON IA 50131-1941

TEL: 515/276-4656 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$8,000,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

CLAUSES INCORPORATED BY FULL TEXT

MVR.03

QUESTION AND ANSWER

via email

Technical inquiries and questions relating to this solicitation are to be submitted to Natalie Werthman at Natalie.e.werthmann@usace.army.mil or Anne Fleischman at anne.m.fleischman@usace.army.mil no later than 18 December 2019.

SCHEDULE OF PRICES

BID SCHEDULE (“CLINS”)

ITEM 001 BASE PERIOD: 1 April 2020 or Contract Award - 31 March 2021

CLINS DESCRIPTION: Mowing and Trimming

PRICE / ACRE QUANTITY PRICE /

ROUND

16 ROUND

TOTAL

001AA Acorn Valley Campground

20 Acres

001AB Bob Shetler Recreation Area

22 Acres

001AC Cherry Glen Campground

12 Acres

001AD Prairie Flower Campground

46 Acres

GRAND TOTAL BASE YEAR PRICE /

ACRE

QUANTITY ROUNDS

TOTAL = 100 Acres 16 mailto:Natalie.e.werthmann@usace.army.mil mailto:anne.m.fleischman@usace.army.mil

ITEM 002 OPTION PERIOD 1: 1 April 2021 - 31 March 2022

CLINS DESCRIPTION: Mowing and Trimming

PRICE / ACRE QUANTITY PRICE /

ROUND

16 ROUND

TOTAL

002AA Acorn Valley Campground

20 Acres

002AB Bob Shetler Recreation Area

22 Acres

002AC Cherry Glen Campground

12 Acres

002AD Prairie Flower

ITEM 003 OPTION PERIOD 2: 1 April 2022 - 1 December 2022

CLINS DESCRIPTION:

Mowing and Trimming

PRICE / ACRE QUANTITY PRICE /

ROUND

16 ROUND

TOTAL

003AA Acorn Valley Campground

20 Acres

003AB Bob Shetler Recreation Area

22 Acres

003AC Cherry Glen Campground

12 Acres

003AD Prairie Flower

PERFORMANCE WORK STATEMENT

INSTRUCTIONS: NOTICE TO

OFFERORS SECTION A

SAYLORVILLE

LAKE MOWING

SAYLORVILLE

LAKE JOHNSTON,

IOWA

A.1 REQUIRED SAM REGISTRATION:

1. Prior to submitting an offer, offerors must be actively registered in the System for Award Management (SAM) website. Registration instructions may be obtained, and online registration may be accomplished at www.sam.gov.

A.2 DOCUMENTS TO RETURN:

1. In order to be considered responsive, offerors must complete and return all of the following:

• Complete and return first page of solicitation (standard form 1449), including offeror’s complete mailing address, telephone number, offeror’s name, title, and signature.

• Complete and return the Bid Schedule (CLINs)

2. Offerors must thoroughly complete the solicitation pages and assure all return pages are received by the due date and time shown on page 1 of the solicitation, at the address indicated. Completed quotation packages may be mailed or emailed to the person mention on the cover sheet.

US ARMY CORPS OF ENGINEERS CLOCK

TOWER BUILDING

P.O. BOX 2004 Attn: Natalie Werthmann/ Anne Fleischman Contracting Division 1500 Rock Island Drive

ROCK ISLAND, IL 61204-2004

A.3 WAGE RATES: Prevailing Wage Rates will apply for any award resulting from this solicitation. See the included Wage Determination, and contract clause 52.222-41, Service Contract Act of 1965.

A.4 SITE VISIT:

1. Offerors who wish to request a site visit should contact the Saylorville Lake Administration Office at (515) 276-4656 to schedule an appointment. The point of contact is Nate Seibert, telephone extension #6507.

http://www.sam.gov/

PERFORMANCE WORK STATEMENT

SECTION B

SAYLORVILLE LAKE MOWING

SAYLORVILLE LAKE

JOHNSTON, IOWA

SECTION TITLE

B-1 GENERAL INFORMATION

B-2 SPECIFIC TASKS

TECHNICAL EXHIBIT #1 MOWING LOCATION AND DETAIL MAP

TECHNICAL EXHIBIT #2 PERFORMANCE MEASUREMENT MATRIX

TECHNICAL EXHIBIT #3 QUALITY ASSURANCE SURVEILLANCE MONITORING FORM

B-1

GENERAL INFORMATION

B.1.1 BACKGROUND. The U.S. Army Corps of Engineers Saylorville Lake Project is a flood control reservoir in Iowa with numerous developed recreation areas, lake access areas, and natural areas.

Saylorville Lake’s recreation areas offer a wide variety of park facilities including boat launching ramps, campgrounds, picnic areas, beaches, and trails. Saylorville Lake Dam is located in Johnston, Iowa. A map of Saylorville Lake Project can be found on the internet at:

https://www.mvr.usace.army.mil/Missions/Recreation/Saylorville-Lake/Maps/

B.1.2 SCOPE OF WORK. The Contractor shall provide all equipment, supplies, labor, manpower, fuel, transportation, and supervision necessary to perform the work described herein at Acorn Valley Campground, Bob Shetler Recreation Area, Cherry Glen Campground, and Prairie Flower Campground.

All work will be performed in accordance with the contract and inspected per the QASP.

B.1.3 PERIOD OF PERFORMANCE. The resulting Contract will be for a base period with one

(1) two (2) year option periods. Option periods will be priced and may be exercised by a contract modification, in accordance with the clause FAR 52.217-9, Option to Extend the Term of the Contract.

Performance of the Mowing Contract with option period are as follows:

BASE PERIOD OF PERFORMANCE: 1 April 2020 OR Contract Award – 31 March 2021 OPTION PERIOD 1 PERIOD OF PERFORMANCE: 1 April 2021 – 31 March 2022 OPTION PERIOD 2 PERIOD OF PERFORMANCE: 1 April 2022 – 1 December 2022

B.1.4 REQUIRED INSURANCE. In accordance with FAR Clause 52.228-5, Insurance-Work on a Government Installation, the Contractor shall obtain and maintain, during the period of performance under this contract, the following types and minimum dollar amounts of insurance*:

Workmen’s Compensation

Coverage complying with applicable State statute** Employer’s Liability Minimum $100,000 Commercial General Liability Minimum $500,000 per occurrence Commercial Automobile Liability Minimum $200,000 per person Minimum $300,000 per occurrence for bodily injury Minimum $20,000 per occurrence for property damage

*Reference FAR 28.307-2 Liability, subparagraphs (a), (b), and (c).

** Iowa Division of Insurance, telephone # (515) 281-5705 Division of Workers Compensation, telephone # (800) 775-2667

NOTE: Coverages listed above is minimums only. It higher limits of coverage are required by State stature, the Contractor shall be responsible for obtaining such additional coverage.

https://www.mvr.usace.army.mil/Missions/Recreation/Saylorville-Lake/Maps/

B.1.5 PRE-WORK CONFERENCE. After award, but prior to commencement of work, the Contracting Officer’s Representative (COR) will contact the Contractor to arrange a mutually agreeable time to meet at the Saylorville Lake Project Office to review the work requirements. The Contractor shall also submit a current copy at this meeting with the following items:

B.1.5.1 Certificate of Insurance. The contractor shall submit a “Certificate of Insurance”, with thirty (30) day cancellation clause as proof of insurance coverage.

B.1.5.2 Letter designating On-the-Job Supervisor and including phone numbers.

B.1.5.3 Environmental Protection Plan. The Contractor shall comply with federal, state, and local laws, regulations and standards regarding environmental protection. All environmental protection matters shall be coordinated with the COR.

B.1.5.4 Accident Prevention Plan. The Contractor shall prepare a written Accident Prevention Plan, IAW EM 385-1-1, and submit it to the COR at the pre-work conference. The Safety Plan shall include at a minimum the following: analysis of job hazards, policy and procedures to minimize hazards, required employee safety equipment, and emergency contacts.

• Additional meetings with the contractor may be held as necessary. Meetings shall be scheduled to take place at the project office as necessary to ensure strict compliance with the terms of the contract and to coordinate work schedules in compliance with the contract specifications.

B.1.6 SUSTAINABLE PRODUCTS REQUIREMENTS. The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA Bio-Preferred’s minimum bio-based content level. Visit the Bio-Preferred web site for the complete list of designated products and the associated minimum bio-based content level requirements.

B.1.7 DOCUMENTS AND CORRESPONDENCE. After award, all documents and related correspondence shall be routed through the Contracting Officer’s Representative (COR) located at the Saylorville Lake Project Office.

B.1.8 SECURITY CLAUSES.

Security Clause 1.

AT Level 1 Training. All Contractor and sub-contractor employees requiring access to non- public or private Government property must complete Anti-Terrorism (AT) Level 1 Training within 30 calendar days after notice to proceed date. AT Level 1 Training is available at the following website:

https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam. The required training is under the heading “JS-US007-14: Level 1 Antiterrorism Awareness Training.” Contractor employees who have a Common Access Card (CAC) may log in with their CAC. Contractor employees without a CAC shall log into the “Non-CAC users” link and need to complete the training all at once, as no record of training shall be maintained aside from the certificate that is printed upon completion. All AT Level 1 Training certificates must be submitted to the Contracting Officer within 5 calendar days of completion.

Security Clause 2(b).

https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam

For Access and General Protection Policy and Procedures. All Contractors and sub- contractor employees shall comply with installation and facility access guidelines and rules as stated herein.

Contractor workforce must comply with all personal identity verification requirements as directed by Department of Defense, Department of the Army Headquarters, Rock Island District and/or local policy. In addition to the changes otherwise authorized by the Changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the Contractor shall submit background checks that have been conducted by a bonded third party within the last 6 months of Notice to Proceed date and authorize reports to be provided to the Rock Island District Security and Law Enforcement Office by the third party. The background check will cover, at a minimum, the ten years covering states the employee has lived in, national criminal records check which includes felony and misdemeanor offenses, Department of Motor Vehicles records, and a national sex offender registry check, submitted 14 days prior to accessing the project site.

Identification Badges: The Contractor shall be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge shall have the following items shown, the employee’s picture, employee’s name, and company name working for. The badge will be prominently displayed unless restricted for safety concerns, in which case it will be available for immediate display upon request (carried on person).

As employees are added or deleted from the submitted and approved Access Control List (ACL), this information will be reported immediately to the Contracting Officer (KO). Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.

Disqualifying factors include, but are not limited to:

1. Criminal conduct, in particular violent crime and sex offenders;

2. Habitual use of intoxicating beverages to excess as evidenced by Driving under the influence or public intoxication records; or

3. Any illegal activity or other disqualification which makes the individual unfit for service (e.g. drug trafficking or procurement fraud).

In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project.

Such action in no way relieves the Contractor from performance of the Contract. The Rock Island District retains the right to deny any Contractor and sub-contractor employee from working on a contract awarded by the Rock Island District based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor shall immediately contact the Contracting Officer to coordinate obtaining written approval from the Security Office for new/additional personnel to be brought on site prior to background check acceptance. Contractor shall submit Personnel Change Request Form and will receive written authorization from the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

In the event of an unforeseen change in work site conditions which may require a contract modification, and the contractor is required to immediately add personnel, a Personnel Change Request Form will be submitted to and approved by the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

Subcontractor personnel not expected to be on the worksite for more than 15 days may be allowed on site with the following conditions:

1) Employee will be on site a total of 15 days or less, for the duration of the project.

2) Employee is added to the ACL as a short term employee.

3) Employee is escorted while on site. This is defined as being in the line of sight of an identified contractor employee who has a background check on file with the Rock Island District (as noted on the ACL).

4) Each contractor employee can sponsor only five short term employees at a time. Foreign National employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the Rock Island District Security Office NLT 30 days prior to arrival on site. Short term foreign national employees (e.g. specialists with a two week period of performance) may work on site with the following conditions:

1) Foreign national employee will be on site a total of 15 days or less, for the duration of the project.

2) Foreign national employee will comply with E-verify requirements E- verify paragraph).

3) Approved and identified contractor employee shall escort the foreign national employee at ALL times while on site.

4) Each contractor employee can sponsor only one short term foreign national at a time.

Contract #

Personnel Change Request Form Date

We, , respectfully request to add/replace (circle one) personnel to the jobsite due to the following situation:

Personnel to be conditionally added to the ACL (escorted by):

Background checks (if required for a long term employee) shall be submitted by close of business on (insert proposed date):

(Insert signature block)

Security Clause 15.

Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. Documentation of company enrollment in E- verify, via a print screen of the company profile within the E-verify system, must be submitted to the Security Office no later than 3 business days after the initial Notice to Proceed. *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification must be given/coordinated with the designated Government representative. This Form will be provided to the Security Office after Notice to Proceed is given.

**NOTE: To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, background checks, OPSEC SOPs, E-verify, and I-9 forms shall be submitted with a coversheet stating the contract number (e.g. W912EK-20-C-XXXX), title of project, and the company's point of contact information, in a sealed envelope/container and mail:

Security Office

U.S. Army Corps of Engineers Rock Island District 1500 Rock Island Drive Rock Island, IL 61201

B.1.9 INSPECTION. The Contractor shall inspect all work performed by employees prior to submittal of invoice to ensure that all work has been performed as described in the Scope.

B.1.9.1 The work will be performed in accordance with contract specifications and is subject to inspection to insure compliance with the terms of the contract and the Quality Assurance Surveillance Plan (QASP).

B.1.9.2 The COR shall be notified the day upon completion of each scheduled round. Any work not meeting the specifications contained within the PWS shall be corrected within five (5) business days at the expense of the contractor or payment deductions will be made for the scheduled mowing round.

B.1.10 WORK LOCATIONS. Acorn Valley Campground, Bob Shetler Recreation Area, Cherry Glen Campground, and Prairie Flower Campground. Please see the maps, attached hereto.

B.1.11 PAYMENT PROCEDURES. Payment for services performed under this contract will be made after satisfactory performance of work according to schedule and upon receipt of invoice. No invoice shall be received or accepted until Contractor inspects own performance first. Floods, high lake pool, construction, plant dormancy, and other circumstances may prohibit access to some areas or render mowing unnecessary. If this occurs, some areas will be excluded from mowing. Payment will be made only for services performed.

http://www.uscis.gov/e-verify)

Invoices shall be submitted to the Saylorville Lake Office, 5600 NW 78th Ave, Johnston, IA 50131.

The Contractor shall submit an original invoice upon completion. Each invoice shall contain the following information:

• Contractor’s name & address as it appears on the contract

• Contract number

• Description of work completed

• Quantity of work completed

• Unit prices

• Extended totals

• Original signature

B.1.12 TIME EXTENSIONS FOR ADVERSE WEATHER. If adverse weather is experienced and work is delayed due to unsafe or unworkable conditions, an extension may be given by the Contracting Officer.

Adverse weather must actually prohibit work beyond the control and without fault or negligence of the Contractor.

B.1.13 SAFETY REQUIREMENTS. All work shall be performed in accordance with the Contractor’s Accident Prevention Plan which shall include applicable safety requirements set forth in Corps of Engineers Manual EM 385-1-1 “Safety and Health Requirements Manual”, revised 30 November 2015. Available at:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1.pdf

No on site work shall be performed until the Contractor Accident Prevention Plan and insurance certificate are submitted and approved. This is normally accomplished at the Pre-Work meeting.

B.1.13.1 PRESCRIBED DRESS. At a minimum, the Contractor and employees shall remain fully clothed wearing short/long sleeved shirts, safety shoes, safety vest or high visibility shirt and long pants without holes as stated in EM 385-1-1.The Contractors Accident Prevention Plan shall address appropriate shoes, gloves, and other required apparel and equipment.

B.1.13.2 EQUIPMENT. Equipment used to accomplish grounds maintenance shall be suitable to perform the work as described herein. All equipment shall be equipped with manufacturer's recommended safety protective devices to ensure worker and public safety at all times.

Equipment shall be inspected daily by the contractor and maintained in good working condition.

B.1.14 EMPLOYEE CONDUCT. The majority of work will be performed in the presence of the general public. Thus, the conduct of all contractor employees is critical and will be closely monitored. The Contractor shall be responsible for ensuring that their employees strictly comply with all Federal and State laws. Any illegal or criminal activity may result in the removal of Contractor employee(s) from the project. Any public complaints on contractor employee(s) behavior will result in removal of the employee(s) from the project.

B.1.14.1 DRUGS OR ALCOHOL. The Contractor or employees, while working on this contract, shall not consume or be under the influence of alcohol and/or drugs.

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

B.1.14.2 FULLY CLOTHED All workers are to be fully clothed, in accordance with EM 385-1- 1, "Safety and Health Requirements Manual", and maintain a neat and clean appearance.

B.1.14.3 IDENTIFICATION While working on this contract, all workers shall have some form of exterior identification that is easily recognizable to the general public, such as uniforms, hats, t-shirts and/or I.D. badges, to designate them as employees of the Contractor. Prior to beginning work, the Contractor shall submit the identification to the Contracting Officer for approval.

B.1.14.4 COOPERATION. Contractor shall at all times cooperate fully with and maintain a courteous, polite and respectful manner with all members of the public, other contractors, volunteers, and Government employees.

B.1.14.5 ENFORCEMENT OF REGULATIONS. Enforcement of Federal Regulations is the responsibility of the Corps of Engineers personnel and not part of the duties or responsibilities of this contract.

B.1.15 DAMAGES. The Contractor is responsible for taking any action necessary to protect all supplies, and property, including material and supplies issued by the Government to accomplish a job, against damage, theft, or loss. Government assumes no responsibility for loss or damage to any material, supplies, or property after it is received by, or in the possession of the Contractor. The Contractor, at no cost to the Government, shall replace any Government property lost or stolen due to negligence of the Contractor. The Contractor shall replace or repair the damage at no expense to the Government within a time frame approved by the Contracting Officer. If the Contractor fails or refuses to make such repairs or replacement, within the time frame, the Contractor shall be liable for the cost to make the repair or replacement, which will be deducted from the contract payment.

B.1.15.1 CAUTION. The work area is located in heavily used recreational areas. The term "heavily used" shall be construed as areas receiving frequent use by hikers, bicycle traffic, motor vehicles, campers, and day use activities. All bidders are encouraged to attend a pre-bid conference and inspection. The contractor must mow and trim each occupied site, including campsites and picnic areas, using extreme caution.

B.1.15.2 DAMAGE PREVENTION. It shall be the Contractor's responsibility in the course of performing the contractual work to guard against destruction, injury, defacement, removal or any alteration of public property including, but not limited to developed facilities and vegetative growth. In the event that the public claims that personal property is damaged, it shall be the Contractor's responsibility to notify the Contracting Officer of the incident within 24 hours. The Contractor shall be responsible for repairing or replacing damaged property to the satisfaction of the Contracting Officer. Work shall be completed within twenty-four hours of the incident, or, as agreed upon by the COR. If the Government has to make necessary repairs or replacements, the charge will be deducted from the next invoice received from the Contractor.

B.2. MOWING AND TRIMMING

B-2

SPECIFIC TASKS

B.2.1. MOWING. Grass shall be cut on approximately 100 acres of improved grounds as indicated in the attached maps. A schedule of 16 mowing rounds will be provided at the pre- work meeting. A mowing round will consist of all 100 acres being completed during the scheduled weekly timeframe. The schedule is subject to change by the government relative to turf conditions, public use patterns, weather, and other factors. The contractor will be given a minimum of three calendar days’ notice when schedule changes are required. The Contractor is to arrive on site on the day scheduled with adequate equipment, labor and supervision to perform a complete mowing and trimming of all scheduled areas within four calendar days. If weather or turf conditions warrant an extension of time for completion of a mowing round the Contractor shall make a specific request for extension to the COR which is subject to approval. The Contractor shall attempt to minimize work adjacent to occupied campsites and picnic facilities when possible. No on site work will be permitted on Fridays after 2:00PM, Saturdays, Sundays, Federal holidays, or between the hours of 6:00 PM and 8:00 AM unless this restriction is specifically waived by the COR. The government reserves the right to designate the starting point and sequence of mowing areas if deemed necessary during any mowing round. All mowing and trimming must be performed in such a manner as to prevent rutting, scalping or tearing of turf or damage to Government facilities or private property. Mower decks will be set at a maximum of 3 inches and the Contractor shall set and maintain equipment to closely meet that range. The Government may add or remove vegetation or structures during the mowing period from the mowing area without additional payment to the Contractor. Road shoulder mowing shall be performed by the Contractor to the pavement edge and shall include rocky shoulder areas and trimming as necessary to provide a smooth uniform height of cut.

Contractor personnel shall properly reposition picnic tables after mowing and trimming under them.

Mowers shall be operated so clippings, residue, or gravel from mowing decks are not deposited on roadways, parking lots, sidewalks, campsites, picnic shelter or comfort station/shower building floors and entryways or bike trails. Contractor shall have proper equipment with each mowing crew and shall sweep, use a power blower or otherwise remove material deposited on those areas by their operations within 2 hours of cutting so that all facilities remain fully usable by the public and that the grass and material are not tracked into facilities.

B.2.2 TRIMMING. Grass and weeds shall be trimmed around trees, shrubs, buildings, campsites fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, and other fixed obstacles. The Contractor shall trim the borders of flower beds and in and around single or multiple trees and shrub mulched plantings. Trimming height shall match surrounding area grass heights. Re-sprouting woody stumps shall be trimmed to the same height as the stump. Trimming involves all improved grounds. All areas shall be trimmed concurrent with mowing. Damage to trees and shrubs from trimming shall be repaired by the contractor. If a plant should die or become unhealthy due to damage, the contractor will be responsible for replacing the damaged plant with a plant of same size and type. Plant replacement shall occur within 15 days of noticed damage. Herbicide may be used in place of mechanical trimming by the Contractor to reduce the cost of mechanical trimming. Contractor must provide evidence of properly licensed applicators prior to approval of herbicide use. Names of chemicals to be used and Material Data Safety Sheets must be submitted to and approved by the COR prior to any herbicide use. The amount of hand trimming and all other costs shall be included in the Contractor's bid prices.

TECHNICAL EXHIBIT #1

MOWING LOCATION AND DETAIL MAP

The following maps contain areas to be mowed/trimmed in Acorn Valley Campground, Cherry Glen Campground, Bob Shetler Recreation Area, and Prairie Flower Campground. Plese see attachment

TECHNICAL EXHIBIT #2

PERFORMANCE MEASUREMENT MATRIX

Performance Element

Performance Requirement

Surveillance Method

Frequency Acceptable Quality Level

Contract Services

Contract Services furnished as prescribed in the PWS as applicable.

Inspection by the COR

Random inspection of all sampling of contract services.

>95% of services inspected performed timely and without rework required.

Overall Contract Performance

Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR's annual report on contractor performance

Assessment by the COR

Annual All service elements rated Satisfactory )or higher) Satisfactory = 95% or above average contract acceptable random sampling

Contractor Self Reporting

Contract Services furnished as prescribed in the PWS as applicable.

Contractor Self Reports

Monthly >95% of services reported performed timely and without rework required.

Customer Feedback

Customer complaints reviewed by COR

Inspection by the COR

Per Occurrence

100% of valid customer complaints resolved

Invoicing Monthly invoices per contract procedures are timely and accurate.

Review & acceptance of the invoice by COR

Monthly 100% accuracy

W912EK20T0013

TECHNICAL EXHIBIT #3

QUALITY ASSURANCE Monitoring Form: MOWING SAYLORVILLE LAKE Mowing Contract Inspection Form

MOWING ROUND # DATE INSPECTED BY

Item Description Acreages

Deficiency Description

Price Per Acre

Deduction $ Amount

Acorn Valley

Campground

20.0 $ $

Bob Shetler

Recreation Area

22.0 $ $

Cherry Glen

Campground

12.0 $ $

Prairie Flower

Campground

46.0 $ $

Total Deductions: _ _ $

DAMAGE TO

VEGETATION

Yes / No

ADEQUATE

SAFETY

EQUIP

Yes / No

DAMAGE TO

GOV’T

PROPERTY

Yes / No

USING

AUTHORIZED

EQUIPMENT

Yes / No

SWEEPING/

BLOWING

COMPLETED

Yes / No

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: % ANALYSIS

OF RESULTS:

Observed Service Provider Performance Measurement Rate: % Service Provider’s Performance (Check): Meets Standards

Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: DATE:

QASP

QUALITY ASSURANCE SURVEILLANCE PLAN

Purpose: This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract, and that the Government only pays for the acceptable level of services received.

1. Critical performance processes and requirements. Critical to the performance of the contract, the contractor shall provide all personnel equipment, tools, materials, supervision, transportation, other items and services necessary to perform as defined in this Performance Work Statement (PWS). The contractor shall provide accurate transaction processing to ensure that material accountability comply with safety and security requirements, in accordance with this PWS. Additionally, the contractor shall be accountable for all auditable documents, establish/maintain effective quality, and perform required within prescribed timeframes. The performance process is the timely, accurate, and thorough completion of all contract requirements.

2. Performance Standards

a. Schedule. The dates for services and the actual accomplishment of the services in accordance with the schedule will be assessed against original dates of services and milestones established for the contract.

b. Service. The services required to be performed will be assessed against the PWS detailed in the contract, for the required content, quality, timeliness, and accuracy.

c. Past Performance. In addition to schedule and services, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.

3. Surveillance methods. The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to: random or planned sampling, periodic inspection, Contractor Self Reporting, and validated customer complaints.

a. Random/Scheduled Monitoring. Random and/or scheduled monitoring will be conducted if and when deemed necessary by the COR to ensure compliance with the terms of the contract. Using the attached matrix the COR will determine whether the contractor is in compliance with the terms of the contract.

b. Contractor Self-Reporting. The contractor shall provide as needed status reports that document significant problems/issues and potential resolutions.

c. Customer Feedback. Customer feedback will be obtained from valid customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint; must be signed and must be forwarded to the COR by the contractor. The contractor shall maintain a log of all customer complaints as well as a copy of each complaint in a documentation file. The COR may request to review the log and/or documentation file at any time.

4. Performance Measurement. Performance will be measured in accordance with the following table:

Performance-Based Matrix

Element

Requirement

Surveillance

Method

Frequency

Acceptable

Quality Level

Contract Services

Contract Services furnished as prescribed in the PWS as applicable.

Inspection by the COR

Random inspection of all sampling of contract services.

>95% of services inspected performed timely and without rework required.

Overall Overall contract Assessment by Annual All service Contract performance of the COR elements Performance sufficient quality rated to earn a Satisfactory Satisfactory (or (or higher) higher) rating in Satisfactory the COR’s = 95% or annual report on above contractor average performance contract acceptable random sampling Contractor Contract Services Contractor Self Monthly >95% of Self furnished as Reports services Reporting prescribed in the reported

PWS as performed applicable. timely and without rework required.

Customer Customer Inspection by Per 100% of Feedback complaints the COR Occurrence valid reviewed by customer COR complaints resolved Invoicing Monthly invoices per contract procedures are timely and accurate.

Review & acceptance of the invoice by

COR

Monthly 100% accuracy

Incentives/Disincentives:

For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented.

Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.

In accordance with the inspection of services provisions of the contract (52.212-4 (a) Inspection/Acceptance), the contractor will provide quality products in a timely manner since the Government can require the contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.

CLAUSES INCORPORATED BY REFERENCE

52.203-18 Prohibition on Contracting With Entities That Require Certain

Internal Confidentiality Agreements or Statements-- Representation

JAN 2017

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

JAN 2017

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017 52.209-2 Prohibition on Contracting with Inverted Domestic

Corporations--Representation

NOV 2015

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law

FEB 2016

52.212-1 (Dev) Instructions to Offerors - Commercial Items. (DEVIATION 2018-O0018)

OCT 2018

52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.217-5 Evaluation Of Options JUL 1990 52.223-1 Biobased Product Certification MAY 2012 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-10 Waste Reduction Program MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

AUG 2018

52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-18 Availability Of Funds APR 1984 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.246-1 Contractor Inspection Requirements APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: PRICE

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (OCT 2018)

ALTERNATE I (OCT 2014)

The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically in the System for Award Management (SAM) accessed through https://www.sam.gov. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (u)) of this provision.

(a) Definitions. As used in this provision--

“Economically disadvantaged women-owned small business (EDWOSB) concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

“Forced or indentured child labor” means all work or service— https://www.sam.gov/

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

“Inverted domestic corporation,” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).

“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except—

(1) PSC 5510, Lumber and Related Basic Wood Materials;

(2) Product or Service Group (PSG) 87, Agricultural Supplies;

(3) PSG 88, Live Animals;

(4) PSG 89, Subsistence;

(5) PSC 9410, Crude Grades of Plant Materials;

(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;

(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;

(8) PSC 9610, Ores;

(9) PSC 9620, Minerals, Natural and Synthetic; and

(10) PSC 9630, Additive Metal Materials.

“Place of manufacture” means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.

“Restricted business operations” means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—

(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;

(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .