B.08.02 Solicitation Amendment One (22Q0117) FINAL.pdf
PDF 572 KB Posted
- Attached to
- Dworshak Dam Elevator Maintenance Services Federal contract opportunity
- Solicitation number
- W912EF22Q0117
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.02 Solicitation (22Q0117) FINAL.pdf | ||
| B.04.30 Service Contract Wage Determination (22-Q-0117).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add a revised Performance Work Statement. Please return One (1) copy of this amendment along w ith your quote
The POC for this amendment is Richard Harvey Phone: 509-527-7504 or email: richard.a.harvey@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-May-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF22Q0117
X 9B. DATED (SEE ITEM 11)
18-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-May-2022
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
RICHARD HARVEY
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF22Q0117
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
PWS
PERFORMANCE WORK STATEMENT (PWS)
ELEVATOR MAINTENANCE SERVICES AND INSPECTIONS
DWORSHAK AND DAM
SECTION 1 General Information
1.0 General: This is a non-personal services contract to provide full maintenance services, repairs, inspections, and safety testing of all elevators at Dworshak Dam and Reservoir, Ahsanka, ID. The Contractor shall provide all personnel, equipment, supplies, tools, transportation, materials, supervision, and other items to perform monthly routine maintenance services, non-routine services and emergency services as needed.
1.1 Scope: The contractor shall inspect, maintain and repair Five elevators at Dworshak Dam Project to ensure maximum availability for safe use by Government personnel.
1.2 The Contractor shall provide preventative maintenance services, inspections and testing necessary too maintain elevators, equipment, appurtenances and accessories in a fully operational mode at all times except for prescheduled downtime. Services include but not limited to scheduled monthly maintenance, lubrication, adjustments, annual inspections and no-load testing, as required by the elevator code for the state of Idaho at the time of this award (https://dbs.idaho.gov/programs/elevators/), and necessary cleaning, lubrication, adjustments, and calibration of the equipment to maintain each elevator to Original Equipment Manufacturers (OEM) specified rated speed, leveling, and door operation condition.
*Last 5-year load tests were performed in August 2020; there will be no 5-year load tests on this contract.
1.3 This full maintenance contract signifies a qualified elevator service Contractor takes total service responsibility for the equipment identified in this contract. The monthly fixed price CLIN includes all regular inspections, maintenance, repairs, replacements for monthly routine calls only described below. A time and materials CLIN will be utilized for all Non-routine and Emergency calls described below. The contractor assumes all responsibility to keep the elevators operating safely and within the performance objectives of this PWS.
1.4 Period of Performance: The period of performance will be for one (1) Base year of 12 months and Two (2) option years of 12 months at the discretion of the Government Contracting Officer (KO) giving written notice of renewal. The period of performance is below:
Base Year 01 July 2022 through 30 June 2023 Option Year 1 01 July 2023 through 30 June 2024 Option Year 2 01 July 2024 through 30 June 2025
1.5 Federal Holidays: The Contractor shall not be permitted to work on these days unless an emergency exists.
The dates of the recognized Federal holidays can be found below at https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.
New Year’s Day (1st Day in January) Labor Day (1st Monday in September)
Martin Luther King Day (3rd Monday in February) Columbus Day (2nd Monday in October) President’s Day (3rd Monday in February) Veteran’s Day (11th Day of November) Memorial Day (Last Monday in May) Thanksgiving Day (4th Thursday in November) Juneteenth (19th Day in June) Christmas Day (25th Day of December) Independence Day (4th Day of July)
1.6 Hours of Operations: Normal workdays and business hours for the Contractor will parallel those of the
Government Project which are generally Monday through Thursday, 0630 to 1700 except Federal Holidays or when Government facility is closed due to Government-directed facility closings. This excludes work under emergency call outs. In case of a non-routine call out, the COR will make arrangements for the service call and time of arrival for the Contractor.
1.7 Contractor Personnel: The Contractor shall perform all work under this contract with his/her own forces except as provided in the section titled Subcontractors. Employees who perform this work shall be qualified persons on the contractor’s own payroll. All Contractor employees shall be at least 18 years of age and must be able to fluently read, write, speak and understand English.
1.8 Appearance: Contractor employees are expected to present a professional appearance and wear the official
Contractor-furnished uniform.
1.9 Subcontracting: No work may be subcontracted without written approval of the Contracting Officer (KO).
Compliance with the provisions of this contract by subcontractors shall be the responsibility of the Contractor.
1.10 Quality Control / Quality Assurance:
1.11 Quality Control: The Contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which ensures the work complies with the requirement of the contract.
1.12 Quality Control Report: At a minimum, the Contractor shall submit a Maintenance Report for each day of work that is performed. Maintenance Reports shall be provided to the COR or designee within two business days of performance. Record provided will be maintained in a binder for each elevator in it’s respective machine room. Binders shall not be removed from the elevator machine room and remains the property of the government. The report will include, but is not limited to the following information:
• Compliance with the maintenance/repair schedule and/or plan
• Reasons for non-compliance with the maintenance schedule and/or plan
• All maintenance/repair work performed
• Parts repaired or replaced
• Safety problems identified
• Corrective actions taken to correct safety problems
• Elevator repairs required that are outside the scope of this contract
1.13 Quality Assurance: The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance and the minimum acceptable defect rate(s).
1.14 Pre-work Conference. A Pre-work meeting will be scheduled within 15 business days after contract award.
At this meeting, the COR will establish lines of authority and Government procedures for contractual, administrative, and work issues. The Contractor must provide all documentation identified as a pre-work submittal at or prior to this meeting. The Government will furnish the Contractor a memorandum for record documenting pre-work conference discussions within one week following the meeting.
1.15 Pre-work Submittals: The Contractor shall complete and submit the following items to the COR within seven (7) days prior to the Post Award meeting:
Certificate(s) of Insurance.
Certificates showing the current State of Idaho Elevator Journeyman License, inspection and maintenance of elevators Certificates for safety training The qualifications of the Contractor’s crew supervisor.
The name, address and telephone number(s) (not to exceed three) where Contractor’s supervisor can be reached.
Contact list for emergency service, including after hour contact information.
A list of all employees that will be working on this contract, their qualification documents and their vehicle identification.
Contractor personnel documentation, as listed in Section 7 “Security” Detailed Quality Control Plan and Inspection Checklist.
Draft Accident Prevention Plan Draft Lockout/ Tagout procedures Material Safety Data Sheets (If Applicable) Maintenance Control Plan In draft form, a Maintenance and Inspection Schedule including any suggested modifications which may be in the interest of practicality, efficiency, economy or effective use of time, including any deficiencies, or items not up to code with elevators inspection schedule.
List of any non-US citizens.
1.16 Maintenance Control Plan (MCP): The Contractor shall develop a written Maintenance Control Plan (MCP) for each elevator. Each MCP shall describe the specific periodic maintenance procedures, appropriate frequency/interval, and required inspections. The MCP shall be kept in each elevator maintenance log binder kept in the respective machine room and shall become the property of the Government. Amendments to schedules shall be coordinated with the COR.
1.17 Condition Assessment. Within 15 calendar days of contract award, the Contractor shall schedule a site visit to Dworshak Project to verify site conditions. The Contractor shall identify any deficiencies and/or non-compliance issues with each elevator and submit findings as a Condition Assessment Report at the pre-work meeting. The Contractor is encouraged to include any suggested modifications that may be in the interest of practicality, efficiency, economy or effective use of time. The Contractor will be responsible for all maintenance, replacement of parts, etc., unless identified in the Condition Assessment Report.
SECTION 2 DEFINITIONS
Acceptable Quality Level (AQL): A predetermined value selected and used by the Government Quality Assurance inspector to distinguish between satisfactory and unsatisfactory performance.
Allowable Reject Level (ARL): The allowable margin of error observed under statistically sound quality assurance surveillance.
Contracting Officer (KO): An employee of the Government with the authority to enter into, administer and/or terminate Government contracts and make related determinations and findings on behalf of the Government. Only a KO is authorized to legally obligate the Government and to make any changes to this contract.
Contracting Officer’s Representative (COR): An employee of the Government who is appointed by the KO to administer a contract after award. The COR (Primary and Alternate) monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to change or to waive any terms of the contract.
Contractor: Refers to the prime Contractor and all contractor employees or personnel. The prime Contractor shall be responsible for ensuring all subcontractors comply with the provisions of this contract.
Deductible Percentage: The percentage obtained when the price for providing a specific requirement for a billing cycle is diminished because performance below the AQL threshold.
Quality Assurance: The Government’s procedures to verify that the Contractor’s Quality Control Plan is effective in ensuring the services being performed by the Contractor meet the contract requirements.
Quality Assurance Surveillance Plan (QASP): A written document specifying the surveillance methodology to be used by the Government for surveillance of Contractor’s performance. The QASP is a “living” document and may be changed through the life of the contract as needed.
Quality Control: All necessary measures taken by the Contractor to assure that the quality of an end product or service conforms to contract requirements.
SECTION 3 GOVERNMENT FURNISHED ITEMS AND SERVICES
3.0 Utilities: The Government will provide electricity outlets, water, restroom facilities and phone use where available that may be required in the performance of the contract. Note that phone use is only available to call Contractor’s main office or Tech Support. Utilities will be provided “as is”. All extension cords, adapters and other necessary items will be Contractor’s responsibility.
3.1 Drawings: The Government will provide schematic and structural drawings, if available, for the Contractor’s use. All drawings shall be retained in each elevator mechanical room. Contractor must note any changes to the drawings and submit to the COR to ensure drawings get updated.
SECTION 4 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES
4.0 General: The Contractor shall furnish all labor, supplies, materials and tools necessary to perform preventive maintenance, inspections, cleanings, Lubrication and adjustments on a monthly basis. Contractor must provide all training to his/her employees required by applicable safety, health or licensing requirements.
4.1 Materials:
4.2 Parts and Materials: The Contractor shall be responsible to furnish the following parts and supplies: all replaceable type contacts, contact insulators, contact springs, copper braids, all oils, greases and cleaning materials. Contractor parts and supplies may be stored at a location designated by the Government however, most spare parts will be carried in Contractor service vehicle.
4.3 Component Replacement: In performing the work under this Contract the contractor shall provide only parts recommended by the manufacturer of the equipment for replacement or repair. Contractor will use only those lubricants of a standard or grade recommended by the manufacturer of the equipment.
4.4 Warranty of Materials and Services: All materials provided and services performed under this contract shall be free from defects and conform to ASME A17.1. The Contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract. The KO or COR will give written notice of any defect or nonconformance within 120 days from the date of acceptance by the Government.
SECTION 5 SPECIFIC TASKS (Description of Services for Routine Services)
5.0 Dworshak Project Elevators
NAME / LOCATION MANUFACTURE DETAILS
Powerhouse
PKD/Total Systems Hoist Machine: Hollister-Whitney Overhead Traction #64 Controls: MCE Installed: 2011
Capacity: 4,000 pounds Lift: 66 feet Travel Speed: 350 fpm Stops: 5 floors Note: 2 floors open to both sides Parks on 4
Visitor Center
Otis Elevator Hoist Machine: Otis 63G4 Controls: Otis Installed: 1970s
Capacity: 1,200 pounds Lift: 25.5 feet Travel Speed: 150 fpm Stops: 3 No parking
North Tower Upstream (P1)
Armstrong Elevator Hoist Machine: Hollister-Whitney Overhead Traction #74 Controls: MCE Installed: 2010
Capacity: 2,500 pounds Lift: 634 feet Travel Speed: 500fpm Stops: 11 Parks on 10
North Tower Downstream (P2)
Armstrong Elevator Hoist Machine: Hollister-Whitney Overhead Traction #74 Controls: MCE Installed: 2010
Capacity: 2,500 pounds Lift: 634 feet Travel Speed: 500fpm Stops: 11 Parks on 10
South Tower
PKD/Total Systems Hoist Machine: Hollister-Whitney Overhead Traction #64 Controls: MCE Installed: 2011
Capacity: 2,000 pounds Lift: 405 feet Travel Speed: 350 fpm Stops: 7 Parks on 7
5.1 Elevator Maintenance (Firm Fixed Price - FFP): The Contractor shall perform all elevator maintenance services for all elevators, unless noted and accepted in the deficiency report or the Quality Control Reports. Work required by this contract shall be performed on a regularly scheduled basis but not less than once every 30 days.
5.2 Scheduling. Elevator maintenance shall be scheduled and coordinated with the COR to minimize disruption to project activities. Unless there is an emergency or an impending safety hazard for an elevator all Project activities will take precedence over elevator maintenance. The Contractor shall notify the COR of its Routine Maintenance schedule at least three days prior to performance.
5.3 Routine Maintenance: Routine maintenance required by this contract shall be performed on a regularly scheduled basis but not less than once each calendar month. Routine maintenance includes, but may not be limited to, cleaning (minimally equipment spaces / machine rooms and daily cleanup of job sites in conjunction with maintenance activities), maintenance, repair, parts replacement, servicing, adjustments, calibrations, and inspections, as needed
5.4 Annual Inspections & Testing: The Contractor shall perform annual service inspections and no-load testing and shall maintain adequate records of compliance. The Contractor is responsible for performing, or causing to be performed, an annual inspection that complies with Idaho Code Title 39 Chapter 86 Idaho Elevator Safety Code Act.
https://legislature.idaho.gov/statutesrules/idstat/Title39/T39CH86/SECT39-8606/ Copies of inspection and test reports, along with a record of all remedial action taken, shall be provided to the COR. The Government reserves the right to have a third party inspect the elevators.
5.5 Five-Year Load Testing. Five-year load testing was completed on these elevators in August 2020. Five-year load testing will not be performed under this contract.
5.6 Changes to Government Property. The Contractor shall make no alterations to Government property or changes to the existing circuits, circuitry wiring and sequencing or otherwise alter the original circuit or wiring design of the elevators except with the written permission of the Government. The Contractor may submit a proposal for any recommended modification or change to the COR in a complete, neatly prepared wiring diagram, accompanied by description of the proposed change.
SECTION 6 SPECIFIC TASKS (Description of Services for Non-Routine Services)
6.0 Non-Routine Services (Time and Materials – T&M): Not included in routine maintenance are hoist enclosures, total replacement of hoist way control cables, door panels, car enclosures, frames, sills, car lighting lamps, hoist ropes, counterweights, and complete replacement of motor assemblies unless damaged as a result of Government, Contractor, or other third party negligence. While work or replacement of these specific items is not included in the contract, the Contractor shall note and report to the COR any required repairs and/or replacements necessary along with a detailed report. The Government reserves the right to obtain repair services for the excluded equipment appurtenances and accessories from other sources. Non-routine work requires a price proposal and approval from the Contracting Officer prior to the work starting.
6.1 Excluded Services. The Contractor shall report to the COR any needed repairs or services that are not covered in Section 5.2, Elevator Maintenance. The report shall include a description of and justification for the needed service or repair, a list of needed materials/parts (if applicable) with part numbers, and an estimate of time and cost to complete the service or repair. The Contractor shall not commence any such service or repair work without advance authorization from the COR. If the Contractor performs any additional work, or provides parts not covered in this contract, without prior authorization, it will be done at the Contractor’s own risk and expense. The Government reserves the right to purchase materials/parts from other vendors and via means other than this contract.
6.2 Interruption of Service: Elevator maintenance shall be scheduled and coordinated with the COR to minimize disruption to project activities. Unless there is an emergency situation or an impending safety hazard for an elevator (the elevator is out of service, stuck, or experiencing a dangerous or potentially dangerous malfunction) all project activities will take precedence over elevator maintenance.
6.3 Emergency Call-Out Service: Only used if an employee is trapped in the elevator. In instances where emergency call-out is needed, the contractor shall provide emergency call-out service 24 (twenty-four) hours a day, 7 (seven) days per week when requested by the COR or the shift operator on duty. If the COR or shift operator receives a pre-recorded phone message, the Contractor will have one hour to respond back with a phone call.
Contractor’s mechanic is required to be on-site to commence work within a maximum of 4 hours after a call for emergency services is made. If the Contractor does not arrive within 4 (four) hours, the Government reserves the right to call an alternate contractor to provide necessary services.
6.4 Non-emergency Call-back: The Contractor shall respond to the Project to troubleshoot and repair causes for elevator service disruptions. Ordinarily, the Government and Contractor will coordinate service dates/times for Non-emergency Call-backs to avoid overtime, as well as to allow the Project to procure necessary parts in the most effective manner. If monthly Routine Maintenance has not yet occurred, maintenance may be moved up, in lieu of a separate call-back.
6.5 Time and Materials (T&M): The Contractor shall provide preventative maintenance services, inspections and testing necessary to maintain elevators, equipment, appurtenances and accessories in a fully operational mode at all times except for prescheduled downtime. Services include but not limited to maintenance, lubrication, adjustments, inspections and load testing, as required by the elevator code for the state of Idaho at the time of this award (https://dbs.idaho.gov/programs/elevators/), and necessary cleaning, lubrication, adjustments, and calibration of the equipment to maintain each elevator to Original Equipment Manufacturers (OEM) specified rated speed, leveling, and door operation condition for all non-routine services.
Repairs covered under this category have the same definition as those stated above EXCEPT that the cost of labor, supplies, parts, and materials is expected to be in EXCESS of $100.00, and the total cost, including LABOR, is less than $10,000. The cost of repairs that meet the stated criteria shall be the responsibility of the Government. The stated criteria shall apply to each individual repair task that may be required.
The COR may notify the Contractor about needed repairs within this category as part of the services to be provided under the terms of this contract.
The Contractor shall report any need for repairs within this category to the COR, but shall not initiate such work until authorized to do so by either the COR. This includes any repair identified under regular inspection in excess of $100.00 or is believed to be work not clearly defined in the PWS. The Contractor shall furnish the COR with an itemized written estimate of the labor hours and the cost of parts and materials which may be required to complete any repair in this category.
Payment for the Time and Material (T&M) line items will be as specified in Contract Clause Payment Under Time-and-Materials and Labor-Hour Contracts. In addition to the basis for the labor rate specified in the clause (wages, indirect costs, G&A expenses, and profit), the contract rates shall include all superintendence for subcontractors and cost for consumables and small tools required to complete the required repairs. Materials that are directly consumed in connection with the furnishing of the labor hours accomplished under the T&M line item will be reimbursed at cost, plus 10 percent for material handling cost. Reimbursement will be limited to the direct cost of materials in excess of the amount paid under the labor hour rates and will be reimburse to the extent supported by invoice cost and previously approved for use by the Contracting Officer.
Time and Material CLINs All Time and Material CLINs will be measured for payment as the number of hours (HRS) performed. Price and payment shall be full compensation for all Time and materials performed, complete, as specified and approved.
Hourly Rates For services pertaining to Time and Materials efforts, provide hourly rates for:
Emergency Services: $________________hour
Non-routine Services: $________________hour
Miscellaneous Maintenance:
(1) Replace burned out lamps in dispatch panel, car and hall push buttons, position indicators, emergency lighting, hoist way lighting as required.
(2) Clean elevator pits and machine room floors
(3) Clean car grille and stile channels
(4) Keep the exterior of the machinery clean and presentable at all times.
SECTION 7 SECURITY, SAFETY & ENVIRONMENTAL REQUIREMENTS
7.0 Access and General Protection. All Contractor and all associated subcontractor employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.
7.1 Contractors Requiring Access to a DoD Facility. All Contractor and associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable facility and area commander facility access, and local security policies and procedures (provided by government representative, as NCIC and TSDB are available).
7.2 Escorting. All Contractor and associated subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
7.3 Pre-screen Candidates Using E-Verify Program. The Contractor must pre-screen candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements.
The Vendor must ensure that the candidate has two valid forms of Government-issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 30 business days after the initial contract award.
7.4 Authorized Personnel. Only persons directly involved with accomplishment of the Contractor’s operations on this contract shall be allowed on the Project. In accordance with the requirements above and Dworshak Project access requirements, a complete submittal package for a contractor employee includes:
Copy of employee’s driver’s license Copy of E-Verify certification Copy of elevator mechanic license Copies of current HECP certificates
7.5 Contractor Employee Identification. Contractor and subcontractor employees must wear official clothing that identifies them as employee of the Contractor, OR each must wear, visibly on their person, a Contractor-provided laminate badge with employee name, photo, and Contractor’s company identification. In any case, all employees must always have valid photo identification on their person while on the Project. Note: The Government reserves the right to obtain digital photographs of all Contractor personnel performing work onsite as part of the Project access control program.
7.6 Contractor Vehicles. All usual Contractor vehicles shall have permanent or temporary identification on both sides, of a size sufficient to provide visual identification from at least 20 feet from the vehicle. If a temporary unmarked vehicle must be used, the Contractor shall provide year, make, model, color, and license plate for the vehicle to the COR prior to arrival of the vehicle to the Project. All vehicles are subject to search.
SECTION 8 SAFETY REQUIREMENTS
8.0 Safety Standards. The Contractor shall comply with all applicable Occupational Safety and Health Act (OSHA) Standards, as well as the Corps of Engineers’ Safety and Health Requirements Manual EM 385-1-1 that are in effect at the time of contract award. This section calls out only a few specific requirements. Prospective offerors are encouraged to review the EM 385-1-1 at:
https://www.publications.usace.army.mil/portals/76/publications/engineermanuals/em_385-1-1.pdf to gain an understanding of the full requirement prior to developing their offer. Contractor personnel and equipment shall be subject to safety inspections by Government personnel while on federal property.
8.1 Accident Prevention Plan (APP). In accordance with EM 385-1-1 paragraph 01.A.12, the Contractor shall prepare and provide a copy of its Accident Prevention Plan / Safety Plan for review and acceptance by the Government.
8.2 Training & PPE. The Contractor shall ensure that all personnel are trained to the level of expertise required for proper performance of the task, general first aid procedures, and use of safety equipment. Personal protective equipment (PPE) shall be provided by the Contractor and must be appropriate to the task.
8.3 Safe Clearance / Hazardous Energy Control / Lockout-Tagout. All Contractor work performed onsite shall meet the requirements of Walla Walla District "Safety and Occupational Health Office; Safe Clearance Program for the Control of Hazardous Energy,” NWWP 385-1-20. In accordance with Chapter 10 of NWWP 385-1-20, the Contractor may perform work under its own Lockout/Tagout procedures for work on elevator equipment that can be completed in one work shift. To obtain authorization to do so, the Contractor must provide a copy of its own Lockout/Tagout procedures to the Government for review and acceptance, as well as provide annual NWW Hazardous Energy Control Program training to each authorized employee (see 1.11.4 below).
8.4 If the Contractor’s Lockout/Tagout procedures are not submitted or accepted, or if elevator equipment must be left under a clearance longer than one shift, the Contractor shall be required to operate under the Walla Walla District Safe Clearance Program requirements.
8.5 All Contractor and subcontractor employees shall be trained in and abide by the accepted Lockout/Tagout or Safe Clearance Program procedures, and Project Control Room personnel shall be notified of all actions involving clearing and switching energy sources.
8.6 Safety Shut-downs. If the Contractor determines an elevator to present a threat to personal safety or property, the Contractor shall notify the COR immediately, providing information regarding the nature of the problem(s), corrective action(s) required, in order to have the elevator taken out of service according to Government protocols and plan initiated for appropriate action.
8.7 Required Annual HECP Training. Contractor and subcontractor employees operating under the Contractor’s Lockout/Tagout procedures or under the Walla Walla District Safe Clearance Program, as described above, shall take the HECP procedure training described below. Any non-working personnel, vendors and visitors that will be entering an area under Safe Clearance shall take Awareness level training. Training and written tests for the modules below shall be completed online prior to commencing onsite work. Time estimates for training follow:
a. Awareness Level Training: Approximately 1 hour
b. Affected Persons: Approximately 2 hours in addition to Awareness Level training.
c. Authorized Individuals: Approximately 3 hours in addition to Awareness Level training and Affected
Personnel Training.
All costs for this training shall be considered incidental to the work, and therefore, no additional payment will be made. Training is an annual requirement and will expire one year from completion date. Training is provided by Vivid Learning Systems and is available online at http://Hecp.vividlms.com. Cost for the training is displayed on the home page. Submit the training completion certification(s) to the COR a minimum of seven days prior to the individual's arrival at site.
8.8 Protection of Government Property. The Contractor shall protect all existing Government structures, utilities, equipment, and work of any kind against damage or interruption of service, which may result from its operations. Persons engaged under this contract may be working in areas containing control systems vital to the operation of the project. The Contractor shall protect against accidental and/or intentional operation of any control systems.
8.9 Incident/Accident Reporting. An accident constitutes an incident or act involving the Contractor, which may or may not have caused obvious damage to persons or property. This includes injuries to Contractor employees, members of the public, or damage to Government or personal property. The Contractor shall notify the COR by telephone within 30 minutes of any incident or accident, followed by a written report. The report shall include, but not be limited to, location, nature of the injury or accident, name(s) of injured party(ies), conditions/circumstances surrounding the occurrence, cause of the occurrence, parties notified, and actions taken. The report shall be accompanied by sketches, graphs, drawings, and photographs, as needed, and forwarded to the COR within one working day following the occurrence of accident or injury.
SECTION 9 ENVIRONMENTAL REQUIREMENTS
9.0 Conservation. The Contractor must ensure employees practice utility conservation. The Contractor is responsible for operating under conditions that prevent the waste of utilities, to include turning off lights when not necessary for work and turning off water faucets and valves when not in use.
9.1 Environmental and Hazardous Materials. The Contractor must establish systems and controls to minimize use of hazardous materials and generation of hazardous wastes, maximize recycling of materials and comply with local, state and federal guidelines for hazardous material and waste storage and disposal. Where applicable, the Contractor shall use environmentally safe products in the course of completion of their project. The Contractor shall maintain, in company vehicle on site, Material Safety Data Sheets (MSDS) for all chemicals. In addition, all requirements in the EM 385-1-1 manual apply.
9.2 Leaks and Spills. The Contractor shall be cautious when filling gear oil tanks to prevent overflow and must carry an inventory of absorbent pads for minor oil spills that may occur during this process.
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY (PRS)
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
PERFORMANCE
OBJECTIVES STANDARDS AQL
SURVEILLANCE
METHOD
Preventive Maintenance Service (5.2)
Routine Elevator Maintenance is performed each month Project elevators to ensure they are maintained to all codes and provide maximum operational ability. The Contractor notified the Project of the schedule three ore more business days in advance of performance.
95% Monthly
Annual Inspections (5.2.4)
Annual Inspections and No-load Tests are performed and documented on all Project elevators annually.
100% 100% Inspection of
KTR reports
Non-emergency Call-back (5.3.2)
Any non-emergency call-back was coordinated with appropriate Project personnel performed during normal business hours.
100% 100% Observation
Emergency Call-back (5.13.3)
Contractor arrived at site for troubleshooting and repair within four hours of authorized emergency call-back request.
100% 100% Observation
PERFORMANCE
OBJECTIVES STANDARDS AQL
SURVEILLANCE
METHOD
Maintenance Records (5.6)
All maintenance and repair work for each elevator is annotated within five days of completion of work.
90% Periodic
Inspection
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
DELIVERABLE FREQ/DUE DATE
COPIES
SUBMIT
TO
Pre-Work Submittals (1.6.2) Prior to pre-work conference 1 each COR
Condition Assessment Report (1.6.3)
Within 30 days of condition assessment inspection and not later than 45 days after award
1 COR
Changes to Elevator Drawings (3.2)
Anytime they are updated 1 COR
Maintenance Records (5.6), including annual inspection/testing reports (5.2.4)
Within five business days of performance of work.
1 per elevator
COR
Authorized Personnel Packets (6.1.5)
Prior to any contractor or subcontractor employee performing work onsite, and annually thereafter for HECP certificates
1 each employee
COR
(End of Summary of Changes)
File details come from the government source that posted it. Updated .