Solicitation No.: W912EK-17-R-0028

US Army Corps of Engineers Rock Island District

MISSISSIPPI RIVER BASIN

LOCK AND DAM NO. 22

SAVERTON, MO

TAINTER GATES REPLACEMENT

Construction Solicitation and Specifications

JULY 2017

Solicitation No.: W912EK-17-R-0028

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 73 05 SPECIAL CONTRACT REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 33 00 SUBMITTAL PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02 QUALITY CONTROL SYSTEM (QCS)

01 45 04 FABRICATOR QUALITY CONTROL

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 05 - METALS

05 50 14 STRUCTURAL METAL FABRICATIONS

DIVISION 09 - FINISHES

09 97 02 PAINTING: HYDRAULIC STRUCTURES

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 05 40 SELF-LUBRICATED BEARING MATERIALS

35 20 16 TAINTER GATES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 29 Aug 2017

A X B

C D

EX

X

G F 144 - 156

H

Benjamin.J.Kimbell@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912EK 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

BENJAMIN J KIMBELL 309-794-5048

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 20

21 - 22

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT

PACKAGING AND MARKING

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

23 - 24

25 - 28 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror)

M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

29 - 143

PART II - CONTRACT CLAUSES

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201 309-794-5613 (INVOICES

--- --- ---- REF BLOCK 18A)FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

96514771256422

5. DATE ISSUED

27 Jul 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912EK17R0028

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT DELIVERY DATE

BASE BID

0001 Tainter Gates 2 EA $ $ __________

0002 Delivery of Tainter Gates 1 JOB XXXXXXXX $ __________

0003 Barge Demurrage

0003AA First 20 Days 20 DY $ $ __________

0003AB Over 20 Days 60 DY $ $ __________

TOTAL OF ESTIMATED AMOUNTS FOR BASE BID

(ITEM NOS. 0001 THROUGH 0003AB, INCL.)

OPTION A

0101 Tainter Gate 1 EA $ $ __________

0102 Delivery of Tainter Gate 1 JOB XXXXXXXX $ __________

0103 Barge Demurrage

0103AA First 20 Days 20 DY $ $ __________

0103AB Over 20 Days 60 DY $ $ __________

TOTAL OF ESTIMATED AMOUNTS FOR OPTION A

(ITEM NOS. 0101 THROUGH 0103AB, INCL.)

OPTION B

0201 Tainter Gate 1 EA $ $ __________

0202 Delivery of Tainter Gate 1 JOB XXXXXXXX $ __________

0203 Barge Demurrage

0203AA First 20 Days 20 DY $ $ __________

0203AB Over 20 Days 60 DY $ $ __________

TOTAL OF ESTIMATED AMOUNTS FOR OPTION B

(ITEM NOS. 0201 THROUGH 0203AB, INCL.)

OPTION C

0301 Tainter Gate 1 EA $ $ __________

0302 Delivery of Tainter Gate 1 JOB XXXXXXXX $ __________

0303 Barge Demurrage

0303AA First 20 Days 20 DY $ $ __________

0303AB Over 20 Days 60 DY $ $ __________

TOTAL OF ESTIMATED AMOUNTS FOR OPTION C

(ITEM NOS. 0301 THROUGH 0303AB, INCL.)

OPTION D

0401 Tainter Gate 1 EA $ $ __________

0402 Delivery of Tainter Gate 1 JOB XXXXXXXX $ __________

0403 Barge Demurrage

0403AA First 20 Days 20 DY $ $ __________

0403AB Over 20 Days 60 DY $ $ __________

TOTAL OF ESTIMATED AMOUNTS FOR OPTION D

(ITEM NOS. 0401 THROUGH 0403AB, INCL.)

TOTAL OF ESTIMATED AMOUNTS FOR BASE BID AND OPTIONS A THROUGH D

(ITEM NOS. 0001 THROUGH 0403AB, INCL.)

DY = DAY EA = EACH JOB = LUMP SUM

PLEASE ENSURE THAT ALL AMOUNT LINES ARE COMPLETED.

DELIVER BASE BID GATES TO THE LOCATION AS INDICATED WITHIN 940 CALENDAR

DAYS AFTER NOTICE TO PROCEED (NTP) OF THE BASE BID.

EXTENSION OF THE CONTRACT PERFORMANCE PERIOD AS A RESULT OF THE

AWARD OF OPTIONS WILL NOT CHANGE THE DELIVERY SCHEDULE

OF THE BASE BID WORK.

THE GOVERNMENT RESERVES THE RIGHT TO AWARD ANY OR ALL OPTIONS

WITHIN THE NUMBER OF CONSECUTIVE CALENDAR DAYS AFTER AWARD

OF THE BASE BID, AS FOLLOWS:

OPTION A AND/OR B TAINTER GATE(S) 365 CALENDAR DAYS

OPTION C AND/OR D TAINTER GATE(S) 730 CALENDAR DAYS

EACH AWARDED OPTION WILL EXTEND THE CONTRACT BY 210 DAYS.

DELIVERY OF OPTION GATES MAY BE MADE AT THE END

OF THE CONTRACT PERIOD. AT CONTRACTOR OWN DISCRETION AND WITH

CONTRACTING OFFICER APPROVAL, THE CONTRACTOR MAY DELIVER

OPTION GATES EARLIER THAN THE END OF THE

CONTRACT PERIOD.

THE GOVERNMENT REQUIRES NOTIFICATION AT LEAST 30 DAYS

PRIOR

TO DELIVERY OF GATE(S).

THE CONTRACTOR TO REMOVE DELIVERY BARGE(S) FROM THE

APPLICABLE SITE

WITHIN 7 CONSECUTIVE CALENDAR DAYS FOLLOWING RELEASE BY THE GOVERNMENT.

DO NOT FILL-IN/COMPLETE THE DELIVERY DATE COLUMN WHEN SUBMITTING

YOUR

SECTION II

SOLICITATION PROVISIONS

A. BASIS FOR AWARD

A single award will be made to the Offeror who provides a technically acceptable proposal with the overall lowest price.

Proposed prices will be evaluated but not scored or otherwise combined with the other aspects of the proposal evaluation.

B. FACTORS TO BE EVALUATED

In order for an Offeror to be considered for award, the proposal must receive an “Acceptable” rating in every non-price factor.

Factor 1: Technical: Certifications

Factor 2: Past Performance

Factor 3: Price

C. EVALUATION APPROACH

All proposals shall be subject to evaluation by the Source Selection Team (SST).

1. Factor 1: Technical:

The Government will evaluate the Technical Factor on an Acceptable/Unacceptable basis. This factor identifies the minimum requirements that are imperative to successful contract performance.

The Source Selection Team will evaluate the Offeror’s proposal against the factors listed below to determine whether the proposal is Acceptable or Unacceptable, using the ratings and descriptions outlined in Table A-1:

PROPOSAL THE GOVERNMENT WILL FILL-IN/COMPLETE THIS INFORMATION AT

THE

TIME OF AWARD AND/OR MODIFICATIONS. PLEASE SEE CLAUSE 52.211-8 FOR

MORE INFORMATION.

Certifications:

The Technical Factor shall include the following to be considered eligible for award:

The Offeror shall submit one (1) copy of the certifications listed below from the American Institute of Steel Construction (AISC) for all fabrication plants to be utilized for this project. The Offeror shall submit the currently held certification(s) as well as the past certifications to show certifications have been held continuously for the past five (5) years.

Intermediate Bridges certification with Supplemental Requirement F- Requirements for Fabricators of Bridges with Fracture-Critical Members

OR

Advanced Bridges certification with Supplemental Requirement F- Requirements for

AND

P3- Sophisticated Paint Endorsement –Outside

For proof that the certifications have been continuously held for the past five (5) years, bridge fabrication certifications since July 1, 2014 shall be the same certifications as listed above.

Bridge fabrication certifications prior to July 1, 2014 shall be:

Intermediate Bridges certification with Supplemental Requirement F- Requirements for

Advanced Bridges certification with Supplemental Requirement F- Requirements for

Major Steel Bridge CBR Certification with Fracture Critical Endorsement

Table A-1. Technical Acceptable/Unacceptable Ratings

Rating Description

ACCEPTABLE Proposal clearly meets the minimum requirements of the solicitation.

UNACCEPTABLE Proposal does not clearly meet the minimum requirements of the solicitation.

2. Factor 2: Past Performance:

The Government will evaluate the Past Performance portion on an Acceptable/Unacceptable basis utilizing the descriptions outlined in A-2. This factor identifies the minimum requirements that are key to successful contract performance. Offeror’s who are determined “Unacceptable” will not be eligible for award.

Table A-2. Past Performance Evaluation Ratings

Rating Description

ACCEPTABLE Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.

UNACCEPTABLE Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.

Note: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a) (2) (iv)). Therefore, the Offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “Acceptable.”

Evaluations of past performance shall be in accordance with this plan while utilizing the Past Performance Questionnaires (PPQ) and forms in Appendix D, Enclosure 2. Offerors shall submit all Government and/or commercial contracts for the prime Offeror and each major subcontractor in performance or awarded during the past ten (10) years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation. Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. Past performance information shall be submitted as part of Volume II, “Past Performance,” of the proposal.

Offerors’ past performance is a measure of the degree to which an Offeror was successful on projects of similar scope, size, and complexity, as measured by the level of past customer satisfaction. It is also a measure of the degree to which an Offeror has complied with Federal, State, and local laws and regulations. The Government will evaluate the past performance information provided by Offerors, as well as information from other sources, such as Government databases.

The past performance evaluation results is an assessment of the offeror’s probability of meeting the past performance requirements stated within the solicitation. This assessment is based on the offeror’s record of relevant and recent past performance information that pertains to the current requirement. There are two aspects to this past performance evaluation. The first is to evaluate whether the offeror’s past performance is relevant or not relevant to the effort required. This will establish what is recent and what is relevant such as an offeror’s contract history that provides the most confidence to satisfy the current requirement. The second is to determine how well the contractor performed.

Recency refers to the state or quality of being current. The more recent the contract, the greater the likelihood that the offeror has the capacity to perform in a like manner. Information regarding contract performance that is recent and has a logical connection with the requirement under consideration indicates relevancy.

Offerors shall submit all Government and/or commercial contracts for the prime Offeror and each major subcontractor in performance or awarded during the past ten (10) years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation. Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order.

The Offeror shall submit up to five (5) PPQs for work performed since 2007. Contracts shall be at least six (6) months old to be considered. Contracts with expiration dates prior to 2007 shall not be considered. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. The forms shall identify if the contract is active or complete, the contract was for Government (federal, state, local, etc.) or commercial, if the offeror was the prime contractor, a teaming partner, and/or joint venture. If more than five (5) are submitted, only the five (5) most recent projects will be considered. The past performance reference must have been a client, or client representative, with whom the Offeror/subcontractor had a contract, or subcontract (if applicable) for one or more projects. Past performance references must hold, or have held at the time, a senior position in the client organization with responsibilities for either contract administration, quality control, engineering, or technical supervision, or was otherwise in a position to evaluate the Offeror or sub-contractor’s performance in executing the contract or subcontract. The past performance reference must have first-hand knowledge of the performance. In the event an Offeror submits fewer than five

(5) PPQs, the Offeror must certify that additional past performance information is not available and provide an acceptable explanation as to why.

o All submitted PPQs shall be for Hydraulic Steel Structure Fabricated Projects.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, Past Performance Questionnaires (PPQs) submitted on prior RFPs, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of entities (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, Federal Awardee Performance and Integrity Information

System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

If the Offeror is employing a recognized team arrangement, Past Performance Information must be completed for each team member by submitting one or more projects (performed individually or as part of the same team).

The Government reserves the right to evaluate the past performance of any subcontractor identified in the Offeror’s proposal as part of its assessment of the acceptability of that Offeror’s proposal.

3. Factor 3: Price:

Offerors shall complete and submit the Schedule of Prices with its proposal and include a price for each line item. Failure to do so will result in the proposal being rejected without further consideration. Offerors will be allowed one proposal submission.

An award will be made to the lowest priced, technically acceptable proposal. The lowest price will be determined by adding up all listed line items. Failure to submit a price for any of the required line items on the Schedule of Prices will render the Offeror’s proposal as ineligible for award.

The Source Selection Evaluation Board will evaluate each Offeror’s price and verify that unbalanced pricing is not present and performance risks are minimal. The Contracting Officer will evaluate each Offeror’s price in accordance with FAR 15.404-1 to determine price reasonableness. Price reasonableness will be determined by comparing all proposed prices, the Independent Government Estimate, and pricing of previous work that is same or similar to the requirement.

D. PROPOSAL SUBMISSION:

The Offeror’s proposal may be submitted as digital copies (pdf), as set forth below, to the Contract Specialist, Benjamin Kimbell, benjamin.j.kimbell@usace.army.mil.

The Offeror’s proposal shall consist of the following four (4) volumes. The volumes are:

I - Technical II - Past Performance III - Price IV - Solicitation, Offer and Award Documents, Bid Bonds and Certifications/Representations/JV or LLC info

Files shall not contain classified data. The use of hyperlinks in the proposals is prohibited.

Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.

1. PROPOSAL SUBMISSION REQUIREMENTS

a. Each volume shall be submitted electronically. Each document within the file shall be clearly labeled with its title. Contractor shall sign the first two (2) pages of SF 33.

b. All documents should be single spaced. Each paragraph shall be separated by at least one (1) blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.

c. The following volumes of material shall be submitted:

DIGITAL MAXIMUM

VOLUME TITLE COPIES PAGES

I – Technical 1 50 o Certifications

II – Past Performance 1 50

III – Price 1 N/A o Schedule of Prices

IV – Solicitation, Offer, Award 1 N/A Documents, Bid Bonds and Certification/Representations

NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.

2. PROPOSAL FILES

a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:

Margins – Top, Bottom, Left, Right – 1” Gutter – 0”

From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”

The following additional restrictions apply:

b. File Packaging. Files shall be in read-only format, using PDF files.

**Please note – Self extracting .exe files are not acceptable.

c. Content Requirement. All information shall be confined to the appropriate volume.

Each volume of the proposal shall consist of a Table of Contents, along with the detailed information provided below:

i. VOLUME I – Technical: The volume shall consist of all information required to demonstrate the technical requirements and shall not exceed 50 pages. No technical information shall be contained in any other volume of this proposal. The volume shall be organized into the following sections:

The Offeror shall submit one (1) copy of the certifications listed below from the American Institute of Steel Construction (AISC) for all fabrication plants to be utilized for this project. The Offeror shall submit the currently held certification(s) as well as the past certifications to show certifications have been held continuously for the past five (5) years.

Intermediate Bridges certification with Supplemental Requirement F- Requirements for Fabricators of Bridges with Fracture-Critical Members

Advanced Bridges certification with Supplemental Requirement F- Requirements for Fabricators of Bridges with Fracture-Critical Members

AND

P3- Sophisticated Paint Endorsement –Outside

For proof that the certifications have been continuously held for the past five (5) years, bridge fabrication certifications since July 1, 2014 shall be the same certifications as listed above.

Bridge fabrication certifications prior to July 1, 2014 shall be:

Intermediate Bridges certification with Supplemental Requirement F- Requirements for Fabricators of Bridges with Fracture-Critical Members

Advanced Bridges certification with Supplemental Requirement F- Requirements for Fabricators of Bridges with Fracture-Critical Members

Major Steel Bridge CBR Certification with Fracture Critical Endorsement

ii. VOLUME II – Past Performance: This section shall contain past performance information regarding similar contracts as a prime contractor and shall not exceed 50 pages. PPQs are excluded from the 50-page count. No past performance information shall be contained in any other volume of this proposal. The volume shall be organized into the following sections:

Government and/or commercial contracts for the prime Offeror and each major subcontractor in performance or awarded during the past ten (10) years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation. Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order.

Past Performance Questionnaires (PPQs):

The Offeror shall submit up to five (5) PPQ’s Forms as stated above in the Evaluation Approach. If more than five (5) are submitted, only the five (5) most recent projects will be considered. In the event an Offeror submits fewer than five (5) PPQs, the Offeror must certify that additional past performance information is not available and provide an acceptable explanation as to why.

Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.

If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Ben Kimbell, via email at benjamin.j.kimbell@usace.army.mil prior to proposal closing date.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

iii. VOLUME III – Price: Schedule of Prices must be completed and returned.

Failure to provide will result in your proposal not being considered for award. No pricing information shall be contained in any other volume of this proposal.

Certified cost and pricing data are not currently required; however, the Government reserves the right to request such data prior to award.

iv. VOLUME IV – Solicitations, Offer, Award Documents, Bid Bond, and Certifications/Representations

Standard Form 33 Solicitation, Offer and all amendments, Representations, Certification and Other Statements of Offerors and Bid Bond.

A copy of the bid bond shall be submitted with the proposal with the original bid bond received by the contract specialist within three (3) days of solicitation closing to be considered for award.

APPENDIX D

USACE Past Performance Questionnaire (PPQ)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information

Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work: High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE requests that the client completes this questionnaire and submits directly back to the Offeror.

The Offeror will submit the completed questionnaire to USACE with their proposal, and may duplicate this questionnaire for future submission on USACE solicitations. Clients are highly encouraged to submit questionnaires directly to the Offeror. However, questionnaires may be submitted directly to USACE. Please contact the Offeror for USACE POC information. The Government reserves the right to verify any and all information on this form.

NAVFAC / USACE Past Performance Questionnaire (PPQ)

TO BE COMPLETED BY CLIENT

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR

EVALUATION OF THE CONTRACTOR’S PERFORMANCE

Form PPQ -0

RATING DEFINITION NOTE

(E) Exceptional

Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good

Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory

Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract Rating will be neither positive nor negative.

PLEASE CIRCLE THE ADJECTIVE RATING

WHICH BEST REFLECTS YOUR

EVALUATION OF THE CONTRACTOR’S

PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance

E VG S M U

N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

b) Ability to hire, apply, and retain a qualified workforce to this effort

E VG S M U

N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U

N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

b) Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U

N

c) Would you hire or work with this firm again? (If no, please explain below)

Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary)

CLAUSES INCORPORATED BY FULL TEXT

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(a) Definition. "Supplies," as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.

(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.

(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor's or subcontractor's premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.

(e)(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.

(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.

(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.

(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place,promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.

(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.

(i)(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time (i) when Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract and (ii) when the supplies will be ready for Government inspection.

(2) The Government's request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor's plant, nor more than 7 workdays in other instances.

(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.

(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.

(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor (1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor's plant at the Contracting Officer's election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer;

provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor's plant and return to the original point when that point is not the Contractor's plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.

(End of clause)

Section F - Deliveries or Performance

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(a) Definitions.

As used in this clause--

New means composed of previously unused components, whether manufactured from virgin material, recovered material in the form of raw material, or materials and by-products generated from, and reused within, an original manufacturing process; provided that the supplies meet contract requirements, including but not limited to, performance, reliability, and life expectancy.

Reconditioned means restored to the original normal operating condition by readjustments and material replacement.

Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

Remanufactured means factory rebuilt to original specifications.

Virgin material means--

(1) Previously unused raw material, including previously unused copper, aluminum, lead, zinc, iron, other metal or metal ore; or

(2) Any undeveloped resource that is, or with new technology will become, a source of raw materials.

(b) Unless this contract otherwise requires virgin material or supplies composed of or manufactured from virgin material, the Contractor shall provide supplies that are new, reconditioned, or remanufactured, as defined in this clause.

(c) A proposal to provide unused former Government surplus property shall include a complete description of the material, the quantity, the name of the Government agency from which acquired, and the date of acquisition.

(d) A proposal to provide used, reconditioned, or remanufactured supplies shall include a detailed description of such supplies and shall be submitted to the Contracting Officer for approval.

(e) Used, reconditioned, or remanufactured supplies, or unused former Government surplus property, may be used in contract performance if the Contractor has proposed the use of such supplies, and the Contracting Officer has authorized their use.

52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires delivery to be made according to the following schedule:

The contract base CLIN performance period is 940 days.

Option A and B may be awarded within 365 days of award.

Option C and D may be awarded within 730 days of the award.

Each awarded Option (A B C D) extend the contract by 210 days.

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

Within Days

After Date

Item No. Quantity of Contract

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

52.247-34 F.O.B. DESTINATION (NOV 1991)

(a) The term "f.o.b. destination," as used in this clause, means--

(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and

(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.

(b) The Contractor shall--

(1)(i) Pack and mark the shipment to comply with contract specifications; or

(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;

(2) Prepare and distribute commercial bills of lading;

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings as listed on drawing sheet with title

“INDEX OF DRAWINGS.”

Section I - Contract Clauses

52.202-1 DEFINITIONS (NOV 2013)

When a solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulation (FAR), the word or term has the same meaning as the definition in FAR 2.101 in effect at the time the solicitation was issued, unless--

(a) The solicitation, or amended solicitation, provides a different definition;

(b) The contracting…