About this file

This solicitation is for erosion and boil repairs at the Mississippi River Basin, Keokuk Flood Risk Management Project in Lee County, Iowa. The scope of work includes erosion repair by stripping topsoil and placing riprap, and boil repair by excavating trenches and filling with filter materials to construct toe filters. The NAICS code is 237990. The estimated value is between $1 million and $5 million. The period of performance is 180 consecutive calendar days. This is a woman-owned small business set-aside being conducted by the Department of the Army Corps of Engineers, Rock Island District. The response due date is not provided.

View the file

Other files

File Type Posted
Bid Opening Summary Sheet.pdf PDF
W912EK20B0006 Amendment 0001 Plans.pdf PDF
W912EK20B0006 Reference Drawings.pdf PDF
W912EK20B0006.pdf PDF
W912EK20B0006 Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

96514793028557

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0001 is to make modifications to SECTION 00 73 05; SECTION 31 41 16; and the DRAWINGS.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK20B0006

X 9B. DATED (SEE ITEM 11)

23-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jul-2020

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK20B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

The following modifications are made to SECTION 00 73 05;

SECTION 31 41 16; and the DRAWINGS.

SECTION 00 73 05

a. PAGE DOCUMENT 00 73 05 PAGE 6. Delete page Document 00 73 05 Page 6 in its entirety, and substitute therefor revised page Document 00 73 05 Page 6.

SECTION 31 41 16

b. PAGES SECTION 31 41 16 PAGE 1 THROUGH SECTION 31 41 16 PAGE 7.

Delete pages SECTION 31 41 16 Page 1 through SECTION 31 41 16 Page 7, in their entirety, and substitute therefor revised and new pages SECTION 31 41 16 Page 1 through SECTION 31 41 16 Page 8.

DRAWINGS (SUPERSEDED)

c. Revised drawings listed below are being issued with this Amendment.

Such revised drawings supersede those of the same sheet identification numbers listed in the INDEX OF DRAWINGS included in the set of drawings furnished with Solicitation No. W912EK20B0006,dated June 16, 2020.

SHEET IDENTIFICATION NO. G-002, and SHEET IDENTIFICATION NO. C-302

ATTACHMENTS: Section 00 73 05 Page 6; Section 31 41 16 Page 1-8; G-002; and C-302.

Solicitation No. W912EK20B0006 addition, an equitable adjustment will be made.

(c) If the actual quantity of work performed under Contract Line Item No. 0003 exceeds 115 percent or is less than 85 percent of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Contract Line Item No. 0003 exceeds 115 percent or is less than 85 percent of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this Contract, the Contract completion time will be adjusted.

1.13 CONDITION OF EXISTING STRUCTURES, ROADWAYS, LEVEES, AND OTHER

FACILITIES

a. Pre-Construction Condition Survey - Prior to commencement of operations by the Contractor, coordinate with the Contracting Officer to make a detailed survey of all existing structures, Contractor staging and parking areas, roadways, railroad tracks and track concrete, levees, and other facilities that may be affected by the Contractor's operations. Conduct survey with the Contracting Officer. Survey sufficiently in scope to provide advance agreement as to the condition of the existing structures, Contractor staging and parking areas, roadways, levees, and other facilities. Presume responsibility for full and active participation in such pre-construction condition survey of existing structures, Contractor staging and parking areas, roadways, levees, and other facilities as deemed necessary to permit determination and accurate assessment of any subsequent damage to existing structures, Contractor staging and parking areas, roadways, levees, and other facilities which may be incurred during the Contract.

b. Post-Construction Condition Survey - After completion of the work, and prior to final acceptance of the work, make a detailed post-construction condition survey of the same structures, Contractor staging and parking areas, roadways, levees, and other facilities previously surveyed with the Contractor and the Contracting Officer.

Conduct survey sufficiently in scope for agreement among all concerned as to the post-project condition of the existing structures, Contractor staging and parking areas, roadways, levees, and other facilities.

Presume responsibility for full and active participation in such post-construction condition survey as deemed necessary to permit determination and accurate assessment of any damage to existing structures, Contractor staging and parking areas, roadways, levees, and other facilities which have been incurred during the Contract.

c. Include, but do not limit the surveys to, photographs, videos, sketches, and written descriptions. Presume responsibility and expenses for all materials and personnel required for accomplishment of the above surveys. Submit all documentation to each party involved.

DOCUMENT 00 73 05 Page 6

AMEND 0001

14 JUL 2020

SECTION TABLE OF CONTENTS

DIVISION 31 - EARTHWORK

SECTION 31 41 16

METAL SHEET PILING

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 QUALITY CONTROL

1.4 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 METAL SHEET PILING

2.1.1 Interlocks

2.1.2 General Requirements

2.2 APPURTENANT METAL MATERIALS

2.3 ROLLED CORNERS

2.4 FABRICATED SECTIONS

2.5 TESTS, INSPECTIONS, AND VERIFICATIONS

PART 3 EXECUTION

3.1 EARTHWORK

3.2 INSTALLATION

3.2.1 Driving Hammers

3.2.2 Placing and Driving

3.2.2.1 Placing

3.2.2.2 Driving

3.2.3 Cutting-Off and Splicing

3.2.4 Inspection of Driven Piling

3.2.5 Pulling and Redriving

3.3 INSTALLATION RECORDS

-- End of Section Table of Contents --

SECTION 31 41 16 Page 1

SECTION 31 41 16

METAL SHEET PILING

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2008; Errata 2009) Structural Welding Code - Steel

ASTM INTERNATIONAL (ASTM)

ASTM A328/A328M (2007) Standard Specification for Steel Sheet Piling

ASTM A36/A36M (2008) Standard Specification for Carbon Structural Steel

ASTM A572/A572M (2007) High-Strength Low-Alloy Columbium-Vanadium Structural Steel

ASTM A6/A6M (2009) Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Pile Driving Plan; G DA Pulling and Redriving Plan; G DA

SD-02 Shop Drawings

Metal Sheet Piling; G DA

SD-03 Product Data

Driving Hammers; G Interlocked Joint Sealant

SECTION 31 41 16 Page 2

SD-06 Test Reports

Tests, Inspections, and Verifications

SD-07 Certificates

Mill Certification

SD-11 Closeout Submittals

Pile Driving Records Driving

1.3 QUALITY CONTROL

For each shipment, submit certificates identified with specific lots prior to installing piling. Include in the identification data piling type, dimensions, chemical composition, mechanical properties, section properties, heat number, and mill identification mark.

Establish and maintain quality control for pile driving operations and maintain records of quality control for all construction operations including, but not limited to, the following:

a. Accurate location, alignment and plumbness of piling.

b. Full and proper engagement of interlocks.

c. Driving (pile hammer and rate of operation).

d. Final position; depth of penetration; tip and cut-off elevations.

e. Uplift and vertical tolerances after driving.

f. Location and elevation of any obstruction encountered and action directed by Contracting Officer.

g. Pulled piles and redriving.

h. Length of cover plate and weld size.

i. Manufacture and driving of fabricated sections.

j. Cutting and splicing (welding).

k. Stockpiling and storage.

l. Removal and disposal of damaged piles.

Submit records and tests, as well as the records of corrective action taken daily.

1.4 DELIVERY, STORAGE, AND HANDLING

Deliver materials to the site accompanied by certified test reports and inspected for damage. Provide the manufacturer's logo and mill identification mark on the sheet piling as required by the referenced

SECTION 31 41 16 Page 3 specifications. Store and handle sheet piling in the manner recommended by the manufacturer; as a minimum, support on level blocks or racks spaced not more than 10 feet apart and not more than 2 feet from the ends. Storage of sheet piling to facilitate required inspection activities and prevent damage to coatings and corrosion prior to installation. Handle sheet piling over 80 feet in length using a minimum of two pickup points.

PART 2 PRODUCTS

2.1 METAL SHEET PILING

Steel for sheet piling in accordance with ASTM A328/A328M or ASTM A572/A572M.

Sheet piling, including special fabricated sections, to be of the type and dimensions as indicated, and designed that when in place they will be continuously interlocked throughout the entire length. All sheet piling to be provided with standard pulling holes located approximately 4 inches below the top of the pile, unless otherwise shown or directed. Steel sheet piling to be hot rolled and have the properties equivalent to those listed in the following Table:

PROPERTIES OF SECTIONS

Nominal Section Moment Nominal Minimum Theoretical Web Modulus of Inertia Section Interlock Driving

Type of Thickness in3/ft in4/ft Depth Strength Width Section (inches) of Wall of Wall (inches) (lbs/lin in.) inches

NZ 19 0.375 35.08 283.1 16.14 * 27.56

PZ 27 0.375 30.2 184.2 12 * 18

* 16,000 for ASTM A328/A328M

* 20,000 for ASTM A572/A572M

2.1.1 Interlocks

Provide free-sliding, swing angle suitable for the intended installation, but not less than 5 degrees when interlocked, and maintain continuous interlocking when installed. Provide hydrophilic interlock sealant to reduce seepage at sheet pile interlocks.

2.1.2 General Requirements

Sheet piling including special fabricated sections to be full-length sections of the dimensions shown. Fabricated tees, wyes, and cross pieces from fabricated piling sections with a minimum web thickness of 1/2 inch.

Provide with standard pulling holes. Fabricate as specified.

2.2 APPURTENANT METAL MATERIALS

Provide metal plates, shapes, bolts, nuts, rivets, and other appurtenant fabrication and installation materials in accordance with manufacturer's standards.

SECTION 31 41 16 Page 4

2.3 ROLLED CORNERS

Rolled corners, formed with new sheet piling, to be of the types and dimensions shown. Submit any proposed variations from the details shown.

Provide sheet pile types as required for the corners being manufactured and in accordance with ASTM A328/A328M and as specified.

2.4 FABRICATED SECTIONS

Fabricated sections, including special corners, transition piles and tee sections as specified, the details as shown and the piling manufacturer's recommendations for fabricated sections. Steel plates and angles used to fabricate the special sections in accordance with ASTM A36/A36M.

2.5 TESTS, INSPECTIONS, AND VERIFICATIONS

Test piling and appurtenant materials and have certified by the manufacturer to meet the specified chemical, mechanical and section property requirements prior to delivery to the site. Perform testing of sheet piling for mechanical properties after the completion of all rolling and forming operations. Test sheet piling in accordance with ASTM A6/A6M.

PART 3 EXECUTION

3.1 EARTHWORK

Repair any levee embankment material that is removed prior to driving sheet pile to initial condition. No rutting, depressions, or surface defects are to be present at the completion of the project Do not degrade levee embankment. Include description of any platform, mat or other equipment to be used for installing sheet pile in Pile Driving Plan.

3.2 INSTALLATION

3.2.1 Driving Hammers

Use steam, air, or diesel drop, single-acting, double-acting, differential-acting , or vibratory type.

3.2.2 Placing and Driving

3.2.2.1 Placing

Any excavation required within the area where sheet pilings are to be installed to be completed prior to placing sheet pilings. Pilings properly placed and driven to be interlocked throughout the entire length with adjacent pilings to form a continuous diaphragm throughout the length or run of piling wall.

a. Locate pilings as shown. Place pilings plumb with out-of-plumbness not exceeding 1/8 inch per foot of length and true to line. Place the pile so the face will not be more than 6 inches from vertical alignment at any point. Top of pile at elevation of cut-off within 1/2 inch horizontally and 2 inches vertically of the location

SECTION 31 41 16 Page 5 indicated. Manipulation of piles to force them into position is prohibited. Check all piles for heave. Redrive all heaved piles to the required tip elevation.

b. Provide temporary wales, templates, or guide structures to ensure that the pilings are placed and driven to the correct alignment. Use a system of structural framing sufficiently rigid to resist lateral and driving forces and to adequately support the sheet piling until design tip elevation is achieved. Use at least two templates in placing each piling not less than 20 feet apart. Templates are not to move when supporting sheet piling. Fit templates with wood blocking to bear against the web of each alternate sheet pile and hold the sheet pile at the design location alignment. Provide outer template straps or other restraints as necessary to prevent the sheets from warping or wandering from the alignment. Mark template for the location of the leading edge of each alternate sheet pile. If in view, also mark the second level to ensure that the piles are vertical and in position. If two guide marks cannot be seen, use other means to keep the sheet pile vertical along its leading edge.

3.2.2.2 Driving

Drive with the proper size hammer and by approved methods so as not to subject the pilings to damage, and to ensure proper interlocking throughout the entire length.

a. Maintain hammers in proper alignment during driving operations by use of leads or guides attached to the hammer. Take caution in the sustained use of vibratory hammers when a hard driving condition is encountered to avoid interlock-melt or damages. The use of vibratory hammers should be discontinued and impact hammers employed when the penetration rate due to vibratory loading is one foot or less per minute.

b. Employ a protecting cap in driving when using impact hammers to prevent damage to the tops of pilings. Pilings damaged during driving or driven out of interlock to be replaced at the Contractor's expense.

c. Take precautions to ensure that pilings are driven plumb. Where possible, drive Z-pile with the ball end leading. If an open socket is leading, a bolt or similar object placed in the bottom of the interlock will minimize packing material into it and ease driving for the next sheet. Sheets are not to be driven horizontally more than 3 feet ahead of the adjacent sheet. Out of plumb piling to be pulled, run to demonstrate no binding, and redriven at the Contractor's expense.

d. Pilings in each run or continuous length of piling wall to be driven alternately in increments of depth to the required depth or elevation. No piling to be driven to a lower elevation than those behind it in the same run except when the pilings behind it cannot be driven deeper. Incrementally sequence driving of individual piles such that the tip of any sheet pile is not to be more than 4 feet below that of any adjacent sheet pile. When the penetration resistance exceeds five blows per inch, the tip of any sheet pile will not be more than 2 feet below any adjacent sheet pile. If the piling next to the one being driven tends to follow below final elevation it may be pinned to the next adjacent piling.

SECTION 31 41 16 Page 6

e. If obstructions restrict driving a piling to the specified penetration depth, notify the Contracting Officer.

f. Drive sheet pile to bedrock refusal. If sheet pile meets refusal prior to reaching depth as shown, cut sheet pile at designated top elevation.

3.2.3 Cutting-Off and Splicing

Pilings driven below the required top elevation and pilings damaged by driving and cut off to permit further driving to be extended as required to reach the top elevation by splicing when directed by the Contracting Officer at no additional cost to the Government. If directed, pilings to be spliced as required to drive them to depths greater than shown and extend up to the required top elevation.

a. Pilings adjoining spliced pilings to be full length unless otherwise approved. Splice pilings as indicated. Spliced ends of pilings to be squared before splicing to eliminate dips or camber.

Splice pilings together with concentric alignment of the interlocks so that there are no discontinuities, dips, or camber at the abutting interlocks. Spliced pilings to be free sliding and able to obtain the maximum swing with contiguous pilings. Shop and field welding, qualification of welding procedures, welders, and welding operators to be in accordance with AWS D1.1/D1.1M.

b. Trim the tops of pilings excessively battered during driving when directed, at no cost to the Government. Piling cut-offs to become the property of the Contractor and removed from the site.

c. Cut holes in pilings for bolts, rods, drains, or utilities as shown or as directed. Complete all cutting in a neat and workmanlike manner. Use a straight edge in cuts made by burning to avoid abrupt nicks. Drill bolt holes in steel piling or burned and reamed by approved methods which will not damage the surrounding metal. Holes other than bolt holes to be reasonably smooth and the proper size for rods and other items to be inserted. Explosives for cutting is prohibited.

3.2.4 Inspection of Driven Piling

Perform continuous inspection during pile driving. Inspect all piles for compliance with tolerance requirements. Bring any unusual problems which may occur to the attention of the Contracting Officer. Inspect the interlocked joints of driven pilings extending above ground. Remove pilings found to be out of interlock and replace at the Contractor's expense.

3.2.5 Pulling and Redriving

Pull, as directed by the Contracting Officer, selected pilings after driving to determine the condition of the underground portions of pilings.

Any piling so pulled and found to be damaged, to the extent that its usefulness in the structure is impaired, to be replaced at the Contractor's expense. Pilings pulled and found to be in satisfactory condition to be redriven when directed by the Contracting Officer.

SECTION 31 41 16 Page 7

3.3 INSTALLATION RECORDS

Maintain a pile driving record for each sheet pile. Indicate on the installation record: installation dates and times, type and size of hammer, rate of operation, total driving time, dimensions of driving helmet and cap used, blows required per foot for each foot of penetration, final driving resistance in blows for final 6 inches, pile locations, tip elevations, ground elevations, cut-off elevations, and any reheading or cutting of piles. Record any unusual pile driving problems during driving. Submit complete records to the Contracting Officer.

-- End of Section --

SECTION 31 41 16 Page 8

Narrative
00 73 05
31 41 16
DIVISION 31 - EARTHWORK
31 41 16 - METAL SHEET PILING