Solicitation Amendment W912EF27QA0110003 SF 30 LMA Diffuser Grating.pdf

PDF 4 MB Posted

Attached to
Lower Monumental Diffuser Grating
Solicitation number
W912EF27QA011
Issued by

About this file

This is Amendment 0003 to Solicitation W912EF27QA011, issued by the US Army Engineer District Walla Walla Contracting Division on November 9, 2026, with an effective date of November 3, 2026. The amendment revises descriptions of CLINs 0006, 0007, and 0008 for clarity and updates associated technical specifications. The solicitation concerns an LMA Adult Collection Channel N Entrance Diffuser Grating project.

The amendment modifies SECTION 05 50 14 STRUCTURAL METAL MATERIALS to clarify bolt and washer requirements, including revisions to paragraph 2.2.4(9) defining 3/4-inch single-washer isolation-kit specifications and dimensions, and paragraph 2.2.5(3) clarifying washer requirements for aluminum hex-head bolt assemblies. The Bill of Materials (2.3) has been revised to identify bolt lengths (3/4-inch and 1/2-inch) and required hardware. DIVISION 01 GENERAL REQUIREMENTS Section 4.1 (Review Notations) review period has been revised to 10 calendar days, and Section 6.0 (Shipment and Delivery) has been revised to 65 calendar days. CLIN 0006 description changed from "3/4" Hex Bolt anchors w/hardware" to "3/4" Dia.X2 1/2 in Long Hex Bolt complete with one nut and two washers"; CLIN 0007 changed from "1/2" Hex Head bolts w/hardware" to "1/2" Hex Head bolt, complete with one nut and two washers"; and CLIN 0008 changed from "Bolt Isolation Kit Sleeves and washers" to "Bolt Isolation Kit 3/4" Single-Washer Isolation Kit." All other terms and conditions remain unchanged. Contracting Officer Cynthia H. Jacobsen signed the amendment on November 9, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose for this amendment is to Block 14 (Description of Amendment/Modification):

revise descriptions to CLINS 0006, 0007, & 0008 for clarity and provide associated revisions to technical specification SECTION 05 50 14 STRUCTURAL METAL MATERIALS. Also included in this amendment is revision to specifications DIVISION 01 GENERAL REQUIREMENTS SECTION 4.1, Review Notations and 6.0 Shipment and Delivery.

See summary of changes for further details.

All other terms and conditions remain unchanged.

Solicitation/Contract Form

The following changes have been made:

Miscellaneous text in this section has been added to:

Summary of changes for Amend-0003

LMA Adult Collection Channel N Entrance Diffuser Grating

W912EF27QA011

1. Revised the following Specifications:

a. SECTION 05 50 14 STRUCTURAL METAL MATERIALS

Revised paragraph 2.2.4(9), to define the 3/4 in single-washer isolation-kit requirements and dimensions.

Revised paragraph 2.2.5 (3), to clarify washer requirements for the aluminum hex-head bolt assemblies.

Revised the Bill of Materials (2.3) to identify 3/4 in and 1/2 in bolt lengths and required nut /washer hardware; revised the isolation-kit description

b. DIVISION 01 GENERAL REQUIRMENTS

Revised Section 4.1, Review Notations, to review period of 10 calendar days.

W912EF27QA0110003

Revised Section 6.0, Shipment and Delivery, to 65 calendar days.

c. Revised Description of CLINs 0006, 0007 & 0008.

See revised specifications for details.

Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Description Bolt

3/4" Hex Bolt anchors w/hardware

Bolt

3/4" Dia.X2 1/2 in Long Hex Bolt complete with one nut and two washers

INFORMATION FROM TO

Description Bolt

1/2" Hex Head bolts w/hardware Bolt 1/2" Hex Head bolt, complete with one nut and two washers

INFORMATION FROM TO

Description Bolt Isolation Kit

Sleeves and washers

Bolt Isolation Kit 3/4" Single-Washer Isolation Kit

W912EF27QA0110003

IDCode: J
Page: 1
Pages: 3
AmendNo: 0003
EffDate: 03 NOV 2026
ReqNo:
ProjNo:
IssCode: W912EF
AdmCode:
IssuedBy: US ARMY ENGINEER DISTRICT WALLA WAL

KO CONTRACTING DIVISION, 201 NORTH 3RD AVE

WALLA WALLA, WA 99362-1876

UNITED STATES

LEANNE WALLING, EMAIL: LEANNE.R.WALLING@USACE.ARMY.MIL TELEPHONE: 5095277230

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912EF27QA011
SolDate: 29 OCT 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: CYNTHIA H. JACOBSEN
ContDate:
CODate: 09 NOV 2026

File details come from the government source that posted it. Updated .