SOURCES SOUGHT ONLY - Technical Specifications - LLA Fish Pump - MCC Support Frame - Action 4.pdf
PDF 189 KB Posted
- Attached to
- Sources Sought -LLA Fish Pump - MCC Support Frame Federal contract opportunity
- Solicitation number
- W912EF25R0003
About this file
These are Technical Specifications for the Lower Granite Lock and Dam Fish Pump Rewind and Bearing Redesign project. The document details requirements for constructing an MCC (Motor Control Centers) platform on the 4th floor, spanning approximately 15ft x 74ft. The platform will be supported by existing concrete walls and columns, topped with steel grating and aluminum diamond plate, and include aluminum railings and toe board plates. Specific material requirements include hot-dipped galvanized structural members (ASTM A992 and A36), steel grating, carbon steel diamond plate, fasteners, and aluminum piping.
The project involves three fish pumps at Lower Granite Lock and Dam, with two pumps driven by 800 horsepower single-speed motors and one by a two-speed 350/800 horsepower motor. Delivery requirements specify shipments are allowed only Monday-Thursday from 7:00am to 4:00pm, with materials to be delivered to Pomeroy, WA 99347. The document includes detailed security requirements for contract personnel, including background checks, access control procedures, and compliance with Department of Defense security training requirements. Contractors must also pre-screen candidates using the E-Verify Program and maintain current lists of verified/eligible employees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice - Action 4.pdf | ||
| SOURCES SOUGHT ONLY - Technical Specifications - LLA Fish Pump - MCC Support Frame - Action 4.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
LOWER GRANITE LOCK AND DAM
FISH PUMP REWIND AND BEARING REDESIGN
1.0 INTENT
These specifications outline the requirements for the rewind and bearing redesign of fish pumps at Lower Granite Dam. The aim is to improve the reliability and performance of the pumps, ensuring uninterrupted fish passage.
This Technical Specification serves as the basis for solicitation of bids. Lower Granite Project staff will install the items listed below.
2.0 SCOPE
There are three fish pumps at Lower Granite Lock and Dam. Two of these pumps are driven by 800 horsepower single speed motors and the third driven using a two-speed 350/800 horsepower motor. The Contractor shall be required to deliver the items to Lower Granite by the date shown in Section 5.0 Delivery Requirements. The Contractor shall provide documentation and other items as stated in the specifications.
3.0 ACTIONS:
3.1 ACTION 4: PROVIDE MCC PLATFORM
The platform will support Motor Control Centers (MCCs). It will be located on the 4th floor (Elevation 620) and will span the whole erection bay opening. The platform will be approximately 15ftx74ft and be supported by existing concrete walls and columns. The frame will be topped with steel grating and aluminum diamond plate to allow for cart access. There will be a hatch in the platform to allow for hoisting items through the platform.
The contractor will need to provide all ASTM A992 and A36 structural members, 19-W-4 steel grating, 1009 diamond plate, aluminum railings and toe board plates, and fasteners. Structural members shall fasten with A325 bolts and adhesive anchors, and flooring shall fasten with grating clips and cap screws. All components will be hot dipped galvanized. The contractor is to machine steel per AISC 360 and be qualified to weld to AWS D1.1. See materials and estimated quantities needed for this effort below:
3.1.1 Structural Members
3.1.1.1 ASTM A992 Hot Dipped Galvanized W10x19, 281ft
3.1.1.2 ASTM A36 Hot Dipped Galvanized C6x13, 32 ft
3.1.1.3 ASTM A36 Hot Dipped Galvanized MC18x58, 74 ft
3.1.1.4 ASTM A36 Hot Dipped Galvanized L3 1/2x3 1/2x1/4,
3.1.2 Flooring
3.1.2.1 19-W-4 Hot Dipped Galvanized 1 ½"x1/8” Grating, 1,073 ft^2
3.1.2.2 1/8” thick 1009 Carbon Steel Diamond Plate, 1,073 ft^2
3.1.3 Fasteners
3.1.3.1 Grating Clips
3.1.3.2 Cap screws
3.1.3.3 ½" A325 Bolts with Washers and Nuts, 100 EA
3.1.3.4 ½" Adhesive Anchors, 65 EA
3.1.4 Railings
3.1.4.1 1 ½" ASTM B241 T-6 Schedule 40 Aluminum Pipe, 180ft
3.1.4.2 3/16”x4” Aluminum Toe Board Plate, 74ft
4.0 COMMERCIAL PACKAGING AND SHIPMENT REQUIREMENTS
4.1 ASTM-A700-14 – Standard Guide of Packaging, Marking, and Loading Methods for Steel Products for
Shipment.
4.2 ASTM-D3951-18 – Standard Practice for Commercial Packing.
5.0 DELIVERY REQUIREMENTS
Shipments are only allowed during normal business hours of Monday – Thursday 7:00am to 4:00pm. No shipments shall be made accepted on Federal Holidays. All shipments shall be delivered to:
Lower Granite Lock and Dam Pomeroy, WA 99347
5.1 Action 4 (Provide MCC Platform): Provide the best estimate for the delivery of materials identified herein to FOB Destination, following the approval of the submittal packages. MCC platform materials shall be delivered prior to the MCC materials to facilitate the construction of the platform for MCC installation.
5.2 General: These estimated timelines provide a clearer understanding of current industry lead times and will assist in guiding the overall project completion timeline.
7.0 SECURITY REQUIREMENTS
7.1 General Security Requirements and Guidance. The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of the contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative. Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements, all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g. email or memorandum) to the Government representative. The documentation shall include the names of the contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable Walla Walla District (NWW) plans and procedures – this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of the contract, should the FPCON and/or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in the local policies or procedures.
7.2 Physical Security and Access Control Requirements. All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshall/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contractor personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of NWW.
7.3 Pre-Screen Candidates Using E-Verify Program. Contractors shall comply with the requirements set forth in FAR 52.222-54 Employment Eligibility Verification and FAR 22.18 in using the E-Verify Program to meet the contract employment eligibility requirements. An initial list of verified/eligible candidates shall be provided to the KO no later than three business days after receipt of Notice of Award. Submit pre-screening results to the KO via email as a password protected pdf file. Submit updates to list of verified/eligible candidates within three business days of new verifications. The Contractor shall maintain a current list of verified/eligible employees as part of their contract files and provide copies to the KO upon request. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.