UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: LD20 Support Beam and Gate Machinery Repair Review: LD20 Support Beam and Gate Machinery Repair (00001) (sorted by CommentID ) Displaying 8 inquiries.
Id Discipline Sheet Detail Spec 7111746 Materials M-510
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing M-510 in the Base Bid specifies quantity 32 EA for M-510-P5 Low Speed Coupling. Is this the correct Quantity (4 each plus 28 spares)?
On: Aug 17 2017.
Government Response. . Only need four (4) low speed couplings which connect the miter gate gear box to the pinion shaft=4 total On: Aug 22 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7111750 Materials M-510
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing M-510 in the Base Bid specifies quantity 9 EA for M-510-P6 Pinion Shaft Pillow Block Bearing. Is this the correct Quantity (8 each plus 1 spare)?
On: Aug 17 2017.
Government Response. . Correct, a spare is included for a total of nine (9) On: Aug 22 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7111819 Materials M-510
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing M-510 in the Base Bid specifies ASTM – A325 material for M-510-A1 for the sector pin bushing. Should this material be a type of bronze?
On: Aug 17 2017.
Government Response. . Amendment is forth coming On: Aug 22 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7112375 Materials 35 01 41, Paragraph 1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec Section 35 01 41, paragraph 1.3 calls for the qualifications of the firm performing the gear reducer repair be a member of AGMA and must have been engaged in this line of work for at least 10 years. The District has had a firm in close proximity to Lock 20, that does not conform to the aforementioned qualifications, perform reducer repairs while under the supervision of a representative of the gear manufacturer which does comply with this qualification requirement. Could the contractor engage the Option A and D work in similar fashion as did the District?
On: Aug 17 2017.
Government Response. . As mentioned in the question, if they are under supervision and have a record of good performance this appears acceptable. On: Aug 22 2017 Government Response. . This new text supercedes ALL previous replies.
The contractor shall follow the requirements of specification section 35 01 41. On: Aug 22 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7112380 Construction Management G-101
Page 1 of 3ProjNet: Logged In User
8/22/2017https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The upstream chamber bulkheads will need to be installed in order to perform the work outlined in the base bid and for options G and K. Will the COE be installing the bulkheads or will it be the responsibility of the contractor to install? Will the bulkheads be located at Lock 20 prior to navigation shutdown or will the contractor be required to transport them from another location? What is the anticipated date for the install of the bulkheads? What is the duration that the bulkheads will be in place? Who will be responsible for removal and where are the bulkheads to be returned?
On: Aug 17 2017.
Government Response. . Typically, the sector pin is salvageable since it is installed with a sliding fit On: Aug 22 2017 Government Response. . This new text supercedes ALL previous replies.
Bulkheads are not available and are not required to perform the work. On: Aug 22 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7112386 Materials M-201
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Plans and specifications call for the reuse of the sector pin. It has been our experience that this pin may not be salvageable during the removal process. With a tight schedule will replacement of this pin be an acceptable alternative to reusing the pin?
On: Aug 17 2017.
Government Response. . An amendment is forth coming On: Aug 22 2017 Government Response. . This new text supercedes ALL previous replies.
Typically, the sector pin is salvageable since it is installed with a sliding fit. On: Aug 22 2017 Government Response. . This new text supercedes ALL previous replies.
Typically, the sector pin is salvageable since it is installed with a sliding fit; however, the offeror's technical proposal can include replacement in lieu of salvage. The replacement must conform to the specifications and be submitted for government approval. On: Aug 22 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7112387 Site S-305
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In Option B, Repair Duct Bank, the plans show depth demo of concrete 78" from existing top of existing lock wall.
After concrete removal, there is a good chance that the retaining wall foundation will be undermined during the process. Is the replacement of the retaining wall required when repairing the duct back? There is a good possibility that the contractor will need to excavate behind the retaining wall in the parking lot to allow us to make the bottom cut for the concrete removal. Is excavation behind the retaining wall allowable? Is excavating under the existing retaining wall will the retaining wall need to be replaced?
On: Aug 17 2017.
Government Response. . an amendment is forth coming On: Aug 22 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7112394 Project Management 01 11 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Could you provide a bid extension of 10-14 days to the current RFP due date?
On: Aug 17 2017.
Government Response. . The solicitation will not be extended. The close date remains 30 August 2017 at 2:00pm CT On: Aug 22 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
Report Complete
Page 2 of 3ProjNet: Logged In User
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
Page 3 of 3ProjNet: Logged In User