This document is a Solicitation Amendment for federal contract opportunity W912EF24Q0110, which is for the rental of an under-bridge inspection truck (UBIT) and operators to inspect bridges at the Lower Granite and Little Goose Dams.

The amendment revises the period of performance for the UBIT rental services to be from January 27, 2025 to May 1, 2025, with the exact inspection days to be finalized within 21 days after contract award. The UBIT must meet specific performance capabilities and characteristics, and the contractor must provide trained and certified operators. Additional requirements include contractor employee identification, safe clearance training, an activity hazard analysis, and an accident prevention plan. The contractor will be escorted on-site and must comply with physical security and access control procedures. Inspections are to be conducted on consecutive weekdays (Monday-Thursday) within one of four specified four-day work windows. The contractor is only to be on-site for one day at each dam location.

View the file

Other files

File Type Posted
W912EF24Q0110 Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to alter the period of performance w ithin the Performance Work Statement to encompass January 27th, 2025 to May 1st, 2025. Exact inspection days w ill be finalized NLT 21 days after contract aw ard.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF24Q0110

X 9B. DATED (SEE ITEM 11)

21-Aug-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Aug-2024

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF24Q0110

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 27-JAN-2025 TO

20-FEB-2025

N/A LOWER GRANITE NATL RES MGT SEC

CONTRACTOR PERFORMANCE

SPECIALIST

100 FAIR STREET

CLARKSTON WA 99403-1943

509-751-0246 FOB: Destination

960514

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 27-JAN-2025 TO

01-MAY-2025

N/A LOWER GRANITE NATL RES MGT SEC

CONTRACTOR PERFORMANCE

SPECIALIST

100 FAIR STREET

CLARKSTON WA 99403-1943

509-751-0246

960514

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

POP 27-JAN-2025 TO

20-FEB-2025

N/A LITTLE GOOSE PROJECT

1001 LITTLE GOOSE DAM RD

DAYTON WA 99328-9753

960500

To:

CAGE

POP 27-JAN-2025 TO

01-MAY-2025

N/A LITTLE GOOSE PROJECT

1001 LITTLE GOOSE DAM RD

DAYTON WA 99328-9753

960500

The following have been modified:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

UNDER-BRIDGE INSPECTION TRUCK RENTAL FOR LITTLE GOOSE & LOWER GRANITE DAMS

AMENDMENT 0001 – 26 AUGUST 2024

REVISIONS IN RED

1. INTRODUCTION

This contract is to provide an under-bridge inspection truck and two operators in order to inspect four USACE-owned bridges: two at Lower Granite Dam and two at Little Goose Dam.

1.1. Project Location

The bridges are located at Little Goose and Lower Granite Dams:

Little Goose Dam 1001 Little Goose Dam Road Dayton, WA 99328

Lower Granite Dam 885 Almota Ferry Road Pomeroy, WA 99347

1.2. Purpose

The periodic inspections of project bridges are required by the Federal Highway Administration. In order to perform a thorough inspection of these bridges, an under bridge inspection truck is required.

1.3. General

A specialized piece of equipment, an under-bridge inspection truck (UBIT), is required to provide access to the bridge structures. The Contractor shall provide inspection truck with the capabilities described below. The inspection truck shall be in good condition with all documentation of inspections and repairs of the inspection truck available for the government’s review. The Contractor shall certify that the inspection truck has been inspected in accordance with ANSI 92.8 within one year of when the truck will be used to inspect the bridges. Any deficiencies or problems noted in the truck’s inspection shall have been corrected. Two operators shall be provided with the inspection truck, with one to operate the truck and one to operate the bucket and assist the government inspector. The operators provided shall be fully trained and certified to operate the inspection truck. The operator’s certifications shall be provided to the Government’s Contracting Officer’s Representative (COR) not later than seven (7) days from contract award. The contractor shall be responsible for lodging and transportation to and from the project site for the inspection truck operators.

1.3.1. Salient Characteristics of Under Bridge Inspection Truck The UBIT shall meet or exceed the following performance capabilities, characteristics and capacities:

Performance Horizontal Underbridge Reach 30 feet Vertical Reach Down 30 feet Vertical extension of 4th boom 5 feet

Dimensions/Capacities

Basket Capacity 450 pounds Basket Floor Size 40 inches by 60 inches Maximum truck width 8 feet 6 inches

Other Features

Basket controls on both basket and truck Intercom between basket and truck

1.4. Additional Requirements

1.4.1. Contractor Employee Identification. The Contractor shall be required to provide names and photo identification of operators at least 14 days in advance of performing work.

1.4.2. Safe Clearance Training. Bridge Inspection will require all Contractor personnel to be trained as Awareness Level Training. Training and written tests for the modules below shall be completed on-line prior to commencing on-site work. Time estimates for training follow:

a. Awareness Level Training: Approximately 1 hour.

A copy of the Safe Clearance Program for the Control of Hazardous Energy (NWWP 385-1-20) can be found on the Walla Walla District Internet site at:

http://www.nww.usace.army.mil/Portals/28/docs/contracting/OP385120.pdf.

All costs for this training shall be considered incidental to the work, and therefore, no additional payment will be made. Training is an annual requirement and will expire one year from completion date. Training is provided by Vivid Learning Systems and is available online at http://Hecp.vividlms.com. Cost for the training is displayed on the home page. Submit the training completion certification a minimum of seven (7) calendar days prior to the individual's arrival at site. Maintain training documentation on site, including the individual’s name and date of training completion, in accordance with NWWP 385-1-20.

1.4.3. Activity Hazard Analysis (AHA). An AHA will be prepared covering all hazards related to the work, steps taken to mitigate the hazard, and the risk associated with the hazard as outlined in EM 385-1-1. All employees shall attend a safety meeting prior to performing any work. A blank AHA template will be provided.

The AHA shall be provided not later than 7 days after contract award to the COR. The AHA must be approved by the Government prior to any on-site work taking place

1.4.4. Accident Prevention Plan (APP). Develop an APP as outlined in EM 385-1-1 Chapter 2-7b. The Contractor shall follow the mandatory form ENG FORM 6293. A fillable form will be provided.

1.4.5. Equipment. The contractor shall provide their own fall protection equipment in good condition.

1.5. Security Requirements

Contractor personnel will be escorted when on-site at Little Goose and Lower Granite.

1.5.1 General security requirements and guidance. The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this task order. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training 14 days prior to on-site work. Within three business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

1.5.2. Physical security and access control requirements. All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location.

Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the

RA.

1.5.3. Escorting in classified and/or sensitive areas. In accordance with the applicable regulations, all personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.

1.5.4. Pre-screen candidates using E-Verify Program. Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

2. SCHEDULE

Inspections need to occur within the time period listed below. work windows below. Inspections need to occur Monday-Thursday only. The inspections will take place on consecutive days. Exact inspection days will be finalized NLT 21 seven (7) days after contract award. The Contractor’s price proposal shall only include two on-site days, one at Little Goose and one at Lower Granite. If the inspections at a given site are not completed in the one day allocated, inspections for that site will not extend into a second day.

Below are work windows that will work for the government. These are four-day work windows, however On-site work will only take place for two days (one for Little Goose and one for Lower Granite). Within your quote submission, please identify which work window is best based on your company’s availability.

Period of Performance: Jan 27th, 2025 – May 1st, 2025.

Work window 1 – Jan. 27th, 2025 – Jan 30th, 2025 Work window 2 – Feb 3rd, 2025 – Feb 6th, 2025 Work window 3 – Feb 10th, 2025 – Feb 13th, 2025 Work window 4 – Feb 17th, 2025 – Feb 20th, 2025

The contractor shall have the inspection truck and operators on site at the following projects for the days given below. It is expected that each day will be completed in less than eight (8) hours but could run as long as 10 hours:

Little Goose Dam 2 bridges, 1 day Lower Granite Dam 2 bridges, 1 day

Schedule shall be coordinated closely with the government point of contact which will be provided at the time of contract award. Unless otherwise agreed to by the government, the truck and operators shall arrive on site, and be prepared to perform work on each scheduled day of work not later than 8:00 a.m.

Pacific Standard time.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .