Solicitation No.: W912EK-17-B-0006
INDEFINITE-QUANTITY DELIVERY
ORDER CONTRACT FOR
MAINTENANCE AND REPAIRS OF
ROADS, PARKING AREAS, AND TRAILS
Lake Red Rock, Marion County, Iowa Coralville Lake, Johnson County, Iowa
Construction Solicitation and Specifications
JUNE 2017
US Army Corps of Engineers Rock Island District
Solicitation No. W912EK-17-B-0006
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 10 SUBMITTALS FOR CONTRACT CLAUSES
00 73 05 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE RATES
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 02 QUALITY CONTROL SYSTEM (QCS)
01 45 04 CONTRACTOR QUALITY CONTROL
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
DIVISION 31 - EARTHWORK
31 00 00 FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 00 00 ACC AND PCC PAVEMENT REMOVAL
32 01 16 MILLING OF PAVEMENTS
32 01 17 SEALING OF CRACKS AND JOINTS ON ASPHALT SURFACES
32 01 18 CUTTING AND SEALING OF JOINTS IN ASPHALT SURFACES
32 01 19 SEALING OF CRACKS AND JOINTS ON EXISTING CONCRETE SURFACES
32 01 20 SEALING OF JOINTS BETWEEN NEW ASPHALT PAVEMENT AND
CONCRETE CURB AND GUTTERS
32 01 21 CUTTING AND SEALING OF JOINTS IN NEW CONCRETE SURFACES
32 01 29 ACC PAVEMENT PATCHING
32 11 16 PREPARATION OF EXISTING AGGREGATE BASE
32 11 17 PREPARATION OF EXISTING BITUMINOUS SURFACING/AGGREGATE
BASE FOR USE AS NEW BASE COURSE
32 11 23 NEW COMPACTED AGGREGATE BASE COURSE OR AGGREGATE SURFACE
COURSE
32 11 34 PORTLAND CEMENT OR FLY ASH MODIFIED BASE COURSE
32 12 10 TACK COAT
32 12 16 HOT-MIX ASPHALT (HMA) PAVING
32 12 37 EMULSIFIED ASPHALT SLURRY SEAL
32 13 13 CONCRETE PAVEMENTS, SLABS, SIDEWALKS AND CURB AND GUTTERS
32 15 00 AGGREGATE SHOULDERS
32 16 00 TOPSOIL SHOULDERS
32 17 20 STEEL BEAM GUARDRAIL
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
32 98 00 STEEL-BACKED TIMBER GUARDRAIL
32 99 00 LOW TENSION CABLE GUARDRAIL
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19 STONE PROTECTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
Solicitation No. W912EK-17-B-0006
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 01 10
SUBMITTALS FOR CONTRACT CLAUSES
PART 1 GENERAL
1.1 SUBMITTALS
1.2 SITE SUPERINTENDENT (FAR 52.236-6)
1.3 ACCIDENT PREVENTION PLAN (FAR 52.236-13)
1.4 CONSTRUCTION SCHEDULE (FAR 52.236-15)
1.5 PAYROLLS - LABOR (FAR 52.222-8)
1.6 PROGRESS CHARTS (FAR 52.236-15)
1.7 CONTRACTOR INVOICES (FAR 52.232-27)
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
DOCUMENT 00 01 10 Page 1
Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Maintenance and Repairs of Roads, Parking Areas, and Trails:
Lake Red Rock, Marion County, Iow a Coralville Lake, Johnson County, Iow a
See Section 01 11 00 for Summary of Work Completion Days: Varies per task order Contract Maximum Capacity: $7.5 million per contract (site)
Bid Bonds shall be submitted on Form SF24. Bid Bond amount should be based on total contract capacity of $7,500,000.00.
Special Note: This procurement is for both Lake Red Rock and Coralville Lake. It is the Government's intention to aw ard one contract for Red Rock and one for Coralville. The bidder can bid on one or both locations; how ever, the bids w ill be evaluated separately. When bidding, please provide a separate bid envelope (and a separate bid bond) for each location. Any bidder that submits for both Lake Red Rock and Coralville Lake shall treat each location as a separate contract requiring adequate manpow er to cover both locations.
X
NICHOLAS M MOORE 309-794-5443
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
20-Jul-2017
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________22 Aug 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
1500 ROCK ISLAND DRIVE
ROCK ISLAND IL 61201
W912EK
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
--- --- ---- REF BLOCK 18A)FAX:TEL: 309-794-5613 (INVOICES TEL: FAX:
W912EK-17-B-0006 170
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912EK-17-B-0006
SCHEDULE OF PRICES RED ROCK
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
BASE BID
Date of Award to December 31, 2018
0001 Removal of Existing Aggregate Base (Up to 8 inches)
0001AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0001AB Over 1,000 Square Yards 1,000 SY $ $
0002 Preparation of Existing Aggregate Base, Shaping, and Compacting
0002AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0002AB Over 1,000 Square Yards 1,000 SY $ $
0003 Preparation of Existing Aggregate Base, Additional Aggregate
100 TN $ $
0004 Preparation of Existing Bituminous Surfacing/Aggregate Base for Use as New Base Course
750 SY $ $
0005 New Compacted Aggregate Base Course
1,000 TN $ $
0006 Asphalt Pavement Patching 500 SY $ $
0007 Compacted Portland Cement or Fly Ash Modified Base Course
0007AA Stabilization 2,000 SY $ $
0007AB Portland Cement 250 TN $ $
0007AC Fly Ash 250 TN $ $
0008 ACC Pavement Milling 1,000 SY $ $
0009 Asphalt Crack Sealing 15,000 LF $ $
0010 PCC Pavement Milling 100 SY $ $
0011 Concrete Crack/Joint Sealing 1,500 LF $ $
0012 Concrete Curb and Gutter 1,000 LF $ $
0013 Saw Cutting of Asphalt 100 LF $ $
0014 HMA Pavement Demolition and Removal
2,500 SY $ $
0015 PCC Pavement and Curb and Gutter Demolition and Removal
2,500 SY $ $
0016 Trail Section Replacement 1,000 SY $ $
0017 Tack Coat 1,500 GA $ $
0018 HMA Binder Course
0018AA Up to 500 Tons (Inclusive) 250 TN $ $
0018AB Between 500 Tons and 1,000 Tons 510 TN $ $
0018AC Over 1,000 Tons (Inclusive) 1,000 TN $ $
0019 HMA Surface Course
0019AA Up to 2,000 Tons (Inclusive) 2,000 TN $ $
0019AB Over 2,000 Tons 2,010 TN $ $
0020 Removal of Existing Pavement Marking
0020AA 4-Inch Wide Lines, Roadways 1,000 LF $ $
0020AB 4-Inch Wide Lines, Parking Areas 1,000 LF $ $
0020AC 12-Inch Wide Lines 200 LF $ $
0020AD Words and Symbols 10 EA $ $
0021 Pavement Marking
0021AA 4-Inch Wide Lines, Roadways 15,000 LF $ $
0021AB 4-Inch Wide Lines, Parking Areas (Layout Required)
7,500 LF $ $
0021AC 12-Inch Wide Lines (Layout Required) 600 LF $ $
0021AD 4-Inch Wide Lines, Parking Areas (Layout Not Required)
7,500 LF $ $
0021AE 12-Inch Wide Lines (Layout Not Required)
600 LF $ $
0021AF Words and Symbols 20 EA $ $
0022 Compacted Aggregate Shoulders 500 TN $ $
0023 Topsoil Shoulders 850 TN $ $
0024 Fill 100 CY $ $
0025 Cut 1,500 CY $ $
0026 Emulsified Asphalt Slurry Seal
0026AA Up to 8,000 Square Yards (Inclusive) 8,000 SY $ $
0026AB Over 8,000 Square Yards 8,000 SY $ $
0027 Removal of Cable Guardrail
0027AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0027AB Over 3,000 Linear Feet 3,000 LF $ $
0028 New Cable Guardrail
0028AA Up to 500 Linear Feet (Inclusive) 500 LF $ $
0028AB Over 500 Linear Feet 500 LF $ $
0029 Removal of Steel-Backed Timber Guardrail
0029AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0029AB Over 3,000 Linear Feet 3,000 LF $ $
0030 New Steel-Backed Timber Guardrail
0030AA Up to 1,000 Linear Feet (Inclusive) 1,000 LF $ $
0030AB Over 1,000 Linear Feet 1,000 LF $ $
0030AC End Posts 12 EA $ $
0031 Removal of Steel Beam Guardrail
0031AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0031AB Over 3,000 Linear Feet 3,000 LF $ $
0032 New Steel Beam Guardrail
0032AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0032AB Over 3,000 Linear Feet 3,000 LF $ $
0033 PCC Sidewalk 150 CY $ $
0034 PCC Sidewalk - Fiber Reinforced 250 CY $ $
0035 Concrete Overlay 1,000 CY $ $
0036 Concrete Pavements and Slabs 500 CY $ $
0037 Concrete Pavements and Slabs - Fiber Reinforced
250 CY $ $
0038 Concrete Steel Reinforcement
0038AA Up to 750 Pounds (Inclusive) 750 LB $ $
0038AB Over 750 Pounds 750 LB $ $
0039 Early High Strength Concrete
0039AA Up to 500 Cubic Yards (Inclusive) 500 CY $ $
0039AB Over 500 Cubic Yards 500 CY $ $
0040 Seeding 1,500 SY $ $
0041 Bedding Stone
0041AA Up to 500 Tons (Inclusive) 500 TN $ $
0041AB Over 500 Tons 2,000 TN $ $
0042 Riprap, Class A
0042AA Up to 500 Tons (Inclusive) 500 TN $ $
0042AB Over 500 Tons 2,000 TN $ $
0043 Riprap, Class D
0043AA Up to 500 Tons (Inclusive) 500 TN $ $
0043AB Over 500 Tons 2,000 TN $ $
0044 Riprap, Class E
0044AA Up to 500 Tons (Inclusive) 500 TN $ $
0044AB Over 500 Tons 2,000 TN $ $
0045 Geotextile 1,500 SY $ $
TOTAL OF ESTIMATED AMOUNTS (BASE BID)
(ITEM NOS. 0001 THROUGH 0045, INCL.)
OPTION PERIOD NO. 1
January 1, 2019 to December 31, 2019
0101 Removal of Existing Aggregate Base (Up to 8 inches)
0101AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0101AB Over 1,000 Square Yards 1,000 SY $ $
0102 Preparation of Existing Aggregate Base, Shaping, and Compacting
0102AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0102AB Over 1,000 Square Yards 1,000 SY $ $
0103 Preparation of Existing Aggregate Base, Additional Aggregate
100 TN $ $
0104 Preparation of Existing Bituminous Surfacing/Aggregate Base for Use as New Base Course
750 SY $ $
0105 New Compacted Aggregate Base
1,000 TN $ $
0106 Asphalt Pavement Patching 500 SY $ $
0107 Compacted Portland Cement or Fly Ash Modified Base
0107AA Stabilization 2,000 SY $ $
0107AB Portland Cement 250 TN $ $
0107AC Fly Ash 250 TN $ $
0108 ACC Pavement Milling 1,000 SY $ $
0109 Asphalt Crack Sealing 15,000 LF $ $
0110 PCC Pavement Milling 100 SY $ $
0111 Concrete Crack/Joint Sealing 1,500 LF $ $
0112 Concrete Curb and Gutter 1,000 LF $ $
0113 Saw Cutting of Asphalt 100 LF $ $
0114 HMA Pavement Demolition and Removal
2,500 SY $ $
0115 PCC Pavement and Curb and Gutter Demolition and Removal
2,500 SY $ $
0116 Trail Section Replacement 1,000 SY $ $
0117 Tack Coat 1,500 GA $ $
0118 HMA Binder Course
0118AA Up to 500 Tons (Inclusive) 250 TN $ $
0118AB Between 500 Tons and 1,000 Tons 510 TN $ $
0118AC Over 1,000 Tons (Inclusive) 1,000 TN $ $
0119 HMA Surface Course
0119AA Up to 2,000 Tons (Inclusive) 2,000 TN $ $
0119AB Over 2,000 Tons 2,010 TN $ $
0120 Removal of Existing Pavement Marking
0120AA 4-Inch Wide Lines, Roadways 1,000 LF $ $
0120AB 4-Inch Wide Lines, Parking Areas 1,000 LF $ $
0120AC 12-Inch Wide Lines 200 LF $ $
0120AD Words and Symbols 10 EA $ $
0121 Pavement Marking
0121AA 4-Inch Wide Lines, Roadways 15,000 LF $ $
0121AB 4-Inch Wide Lines, Parking Areas (Layout Required)
7,500 LF $ $
0121AC 12-Inch Wide Lines (Layout Required) 600 LF $ $
0121AD 4-Inch Wide Lines, Parking Areas (Layout Not Required)
7,500 LF $ $
0121AE 12-Inch Wide Lines (Layout Not Required)
600 LF $ $
0121AF Words and Symbols 20 EA $ $
0122 Compacted Aggregate Shoulders 500 TN $ $
0123 Topsoil Shoulders 850 TN $ $
0124 Fill 100 CY $ $
0125 Cut 1,500 CY $ $
0126 Emulsified Asphalt Slurry Seal
0126AA Up to 8,000 Square Yards (Inclusive) 8,000 SY $ $
0126AB Over 8,000 Square Yards 8,000 SY $ $
0127 Removal of Cable Guardrail
0127AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0127AB Over 3,000 Linear Feet 3,000 LF $ $
0128 New Cable Guardrail
0128AA Up to 500 Linear Feet (Inclusive) 500 LF $ $
0128AB Over 500 Linear Feet 500 LF $ $
0129 Removal of Steel-Backed Timber Guardrail
0129AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0129AB Over 3,000 Linear Feet 3,000 LF $ $
0130 New Steel-Backed Timber Guardrail
0130AA Up to 1,000 Linear Feet (Inclusive) 1,000 LF $ $
0130AB Over 1,000 Linear Feet 1,000 LF $ $
0130AC End Posts 12 EA $ $
0131 Removal of Steel Beam Guardrail
0131AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0131AB Over 3,000 Linear Feet 3,000 LF $ $
0132 New Steel Beam Guardrail
0132AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0132AB Over 3,000 Linear Feet 3,000 LF $ $
0133 PCC Sidewalk 150 CY $ $
0134 PCC Sidewalk - Fiber Reinforced 250 CY $ $
0135 Concrete Overlay 1,000 CY $ $
0136 Concrete Pavements and Slabs 500 CY $ $
0137 Concrete Pavements and Slabs - Fiber Reinforced
250 CY $ $
0138 Concrete Steel Reinforcement
0138AA Up to 750 Pounds (Inclusive) 750 LB $ $
0138AB Over 750 Pounds 750 LB $ $
0139 Early High Strength Concrete
0139AA Up to 500 Cubic Yards (Inclusive) 500 CY $ $
0139AB Over 500 Cubic Yards 500 CY $ $
0140 Seeding 1,500 SY $ $
0141 Bedding Stone
0141AA Up to 500 Tons (Inclusive) 500 TN $ $
0141AB Over 500 Tons 2,000 TN $ $
0142 Riprap, Class A
0142AA Up to 500 Tons (Inclusive) 500 TN $ $
0142AB Over 500 Tons 2,000 TN $ $
0143 Riprap, Class D
0143AA Up to 500 Tons (Inclusive) 500 TN $ $
0143AB Over 500 Tons 2,000 TN $ $
0144 Riprap, Class E
0144AA Up to 500 Tons (Inclusive) 500 TN $ $
0144AB Over 500 Tons 2,000 TN $ $
0145 Geotextile 1,500 SY $ $
TOTAL OF ESTIMATED AMOUNTS (OPTION PERIOD NO. 1)
(ITEM NOS. 0101 THROUGH 0145, INCL.)
OPTION PERIOD NO. 2
January 1, 2020 to December 31, 2020
0201 Removal of Existing Aggregate Base (Up to 8 inches)
0201AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0201AB Over 1,000 Square Yards 1,000 SY $ $
0202 Preparation of Existing Aggregate Base, Shaping, and Compacting
0202AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0202AB Over 1,000 Square Yards 1,000 SY $ $
0203 Preparation of Existing Aggregate Base, Additional Aggregate
100 TN $ $
0204 Preparation of Existing Bituminous Surfacing/Aggregate Base for Use as New Base Course
750 SY $ $
0205 New Compacted Aggregate Base Course
1,000 TN $ $
0206 Asphalt Pavement Patching 500 SY $ $
0207 Compacted Portland Cement or Fly Ash Modified Base
0207AA Stabilization 2,000 SY $ $
0207AB Portland Cement 250 TN $ $
0207AC Fly Ash 250 TN $ $
0208 ACC Pavement Milling 1,000 SY $ $
0209 Asphalt Crack Sealing 15,000 LF $ $
0210 PCC Pavement Milling 100 SY $ $
0211 Concrete Crack/Joint Sealing 1,500 LF $ $
0212 Concrete Curb and Gutter 1,000 LF $ $
0213 Saw Cutting of Asphalt 100 LF $ $
0214 HMA Pavement Demolition and Removal
2,500 SY $ $
0215 PCC Pavement and Curb and Gutter Demolition and Removal
2,500 SY $ $
0216 Trail Section Replacement 1,000 SY $ $
0217 Tack Coat 1,500 GA $ $
0218 HMA Binder Course
0218AA Up to 500 Tons (Inclusive) 250 TN $ $
0218AB Between 500 Tons and 1,000 Tons 510 TN $ $
0218AC Over 1,000 Tons (Inclusive) 1,000 TN $ $
0219 HMA Surface Course
0219AA Up to 2,000 Tons (Inclusive) 2,000 TN $ $
0219AB Over 2,000 Tons 2,010 TN $ $
0220 Removal of Existing Pavement Marking
0220AA 4-Inch Wide Lines, Roadways 1,000 LF $ $
0220AB 4-Inch Wide Lines, Parking Areas 1,000 LF $ $
0220AC 12-Inch Wide Lines 200 LF $ $
0220AD Words and Symbols 10 EA $ $
0221 Pavement Marking
0221AA 4-Inch Wide Lines, Roadways 15,000 LF $ $
0221AB 4-Inch Wide Lines, Parking Areas (Layout Required)
7,500 LF $ $
0221AC 12-Inch Wide Lines (Layout Required) 600 LF $ $
0221AD 4-Inch Wide Lines, Parking Areas (Layout Not Required)
7,500 LF $ $
0221AE 12-Inch Wide Lines (Layout Not Required)
600 LF $ $
0221AF Words and Symbols 20 EA $ $
0222 Compacted Aggregate Shoulders 500 TN $ $
0223 Topsoil Shoulders 850 TN $ $
0224 Fill 100 CY $ $
0225 Cut 1,500 CY $ $
0226 Emulsified Asphalt Slurry Seal
0226AA Up to 8,000 Square Yards (Inclusive) 8,000 SY $ $
0226AB Over 8,000 Square Yards 8,000 SY $ $
0227 Removal of Cable Guardrail
0227AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0227AB Over 3,000 Linear Feet 3,000 LF $ $
0228 New Cable Guardrail
0228AA Up to 500 Linear Feet (Inclusive) 500 LF $ $
0228AB Over 500 Linear Feet 500 LF $ $
0229 Removal of Steel-Backed Timber Guardrail
0229AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0229AB Over 3,000 Linear Feet 3,000 LF $ $
0230 New Steel-Backed Timber Guardrail
0230AA Up to 1,000 Linear Feet (Inclusive) 1,000 LF $ $
0230AB Over 1,000 Linear Feet 1,000 LF $ $
0230AC End Posts 12 EA $ $
0231 Removal of Steel Beam Guardrail
0231AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0231AB Over 3,000 Linear Feet 3,000 LF $ $
0232 New Steel Beam Guardrail
0232AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0232AB Over 3,000 Linear Feet 3,000 LF $ $
0233 PCC Sidewalk 150 CY $ $
0234 PCC Sidewalk - Fiber Reinforced 250 CY $ $
0235 Concrete Overlay 1,000 CY $ $
0236 Concrete Pavements and Slabs 500 CY $ $
0237 Concrete Pavements and Slabs - Fiber Reinforced
250 CY $ $
0238 Concrete Steel Reinforcement
0238AA Up to 750 Pounds (Inclusive) 750 LB $ $
0238AB Over 750 Pounds 750 LB $ $
0239 Early High Strength Concrete
0239AA Up to 500 Cubic Yards (Inclusive) 500 CY $ $
0239AB Over 500 Cubic Yards 500 CY $ $
0240 Seeding 1,500 SY $ $
0241 Bedding Stone
0241AA Up to 500 Tons (Inclusive) 500 TN $ $
0241AB Over 500 Tons 2,000 TN $ $
0242 Riprap, Class A
0242AA Up to 500 Tons (Inclusive) 500 TN $ $
0242AB Over 500 Tons 2,000 TN $ $
0243 Riprap, Class D
0243AA Up to 500 Tons (Inclusive) 500 TN $ $
0243AB Over 500 Tons 2,000 TN $ $
0244 Riprap, Class E
0244AA Up to 500 Tons (Inclusive) 500 TN $ $
0244AB Over 500 Tons 2,000 TN $ $
0245 Geotextile 1,500 SY $ $
TOTAL OF ESTIMATED AMOUNTS (OPTION PERIOD NO. 2)
(ITEM NOS. 0201 THROUGH 0245, INCL.)
OPTION PERIOD NO. 3
January 1, 2021 to December 31, 2021
0301 Removal of Existing Aggregate Base (Up to 8 inches)
0301AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0301AB Over 1,000 Square Yards 1,000 SY $ $
0302 Preparation of Existing Aggregate Base, Shaping, and Compacting
0302AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0302AB Over 1,000 Square Yards 1,000 SY $ $
0303 Preparation of Existing Aggregate Base, Additional Aggregate
100 TN $ $
0304 Preparation of Existing Bituminous Surfacing/Aggregate Base for Use as New Base Course
750 SY $ $
0305 New Compacted Aggregate Base Course
1,000 TN $ $
0306 Asphalt Pavement Patching 500 SY $ $
0307 Compacted Portland Cement or Fly Ash Modified Base
0307AA Stabilization 2,000 SY $ $
0307AB Portland Cement 250 TN $ $
0307AC Fly Ash 250 TN $ $
0308 ACC Pavement Milling 1,000 SY $ $
0309 Asphalt Crack Sealing 15,000 LF $ $
0310 PCC Pavement Milling 100 SY $ $
0311 Concrete Crack/Joint Sealing 1,500 LF $ $
0312 Concrete Curb and Gutter 1,000 LF $ $
0313 Saw Cutting of Asphalt 100 LF $ $
0314 HMA Pavement Demolition and Removal
2,500 SY $ $
0315 PCC Pavement and Curb and Gutter Demolition and Removal
2,500 SY $ $
0316 Trail Section Replacement 1,000 SY $ $
0317 Tack Coat 1,500 GA $ $
0318 HMA Binder Course
0318AA Up to 500 Tons (Inclusive) 250 TN $ $
0318AB Between 500 Tons and 1,000 Tons 510 TN $ $
0318AC Over 1,000 Tons (Inclusive) 1,000 TN $ $
0319 HMA Surface Course
0319AA Up to 2,000 Tons (Inclusive) 2,000 TN $ $
0319AB Over 2,000 Tons 2,010 TN $ $
0320 Removal of Existing Pavement Marking
0320AA 4-Inch Wide Lines, Roadways 1,000 LF $ $
0320AB 4-Inch Wide Lines, Parking Areas 1,000 LF $ $
0320AC 12-Inch Wide Lines 200 LF $ $
0320AD Words and Symbols 10 EA $ $
0321 Pavement Marking
0321AA 4-Inch Wide Lines, Roadways 15,000 LF $ $
0321AB 4-Inch Wide Lines, Parking Areas (Layout Required)
7,500 LF $ $
0321AC 12-Inch Wide Lines (Layout Required) 600 LF $ $
0321AD 4-Inch Wide Lines, Parking Areas (Layout Not Required)
7,500 LF $ $
0321AE 12-Inch Wide Lines (Layout Not Required)
600 LF $ $
0321AF Words and Symbols 20 EA $ $
0322 Compacted Aggregate Shoulders 500 TN $ $
0323 Topsoil Shoulders 850 TN $ $
0324 Fill 100 CY $ $
0325 Cut 1,500 CY $ $
0326 Emulsified Asphalt Slurry Seal
0326AA Up to 8,000 Square Yards (Inclusive) 8,000 SY $ $
0326AB Over 8,000 Square Yards 8,000 SY $ $
0327 Removal of Cable Guardrail
0327AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0327AB Over 3,000 Linear Feet 3,000 LF $ $
0328 New Cable Guardrail
0328AA Up to 500 Linear Feet (Inclusive) 500 LF $ $
0328AB Over 500 Linear Feet 500 LF $ $
0329 Removal of Steel-Backed Timber Guardrail
0329AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0329AB Over 3,000 Linear Feet 3,000 LF $ $
0330 New Steel-Backed Timber Guardrail
0330AA Up to 1,000 Linear Feet (Inclusive) 1,000 LF $ $
0330AB Over 1,000 Linear Feet 1,000 LF $ $
0330AC End Posts 12 EA $ $
0331 Removal of Steel Beam Guardrail
0331AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0331AB Over 3,000 Linear Feet 3,000 LF $ $
0332 New Steel Beam Guardrail
0332AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0332AB Over 3,000 Linear Feet 3,000 LF $ $
0333 PCC Sidewalk 150 CY $ $
0334 PCC Sidewalk - Fiber Reinforced 250 CY $ $
0335 Concrete Overlay 1,000 CY $ $
0336 Concrete Pavements and Slabs 500 CY $ $
0337 Concrete Pavements and Slabs - Fiber Reinforced
250 CY $ $
0338 Concrete Steel Reinforcement
0338AA Up to 750 Pounds (Inclusive) 750 LB $ $
0338AB Over 750 Pounds 750 LB $ $
0339 Early High Strength Concrete
0339AA Up to 500 Cubic Yards (Inclusive) 500 CY $ $
0339AB Over 500 Cubic Yards 500 CY $ $
0340 Seeding 1,500 SY $ $
0341 Bedding Stone
0341AA Up to 500 Tons (Inclusive) 500 TN $ $
0341AB Over 500 Tons 2,000 TN $ $
0342 Riprap, Class A
0342AA Up to 500 Tons (Inclusive) 500 TN $ $
0342AB Over 500 Tons 2,000 TN $ $
0343 Riprap, Class D
0343AA Up to 500 Tons (Inclusive) 500 TN $ $
0343AB Over 500 Tons 2,000 TN $ $
0344 Riprap, Class E
0344AA Up to 500 Tons (Inclusive) 500 TN $ $
0344AB Over 500 Tons 2,000 TN $ $
0345 Geotextile 1,500 SY $ $
TOTAL OF ESTIMATED AMOUNTS (OPTION PERIOD NO. 3)
(ITEM NOS. 0301 THROUGH 0345, INCL.)
OPTION PERIOD NO. 4
January 1, 2022 to December 31, 2022
0401 Removal of Existing Aggregate Base (Up to 8 inches)
0401AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0401AB Over 1,000 Square Yards 1,000 SY $ $
0402 Preparation of Existing Aggregate Base, Shaping, and Compacting
0402AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0402AB Over 1,000 Square Yards 1,000 SY $ $
0403 Preparation of Existing Aggregate Base, Additional Aggregate
100 TN $ $
0404 Preparation of Existing Bituminous Surfacing/Aggregate Base for Use as New Base Course
750 SY $ $
0405 New Compacted Aggregate Base Course
1,000 TN $ $
0406 Asphalt Pavement Patching 500 SY $ $
0407 Compacted Portland Cement or Fly Ash Modified Base
0407AA Stabilization 2,000 SY $ $
0407AB Portland Cement 250 TN $ $
0407AC Fly Ash 250 TN $ $
0408 ACC Pavement Milling 1,000 SY $ $
0409 Asphalt Crack Sealing 15,000 LF $ $
0410 PCC Pavement Milling 100 SY $ $
0411 Concrete Crack/Joint Sealing 1,500 LF $ $
0412 Concrete Curb and Gutter 1,000 LF $ $
0413 Saw Cutting of Asphalt 100 LF $ $
0414 HMA Pavement Demolition and Removal
2,500 SY $ $
0415 PCC Pavement and Curb and Gutter Demolition and Removal
2,500 SY $ $
0416 Trail Section Replacement 1,000 SY $ $
0417 Tack Coat 1,500 GA $ $
0418 HMA Binder Course
0418AA Up to 500 Tons (Inclusive) 250 TN $ $
0418AB Between 500 Tons and 1,000 Tons 510 TN $ $
0418AC Over 1,000 Tons (Inclusive) 1,000 TN $ $
0419 HMA Surface Course
0419AA Up to 2,000 Tons (Inclusive) 2,000 TN $ $
0419AB Over 2,000 Tons 2,010 TN $ $
0420 Removal of Existing Pavement Marking
0420AA 4-Inch Wide Lines, Roadways 1,000 LF $ $
0420AB 4-Inch Wide Lines, Parking Areas 1,000 LF $ $
0420AC 12-Inch Wide Lines 200 LF $ $
0420AD Words and Symbols 10 EA $ $
0421 Pavement Marking
0421AA 4-Inch Wide Lines, Roadways 15,000 LF $ $
0421AB 4-Inch Wide Lines, Parking Areas (Layout Required)
7,500 LF $ $
0421AC 12-Inch Wide Lines (Layout Required) 600 LF $ $
0421AD 4-Inch Wide Lines, Parking Areas (Layout Not Required)
7,500 LF $ $
0421AE 12-Inch Wide Lines (Layout Not Required)
600 LF $ $
0421AF Words and Symbols 20 EA $ $
0422 Compacted Aggregate Shoulders 500 TN $ $
0423 Topsoil Shoulders 850 TN $ $
0424 Fill 100 CY $ $
0425 Cut 1,500 CY $ $
0426 Emulsified Asphalt Slurry Seal
0426AA Up to 8,000 Square Yards (Inclusive) 8,000 SY $ $
0426AB Over 8,000 Square Yards 8,000 SY $ $
0427 Removal of Cable Guardrail
0427AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0427AB Over 3,000 Linear Feet 3,000 LF $ $
0428 New Cable Guardrail
0428AA Up to 500 Linear Feet (Inclusive) 500 LF $ $
0428AB Over 500 Linear Feet 500 LF $ $
0429 Removal of Steel-Backed Timber Guardrail
0429AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0429AB Over 3,000 Linear Feet 3,000 LF $ $
0430 New Steel-Backed Timber Guardrail
0430AA Up to 1,000 Linear Feet (Inclusive) 1,000 LF $ $
0430AB Over 1,000 Linear Feet 1,000 LF $ $
0430AC End Posts 12 EA $ $
0431 Removal of Steel Beam Guardrail
0431AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0431AB Over 3,000 Linear Feet 3,000 LF $ $
0432 New Steel Beam Guardrail
0432AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0432AB Over 3,000 Linear Feet 3,000 LF $ $
0433 PCC Sidewalk 150 CY $ $
0434 PCC Sidewalk - Fiber Reinforced 250 CY $ $
0435 Concrete Overlay 1,000 CY $ $
0436 Concrete Pavements and Slabs 500 CY $ $
0437 Concrete Pavements and Slabs - Fiber Reinforced
250 CY $ $
0438 Concrete Steel Reinforcement
0438AA Up to 750 Pounds (Inclusive) 750 LB $ $
0438AB Over 750 Pounds 750 LB $ $
0439 Early High Strength Concrete
0439AA Up to 500 Cubic Yards (Inclusive) 500 CY $ $
0439AB Over 500 Cubic Yards 500 CY $ $
0440 Seeding 1,500 SY $ $
0441 Bedding Stone
0441AA Up to 500 Tons (Inclusive) 500 TN $ $
0441AB Over 500 Tons 2,000 TN $ $
0442 Riprap, Class A
0442AA Up to 500 Tons (Inclusive) 500 TN $ $
0442AB Over 500 Tons 2,000 TN $ $
0443 Riprap, Class D
0443AA Up to 500 Tons (Inclusive) 500 TN $ $
0443AB Over 500 Tons 2,000 TN $ $
0444 Riprap, Class E
0444AA Up to 500 Tons (Inclusive) 500 TN $ $
0444AB Over 500 Tons 2,000 TN $ $
0445 Geotextile 1,500 SY $ $
TOTAL OF ESTIMATED AMOUNTS (OPTION PERIOD NO. 4)
(ITEM NOS. 0401 THROUGH 0445, INCL.)
TOTAL OF ESTIMATED AMOUNTS (BASE BID AND OPTION PERIOD NO. 1)
(ITEM NOS. 0001 THROUGH 0145, INCL.)
TOTAL OF ESTIMATED AMOUNTS (BASE BID, OPTION PERIOD NO. 1, AND
OPTION PERIOD NO. 2)
(ITEM NOS. 0001 THROUGH 0245, INCL.)
TOTAL OF ESTIMATED AMOUNTS (BASE BID, OPTION PERIOD NO. 1, OPTION
PERIOD NO. 2, AND OPTION PERIOD NO. 3)
(ITEM NOS. 0001 THROUGH 0345, INCL.)
TOTAL OF ESTIMATED AMOUNTS (BASE BID, OPTION PERIOD NO. 1, OPTION
PERIOD NO. 2, OPTION PERIOD NO. 3, AND OPTION PERIOD NO. 4)
(ITEM NOS. 0001 THROUGH 0445, INCL.)
CY = CUBIC YARDS
EA = EACH
GA = GALLONS
LF = LINEAR FEET
LB = POUNDS
SY = SQUARE YARDS
TN = TONS
ENSURE UNIT PRICES AND AMOUNT LINES FOR ALL ITEMS ARE COMPLETED.
THIS PROCUREMENT IS FOR LAKE RED ROCK AND CORALVILLE LAKE. IT IS
THE GOVERNMENT'S INTENTION TO AWARD ONE CONTRACT FOR LAKE
RED ROCK AND ONE FOR CORALVILLE LAKE. THE BIDDER MAY BID ON ONE OR
BOTH LOCATIONS, BUT THE BIDS WILL BE EVALUATED SEPARATELY. WHEN
BIDDING, PROVIDE A SEPARATE BID ENVELOPE FOR EACH LOCATION. BIDDERS
THAT SUBMIT FOR BOTH LAKE RED ROCK AND CORALVILLE LAKE MUST
TREAT EACH LOCATION AS A SEPARATE CONTRACT REQUIRING ADEQUATE
MANPOWER TO COVER BOTH LOCATIONS.
THE GOVERNMENT RESERVES THE RIGHT TO AWARD ANY OR ALL OPTIONS
AFTER THE DATE THE CONTRACTOR RECEIVES NOTICE TO PROCEED.
NOTE: THE TOTAL ESTIMATED AMOUNTS (ITEMS 0001 – 0045), THE TOTAL
ESTIMATED AMOUNTS (ITEMS 0101-0145), THE TOTAL ESTIMATED AMOUNTS
(ITEMS 0201 – 0245), THE TOTAL ESTIMATED AMOUNTS (ITEMS 0301 – 0345), AND
THE TOTAL ESTIMATED AMOUNTS (ITEMS 0401 – 0445) MAY EACH EXCEED
$1,500,000. THESE TOTALS OF ESTIMATED AMOUNTS ARE NOT PURCHASED BY
THIS CONTRACT, BUT WILL BE USED BY THE GOVERNMENT TO EVALUATE OFFERS
FOR AWARD PURPOSES. THE TOTAL CAPACITY FOR THE BASE YEAR AND FOUR
OPTION YEARS IS $7,500,000. THE CONTRACT MINIMUM GUARANTEE IS $25,000.
THE MINIMUM WILL BE CONSIDERED SATISFIED FOR THE LIFE OF THE CONTRACT
UPON THE ISSUANCE OF A TASK ORDER(S) EQUAL TO OR GREATER THAN THE
MINIMUM GUARANTEE.
SCHEDULE OF PRICES CORALVILLE
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
BASE BID
Date of Award to December 31, 2018
0501 Removal of Existing Aggregate Base (Up to 8 inches)
0501AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0501AB Over 1,000 Square Yards 1,000 SY $ $
0502 Preparation of Existing Aggregate Base, Shaping, and Compacting
0502AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0502AB Over 1,000 Square Yards 1,000 SY $ $
0503 Preparation of Existing Aggregate Base, Additional Aggregate
100 TN $ $
0504 Preparation of Existing Bituminous Surfacing/Aggregate Base for Use as New Base Course
750 SY $ $
0505 New Compacted Aggregate Base Course
1,000 TN $ $
0506 Asphalt Pavement Patching 500 SY $ $
0507 Compacted Portland Cement or Fly Ash Modified Base
0507AA Stabilization 2,000 SY $ $
0507AB Portland Cement 250 TN $ $
0507AC Fly Ash 250 TN $ $
0508 ACC Pavement Milling 1,000 SY $ $
0509 Asphalt Crack Sealing 15,000 LF $ $
0510 PCC Pavement Milling 100 SY $ $
0511 Concrete Crack/Joint Sealing 1,500 LF $ $
0512 Concrete Curb and Gutter 1,000 LF $ $
0513 Saw Cutting of Asphalt 100 LF $ $
0514 HMA Pavement Demolition and Removal
2,500 SY $ $
0515 PCC Pavement and Curb and Gutter Demolition and Removal
2,500 SY $ $
0516 Trail Section Replacement 1,000 SY $ $
0517 Tack Coat 1,500 GA $ $
0518 HMA Binder Course
0518AA Up to 500 Tons (Inclusive) 250 TN $ $
0518AB Between 500 Tons and 1,000 Tons 510 TN $ $
0518AC Over 1,000 Tons (Inclusive) 1,000 TN $ $
0519 HMA Surface Course
0519AA Up to 2,000 Tons (Inclusive) 2,000 TN $ $
0519AB Over 2,000 Tons 2,010 TN $ $
0520 Removal of Existing Pavement Marking
0520AA 4-Inch Wide Lines, Roadways 1,000 LF $ $
0520AB 4-Inch Wide Lines, Parking Areas 1,000 LF $ $
0520AC 12-Inch Wide Lines 200 LF $ $
0520AD Words and Symbols 10 EA $ $
0521 Pavement Marking
0521AA 4-Inch Wide Lines, Roadways 15,000 LF $ $
0521AB 4-Inch Wide Lines, Parking Areas (Layout Required)
7,500 LF $ $
0521AC 12-Inch Wide Lines (Layout Required) 600 LF $ $
0521AD 4-Inch Wide Lines, Parking Areas (Layout Not Required)
7,500 LF $ $
0521AE 12-Inch Wide Lines (Layout Not Required)
600 LF $ $
0521AF Words and Symbols 20 EA $ $
0522 Compacted Aggregate Shoulders 500 TN $ $
0523 Topsoil Shoulders 850 TN $ $
0524 Fill 100 CY $ $
0525 Cut 1,500 CY $ $
0526 Emulsified Asphalt Slurry Seal
0526AA Up to 8,000 Square Yards (Inclusive) 8,000 SY $ $
0526AB Over 8,000 Square Yards 8,000 SY $ $
0527 Removal of Cable Guardrail
0527AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0527AB Over 3,000 Linear Feet 3,000 LF $ $
0528 New Cable Guardrail
0528AA Up to 500 Linear Feet (Inclusive) 500 LF $ $
0528AB Over 500 Linear Feet 500 LF $ $
0529 Removal of Steel-Backed Timber Guardrail
0529AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0529AB Over 3,000 Linear Feet 3,000 LF $ $
0530 New Steel-Backed Timber Guardrail
0530AA Up to 1,000 Linear Feet (Inclusive) 1,000 LF $ $
0530AB Over 1,000 Linear Feet 1,000 LF $ $
0530AC End Posts 12 EA $ $
0531 Removal of Steel Beam Guardrail
0531AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0531AB Over 3,000 Linear Feet 3,000 LF $ $
0532 New Steel Beam Guardrail
0532AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0532AB Over 3,000 Linear Feet 3,000 LF $ $
0533 PCC Sidewalk 150 CY $ $
0534 PCC Sidewalk - Fiber Reinforced 250 CY $ $
0535 Concrete Overlay 1,000 CY $ $
0536 Concrete Pavements and Slabs 500 CY $ $
0537 Concrete Pavements and Slabs - Fiber Reinforced
250 CY $ $
0538 Concrete Steel Reinforcement
0538AA Up to 750 Pounds (Inclusive) 750 LB $ $
0538AB Over 750 Pounds 750 LB $ $
0539 Early High Strength Concrete
0539AA Up to 500 Cubic Yards (Inclusive) 500 CY $ $
0539AB Over 500 Cubic Yards 500 CY $ $
0540 Seeding 1,500 SY $ $
0541 Bedding Stone
0541AA Up to 500 Tons (Inclusive) 500 TN $ $
0541AB Over 500 Tons 2,000 TN $ $
0542 Riprap, Class A
0542AA Up to 500 Tons (Inclusive) 500 TN $ $
0542AB Over 500 Tons 2,000 TN $ $
0543 Riprap, Class D
0543AA Up to 500 Tons (Inclusive) 500 TN $ $
0543AB Over 500 Tons 2,000 TN $ $
0544 Riprap, Class E
0544AA Up to 500 Tons (Inclusive) 500 TN $ $
0544AB Over 500 Tons 2,000 TN $ $
0545 Geotextile 1,500 SY $ $
TOTAL OF ESTIMATED AMOUNTS (BASE BID)
(ITEM NOS. 0501 THROUGH 0545, INCL.)
OPTION PERIOD NO. 1
January 1, 2019 to December 31, 2019
0601 Removal of Existing Aggregate Base (Up to 8 inches)
0601AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0601AB Over 1,000 Square Yards 1,000 SY $ $
0602 Preparation of Existing Aggregate Base, Shaping, and Compacting
0602AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0602AB Over 1,000 Square Yards 1,000 SY $ $
0603 Preparation of Existing Aggregate Base, Additional Aggregate
100 TN $ $
0604 Preparation of Existing Bituminous Surfacing/Aggregate Base for Use as New Base Course
750 SY $ $
0605 New Compacted Aggregate Base Course
1,000 TN $ $
0606 Asphalt Pavement Patching 500 SY $ $
0607 Compacted Portland Cement or Fly Ash Modified Base
0607AA Stabilization 2,000 SY $ $
0607AB Portland Cement 250 TN $ $
0607AC Fly Ash 250 TN $ $
0608 ACC Pavement Milling 1,000 SY $ $
0609 Asphalt Crack Sealing 15,000 LF $ $
0610 PCC Pavement Milling 100 SY $ $
0611 Concrete Crack/Joint Sealing 1,500 LF $ $
0612 Concrete Curb and Gutter 1,000 LF $ $
0613 Saw Cutting of Asphalt 100 LF $ $
0614 HMA Pavement Demolition and Removal
2,500 SY $ $
0615 PCC Pavement and Curb and Gutter Demolition and Removal
2,500 SY $ $
0616 Trail Section Replacement 1,000 SY $ $
0617 Tack Coat 1,500 GA $ $
0618 HMA Binder Course
0618AA Up to 500 Tons (Inclusive) 250 TN $ $
0618AB Between 500 Tons and 1,000 Tons 510 TN $ $
0618AC Over 1,000 Tons (Inclusive) 1,000 TN $ $
0619 HMA Surface Course
0619AA Up to 2,000 Tons (Inclusive) 2,000 TN $ $
0619AB Over 2,000 Tons 2,010 TN $ $
0620 Removal of Existing Pavement Marking
0620AA 4-Inch Wide Lines, Roadways 1,000 LF $ $
0620AB 4-Inch Wide Lines, Parking Areas 1,000 LF $ $
0620AC 12-Inch Wide Lines 200 LF $ $
0620AD Words and Symbols 10 EA $ $
0621 Pavement Marking
0621AA 4-Inch Wide Lines, Roadways 15,000 LF $ $
0621AB 4-Inch Wide Lines, Parking Areas (Layout Required)
7,500 LF $ $
0621AC 12-Inch Wide Lines (Layout Required) 600 LF $ $
0621AD 4-Inch Wide Lines, Parking Areas (Layout Not Required)
7,500 LF $ $
0621AE 12-Inch Wide Lines (Layout Not Required)
600 LF $ $
0621AF Words and Symbols 20 EA $ $
0622 Compacted Aggregate Shoulders 500 TN $ $
0623 Topsoil Shoulders 850 TN $ $
0624 Fill 100 CY $ $
0625 Cut 1,500 CY $ $
0626 Emulsified Asphalt Slurry Seal
0626AA Up to 8,000 Square Yards (Inclusive) 8,000 SY $ $
0626AB Over 8,000 Square Yards 8,000 SY $ $
0627 Removal of Cable Guardrail
0627AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0627AB Over 3,000 Linear Feet 3,000 LF $ $
0628 New Cable Guardrail
0628AA Up to 500 Linear Feet (Inclusive) 500 LF $ $
0628AB Over 500 Linear Feet 500 LF $ $
0629 Removal of Steel-Backed Timber Guardrail
0629AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0629AB Over 3,000 Linear Feet 3,000 LF $ $
0630 New Steel-Backed Timber Guardrail
0630AA Up to 1,000 Linear Feet (Inclusive) 1,000 LF $ $
0630AB Over 1,000 Linear Feet 1,000 LF $ $
0630AC End Posts 12 EA $ $
0631 Removal of Steel Beam Guardrail
0631AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0631AB Over 3,000 Linear Feet 3,000 LF $ $
0632 New Steel Beam Guardrail
0632AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0632AB Over 3,000 Linear Feet 3,000 LF $ $
0633 PCC Sidewalk 150 CY $ $
0634 PCC Sidewalk - Fiber Reinforced 250 CY $ $
0635 Concrete Overlay 1,000 CY $ $
0636 Concrete Pavements and Slabs 500 CY $ $
0637 Concrete Pavements and Slabs - Fiber Reinforced
250 CY $ $
0638 Concrete Steel Reinforcement
0638AA Up to 750 Pounds (Inclusive) 750 LB $ $
0638AB Over 750 Pounds 750 LB $ $
0639 Early High Strength Concrete
0639AA Up to 500 Cubic Yards (Inclusive) 500 CY $ $
0639AB Over 500 Cubic Yards 500 CY $ $
0640 Seeding 1,500 SY $ $
0641 Bedding Stone
0641AA Up to 500 Tons (Inclusive) 500 TN $ $
0641AB Over 500 Tons 2,000 TN $ $
0642 Riprap, Class A
0642AA Up to 500 Tons (Inclusive) 500 TN $ $
0642AB Over 500 Tons 2,000 TN $ $
0643 Riprap, Class D
0643AA Up to 500 Tons (Inclusive) 500 TN $ $
0643AB Over 500 Tons 2,000 TN $ $
0644 Riprap, Class E
0644AA Up to 500 Tons (Inclusive) 500 TN $ $
0644AB Over 500 Tons 2,000 TN $ $
0645 Geotextile 1,500 SY $ $
TOTAL OF ESTIMATED AMOUNTS (OPTION PERIOD NO. 1)
(ITEM NOS. 0601 THROUGH 0645, INCL.)
OPTION PERIOD NO. 2
January 1, 2020 to December 31, 2020
0701 Removal of Existing Aggregate Base (Up to 8 inches)
0701AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0701AB Over 1,000 Square Yards 1,000 SY $ $
0702 Preparation of Existing Aggregate Base, Shaping, and Compacting
0702AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0702AB Over 1,000 Square Yards 1,000 SY $ $
0703 Preparation of Existing Aggregate Base, Additional Aggregate
100 TN $ $
0704 Preparation of Existing Bituminous Surfacing/Aggregate Base for Use as New Base Course
750 SY $ $
0705 New Compacted Aggregate Base Course
1,000 TN $ $
0706 Asphalt Pavement Patching 500 SY $ $
0707 Compacted Portland Cement or Fly Ash Modified Base
0707AA Stabilization 2,000 SY $ $
0707AB Portland Cement 250 TN $ $
0707AC Fly Ash 250 TN $ $
0708 ACC Pavement Milling 1,000 SY $ $
0709 Asphalt Crack Sealing 15,000 LF $ $
0710 PCC Pavement Milling 100 SY $ $
0711 Concrete Crack/Joint Sealing 1,500 LF $ $
0712 Concrete Curb and Gutter 1,000 LF $ $
0713 Saw Cutting of Asphalt 100 LF $ $
0714 HMA Pavement Demolition and Removal
2,500 SY $ $
0715 PCC Pavement and Curb and Gutter Demolition and Removal
2,500 SY $ $
0716 Trail Section Replacement 1,000 SY $ $
0717 Tack Coat 1,500 GA $ $
0718 HMA Binder Course
0718AA Up to 500 Tons (Inclusive) 250 TN $ $
0718AB Between 500 Tons and 1,000 Tons 510 TN $ $
0718AC Over 1,000 Tons (Inclusive) 1,000 TN $ $
0719 HMA Surface Course
0719AA Up to 2,000 Tons (Inclusive) 2,000 TN $ $
0719AB Over 2,000 Tons 2,010 TN $ $
0720 Removal of Existing Pavement Marking
0720AA 4-Inch Wide Lines, Roadways 1,000 LF $ $
0720AB 4-Inch Wide Lines, Parking Areas 1,000 LF $ $
0720AC 12-Inch Wide Lines 200 LF $ $
0720AD Words and Symbols 10 EA $ $
0721 Pavement Marking
0721AA 4-Inch Wide Lines, Roadways 15,000 LF $ $
0721AB 4-Inch Wide Lines, Parking Areas (Layout Required)
7,500 LF $ $
0721AC 12-Inch Wide Lines (Layout Required) 600 LF $ $
0721AD 4-Inch Wide Lines, Parking Areas (Layout Not Required)
7,500 LF $ $
0721AE 12-Inch Wide Lines (Layout Not Required)
600 LF $ $
0721AF Words and Symbols 20 EA $ $
0722 Compacted Aggregate Shoulders 500 TN $ $
0723 Topsoil Shoulders 850 TN $ $
0724 Fill 100 CY $ $
0725 Cut 1,500 CY $ $
0726 Emulsified Asphalt Slurry Seal
0726AA Up to 8,000 Square Yards (Inclusive) 8,000 SY $ $
0726AB Over 8,000 Square Yards 8,000 SY $ $
0727 Removal of Cable Guardrail
0727AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0727AB Over 3,000 Linear Feet 3,000 LF $ $
0728 New Cable Guardrail
0728AA Up to 500 Linear Feet (Inclusive) 500 LF $ $
0728AB Over 500 Linear Feet 500 LF $ $
0729 Removal of Steel-Backed Timber Guardrail
0729AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0729AB Over 3,000 Linear Feet 3,000 LF $ $
0730 New Steel-Backed Timber Guardrail
0730AA Up to 1,000 Linear Feet (Inclusive) 1,000 LF $ $
0730AB Over 1,000 Linear Feet 1,000 LF $ $
0730AC End Posts 12 EA $ $
0731 Removal of Steel Beam Guardrail
0731AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0731AB Over 3,000 Linear Feet 3,000 LF $ $
0732 New Steel Beam Guardrail
0732AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0732AB Over 3,000 Linear Feet 3,000 LF $ $
0733 PCC Sidewalk 150 CY $ $
0734 PCC Sidewalk - Fiber Reinforced 250 CY $ $
0735 Concrete Overlay 1,000 CY $ $
0736 Concrete Pavements and Slabs 500 CY $ $
0737 Concrete Pavements and Slabs - Fiber Reinforced
250 CY $ $
0738 Concrete Steel Reinforcement
0738AA Up to 750 Pounds (Inclusive) 750 LB $ $
0738AB Over 750 Pounds 750 LB $ $
0739 Early High Strength Concrete
0739AA Up to 500 Cubic Yards (Inclusive) 500 CY $ $
0739AB Over 500 Cubic Yards 500 CY $ $
0740 Seeding 1,500 SY $ $
0741 Bedding Stone
0741AA Up to 500 Tons (Inclusive) 500 TN $ $
0741AB Over 500 Tons 2,000 TN $ $
0742 Riprap, Class A
0742AA Up to 500 Tons (Inclusive) 500 TN $ $
0742AB Over 500 Tons 2,000 TN $ $
0743 Riprap, Class D
0743AA Up to 500 Tons (Inclusive) 500 TN $ $
0743AB Over 500 Tons 2,000 TN $ $
0744 Riprap, Class E
0744AA Up to 500 Tons (Inclusive) 500 TN $ $
0744AB Over 500 Tons 2,000 TN $ $
0745 Geotextile 1,500 SY $ $
TOTAL OF ESTIMATED AMOUNTS (OPTION PERIOD NO. 2)
(ITEM NOS. 0701 THROUGH 0736, INCL.)
OPTION PERIOD NO. 3
January 1, 2021 to December 31, 2021
0801 Removal of Existing Aggregate Base (Up to 8 inches)
0801AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0801AB Over 1,000 Square Yards 1,000 SY $ $
0802 Preparation of Existing Aggregate Base, Shaping, and Compacting
0802AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0802AB Over 1,000 Square Yards 1,000 SY $ $
0803 Preparation of Existing Aggregate Base, Additional Aggregate
100 TN $ $
0804 Preparation of Existing Bituminous Surfacing/Aggregate Base for Use as New Base Course
750 SY $ $
0805 New Compacted Aggregate Base Course
1,000 TN $ $
0806 Asphalt Pavement Patching 500 SY $ $
0807 Compacted Portland Cement or Fly Ash Modified Base
0807AA Stabilization 2,000 SY $ $
0807AB Portland Cement 250 TN $ $
0807AC Fly Ash 250 TN $ $
0808 ACC Pavement Milling 1,000 SY $ $
0809 Asphalt Crack Sealing 15,000 LF $ $
0810 PCC Pavement Milling 100 SY $ $
0811 Concrete Crack/Joint Sealing 1,500 LF $ $
0812 Concrete Curb and Gutter 1,000 LF $ $
0813 Saw Cutting of Asphalt 100 LF $ $
0814 HMA Pavement Demolition and Removal
2,500 SY $ $
0815 PCC Pavement and Curb and Gutter Demolition and Removal
2,500 SY $ $
0816 Trail Section Replacement 1,000 SY $ $
0817 Tack Coat 1,500 GA $ $
0818 HMA Binder Course
0818AA Up to 500 Tons (Inclusive) 250 TN $ $
0818AB Between 500 Tons and 1,000 Tons 510 TN $ $
0818AC Over 1,000 Tons (Inclusive) 1,000 TN $ $
0819 HMA Surface Course
0819AA Up to 2,000 Tons (Inclusive) 2,000 TN $ $
0819AB Over 2,000 Tons 2,010 TN $ $
0820 Removal of Existing Pavement Marking
0820AA 4-Inch Wide Lines, Roadways 1,000 LF $ $
0820AB 4-Inch Wide Lines, Parking Areas 1,000 LF $ $
0820AC 12-Inch Wide Lines 200 LF $ $
0820AD Words and Symbols 10 EA $ $
0821 Pavement Marking
0821AA 4-Inch Wide Lines, Roadways 15,000 LF $ $
0821AB 4-Inch Wide Lines, Parking Areas (Layout Required)
7,500 LF $ $
0821AC 12-Inch Wide Lines (Layout Required) 600 LF $ $
0821AD 4-Inch Wide Lines, Parking Areas (Layout Not Required)
7,500 LF $ $
0821AE 12-Inch Wide Lines (Layout Not Required)
600 LF $ $
0821AF Words and Symbols 20 EA $ $
0822 Compacted Aggregate Shoulders 500 TN $ $
0823 Topsoil Shoulders 850 TN $ $
0824 Fill 100 CY $ $
0825 Cut 1,500 CY $ $
0826 Emulsified Asphalt Slurry Seal
0826AA Up to 8,000 Square Yards (Inclusive) 8,000 SY $ $
0826AB Over 8,000 Square Yards 8,000 SY $ $
0827 Removal of Cable Guardrail
0827AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0827AB Over 3,000 Linear Feet 3,000 LF $ $
0828 New Cable Guardrail
0828AA Up to 500 Linear Feet (Inclusive) 500 LF $ $
0828AB Over 500 Linear Feet 500 LF $ $
0829 Removal of Steel-Backed Timber Guardrail
0829AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0829AB Over 3,000 Linear Feet 3,000 LF $ $
0830 New Steel-Backed Timber Guardrail
0830AA Up to 1,000 Linear Feet (Inclusive) 1,000 LF $ $
0830AB Over 1,000 Linear Feet 1,000 LF $ $
0830AC End Posts 12 EA $ $
0831 Removal of Steel Beam Guardrail
0831AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0831AB Over 3,000 Linear Feet 3,000 LF $ $
0832 New Steel Beam Guardrail
0832AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0832AB Over 3,000 Linear Feet 3,000 LF $ $
0833 PCC Sidewalk 150 CY $ $
0834 PCC Sidewalk - Fiber Reinforced 250 CY $ $
0835 Concrete Overlay 1,000 CY $ $
0836 Concrete Pavements and Slabs 500 CY $ $
0837 Concrete Pavements and Slabs - Fiber Reinforced
250 CY $ $
0838 Concrete Steel Reinforcement
0838AA Up to 750 Pounds (Inclusive) 750 LB $ $
0838AB Over 750 Pounds 750 LB $ $
0839 Early High Strength Concrete
0839AA Up to 500 Cubic Yards (Inclusive) 500 CY $ $
0839AB Over 500 Cubic Yards 500 CY $ $
0840 Seeding 1,500 SY $ $
0841 Bedding Stone
0841AA Up to 500 Tons (Inclusive) 500 TN $ $
0841AB Over 500 Tons 2,000 TN $ $
0842 Riprap, Class A
0842AA Up to 500 Tons (Inclusive) 500 TN $ $
0842AB Over 500 Tons 2,000 TN $ $
0843 Riprap, Class D
0843AA Up to 500 Tons (Inclusive) 500 TN $ $
0843AB Over 500 Tons 2,000 TN $ $
0844 Riprap, Class E
0844AA Up to 500 Tons (Inclusive) 500 TN $ $
0844AB Over 500 Tons 2,000 TN $ $
0845 Geotextile 1,500 SY $ $
TOTAL OF ESTIMATED AMOUNTS (OPTION PERIOD NO. 3)
(ITEM NOS. 0801 THROUGH 0845, INCL.)
OPTION PERIOD NO. 4
January 1, 2022 to December 31, 2022
0901 Removal of Existing Aggregate Base (Up to 8 inches)
0901AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0901AB Over 1,000 Square Yards 1,000 SY $ $
0902 Preparation of Existing Aggregate Base, Shaping, and Compacting
0902AA Up to 1,000 Square Yards (Inclusive) 500 SY $ $
0902AB Over 1,000 Square Yards 1,000 SY $ $
0903 Preparation of Existing Aggregate Base, Additional Aggregate
100 TN $ $
0904 Preparation of Existing Bituminous Surfacing/Aggregate Base for Use as New Base Course
750 SY $ $
0905 New Compacted Aggregate Base Course
1,000 TN $ $
0906 Asphalt Pavement Patching 500 SY $ $
0907 Compacted Portland Cement or Fly Ash Modified Base
0907AA Stabilization 2,000 SY $ $
0907AB Portland Cement 250 TN $ $
0907AC Fly Ash 250 TN $ $
0908 ACC Pavement Milling 1,000 SY $ $
0909 Asphalt Crack Sealing 15,000 LF $ $
0910 PCC Pavement Milling 100 SY $ $
0911 Concrete Crack/Joint Sealing 1,500 LF $ $
0912 Concrete Curb and Gutter 1,000 LF $ $
0913 Saw Cutting of Asphalt 100 LF $ $
0914 HMA Pavement Demolition and Removal
2,500 SY $ $
0915 PCC Pavement and Curb and Gutter Demolition and Removal
2,500 SY $ $
0916 Trail Section Replacement 1,000 SY $ $
0917 Tack Coat 1,500 GA $ $
0918 HMA Binder Course
0918AA Up to 500 Tons (Inclusive) 250 TN $ $
0918AB Between 500 Tons and 1,000 Tons 510 TN $ $
0918AC Over 1,000 Tons (Inclusive) 1,000 TN $ $
0919 HMA Surface Course
0919AA Up to 2,000 Tons (Inclusive) 2,000 TN $ $
0919AB Over 2,000 Tons 2,010 TN $ $
0920 Removal of Existing Pavement Marking
0920AA 4-Inch Wide Lines, Roadways 1,000 LF $ $
0920AB 4-Inch Wide Lines, Parking Areas 1,000 LF $ $
0920AC 12-Inch Wide Lines 200 LF $ $
0920AD Words and Symbols 10 EA $ $
0921 Pavement Marking
0921AA 4-Inch Wide Lines, Roadways 15,000 LF $ $
0921AB 4-Inch Wide Lines, Parking Areas (Layout Required)
7,500 LF $ $
0921AC 12-Inch Wide Lines (Layout Required) 600 LF $ $
0921AD 4-Inch Wide Lines, Parking Areas (Layout Not Required)
7,500 LF $ $
0921AE 12-Inch Wide Lines (Layout Not Required)
600 LF $ $
0921AF Words and Symbols 20 EA $ $
0922 Compacted Aggregate Shoulders 500 TN $ $
0923 Topsoil Shoulders 850 TN $ $
0924 Fill 100 CY $ $
0925 Cut 1,500 CY $ $
0926 Emulsified Asphalt Slurry Seal
0926AA Up to 8,000 Square Yards (Inclusive) 8,000 SY $ $
0926AB Over 8,000 Square Yards 8,000 SY $ $
0927 Removal of Cable Guardrail
0927AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0927AB Over 3,000 Linear Feet 3,000 LF $ $
0928 New Cable Guardrail
0928AA Up to 500 Linear Feet (Inclusive) 500 LF $ $
0928AB Over 500 Linear Feet 500 LF $ $
0929 Removal of Steel-Backed Timber Guardrail
0929AA Up to 3,000 Linear Feet (Inclusive) 3,000 LF $ $
0929AB Over 3,000 Linear…