Technical Specifications.pdf
PDF 97 MB Posted
- Attached to
- Little Goose Powerhouse Unit 3 Federal contract opportunity
- Solicitation number
- W912EF25BA013
About this file
The file is a technical specification document for a repair project at the Little Goose Powerhouse Unit 3, located on the Lower Snake River near Starbuck, Washington. The work involves addressing an oil leak at the turbine shaft to Kaplan hub connection, specifically requiring three key repair actions: fabricating and installing a sealing ring at the hub connection flange, installing stainless-steel tubing, and welding thirty caps to seal coupling bolts and nuts. The project is being solicited by the Department of the Army Corps of Engineers Engineering District Walla Walla, and will be performed within the powerhouse of Little Goose Dam, which has six main generating units, with this specific repair targeting Unit 3. Notably, the contractor will not be required to disassemble or reassemble any existing components during the repair process.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 03.pdf | ||
| Amend 0003 25BA013_SUPPLEMENTAL DRAWINGS.pdf | ||
| Amendment 03.pdf | ||
| Amend 0003 25BA013 - LGA Unit 3 Repair Tech spec.pdf | ||
| Amendment 02.pdf | ||
| Amendment 01.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .