W912EK20B0005 Amendment 0003.pdf

PDF 900 KB Posted

Attached to
PL84-99 Marion County Drainage District and South Quincy Drainage District, 2019 Event Levee Repairs
Solicitation number
W912EK20B0005
Issued by

About this file

This document is an amendment to a solicitation for levee repairs in Marion County and South Quincy Drainage Districts in Illinois. The scope of work includes site preparation, mechanically dredging and placing sand material, riprap stone protection placement, and site restoration. At the Marion County location, dredged material will be placed and shaped. For South Quincy, work also involves over-the-road and off-road hauling of dredged material. Payment will cover material placed to design grade but not overdepth dredging more than one foot below grade. The solicitation is issued by the US Army Corps of Engineers Rock Island District and governed by permits for the work. The amendment revises pages in Section 35 20 23 relating to mechanical dredging and excavation requirements and submittals.

View the file

Other files

File Type Posted
Bid Summary Marion and S. Quincy.pdf PDF
W912EK20B0005 Amendment 0004.pdf PDF
W912EK20B0005 Amendment 0002.pdf PDF
W912EK20B0005 Amendment 0001.pdf PDF
A22.W912EK20B0005.pdf PDF
A22.PLAN SET_SOL-2020-03-27.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE SCHEDULE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PL84-99 Marion County Drainage District and South Quincy Drainage District, 2019 Event Levee Repairs.

The reason for this amendment is to make modifications to SECTION 35 20 23.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK20B0005

X 9B. DATED (SEE ITEM 11)

15-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jun-2020

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

The following modifications are made to SECTION 35 20 23.

SECTION 35 20 23

PAGE SECTION 35 20 23 PAGE 2. Delete page SECTION 35 20 23 Page 2, in its entirety, and substitute therefor revised page SECTION 35 20 23 Page 2.

Solicitation No. W912EK20B0005

SECTION 35 20 23

MECHANICAL DREDGING / EXCAVATION

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Excavation Plan; G DA

1.2 MATERIAL TO BE REMOVED

The material is pervious material. Material removed is not to exceed the bottom elevation as shown.

1.3 ARTIFICIAL OBSTRUCTIONS

The Government has no knowledge of cables, pipes, or other artificial obstructions or of any wrecks, wreckage, or other material that would necessitate the use of employment of additional equipment for economical removal. If actual conditions differ from those stated or shown, or both, an adjustment in Contract price or time for completion, or both, will be made in accordance with FAR 52.236-2 Differing Site Conditions.

1.4 QUANTITY OF MATERIAL

The total estimated amount of material placed from within the specified limits, excluding overdepths. Overdepth dredging, while allowed, will not be included for payment of overdepth quantity and will be at the expense of the Contractor.

1.5 OVERDEPTH DREDGING

To cover unavoidable inaccuracies of dredging processes, material actually removed to a depth of 1 foot below the depth specified and within the dredging limits will be allowed, but payment will only be to design grade of material placed and will not include overdepth dredging.

1.6 PERMITS

Comply with conditions and requirements of State and Federal permits.

Conduct all work conducted in accordance with the permits in Section 00 73 05 SPECIAL CONTRACT REQUIREMENTS. Comply with all Federal, State, and local permits.

SECTION 35 20 23 Page 2

AMEND 0003

18 JUNE 2020