W912EK20R0009-0002.pdf
PDF 716 KB Posted
- Attached to
- FACILITIES MAINTENANCE-MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) Federal contract opportunity
- Solicitation number
- W912EK20R0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0002 drawing set.pdf | ||
| Photo Set 1-Work Bays.pdf | ||
| Photo Set 2-Office and Storage.pdf | ||
| Photo Set 3-Restroom.pdf | ||
| W912EK20R0009-0001.pdf | ||
| Photo Set 4-Mezzanine.pdf | ||
| Photo Set 5-Exterior.pdf | ||
| Task Order 0001- OMS AS-Blts 1961_reference drawings.pdf | ||
| W912EK20R0009.pdf | ||
| Task Order 0001-Specifications.pdf | ||
| Task Order 0001-PLAN_SET.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FACILITIES- MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) ROCK ISLAND DISTRICT
STATES OF COLORADO, ILLINOIS, INDIANA, IOWA, KANSAS, MICHIGAN, MINNESOTA,MISSOURI, NEBRASKA. NORTH DAKOTA, OHIO AND WISCONSIN
The reason for this amendment is to update the speciifcations and extend the solicitation close date, see summary of changes.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Apr-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EK20R0009
X 9B. DATED (SEE ITEM 11)
06-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Apr-2020
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
1500 ROCK ISLAND DRIVE
ROCK ISLAND IL 61201
W912EK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EK20R0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0002
The following modifications are made to MATOC Solicitation:
Section 00 73 05; Section 01 33 00; and Section 01 33 00 Submittal Register.
The following modifications are made to the MATOC Solicitation Task Order 0001, 88th Ann Arbor, MI, OMS:
PROJECT TABLE OF CONTENTS; SECTION 00 73 05; SECTION 01 33 00
Submittal Register; SECTION 01 45 04; SECTION 08 71 00; SECTION 09 90 00;
SECTION 26 20 00, SECTION 28 31 76; and to add SECTION 07 21 29.
(as attached)
As a result of this amendment, the solicitation close date is extended from 17 April 2020 at 2:00pm CT to 21 April 2020 at 2:00pm CT. The Question and Answer period will remain closed.
(end of summary of changes)
The following modifications are made to MATOC Solicitation:
Section 00 73 05; Section 01 33 00; and Section 01 33 00 Submittal Register.
SECTION 00 73 05
a. PAGE DOCUMENT 00 73 05 PAGE 3 AND DOCUMENT 00 73 05 Page 10. Delete page
DOCUMENT 00 73 05 Page 3 and DOCUMENT 00 73 05 Page 10 in their entirety, and substitute therefor revised page DOCUMENT 00 73 05 Page 3 and DOCUMENT 00 73 05
Page 10.
SECTION 01 33 00
b. PAGES 01 33 00-1 THROUGH 01 33 00-11. Delete pages 01 33 00-1 through
01 33 00-11 in their entirety, and substitute therefor revised and new pages
01 33 00-1 through 01 33 00-11.
c. SECTION 01 33 00 SUBMITTAL REGISTER (Page 1 of 2 through Page 2 of 2).
Delete the Submittal Register, in its entirety, and substitute therefor revised and new Submittal Register (Page 1 of 2 through Page 2 of 2).
The following modifications are made to the MATOC Solicitation Task
Order 1: PROJECT TABLE OF CONTENTS; SECTION 00 73 05; SECTION 01 33 00
Submittal Register; SECTION 01 45 04; SECTION 08 71 00; SECTION 09 90 00;
SECTION 26 20 00, SECTION 28 31 76; and to add SECTION 07 21 29.
PROJECT TABLE OF CONTENTS
d. PROJECT TABLE OF CONTENTS PAGES 1 AND 2. Delete the Project Table of
Contents Pages 1 and 2, in their entirety, and substitute therefor revised
Project Table of Contents Pages 1 and 2.
e. PAGE 00 73 05-1. Delete page 00 73 05-1 in its entirety, and substitute therefor revised page 00 73 05-1.
f. SECTION 01 33 00 SUBMITTAL REGISTER (Page 1 of 18 through Page 18 of
18). Delete the Submittal Register, in its entirety, and substitute therefor revised and new Submittal Register (Page 1 of 18 through Page 18 of 18).
SECTION 01 45 04
g. PAGES 01 45 04-1 AND 01 45 04-2. Delete pages 01 45 04-1 and
01 45 04-2 in their entirety, and substitute therefor revised pages 01 45 04-1 and 01 45 04-2.
SECTION 07 21 29
h. NEW SECTION PAGES 07 21 29-1 THROUGH 07 21 29-8. Insert new Section
07 21 29 immediately behind page 06 10 01-6.
SECTION 08 71 00
i. PAGE 08 71 00-6. Delete page 08 71 00-6 in its entirety, and substitute therefor revised page PAGES 08 71 00-6.
SECTION 09 90 00
j. PAGES 09 90 00-1 THROUGH 09 90 00-22. Delete pages 09 90 00-1 THROUGH
09 90 00-22 in their entirety, and substitute therefor revised pages 09 90 00-1
THROUGH 09 90 00-22.
SECTION 26 20 00
k. PAGES 26 20 00-10 AND 26 20 00-16. Delete pages 26 20 00-10 and 26 20
00-16 in their entirety, and substitute therefor revised pages 26 20 00-10 and
26 20 00-16.
SECTION 28 31 76
l. PAGES 28 31 76-1, 28 31 76-16, AND 28 31 76-28. Delete pages
28 31 76-1, 28 31 76-16, and 28 31 76-28 in their entirety, and substitute therefor revised pages 28 31 76-1, 28 31 76-16, and 28 31 76-28.
DRAWINGS (SUPERCEDED)
m. Revised drawings listed below are being issued with this Amendment.
Such revised drawings supersede those of the same sheet identification numbers listed in the INDEX OF DRAWINGS:
C-101, A-101, A-102, F-101, P-601, E-002, E-003, E-004, E-502, E-601, and E-602.
MAIN MATOC - FACILITIES
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 1110-1-8 (2014) Construction Equipment Ownership and Operating Expense Schedule
1.2 SUBMITTALS
For each Task Order, unless specified otherwise, the Government will require the following submittals in accordance with paragraph "DATA SUBMITTALS AND TIME FREQUENCIES." For this Contract, submit the following data. Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Company Enrollment in E-Verify; G DA Form I-9; G DA
**NOTE: To protect the privacy of the Contractor, all Contractor employees, and all subcontractor employee's security information, submit with a cover page stating the Contract Number with Task Order Number,(e.g. W912EK20CXXXX-xxxx), Contract Title, and the Contractor's point of contact information in a sealed envelope/container and mail to:
Security and Law Enforcement Office U.S. Army Corps of Engineers Rock Island District 1500 Rock Island Drive Rock Island, Illinois 61201
Pre-Construction Condition Survey; G Insurance Payrolls
DOCUMENT 00 73 05 Page 3
AMEND 0002
8 APRIL 2020
1.12 DELETED
1.13 CONDITION OF EXISTING STRUCTURES, ROADWAYS, AND OTHER FACILITIES
a. Pre-Construction Condition Survey - Prior to commencement of operations by the Contractor, make a detailed survey of all existing structures, Contractor staging and parking areas, roadways, railroad tracks and concrete, and other facilities that may be affected by the Contractor's operations. Conduct the survey with the Contractor, Area Facility Operations Specialist, and the Contracting Officer and obtain signatures from all parties. Survey sufficiently in scope to provide advance agreement among all concerned as to the condition of the existing structures, Contractor staging and parking areas, roadways, and other facilities. Presume responsibility for full and active participation in such pre-construction condition survey of existing structures, Contractor staging and parking areas, roadways, and other facilities as deemed necessary to permit determination and accurate assessment of any subsequent damage to existing structures, Contractor staging and parking areas, roadways, and other facilities which may be incurred during the Contract.
b. Post-Construction Condition Survey - After completion of the work, and prior to final acceptance of the work, make a detailed post-construction condition survey of the same structures, Contractor staging and parking areas, roadways, railroad tracks and concrete, and other facilities previously surveyed with the Contractor, Area Facility Operations Specialist, and the Contracting Officer and obtain signatures from all parties. Survey sufficiently in scope to provide for agreement among all concerned as to the post-project condition of the existing structures, Contractor staging and parking areas, roadways, and other facilities. Presume responsibility for full and
DOCUMENT 00 73 05 Page 10
AMEND 0002
8 APRIL 2020
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUMMARY
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
1.2.2 Approving Authority
1.2.3 Work
1.3 SUBMITTAL CLASSIFICATION
1.3.1 Government Approved
1.3.2 Information Only
1.4 SUBMITTAL REGISTER AND DATABASE
1.4.1 Use of Submittal Register
1.4.2 Contractor Use of Submittal Register
1.4.3 Approving Authority Use of Submittal Register
1.4.4 Contractor Action Code and Action Code
1.5 CONTRACTOR'S TRANSMITTAL FORM PREPARATION
1.6 VARIATIONS
1.6.1 Considering Variations
1.6.2 Proposing Variations
1.6.3 Warranting that Variations are Compatible
1.6.4 Review Schedule is Modified
1.7 GOVERNMENT APPROVING AUTHORITY
1.7.1 Review Period
1.8 SCHEDULING
1.9 DISAPPROVED SUBMITTALS
1.10 APPROVED SUBMITTALS
1.11 APPROVED SAMPLES
PART 2 PRODUCTS
PART 3 EXECUTION
ATTACHMENTS:
ATTACHMENT A - Submittal Register
ATTACHMENT B - Transmittal Form (ENG Form 4025-R)
-- End of Section Table of Contents --
SECTION 01 33 00 Page 1
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUMMARY
Submittal process is intended to be a paperless, electronic process using the Resident Management System's (RMS) Transmittal module to the maximum extent possible, unless otherwise noted in this Contract or as directed by the Contracting Officer in writing.
Contract Clause 52.236-5 MATERIAL AND WORKMANSHIP and Contract Clause 252.236-7001, CONTRACT DRAWINGS AND SPECIFICATIONS applies to all "submittals."
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Complete each submittal in sufficient detail to allow ready determination of compliance with Contract requirements.
The Contractor's Quality Control (CQC) System Manager must check and approve all items prior to submittal and code, sign, and date indicating action taken. Clearly identify proposed deviations from the Contract requirements. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves;
test reports; test cylinders; samples; O&M manuals (including parts list);
certifications; warranties; and other such required submittals.
Schedule and submit submittals requiring Government approval prior to the acquisition of the material or equipment covered thereby. Pick up and dispose samples not incorporated into the work in accordance with manufacturer's Safety Data Sheets (SDS's) and in compliance with existing laws and regulations.
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by the Submittal Description (SD) numbers and titles as follows:
SECTION 01 33 00 Page 2
SECTION 01 33 00 Page 3
1.2.2 Approving Authority
Office or designated person authorized to approve submittal.
1.2.3 Work
As used in this section, on- and off-site construction required by Contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.3 SUBMITTAL CLASSIFICATION
1.3.1 Government Approved
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system to be checked, and other items as designated by the Contracting Officer.
Government approval is required for any deviations from the Solicitation or Accepted Proposal and other items as designated by the Contracting Officer. Within the terms of Contract Clause 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are considered "shop drawings."
1.3.2 Information Only
Submittals not requiring Government approval are for information only.
They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
Approval of the Contracting Officer is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the Contract. This does not relieve the Contractor from the obligation to furnish material in accordance with the drawings and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of
SECTION 01 33 00 Page 4 the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.4 SUBMITTAL REGISTER AND DATABASE
The Government-provided ATTACHMENT A - Submittal Register, must have columns (a), (g), (h), and (i) filled in with planning dates and submitted for approval within [30] calendar days after Notice to Proceed is received. Maintain the Submittal Register and keep it updated as the work progresses throughout Contract duration. Submit completed Submittal Register with all final approved submittal items after the final inspection and prior to close out of the Contract.
Use the RESIDENT MANAGEMENT SYSTEM (RMS) program as the primary tracking system for the Submittal Register and associated transmittals.
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
Thereafter, track all submittals by maintaining a complete Submittal Register, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.4.1 Use of Submittal Register
Verify that all submittals required for the project are listed and add missing submittals. Coordinate and complete the following fields on the register:
Column (a) Activity Number: Activity number from the project schedule.
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Needed By: Scheduled date that submittal item requires approval.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.4.2 Contractor Use of Submittal Register
Update the following fields with each submittal throughout Contract.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j): Action Code date used to record Contractor's review before transmitting to the Government.
SECTION 01 33 00 Page 5
Column (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l): List date of submittal transmission.
Column (q): List date approval received.
1.4.3 Approving Authority Use of Submittal Register
Update the following fields:
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l): List date of submittal receipt.
Column (m) through (p): List date related to review actions.
Column (q): List date returned to Contractor.
1.4.4 Contractor Action Code and Action Code
Entries for columns (j) and (o), as prescribed by ATTACHMENT B - Transmittal Form (ENG Form 4025-R)).
1.5 CONTRACTOR'S TRANSMITTAL FORM PREPARATION
Use the RMS Transmittal Log for submitting both Government Approved and Information Only submittals in accordance with the instructions on the reverse side of the form and as specified. Generate the Transmittal Form (ENG Form 4025-R) and electronically signed by the Contractor Quality Control System Manager using the Resident Management System (RMS) Transmittal Log. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted.
Include all required submittal information, for each submittal item, and in the order listed on the ENG Form 4025-R. Multiple submittal items from the same specification section may be transmitted with one ENG Form 4025-R.
Save submittal information as a .pdf file, separate from the ENG Form 4025-R, named with the Contract Number with Task Order number -xxxx and the transmittal number (for example: W912EK20C0001-xxxx 00 73 05-1.pdf).
Large File Transmittal Submissions:
For transmittal document files too large for the RMS Transmittal Document Package (usually 250 MB or larger), post the transmittal to the following website:
https://safe.apps.mil/
The Contractor must request that the Contracting Officer provide a file drop-off request through the safe website, which will provide instructions for uploading the file. The E-mail subject and file name are to follow the same format as specified.
SECTION 01 33 00 Page 6
Sample Transmittal Submission:
For samples, mail or deliver the .pdf hard copy of the ENG Form 4025-R with the samples attached. Submit the ENG Form 4025-R electronically to serve as the official approval/disapproval document for the submission and to meet the requirements of this Contract. The sample will be kept by the Government unless otherwise coordinated.
1.6 VARIATIONS
Variations from Contract requirements require a Government approval in accordance with Contract Clause FAR 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION and will be considered where advantageous to the Government.
1.6.1 Considering Variations
Discussion with Contracting Officer prior to submission, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal
(VECP).
Specifically point out variations from Contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.6.2 Proposing Variations
Check the column "variation" of ENG Form 4025-R for submittals which include proposed deviations requested by the Contractor. If lower cost is a benefit, also include an estimate of the cost savings. Set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.6.3 Warranting that Variations are Compatible
When delivering a variation for approval, Contractor warrants that this Contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.6.4 Review Schedule is Modified
In addition to normal submittal review period, 10 working days will be allowed for consideration by the Government of submittals with variations.
1.7 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
a. Note the date on which the submittal was received.
SECTION 01 33 00 Page 7
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with Contract documents.
c. Identify returned submittals with one of the actions defined in paragraph "Review Notations," of this section and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, code and date approved submittals. An electronic copy of the approved submittal will be retained by the Contracting Officer and an electronic copy of the submittal will be returned to the Contractor.
1.7.1 Review Period
Contracting Officer review will be completed within [30] calendar days after date of submission. Submittals will be returned to the Contractor with submittal action codes described in the instructions as provided on the ENG FORM 4025-R.
1.8 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals. Adequate time (a minimum of [30] calendar days exclusive of mailing time) must be allowed and shown on the register for review and approval.
a. Coordinate scheduling, sequencing, preparing, and processing of submittals with performance of work to avoid delays. Allow for potential resubmittal of requirements.
b. Submittals called for by the Contract documents to be listed on the register. If a submittal is called for but does not pertain to the Contract, include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the Contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.9 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the Contract drawings or specifications, notify the Contracting Officer, as required under the Contract Clause 52.243-4 CHANGES. The Contractor is responsible for the dimensions and design of
SECTION 01 33 00 Page 8 connection details and construction of work. Failure to point out deviations may result in rejection and removal of such work at the Contractor's expense.
If changes are necessary to the submittals, make revisions and re-submit in accordance with the procedures above. Accomplish no item of work requiring a submittal change until the changed submittals are approved.
1.10 APPROVED SUBMITTALS
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing, and other information are satisfactory. Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this Contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work. After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
The Government will electronically code and sign the transmittal form, and return the completed transmittal package back to the Contractor through RMS.
1.11 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any Contract requirements. Before submitting samples, ensure that the materials or equipment will be available in quantities required for the project. No change or substitution will be permitted after a sample has been approved.
Match the approved samples for materials and equipment incorporated in the work. If requested, any sample(s) provided for approval, including those which may be damaged in testing, will be returned to the Contractor, at its expense, upon completion of the Contract.
Failure of any materials to pass the specified tests is sufficient cause for refusal to consider, under this Contract, any further samples of the same brand or make of that material. The Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet Contract requirements will automatically void previous approvals.
Replace such materials or equipment to meet Contract requirements.
Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of its responsibilities under this Contract.
PART 2 PRODUCTS
Not Used
SECTION 01 33 00 Page 9
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 33 00 Page 10
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES
00 73 05 SD-01 Preconstruction Submittals
1.8.1 G DACompany Enrollment in E-Verify
1.8.1 G DAForm I-9
1.13 GPre-Construction Condition
Survey 1.11Insurance 1.4Payrolls
SD-07 Certificates Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans
SD-11 Closeout Submittals
1.13 GPost-Construction Condition
Survey 01 32 16 SD-01 Preconstruction Submittals
1.2 GConstruction Schedule
SD-07 Certificates
1.4Monthly Updates 01 35 26 SD-01 Preconstruction Submittals
1.5 G DAAccident Prevention Plan (APP)
1.5 G DAAsbestos Hazard Abatement
Plan
1.6 G DAActivity Hazard Analysis (AHA)
1.5 G DACrystalline Silica Plan
1.5 G DAConfined Space Entry Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES
01 35 26 1.5 G DACrane Critical Lift Plan
1.4.1 G DACrane Operators
SD-06 Test Reports 1.9Accident Reports 1.9Crane Reports
SD-07 Certificates G DAConfined Space Entry Permit
1.10 G DAHot Work Permit
1.9 G DACertificate of Compliance
1.8First Aid and CPR
01 45 00 SD-01 Preconstruction Submittals
1.6.2.1 GPay Activity Data
01 45 04 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan 01 57 19 SD-01 Preconstruction Submittals
1.6 G DAEnvironmental Protection Plan
3.6Hazardous Material Management
SD-06 Test Reports G DALaboratory Analysis
1.8Solid Waste Management Report SD-11 Closeout Submittals
3.5.3.4 G DADisposal Documentation for
Hazardous and Regulated Waste
01 78 00 SD-11 Closeout Submittals
1.2.1 GAs-Built Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES
01 78 00 1.2.2 GOperation and Maintenance (O&M) Manuals
1.2.3 GFinal Records
GC&D Waste Reporting Form
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
RFTOP - 88th RD Ann Arbor OMS VER TO#1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 73 05 SPECIAL CONTRACT REQUIREMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 22 00 PRICE AND PAYMENT PROCEDURES
01 32 16 CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 57 19 ENVIRONMENTAL PROTECTION
01 78 00 CLOSEOUT SUBMITTALS
01 91 00 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 82 13 ASBESTOS ABATEMENT
02 82 33 REMOVAL, CONTROL, AND DISPOSAL OF PAINT WITH LEAD
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 01 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 29 07 84 00 07 92 00
SPRAYED INSULATION
FIRESTOPPING
JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 36 13 SECTIONAL OVERHEAD DOORS
08 45 23 INSULATED TRANSLUCENT FIBERGLASS WALL PANEL ASSEMBLIES
08 71 00 DOOR HARDWARE
DIVISION 09 - FINISHES
09 67 23 RESINOUS FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 22 - PLUMBING
PROJECT TABLE OF CONTENTS Page 1
AMEND 0002
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19 PLUMBING PIPING INSULATION
22 15 14 COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING OF HVAC SYSTEMS
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 11 23 GAS PIPING SYSTEMS
23 23 00 REFRIGERANT PIPING
23 35 00 OVERHEAD VEHICLE TAILPIPE EXHAUST REMOVAL SYSTEM
23 54 16 HEATING SYSTEM; GAS-FIRED HEATERS
23 81 00 UNITARY AIR CONDITIONING EQUIPMENT
23 82 01 WARM AIR HEATING SYSTEMS
DIVISION 26 - ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE
32 13 13 CONCRETE PAVEMENT
32 92 10 REPAIR DAMAGED TURFED AREAS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
AT Level 1 Training Certificates; G, SL Background Checks; G, SL OPSEC Level 1 Training; G, SL Company Enrollment in E-Verify; G, SL Form I-9; G, SL
**NOTE: To protect the privacy of the Contractor, all Contractor employees, and all subcontractor employee's security information, submit with a cover page stating the Contract Number with Task Order Number (e.g., W912EK20CXXXX-xxxx), Contract Title, and the Contractor's point of contact information in a sealed envelope/container and mail to:
Security and Law Enforcement Office U.S. Army Corps of Engineers Rock Island District 1500 Rock Island Drive Rock Island, IL 61201
Pre-Construction Condition Survey; G Insurance; G; FAR 52.228-5 Payrolls
SD-07 Certificates
Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans; FAR 52.222-37
Send completed original form to Department of Labor and a copy of the completed form submitted.
SD-11 Closeout Submittals
Post-Construction Condition Survey; G
00 73 05-2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 18 PAGES
00 73 05 SD-01 Preconstruction Submittals
1.4.1 G SLAT Level 1 Training Certificates
1.4.2 G SLBackground Checks
1.4.3 G SLOPSEC Level 1 Training
1.4.4 G SLCompany Enrollment in E-Verify
1.4.4 G SLForm I-9
GSuperintendence of Subcontractors
GPre-Construction Condition Survey
GInsurance Payrolls
SD-07 Certificates Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans
SD-11 Closeout Submittals GPost-Construction Condition
Survey 01 32 16 SD-01 Preconstruction Submittals
GConstruction Schedule SD-07 Certificates Monthly Updates
01 35 26 SD-01 Preconstruction Submittals G DAAccident Prevention Plan (APP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 18 PAGES
01 35 26 GActivity Hazard Analysis SD-06 Test Reports Accident Reports
SD-07 Certificates First Aid and CPR
01 45 00 SD-01 Preconstruction Submittals GPay Activity Data
01 45 04 SD-01 Preconstruction Submittals GContractor Quality Control (CQC)
Plan 01 57 19 SD-01 Preconstruction Submittals
G DAEnvironmental Protection Plan 01 78 00 SD-11 Closeout Submittals
GAs-Built Drawings GOperation and Maintenance
(O&M) Manuals GFinal Records G88th RSC C&D Waste Reporting
Form 01 91 00 SD-01 Preconstruction Submittals
1.7 GECDGCommissioning Firm
1.7.1 GECDGLead Commissioning Specialist
1.7.2 GECDGTechnical Commissioning
Specialists GECDGCommissioning Firm's Contract
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 18 PAGES
01 91 00 3.1.3 GECDGDesign Review Report
3.1.2.3 GECDGFinal Construction Phase
Commissioning Plan
3.1.5.2 GECDGPre-Functional Checklists
Issues Log
3.2 GECDGCommissioning Report
02 82 13 SD-02 Shop Drawings G DADetailed Drawings
SD-03 Product Data
3.11.3.1 G DAAsbestos Waste Shipment
Records
3.11.3.2 G DAAsbestos Management Plan
1.9.1 G DARespiratory Protection Program
1.8.1 G DALicenses, Permits, and
Notifications
3.11 G DACleanup and Disposal
SD-06 Test Reports
3.9 G DAExposure Assessment and Air
Monitoring SD-07 Certificates
1.9 G DAMedical Surveillance
Requirements
Weight Bills and Delivery Tickets 02 82 33 SD-01 Preconstruction Submittals
1.5.2.8 GLead Waste Management Plan
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 18 PAGES
02 82 33 1.6.4 GVacuum Filters
1.6.1 GRespirators
SD-06 Test Reports
1.5.2.3 G DASampling Results
1.5.2.3 G DAOccupational and Environmental
Assessment Data Report SD-07 Certificates
1.5.1.1 G DAQualifications of CP
1.5.1.3 GTesting Laboratory
1.5.1.2 G DATraining Certification
1.5.1.4 GThird Party Consultant
Qualifications
1.5.2.2 G DALead-Based Paint/Paint with
Lead Removal/Control Plan
1.6.3 GRental Equipment Notifications
1.5.2.6 GRespiratory Protection Program
1.5.2.7 GHazard Communication Program
3.5.2 GEPA or State Approved
Hazardous Waste Treatment, Storage, or Disposal Facility
1.6.4 GVacuum Filters
3.5.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2 G DAHazardous Waste Manifest
3.5.2 GTurn-In Documents or Weight
Tickets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 18 PAGES
02 84 16 SD-07 Certificates
1.8.1 GQualifications of CIH
1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter Certification
3.2.4Certification of Decontamination 3.5.2Certificate of Disposal and/or
Recycling Testing Results
04 20 00 SD-03 Product Data GMasonry Materials and
Admixtures
2.5 GJoint Reinforcement
SD-04 Samples GClay or Shale Brick
05 12 00 SD-02 Shop Drawings
1.3.1 G DAFabrication Drawings
SD-07 Certificates
1.3.2 G DAWelding Procedures and
Qualifications 05 50 13 SD-02 Shop Drawings
G DASteel Guardrail
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 18 PAGES
05 50 13 G DAStructural Steel Supporting Mechanical Equipment
2.5 G DALadders
06 10 01 SD-03 Product Data
2.1 G DALumber
G DAPlywood
07 21 29 SD-03 Product Data
2.1 GPolyurethane Foam
2.2 GThermal Barrier
SD-07 Certificates
1.3 GInstaller Qualifications
1.3 GEvaluation Report
07 84 00 SD-03 Product Data
2.1 GFirestopping Materials
07 92 00 SD-03 Product Data GSealants
SD-04 Samples GColor
08 11 13 SD-02 Shop Drawings
2.1 G DADoors and Frames
SD-03 Product Data
2.1 G DADoors and Frames
08 36 13 SD-02 Shop Drawings
2.2 GDoors
SD-03 Product Data
2.2 GDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 18 PAGES
08 36 13 2.6 GElectric Operators 08 45 23 SD-02 Shop Drawings
G DADrawings SD-03 Product Data
G DAPanel System SD-04 Samples
G DASamples 08 71 00 SD-03 Product Data
G DAHardware 09 67 23 SD-03 Product Data
2.1 G DAFlooring System
SD-04 Samples
GFlooring Systems
1.3.3 GMockup
2.2 GWall Base
SD-07 Certificates GInstaller
09 90 00 SD-03 Product Data
2.1 GCoating
SD-04 Samples
2.1 GCoating
22 00 00 SD-03 Product Data G DAPiping Materials G DAPlumbing Materials and Fixtures
22 07 19 SD-03 Product Data
2.1 G DAInsulation Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 18 PAGES
22 07 19 2.4Jacketing 22 15 14 SD-02 Shop Drawings
1.5 G DAInstallation Drawings
SD-03 Product Data
1.3Equipment and Performance Data
G DAAboveground Piping Materials
2.2 G DAPiping Specialties
2.6 G DASupporting Elements
2.3 G DAAir Compressors
2.4 G DAValves
3.1.1 G DAAccessories
2.5 G DAMiscellaneous Materials
3.1.4 G DAVibration
SD-05 Design Data
1.3 G DADesign Analysis and Calculations
1.3 G DAFlow Rates
1.3 G DAAir Distribution
1.3 G DAPressure Requirements
1.3 G DAInsulation Requirements
1.3 G DAEquipment and Performance
Data SD-06 Test Reports
3.2.1Hydrostatic Testing 3.2Compressed Air Systems Testing 3.2.1Valve-Operating Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 18 PAGES
22 15 14 3.2.1Drainage Tests 3.2.1Pneumatic Testing
SD-07 Certificates Aboveground Piping Materials
2.6Supporting Elements 2.4Valves 2.5Miscellaneous Materials
23 00 00 SD-02 Shop Drawings
1.4.4 G DADetail Drawings
SD-03 Product Data 2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible
Duct Runouts 2.9.1.2Duct Connectors
2.9.3 G DAManual Balancing Dampers
2.9.6.1Diffusers 2.9.6.2Registers and Grilles
Louvers 2.10.1.2Centrifugal Type Power Wall
Ventilators 2.10.1.3Centrifugal Type Power Roof
Ventilators
2.11 G DAAir Handling Units
1.4.5Test Procedures
SD-06 Test Reports
3.10 G DAPerformance Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 18 PAGES
23 00 00 SD-07 Certificates 1.4.3Ozone Depleting Substances
Technician Certification SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation Instructions
3.12.2Operation and Maintenance Training
SD-10 Operation and Maintenance Data
3.12.1 G DAOperation and Maintenance
Manuals
2.9.3 G DAManual Balancing Dampers
2.10.1.2 G DACentrifugal Type Power Wall
Ventilators
2.10.1.3 G DACentrifugal Type Power Roof
Ventilators
2.11 G DAAir Handling Units
SD-11 Closeout Submittals 3.11Indoor Air Quality During
Construction 23 05 93 SD-02 Shop Drawings
3.3 G DATAB Schematic Drawings and
Report Forms
SD-03 Product Data
3.2 G DATAB Related HVAC Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 18 PAGES
23 05 93 3.5.1 G DATAB Procedures
3.5.2 G DASystems Readiness Check
3.5.1 G DATAB Execution
3.5.4 G DATAB Verification
SD-06 Test Reports
3.1 G DADesign Review Report
3.5.2 G DASystems Readiness Check
3.5.3 G DATAB Report
3.5.4 G DATAB Verification Report
SD-07 Certificates
3.4 G DADuctwork Leak Testing
1.5.1 G DATAB Firm
1.5.2 G DATAB Specialist
23 07 00 SD-03 Product Data
2.1 G DAPipe Insulation
2.2 G DADuct Insulation
23 09 00 SD-02 Shop Drawings G DAControl System
SD-03 Product Data G DADDC System
23 11 23 SD-03 Product Data 3.1Gas Piping System
SD-06 Test Reports 3.12Testing
23 23 00 SD-02 Shop Drawings
2.3 GECDGRefrigerant Piping System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 18 PAGES
23 23 00 SD-03 Product Data Demonstrations
3.1Verification of Dimensions SD-06 Test Reports
3.5Refrigerant Piping Tests SD-07 Certificates
2.1 GECDGService Organization
SD-10 Operation and Maintenance Data Operation and Maintenance Manuals
23 35 00 SD-02 Shop Drawings G DADetailed Drawings
3.4 G DAExhaust System Installation
SD-03 Product Data
G DAExhaust System
2.7 G DAMaterials and Equipment
G DAVehicle Exhaust Fans
2.5 G DADuctwork Components
G DAHose Reels 3.7Field Instructions
Spare Parts Lists 3.6Final Acceptance Tests
3.7 GOn-Site Training
1.5 GExhaust System Specialist
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 18 PAGES
23 35 00 3.6 GFinal Acceptance Tests SD-07 Certificates
3.3 G DAInspection by Exhaust System
Specialist
SD-10 Operation and Maintenance Data Vehicle Exhaust Fans Hose Reels Exhaust System
3.7Operation and Maintenance Manuals
23 54 16 SD-02 Shop Drawings
2.3 G DAIndirect Fired Make-Up Heater
1.3 G DADetail Drawings
3.2 G DAInstallation
SD-03 Product Data
2.3 G DAIndirect Fired Make-Up Heater
2.4 G DAGas Fired Unit Heater
SD-06 Test Reports
2.3 GIndirect Fired Make-Up Heater
2.4 GGas Fired Unit Heater
3.4Testing, Adjusting, and Balancing
23 81 00 SD-03 Product Data
2.1 G DAAir Cooled Condensing Units
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N…