REQUEST FOR QUOTATION

PLEASE RETURN TO:

US Army Corps of Engineers

US Army Corps of Engineers Vegetation Management for Coralville Lake Recreation Area

W912EK19T0023

Attn: Jacob Toft 1500 Rock Island Drive Rock Island, Illinois 61201 Email: jacob.j.toft@usace.army.mil

PLEASE INCLUDE THE FOLLOWING INFORMATION:

1. Complete Block 17a on the SF1449 - Enter Name, Address, and Current Phone Number of Person to

Contact Regarding Proposal

2. Complete and sign Blocks 30a, 30b, and 30c on the SF1449

3. Complete Offeror Representations and Certifications (Clause 52.212-3) if your company has not completed the Representations and Certifications located with your company’s SAM record (https://www.sam.gov).

4. Complete and submit the Technical Capabiltiy Statement (Exhibit 4) and Past Performance

Questionnaire (Exhibit 5) per clause 52.212-2.

5. Please fill out the the below information completely and include this cover page with your offer, along with the above items that need to be filled out.

6. Include the Solicitation Number on the outside of your envelope or as subject line if submitting by email pdf format. It is the responsibility of the offeror to verify that their offer has been received and is legible when using a method other than electronic format to submit an offer.

Contractors must be current in their registration in the System for Award Management (SAM) Database before a Government Contract award can be made.https://www.sam.gov/

Please provide: Taxpayer ID Number: ____________________________ CAGE Code (SAM):_______________________________ Point of Contact: _________________________________ Phone & Email: __________________________________

FOR ADDITIONAL INFORMATION, CONTACT:

Jacob Toft - Phone: 309-794-5048 or Email: jacob.j.toft@usace.army.mil mailto:jacob.j.toft@usace.army.mil mailto:jacob.j.toft@usace.army.mil

SEE ADDENDUM

(No Collect Calls)

W912EK19T0023 31-Jan-2019

b. TELEPHONE NUMBER

309-794-5048

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 21 Feb 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EK9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JACOB J TOFT

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

96514782911585

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 966108 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

CORALVILLE LAKE PROJECT OFFE

CEMVR-OD-C

US ARMY CORPS OF ENGINEERS

2850 PRAIRIE DUCHIEN RD NE

IOWA CITY IA 52240-7820

TEL: FAX:

--- --- ---- REF BLOCK 18A)FAX:

TEL: 309-794-5613 (INVOICES SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$7,500,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

SCHEDULE OF PRICES

SECTION B

BID SCHEDULE (CLINS)

INSTRUCTIONS TO OFFERORS: Please offer to perform the tasks listed below and described in the Performance Work Statement (PWS). Payment for satisfactory performance shall be at the accepted rate times the quoted unit price, with fractional units (i.e., acres, feet.) prorated. The number sequence below corresponds to the Performance Work Statement, with Specific Task items identified.

OFFER SCHEDULE (BASE PERIOD OF PERFORMANCE) TIME OF AWARD THROUGH 31 January

Task No. Description Estimated Quantities Contracted Per Year

Quantity Unit Rate

VM001 Tree Mulching/Shearing/Girdling and

Shrub Removal

0-75 Acres Acre Per Acre

VM002 Woody Spot Mowing 0-300 Acres Acre Per Acre VM003 Woody Entire Mowing 0-300 Acres Acre Per Acre VM004 Herbaceous Mowing 0-200 Acres Acre Per Acre VM005 Firebreak Creation 0-12,000 feet Foot Per Foot VM006 Firebreak Maintenance Mowing 0-30,000 feet Foot Per Foot VM007 Pruning - Field Edges/Firebreaks 0-30,000 feet Foot Per Foot VM008 Pruning - Remote Roads, Access Lanes and Field Entrances

0-30,000 feet Foot Per Foot

VM009 Spot Spraying of Herbaceous Material 0-400 Acres Acre Per Acre VM010 Spot Spraying of Woody Regrowth 0-400 Acres Acre Per Acre VM011 Spot Treatment of Mature Woody

Shrubs

0-100 Acres Acre Per Acre

VM012 Broadcast Herbicide Application - non-selective, burn down

0-100 Acres Acre Per Acre

VM013 Broadcast Herbicide Application - post-emergent, selective

0-100 Acres Acre Per Acre

VM014 Field Disking 0-100 Acres Acre Per Acre VM015 Field Drag Harrow 0-100 Acres Acre Per Acre VM016 Field Cultipacking 0-100 Acres Acre Per Acre VM017 Broadcast Seeding 0-100 Acres Acre Per Acre VM018 Cool Season Grass and Legume Seeding with Drill

0-100 Acres Acre Per Acre

VM019 Native Seed Drill Seeding 0-100 Acres Acre Per Acre

TOTAL

OFFER SCHEDULE (ORDERING PERIOD I)

01 February 2020 THROUGH 31 January 2021

Task No. Description Estimated Quantities Contracted Per Year

Quantity Unit Rate

VM101 Tree Mulching/Shearing/Girdling and Shrub Removal

0-75 Acres Acre Per Acre

VM102 Woody Spot Mowing 0-300 Acres Acre Per Acre VM103 Woody Entire Mowing 0-300 Acres Acre Per Acre VM104 Herbaceous Mowing 0-200 Acres Acre Per Acre VM105 Firebreak Creation 0-12,000 feet Foot Per Foot VM106 Firebreak Maintenance Mowing 0-30,000 feet Foot Per Foot VM107 Pruning - Field Edges/Firebreaks 0-30,000 feet Foot Per Foot VM108 Pruning - Remote Roads, Access

Lanes and Field Entrances 0-30,000 feet Foot Per Foot

VM109 Spot Spraying of Herbaceous Material 0-400 Acres Acre Per Acre VM110 Spot Spraying of Woody Regrowth 0-400 Acres Acre Per Acre VM111 Spot Treatment of Mature Woody

Shrubs 0-100 Acres Acre Per Acre

VM112 Broadcast Herbicide Application -non- selective, burn down

0-100 Acres Acre Per Acre

VM113 Broadcast Herbicide Application -post- emergent, selective

0-100 Acres Acre Per Acre

VM114 Field Disking 0-100 Acres Acre Per Acre VM115 Field Drag Harrow 0-100 Acres Acre Per Acre VM116 Field Cultipacking 0-100 Acres Acre Per Acre VM117 Broadcast Seeding 0-100 Acres Acre Per Acre VM118 Cool Season Grass and Legume

Seeding with Drill 0-100 Acres Acre Per Acre

VM119 Native Seed Drill Seeding 0-100 Acres Acre Per Acre

OFFER SCHEDULE (ORDERING PERIOD II)

01 February 2021 THROUGH January 31 2022

Task No. Description Estimated Quantities Contracted Per Year

Quantity Unit Rate

VM201 Tree Mulching/Shearing/Girdling and Shrub Removal

0-75 Acres Acre Per Acre

VM202 Woody Spot Mowing 0-300 Acres Acre Per Acre VM203 Woody Entire Mowing 0-300 Acres Acre Per Acre VM204 Herbaceous Mowing 0-200 Acres Acre Per Acre VM205 Firebreak Creation 0-12,000 feet Foot Per Foot VM206 Firebreak Maintenance Mowing 0-30,000 feet Foot Per Foot VM207 Pruning - Field Edges/Firebreaks 0-30,000 feet Foot Per Foot VM208 Pruning - Remote Roads, Access

Lanes and Field Entrances

0-30,000 feet

Foot Per Foot

VM209 Spot Spraying of Herbaceous Material 0-400 Acres Acre Per Acre VM210 Spot Spraying of Woody Regrowth 0-400 Acres Acre Per Acre VM211 Spot Treatment of Mature Woody

Shrubs 0-100 Acres Acre Per Acre

VM212 Broadcast Herbicide Application -non- selective, burn down

0-100 Acres

Acre Per Acre

VM213 Broadcast Herbicide Application -post- emergent, selective

VM214 Field Disking 0-100 Acres

Acre Per Acre

VM215 Field Drag Harrow 0-100 Acres

Acre Per Acre

VM216 Field Cultipacking 0-100 Acres Acre Per Acre VM217 Broadcast Seeding 0-100 Acres Acre Per Acre VM218 Cool Season Grass and Legume

Seeding with Drill

0-100 Acres

Acre Per Acre

VM219 Native Seed Drill Seeding 0-100 Acres Acre Per Acre

OFFER SCHEDULE (ORDERING PERIOD III)

01 February 2022 THROUGH January 31 2023

Task No. Description Estimated Quantities Contracted Per Year

Quantity Unit Rate

VM301 Tree Mulching/Shearing/Girdling and Shrub Removal

0-75 Acres Acre Per Acre

VM302 Woody Spot Mowing 0-300 Acres Acre Per Acre VM303 Woody Entire Mowing 0-300 Acres Acre Per Acre VM304 Herbaceous Mowing 0-200 Acres Acre Per Acre VM305 Firebreak Creation 0-12,000 feet Foot Per Foot VM306 Firebreak Maintenance Mowing 0-30,000 feet Foot Per Foot VM307 Pruning - Field Edges/Firebreaks 0-30,000 feet Foot Per Foot VM308 Pruning - Remote Roads, Access

Lanes and Field Entrances

0-30,000 feet

Foot Per Foot

VM309 Spot Spraying of Herbaceous Material 0-400 Acres Acre Per Acre VM310 Spot Spraying of Woody Regrowth 0-400 Acres Acre Per Acre VM311 Spot Treatment of Mature Woody

Shrubs 0-100 Acres Acre Per Acre

VM312 Broadcast Herbicide Application -

VM313 Broadcast Herbicide Application -

VM314 Field Disking 0-100 Acres

Acre Per Acre

VM315 Field Drag Harrow 0-100 Acres

Acre Per Acre

VM316 Field Cultipacking 0-100 Acres Acre Per Acre VM317 Broadcast Seeding 0-100 Acres Acre Per Acre VM318 Cool Season Grass and Legume

Seeding with Drill

0-100 Acres

Acre Per Acre

VM319 Native Seed Drill Seeding 0-100 Acres Acre Per Acre

OFFER SCHEDULE (ORDERING PERIOD IV)

01 February 2023 THROUGH January 31 2024

Task No. Description Estimated Quantities Contracted Per Year

Quantity Unit Rate

VM401 Tree Mulching/Shearing/Girdling and Shrub Removal

0-75 Acres Acre Per Acre

VM402 Woody Spot Mowing 0-300 Acres Acre Per Acre VM403 Woody Entire Mowing 0-300 Acres Acre Per Acre VM404 Herbaceous Mowing 0-200 Acres Acre Per Acre VM405 Firebreak Creation 0-12,000 feet Foot Per Foot VM406 Firebreak Maintenance Mowing 0-30,000 feet Foot Per Foot VM407 Pruning - Field Edges/Firebreaks 0-30,000 feet Foot Per Foot VM408 Pruning - Remote Roads, Access

Lanes and Field Entrances

0-30,000 feet

Foot Per Foot

VM409 Spot Spraying of Herbaceous Material 0-400 Acres Acre Per Acre VM410 Spot Spraying of Woody Regrowth 0-400 Acres Acre Per Acre VM411 Spot Treatment of Mature Woody

Shrubs 0-100 Acres Acre Per Acre

VM412 Broadcast Herbicide Application -

VM413 Broadcast Herbicide Application -

VM414 Field Disking 0-100 Acres

Acre Per Acre

VM415 Field Drag Harrow 0-100 Acres

Acre Per Acre

VM416 Field Cultipacking 0-100 Acres Acre Per Acre VM417 Broadcast Seeding 0-100 Acres Acre Per Acre VM418 Cool Season Grass and Legume

Seeding with Drill

0-100 Acres

Acre Per Acre

VM419 Native Seed Drill Seeding 0-100 Acres Acre Per Acre

SUMMARY SCHEDULE OF PRICES

PERIOD OF PERFORMANCE OFFERED PRICE

Total - Base Period (TIME OF AWARD - January 31, 2020) $

Total - Ordering Period I (February 1, 2020 - January 31, 2021) $

Total - Ordering Period II (February 1, 2021 - January 31, 2022) $

Total - Ordering Period III (February 1, 2022 - January 31, 2023) $

Total - Ordering Period IV (February 1, 2023 - January 31, 2024) $

GRAND TOTAL BASE PLUS ADDITIONAL ORDERING PERIODS $

THE TOTAL CAPACITY FOR THE BASE YEAR AND FOUR ORDERING

PERIODS IS 249,999. THE CONTRACT MINIMUM GUARANTEE IS $25,000.

THE MINIMUM SHALL BE CONSIDERED SATISFIED FOR THE LIFE OF

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

VEGETATIVE MANAGEMENT INDEFINATE DELIVERY INDEFINATE QUANITITY

U.S. Army Corps of Engineers Coralville Lake

Iowa City, Iowa

SECTION TITLE

1.1. GENERAL INFORMATION

1.2. CONTRACTOR FURNISHED ITEMS

1.3. SPECIFIC TASKS

TECHNICAL EXHIBIT #1 PROJECT AREA MAP

TECHNICAL EXHIBIT #2 CONTRACTOR WEEKLY WORK LOG

TECHNICAL EXHIBIT #3 QUALITY ASSURANCE SURVEILLANCE PLAN

TECHNICAL EXHIBIT #4 TECHNICAL CAPABILITY STATEMENT

TECHNICAL EXHIBIT #5 USACE PAST PERFORMANCE QUESTIONNAIRE (PPO)

1.1

GENERAL

INFORMATION

1.1.1. BACKGROUND. Coralville Lake is a flood control reservoir, with numerous parks and natural resource areas managed by the U.S. Army Corps of Engineers.

The Coralville Lake Project encompasses more than 24,000 acres of land that is comprised of natural resource management units, developed recreation areas and agricultural fields. Campgrounds and day-use areas provide outdoor recreation opportunities for the public and bolster significant tourism in the area, while natural resource management provides habitat for native plant and animal species.

1.1.2. CONTRACT OBJECTIVES. This contract provides for vegetative management in varied settings to accomplish a multitude of specific goals related to project missions at Coralville Lake. Settings include vegetative management in woodland, savanna, prairie, and right-of-way access areas. A major component to the contract is the complete control or eradication of vegetative growth through mowing, forestry mulching, tree shearing or removal by chain saw, and/or the application of chemical herbicides on specified areas at Coralville Lake Project. The purpose of the mechanical removal and herbicide treatment are to achieve complete (95-100%) vegetation control of targeted vegetation in treatment areas without impacting desirable species of plants and animals. Another component to the contract is the restoration or reestablishment of native plant systems through the use of prairie plantings.

1.1.3. SCOPE OF WORK. The Contractor shall provide all equipment, supplies

(unless specified otherwise), chemicals, carrier (water or other), surfactants, labor, and supervision necessary to perform the work described herein at various locations throughout the Coralville Lake Corps of Engineers (COE) managed areas. All herbicide applications shall be consistent with federal and state laws and regulations; following product label instructions and manufacturer’s guidance in addition to the requirements of this contract. Each work item shall be performed according to specifications described herein.

1.1.4. PERIOD OF PEFORMANCE. The resulting contract will be for a base period with four (4) ordering periods. The ordering periods are priced separately and shall be exercised unless notified otherwise. See 52.217-9 for information regarding ordering periods.

BASE PERIOD OF PERFORMANCE:

TIME OF AWARD THROUGH 31 January 2020

ORDERING PERIOD I PERIOD OF PEFORMANCE:

01 February 2020 THROUGH 31 January 2021

ORDERING PERIOD II PERIOD OF PERFORMANCE:

01 February 2021 THROUGH January 31 2022

ORDERING PERIOD III PERIOD OF PERFORMANCE:

01 February 2022 THROUGH January 31 2023

ORDERING PERIOD IV PERIOD OF PERFORMANCE:

01 February 2023 THROUGH January 31 2024

1.1.5. REQUIRED INSURANCE. In accordance with the FAR Clause 52.228-5, Insurance-Work on a Government Installation, the Contractor shall obtain and maintain, during the period of performance under this contract, the following types and minimum amounts of insurance*:

Workmen’s Compensation Coverage complying with applicable State statute**

Employer’s Liability Minimum $100,000

Commercial General Liability Minimum $500,000 per occurrence

Commercial Automobile Liability Minimum $200,000 per person

Minimum $300,000 per occurrence for bodily injury Minimum $ 20,000 per occurrence for property damage

* Reference FAR 28.307-2 Liability, subparagraphs (a), (b), and (c).

** Iowa Division of Insurance, telephone # (515) 281-5705 Division of Workers Compensation, telephone # (800) 775-2667

NOTE: Coverage listed above is minimums only. If higher limits of coverage are required by State statute, the Contractor shall be responsible for obtaining such additional coverage.

1.1.6. PRE-WORK CONFERENCE. After award, but prior to commencement of work, the Contracting Officer’s Representative (COR) shall contact the Contractor to arrange a mutually agreeable time to meet at the Coralville Lake Project Office to review the work requirements. The Contractor shall also submit a current copy at this meeting the following items: (a) Insurance Certificate, (b) Letter designating On-the- Job Supervisor, (c) written Accident Prevention Plan,

(d) Environmental Protection Plan, (f) Chemical Applicator’s license(s), and (g) CPR/First Aid certificate(s) for all employees.

1.1.7. DOCUMENTS AND CORRESPONDENCE After award, all documents and related correspondence shall be routed through the Contracting Officer’s Representative (COR) at the Coralville Lake Project Office.

1.1.8. SAFETY AND SECURITY. All work shall be performed in accordance with safety requirements set forth in Corps of Engineer’s Safety and Health Requirements Manual, EM 385-1-1, dated 15 September 2014 (or current copy). A reference copy is available at the Coralville Lake Project Office or online at:

http://www.usace.army.mil/publications/eng-manuals/em385-1-1/entire.pdf)

1.1.8.1. The Contractor shall prepare a written Safety Plan and submit it to the COR at the pre-work conference. The Safety Plan shall include at a minimum the following: analysis of job hazards, policy and procedures to minimize hazards, required employee safety equipment, and emergency contacts.

1.1.8.2. Keys may be assigned to the Contractor for access to sites. The

Contractor shall not duplicate keys, shall be accountable and return all keys to the Project office before final payment.

1.1.8.3. AT Level 1 Training.

All Contractor and sub-contractor employees requiring access to non-public or private Government property must complete Anti-Terrorism (AT) Level 1 Training within 30 calendar days after notice to proceed date. AT Level 1 Training is available at the following website:

https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam. The required training is under the heading “JS-US007-14: Level 1 Antiterrorism Awareness Training.” Contractor employees who have a Common Access Card (CAC) may log in with their CAC. Contractor employees without a CAC shall log into the “Non-CAC users” link and need to complete the training all at once, as no record of training shall be maintained aside from the certificate that is printed upon completion. All AT Level 1 Training certificates must be submitted to the Contracting Officer within 5 calendar days of completion.

1.1.8.4. For Access and General Protection Policy and Procedures.

All Contractors and sub-contractor employees shall comply with installation and facility access guidelines and rules as stated herein. Contractor workforce must comply with all personal identity verification requirements as directed by Department of Defense, Department of the Army Headquarters, Rock Island District and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the Contractor shall submit background checks that have been conducted by a bonded third party within the last 6 months of Notice to Proceed date and authorize reports to be provided to the Rock Island District Security and Law Enforcement Office by the third party. The background check will cover, at a minimum, the last ten years covering States the contractor has lived in, national criminal records check which includes felony http://www.usace.army.mil/publications/eng-manuals/em385-1-1/entire.pdf) and misdemeanor offenses, DMV records, and a national sex offender registry check, submitted 14 days prior to accessing the project site.

Identification Badges: The Contractor shall be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge shall have the following items shown, the employee’s picture, employee’s name, and company name working for. The badge will be prominently displayed unless restricted for safety concerns, in which case it will be available for immediate display upon request (carried on person).

As employees are added or deleted from the submitted and approved Access Control List (ACL), this information will be reported immediately to the Contracting Officer Representative (COR). Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.

Disqualifying factors include, but are not limited to:

(1) Criminal conduct, in particular violent crime and sex offenders;

(2) Habitual use of intoxicating beverages to excess as evidenced by DUI or public intoxication records; or

(3) Any illegal activity or other disqualification which makes the individual unfit for service (e.g. drug trafficking or procurement fraud).

In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the contract. The Rock Island District retains the right to deny any Contractor and sub-contractor employee from working on a contract awarded by the Rock Island District based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor shall immediately contact the COR, and or the Contracting Officer to coordinate obtaining written approval from the Security Office for new/additional personnel to be brought on site prior to background check acceptance. Contractor shall submit Personnel Change Request Form and will receive written authorization from the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

In the event of an unforeseen change in work site conditions which may require a contract modification, and the contractor is required to immediately add personnel, a Personnel Change Request Form will be submitted to and approved by the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

Subcontractor personnel not expected to be on the worksite for more than 15 days may be allowed on site with the following conditions:

1) Employee will be on site a total of 15 days or less, for the duration of the project.

2) Employee is added to the ACL as a short term employee.

3) Employee is escorted while on site. This is defined as being in the line of sight of an identified prime contractor employee who has a background check on file with the Rock Island District (as noted on the ACL).

4) Each prime contractor employee can sponsor only five short term employees at a time.

Foreign National employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the Rock Island District Security Office No Later Than (NLT) 30 days prior to arrival on site. Short term foreign national employees (e.g. specialists with a two week period of performance) may work on site with the following conditions:

1) Foreign national employee will be on site a total of 15 days or less, for the duration of the project.

2) Foreign national employee will comply with E-verify requirements (see AT/OPSEC E-verify paragraph).

3) Approved and identified prime contractor employee shall escort the foreign national employee at ALL times while on site.

4) Each prime contractor employee can sponsor only one short term foreign national at a time.

For all projects located at the Clock Tower and Annex Building, all personnel will receive an identification badge or pass for access to either building. This must be accomplished prior to start of work and will be coordinated with the Contractor, COR and local security office.

Contract # Personnel Change Request Form

Date

We, due to the following situation:

, respectfully request to add/replace (circle one) personnel to the jobsite

Personnel to be conditionally added to the ACL (escorted by):

Background checks (if required for a long term employee) shall be submitted by close of business on (insert proposed date):

(Insert signature block)

1.8.5. Pre-screen candidates using E-Verify Program. The Contractor must pre- screen Candidates using the E-verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. Documentation of company enrollment in E-verify, via a print screen of the company profile within the E-verify system, must be submitted to the Security Office no later than 3 business days after the initial Notice to Proceed.

*When contracts are with individuals, the individuals will be required to complete a Form I- 9, Employment Eligibility Verification must be given/coordinated with the designated Government representative. This Form will be provided to the Security Office after Notice to Proceed is given.

To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, background checks, OPSEC SOPs, E-verify, and I-9 forms shall be submitted with a coversheet stating the contract number (e.g. W912EK-15-C- XXXX), title of project, and the company's point of contact information, in a sealed envelope/container and mailed to:

Security Office U.S. Army Corps of Engineers Rock Island District 1500 Rock Island Drive Rock Island, IL 61201

1.1.9. ENVIRONMENTAL PROGRAM AND CONTROLS. The Contractor

shall comply with Federal, State, and local laws, regulations and standards regarding environmental protection. All environmental protection matters shall be coordinated with the COR.

1.1.9.1. The Contractor shall prepare a written environmental protection plan that shall be carried out throughout the life of this contract. This plan shall be submitted to the COR for approval within five (5) working days after the pre-work meeting. No work shall commence until the plan has been approved.

1.1.9.2. The Contractor shall conduct all services in a manner to prevent contamination of Government land, water resources and property.

The Contractor’s environmental protection plan properly implemented will insure pesticides, petroleum products, or any other pollutants are not spilled, leaked or disposed of on Government property. No overnight storage of Contractor pesticides are allowed under this contract. Pesticides are to be stored off Government property and transported into the site daily.

Contractor shall ensure equipment is cleaned properly at the location of last use before being moved to a new location to prevent the spread of invasive species.

1.1.9.3. All pouring, mixing and rinsing of pesticides shall be protected from spillage by a containment and recovery basin or device provided by the http://www.uscis.gov/e-verify)

Contractor. The Contractor shall have emergency spill containment and clean-up supplies with application equipment. If spills or contamination occur, the Contractor shall notify the COR and be responsible for cleanup in accordance with federal, state and local law.

1.1.9.4. Disposal of Waste Materials. All materials, wastes, effluents, trash, oil, grease, chemicals, etc. will be disposed of off project lands in a lawful manner. Pesticide containers shall be recycled or disposed of off project land according to label directions.

1.1.9.5. Supplies and Materials. The Contractor shall supply the COR with a list

(to include brand names) of all pesticides to be used by the Contractor.

This list shall include the manufacturer's label and OSHA Material Safety Data Sheets (Form OSHA-20) or OMB form No. 44-R1387 for all materials.

1.1.9.6. The Contractor may select the chemical formulation to be used in order to obtain complete control of target vegetation. Proposed formulations must conform to pesticide label and submitted to the COR for approval. Products must also be on the Rock Island District’s list of Pre-Approved Pesticides. Use of any other pesticides is prohibited unless approval is received from the Rock Island District Pesticide Coordinator. Requests for pesticide approval should be sent to the COR for preliminary review and then forwarded to the District Coordinator for final review. All herbicides must be in accordance with Federal, State, and local laws, rules and regulations governing the use of such herbicides and pesticides.

1.1.9.7. The Contractor assumes all liability for improperly applied herbicides.

1.1.9.8. If any herbicide application could contact surface water then an equivalent water label herbicide must be used.

1.1.9.9. The Contractor shall meet the recycled content requirements set forth by the EPA. For a list of items that qualify for use within this contract, visit the EPA’s website at:

http://www3.epa.gov/epawaste/conserve/tools/cpg/products/) for updates

1.1.9.10. The Contractor shall meet the BioPreferred Program requirements set forth by the USDA. For a list of items that qualify for use in this contract, visit the USDA website at:

http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCateg ories.xhtml) for updates

1.1.10. INSPECTION. The Contractor shall inspect all work performed by employees prior to submittal of invoice to ensure that all work has been performed as described in the Scope.

1.1.10.1. The work will be performed in accordance with contract specifications and is subject to inspection to insure compliance with the terms of the contract and the Quality Assurance Surveillance Plan (QASP).

http://www3.epa.gov/epawaste/conserve/tools/cpg/products/) http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories

1.1.10.2. The COR shall be notified within one (1) business day upon completion of each work item. Any work not meeting the specifications contained within the PWS shall be corrected within five (5) business days at the expense of the Contractor.

1.1.11. WORK LOCATIONS. Work sites are widely scattered and vary in topography, vegetative cover and access for equipment. Travel time between sites should also be considered and offer accordingly. See project area map (attached as Technical Exhibit #1).

1.1.12. REPORT OF WORK PERFORMED. The contractor shall submit weekly the Contractors Weekly Work Log (Attached as Technical Exhibit #2) of all man hours and descriptions of work performed.

1.1.13. PAYMENT PROCEDURES. Payment for services performed under this contract will be made after satisfactory performance of work according to schedule and upon receipt of invoice. No invoice shall be received or accepted until Contractor inspects own performance first. Floods, high lake pool, construction, plant dormancy, and other circumstances may prohibit access to some areas or render mowing unnecessary. If this occurs, some areas will be excluded or an extension may be granted for Adverse Weather (See Section C.1.14). Payment will be made only for services performed.

Invoices shall be submitted to the Coralville Lake Project Office, 2850 Prairie du Chien Road NE, Iowa City, IA 52240. The Contractor shall submit an original invoice upon completion of work. Each invoice shall contain the following information:

Contractor’s name & address as it appears on the contract Contract number Description of work completed Quantity of work completed Unit Unit prices Extended totals Original Signature

1.1.14. TIME EXTENSIONS FOR ADVERSE WEATHER OR NO ACCESS

DUE TO HIGH LAKE. If adverse weather causes delays due to unsafe or unworkable conditions; or high lake levels prevent access to work areas; extensions may be given by the Contracting Officer. Conditions must actually prohibit work, beyond the control and without fault or negligence of the Contractor. If the worksite is found to be unfavorable by the contractor notification to the COR must be made in a timely manner.

1.2.

CONTRACTOR FURNISHED

ITEMS

1.2.1. EQUIPMENT AND OTHER QUALIFICATIONS NECESSARY

UNDER THIS CONTRACT.

1.2.1.1. The Contractor and all applicators must possess a valid Iowa Commercial Pesticide Applicators License, including appropriate categories for applications. Copies of license are to be furnished at the pre-work conference.

1.2.1.2. Mowing equipment must comply with Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, dated 15 September 2014, or current version.

A current version is available at the Coralville Lake Project Office.

The safety manual is also available at:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerMan uals/EM_385-1-1.pdf

1.2.1.3. Mowing machinery shall be tractor-drawn and/or mounted rotary mower(s) unless specified otherwise in this section, with tractor or other machine appropriately matched with specifications required for safe, efficient operation of the implement or attachment. Mowers must give a smooth even cut.

1.2.1.4. Equipment must be equipped and maintained continuously with all manufacturer approved protective devices in place.

1.2.1.5. Machines powering heavy duty brush mowers, forestry mulchers, and tree shears must have high pressure hydraulic system and impact resistant windows to protect operators. Mowing/mulching equipment must be capable of cutting brush into pieces six inches (6”) or less and capable of cutting trees and brush up to four inch (4”) diameter at base and not higher than three inches (3”) from the ground.

1.2.1.6. Tree shears must be capable of cutting and moving trees up to twelve inches (12”) diameter at breast height (dbh) from the restoration site.

1.2.1.7. Depending on site conditions, mowing equipment (e.g. a skid steer rotary mower) may be needed to maneuver around desirable species (e.g., mast producing species). In areas with minimal desirable trees, larger mowing equipment (e.g., tractor with heavy duty rotary brush mower) can be used. All forestry mulching and/or mowing equipment must be capable of removing trees and shrubs up to four inches (4”) at base. Contractor shall review prescription summary and visit sites to determine the appropriate sized equipment to meet prescription requirements.

1.2.1.8. Contractor must have or be able to obtain all equipment needed to fulfill requirements of the contract. The Contractor must be able to obtain on short notice sufficient back-up equipment to continue without interruption if mechanical failure of the primary occurs equipment.

1.2.1.9. Equipment may be stored overnight, and on weekends during continuous workdays at the work sites. It is requested that the Contractor coordinate with Contracting Officer’s Representative so that parking locations do not hamper public use, field accesses, and gates; a n d is off public roadways. U.S. Army Corps of Engineers (USACE) would assume no liability to Contractor equipment caused by vandalism/damage/theft or tampering.

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerMan

1.3

SPECIFIC TASKS

1.3.1. VEGETATIVE MANAGEMENT. The Contractor shall execute tasks according to the Performance Work Statement.

1.3.1.1. For the purposes of this Performance Work Statement, tree and shrub removal is defined as removal of all unmarked trees and shrubs (e.g., trees and shrubs that are not painted or flagged). Trees and shrubs to be saved are marked with paint or flagging. Paint and flagging color will be discussed at the pre-work meeting.

Woody species to be removed are typically (but not exclusively) autumn olive, honeysuckle, multi-flora rose, tree of heaven, honey locust, black locust, mulberry, elm, box elder, dogwoods, hackberry, and red cedar.

This Performance Work Statement utilizes a variety of methods to achieve this result.

1.3.1.2. Tree Mulching/Shearing/Girdling and Shrub Removal involves mulching, shearing, cutting or girdling trees and removing shrubs. All trees and shrubs that are not marked (flagged or painted) must be forestry mulched, mowed, sheared, cut down or girdled.

Tree shear all unmarked trees greater than two inches (2”) dbh and up to twelve inches (12”) dbh, and move sheared trees to the designated tree pile location as identified during the pre-work meeting. All unmarked trees and shrubs that are not accessible to shearing equipment (e.g., ditches, hillsides, lake shoreline) in identified areas must be cut down and removed to designated piles. All cut/sheared trees shall be piled as tight as possible to minimize the size and breadth of the piles. No sheared or cut trees or debris shall be left in a firebreak, roadway or in the prairie and woodland maintenance area unless the pile location identified on the maps is within the identified work area.

All remaining unmarked trees greater than twelve inches (12”) dbh shall be double girdled with a chainsaw, cutting at least 1” deep completely around the tree. The girdle shall be a continuous cut around the circumference of the tree with the parallel cut about three inches (3 ”) apart.

Any remaining woody growth (except trees and shrubs that have been marked to be saved) shall be removed by cutting, mulching or mowing.

All shrubs regardless of size may be cut down or forestry mulched within three inches (3”) of the ground instead of girdling or shearing.

All sheared, cut or girdled trees and shrubs, shall be treated with an herbicide formulation approved by the COR and listed on the approved pesticide list within 1 hour of cutting/girdling to eliminate resprouting.

The contractor shall complete all Tree Mulching/Shearing/Girdling and Shrub Removal ordered within 60 calendar days of the task delivery order start date.

1.3.1.3. Woody Mowing (Spot & Entire) involves mowing or shredding smaller tree and shrub growth as close to the ground as possible with a heavy duty rotary mower or a forestry mulcher (e.g. Fecon, Timberaxe).

All trees less than four inch (4”) diameter at breast height (dbh) and ALL invasive shrubs, such as autumn olive and honeysuckle, shall be mowed or mulched except save trees and shrubs marked with flagging or paint in the identified work areas on the maps. Mowing/mulching implements must be able to maneuver around trees to mow targeted woody vegetation and must be capable of cutting woody vegetation as described below. It is permissible for the Contractor to use chain saws to cut the woody growth and remove off of the mowed field. Sites include prairies, root/stump sprouts; old fields; prairie remnants; prairie re-establishments;

prairie expansion areas; woodlands with woody regrowth; and savanna restorations.

Spot mowing is defined as mowing only the woody growth portions in the areas identified on maps, and not mowing areas lacking woody growth.

Chips/shreds are not to exceed six inches (6”) long and tree and shrub stumps shall be no higher than three inches (3”) from the ground.

Entire area mowing is defined as mowing the entire area identified on the maps, leaving no woody growth less than four inches (4”) at base unless marked to be saved. Mowing height shall not be higher than three inches (3”).

Chips/shreds are not to exceed six inches (6”) long and tree and shrub stumps shall be no higher than three inches (3”) from the ground.

The contractor shall complete all woody mowing ordered within 60 calendar days of the task delivery order start date.

1.3.1.4. Herbaceous Mowing involves mowing areas that are comprised mostly of herbaceous plants and very little woody growth. Areas could include, but are not limited to; prairies, savannas, old fields, and food plots.

Vegetation shall be mowed to a uniform height, between 3.0 and 4.0 inches from the ground.

The contractor shall complete all Herbaceous Mowing ordered within 30 calendar days of the task delivery order start date.

1.3.1.5. Firebreak Creation involves clearing a 20’ wide path of all woody and herbaceous vegetation. Trees greater than 4” dbh and less than 18” dbh shall be sheared or cut down and removed to a designated tree pile location. All trees less than 4” dbh and shrubs may be removed by a forestry mulcher or rotary mower with chips/shreds left where they were mulched/mowed. Chips and shreds shall not exceed 6” in length. It is permissible to use chainsaws to cut all woody plants and remove to a designated tree pile location. The cut shall be flush with the ground and not angled.

All stumps larger than 1” at the base shall be no higher than 3” from the ground and shall be treated within 1 hour of cutting/girdling, according to pesticide label. The Contractor may select the chemical formulation to be used in order to obtain complete control of target vegetation. Proposed formulations must conform to pesticide label and submitted to the COR for approval prior to application. Products must also be on the Rock Island District’s list of Pre-Approved Pesticides.

The completed firebreak must be accessible for maintenance by a tractor with a rotary brush mower (only small debris remaining with maneuverable corners). The outside of the new firebreak will be flagged with red flagging.

The contractor shall complete all New Firebreak Creation ordered within 60 calendar days of the task delivery order start date.

1.3.1.6. Firebreak Maintenance Mowing involves mowing herbaceous vegetation in a previously established firebreak to height no greater than 3 inches.

Maintenance mowing typically occurs four times throughout the growing season (fewer times in years of drought) to prevent annual weeds from going to seed and to keep vegetation from getting more than two feet in height between mowings.

The contractor shall complete all Firebreak Maintenance Mowing ordered within 14 calendar days of the task delivery schedule.

1.3.1.7. Pruning Operations requires the Contractor to provide pruning services throughout the year as specified by task order. This service is to occur along, firebreaks, field edges, remote roads, and field entrances, in natural resource managed areas.

Areas where Pruning Operations have been ordered shall have all branches removed whose tips hang lower than 12’ above the ground and extend within the maintained feature. Large savanna structured oak trees with low limbs will be excluded from pruning work. These trees will be marked with paint or flagging.

The task order will require the Contractor to clean the grounds and dispose of all tree debris outside of the maintained area.

The contractor shall use proper pruning methods. The Contractor shall cut outside of the branch collar ridge or branch fork (except the main stem).

Pruning operations will be performed in accordance with US Forest Brochure, How to Prune Trees, available at http://na.fs.fed.us/spfo/pubs/howtos/ht_prune/htprune-rev-2012-screen.pdf Pruning operations must comply with Corps of Engineers Safety and Health Requirements Manual EM 385-1-1Sec 31, revised 30 November 2014, or current copy.

Pruning cuts must be made with clean, sharp, non-powered hand tools, or small chain saw, to minimize damage to the trees. Pruning shall be done to prevent dieback from occurring. Remove all dead, diseased, injured or weak branches.

Restitution for damages will be withheld for any trees that are irreversibly damaged due to improper pruning. Damages will be assessed in accordance with the Ornamental Tree and Shrub Evaluation Method.

No pruning of oak trees will be permitted from March 1 to October 31 unless specifically ordered.

The contractor shall complete all pruning ordered within 60 calendar days of the delivery order start date.

1.3.1.8. Spot Spraying of Herbaceous Material involves spraying unwanted herbaceous plants (e.g. reed canary grass, Serecia lespedeza, thistles). Task orders will indicate target species. Do not overspray surrounding vegetation. Do not spray any oak regrowth. Make special note to avoid spray drift on native prairie grasses and forbs. Spraying shall only be conducted by certified pesticide applicators that are proficient in identifying target species, and will avoid harming native, rare, or otherwise conservative plant species. The Contractor should also employ sufficient methods that ensure target plant species are eradicated per the acceptable percentage (95%) set forth within the Quality Assurance Surveillance Plan.

http://na.fs.fed.us/spfo/pubs/howtos/ht_prune/htprune-rev-2012-screen.pdf

The Contractor may select the chemical formulation to be used in order to obtain complete control of target vegetation. Proposed formulations must conform to pesticide label and submitted to the COR for approval.

Products must also be on the Rock Island District’s list of Pre-Approved Pesticides.

The contractor shall complete all Spot Spraying of Herbaceous Material ordered within 45 calendar days of the delivery order start date.

1.3.1.9. Spot Spraying of Woody Regrowth involves spraying woody regrowth that was mowed/mulched in the past two years (e.g., autumn olive, honeysuckle, multi-flora rose, honey locust, black locust, mulberry, box elder, elm, hackberry) All regrowth of trees and shrubs shall be treated with herbicides according to pesticide label. Do not overspray surrounding vegetation. Do not spray any oak regrowth. Make special note to avoid spray drift on native prairie grasses and forbs. Spraying shall only be conducted by certified pesticide applicators that are proficient in identifying target species and will avoid harming native, rare, or otherwise conservative plant species. The Contractor should also employ sufficient methods that ensure target plant species are eradicated per the acceptable percentage (95%) set forth within the Quality Assurance Surveillance Plan.

conform to pesticide label and submitted to the COR for approval.

The contractor shall complete all Spot Spraying of Woody Regrowth

1.3.1.10. Spot Treatment of Mature Woody Shrubs involves foliar spraying ALL shrubs and smaller trees that are less than four inch (4”) dbh. Save trees and shrubs will be marked with flagging or paint in the identified work areas on the maps. Do not overspray surrounding vegetation. Do not spray any oak regrowth. Make special note to avoid spray drift on native prairie grasses and forbs. Spraying shall only be conducted by certified pesticide applicators that are proficient in identifying target species and will avoid harming native, rare, or otherwise conservative plant species.

The Contractor should also employ sufficient methods that ensure target plant species are eradicated per the acceptable percentage (95%) set forth within the Quality Assurance Surveillance Plan.

conform to pesticide label and submitted to the COR for approval.

The Contractor shall complete all spot treatment of mature woody shrubs

1.3.1.11. Broadcast Herbicide Application involves the contractor spraying open areas with booms calibrated for proper rate/acre. Sites are typically with few or no obstacles, and include but are not limited to: current and future prairie reestablishments, old fields, and crop or food plot fields.

The COR will identify and designate the target species as described within the task order.