W912EF25BA001_Plans_Amend-003.pdf

PDF 12 MB Posted

Attached to
Little Goose Dam Stilling Basin Sediment Removal
Solicitation number
W912EF25BA001
Issued by

About this file

This document is a technical plan view drawing for the Little Goose Dam Stilling Basin Sediment Removal project located on the Snake River, spanning Oregon, Washington, and Idaho. The plan, issued by the U.S. Army Corps of Engineers Walla Walla District in July 2025, details the overall site layout for the Little Goose Dam, including key infrastructure elements such as the powerhouse, spillway, navigation lock, and fishway channel. The drawing provides specific details about boat restricted zones, a fish facility barge dock, Texas Rapids boat launch, and surrounding site features, with precise geographic coordinates and elevation data. Notable annotations include provisions for mooring floating plants at the fish facility dock, bird deterrent wire locations, and maintenance of public access to the Texas Rapids Park during construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS

LEWISTON

ID

A

H O

WAITSBURG

WALLA WALLA

PASCO

KENNEWICK

COLFAX

RICHLAND

OREGON

WASHINGTON

CLARKSTON

HERMISTON

MILTON-FREEWATER

KAHLOTUS

DAYTON

RIVER MILE 57

JOSO DISPOSAL SITE

107.5

RIVER MILE

DAM

GRANITE

LOWER

41.6

RIVER MILE

DAM

MONUMENTAL

LOWER

DAM

ICE HARBOR

MCNARY DAM

F

IN

A L

S T

IL

L

IN

G

B A

S

IN

S E

D

IM

E N

T R

E M

O V

A L

S P

IL

L

W A

Y

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

B A

A P

R

IL

W A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

IL

E N

O

M

IC

H A

E L

F R

A N

S S

E N

P

.E

L

IT

T L

E G

O O

S E

D A

M

P L

A N

V

IE

W

G-101

G F

R E

N C

H

N

P

IE

R S

O N

J U

L

M O

D

IF

IE

D

N O

T E

T

O A

L L

O W

M O

O R

IN

G

A T

F

IS

H F

A C

IL

IT

Y

L G

G -1

-0 -0

/1

W A

C H

O B

D S

P

D

:2

:1

A

M

/3 /2

L G

G -1

X X

X .d g n

400' 800'0

NORTH

400' 800'0

NORTH

RIVER MILE 70.3

DAM

GOOSE

LITTLE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

POWERHOUSE

SPILLWAY

STILLING BASIN

N A

V

IG

A T

IO

N

L O

C K

L

IT

T L E G

O O

S E D

A M R

O A

D

L

IT

T L

E G

O O

S E

D A

M R

O A

D

S N

A K

E R

IV

E

R

F L

O W

BOAT RESTRICTED ZONE BOUNDARY

BOAT RESTRICTED ZONE BOUNDARY

12345678

CONSTRUCTION BASE LINE (CBL)

NAVIGATION LOCK CULVERT OUTLET

FISHWAY CHANNEL

NORTH SHORE

SEE NOTE 5

30' MINIMUM EQUIPMENT DISTANCE

500 KV OVERHEAD POWER LINES

SEE NOTE 6

BIRD WIRES

SEE NOTE 7

FISH FACILITY BARGE DOCK

STAGING AREA

PARKING LOT

EL 557.9

E 2621353.93 N 465366.15

JFF-1

EL 650.89

E 2622137.27 N 465334.38

CBL 50+57.89

RECREATION AREA

TEXAS RAPIDS

BOAT LAUNCH

LIT

T

LE

G

O O S E D

A M R

O A D

LITTLE GOOSE DAM)

MILES DOWNSTREAM OF

(APPROXIMATELY 3.8

PARK ENTRANCE

S N

A K E R

IV

E R

F

LO

W

DOCK

A1

1"=400'SCALE:

PLAN: LITTLE GOOSE OVERALL SITE

STILL BE OPEN TO THE PUBLIC DURING CONSTRUCTION.

LAND ACCESS AND TO LAUNCH SMALL CRAFT. THE TEXAS RAPIDS PARK WILL

APPROXIMATELY 4 MILES DOWNSTREAM OF THE DAM IS ALSO AVAILABLE FOR

AND SMALL CRAFT AND FOR LAND ACCESS. THE TEXAS RAPIDS PARK

THE FISH FACILITY BARGE DOCK MAY BE USED TO MOOR FLOATING PLANTS 7.

LOW VERTICAL CLEARANCE ABOVE WATER. DO NOT DAMAGE WIRES.

BIRD DETERRENT WIRES ARE LOCATED NEAR THE POWERHOUSE AND HAVE 6.

ELEVATION).

IS APPROXIMATELY 635' (APPROXIMATELY 98' ABOVE MINIMUM POOL

OVERHEAD POWER LINES SHOWN ARE APPROXIMATE. ELEVATION OF LINES 5.

PERFORMANCE AS SPECIFIED.

SEDIMENT REMOVAL BOUNDARY AT THE COMMENCEMENT OF DREDGING

RESPONSIBLE FOR LOCATING THE ACTUAL DREDGING EXTENTS WITHIN THE

COLLECTED IN SEPTEMBER OF 2018. THE CONTRACTOR SHALL BE

MATERIAL VOLUMES ARE BASED ON HYDROGRAPHIC SURVEY DATA 4.

(NGVD29).

(NAD27). VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929

WASHINGTON STATE PLANE, SOUTH ZONE, NORTH AMERICAN DATUM 1927

UNIT OF MEASURE IS THE U.S. SURVEY FOOT. HORIZONTAL DATUM: 3.

OF THE BOAT RESTRICTED ZONE BOUNDARIES.

SEE RESOURCE DRAWINGS FOR DETAILED INFORMATION IN THE LOCATION 2.

RESTRICTED ZONES.

CONTRACTOR TO COORDINATE ACCESS WITH COR BEFORE ENTERING BOAT 1.

GENERAL NOTES

KEY PLAN

D15

1"=400'SCALE:

PLAN: TEXAS RAPIDS DOCK

CONTROL POINT DATAC-101

A1

LG508808G-101XXX

File details come from the government source that posted it. Updated .