This is a project milestones timeline chart for a U.S. Army Corps of Engineers federal infrastructure project spanning fiscal years 2025 through 2035. The project encompasses multiple construction and renovation efforts organized into distinct work packages, each with defined acquisition strategies and implementation schedules.
The project consists of seven primary effort categories: (1) PH Roof and PH Life Safety, both utilizing Design-Bid-Build (DBB) contracting; (2) Vol. 2/3/6 utilizing Design-Build (DB) contracting, which includes PH Extension, Turbine-generator, and Balance of Plant components; (3) GSU Transformer Supply procured through MADOC; (4) Tailrace HSS Rehabilitation using DBB; (5) Intake HSS using DBB; and (6) Hydraulics Upgrades using DBB. Each work package follows a standardized progression of government design and BCOES (Board of Consultants on Engineering Services) activities, followed by solicitation and award phases, with contractor (KTR) involvement in mobilization, construction, fabrication, and installation. The timeline identifies critical dependencies, including requirements that certain components must be installed before Unit 4 Commissioning (U4 Cx). The GSU Transformer installation and commissioning extends into FY35, representing the project's final major milestone. The chart uses color coding to distinguish between planning/scoping, in-house design, KTR design/fabrication, DWA project work, and construction/installation activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MILESTONES
Planning/Scoping
In-house Design
Effort / Contract
Framing
PH Roof (DBB)
PH Life Safety (DBB)
Vol. 2/3/6 (DB)
- PH Extension
- Turbine-generator
- Balance of plant
GSU Xfmr Supply3 (MADOC)
Tailrace HSS Rehab4 (DBB)
Intake HSS5 (DBB)
Hydraulics Upgrades (DBB)
FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33
Acq. Strategy Char
Pre-Design DDR
GOV
Design +
BCOES
Solicit + Award
Install Dependency
S T
A R
T D
E S
IG
N
GOV Design +
BCOES
KTR
Mob. + Const.
Solicit Award
KT
R
Pre-con
GOV
Design +
BCOES
KTR Mobilize + Construct
Solicit
Award
KTR
Prec on
CWG
KTR Design/Fab
KTR
Construct/Install
GOV Design +
BCOES
Solicit Ph 1
KTR Design
PH Extension Mobilize & Construction
T-G Fabrication & Delivery T-G Install & Cx
FY34 FY35
GSU
Install & Cx
GOV
Design +
BCOES
Solicit /Award
KTR
Paint
DWA Project Work
Strip Seals
Install Seals
I n s t a l l
GOV Design +
BCOES
Solicit / Award
Must install before U4 Cx
I n s t a l l
GOV Design +
BCOES
Solicit / Award
KTR Mobilize + Construct
KTR
Precon
Must install before U4 Cx
KTR Design + Manufacture + Deliver
Solicit Ph 2 + Award
KTR Fabricate + Deliver