Solicitation 21R0012 NWD MATOC Phase I.pdf

PDF 997 KB Posted

Attached to
Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Solicitation number
W912EF21R0012
Issued by

About this file

This notice describes a solicitation for a construction contract. The U.S. Army Corps of Engineers seeks proposals for a Multiple Award Task Order Contract to provide new cranes, hoists, and lifting devices as well as rehabilitation of various types of cranes and hoists at federal facilities located in 12 Midwestern and Western states. Work may include overhead bridge cranes up to 600 tons, gantry cranes up to 480 tons, underhung monorail cranes up to 15 tons, derrick/pedestal cranes up to 200 tons, and below-the-hook devices. Task orders will range from $1 million to $25 million and may involve design-build, design-bid-build, or hybrid supply-construction contracts. Proposals are due as specified in solicitation W912EF21R0012 to be posted on beta.sam.gov on April 13, 2020. The small business size standard is $16.5 million average annual receipts. A site visit may be offered during Phase II and security clearance is required for foreign national attendees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Indefinite Delivery Indefinite Quantity (IDIQ) Design-Build, Design-Bid-Build Multiple Aw ard Task Order Contract (MATOC) for Crane Replacement and Rehabilitation for the USACE Northw estern Division. The MATOC and Task Order 0001 w ill be made based on the best value to the Government using the Best Value Trade-Off source selection process in accordance w ith FAR Part 15 and the tw o-phase design-build procedures in FAR 36.3. The MATOCs w ill be aw arded for a three year base period w ith a tw o-year option period. The total contract dollar capacity shared among firms w ill not exceed $99,900,000. Any unused capacity in one period may be carried over into the subsequent contract period. The minimum guarantee amount for the entire life of the contract for each IDIQ aw ardee is $10,000. The minimum Task Order value is $2,000 and the maximum Task Order value is $20,000,000. The Government intends to aw ard up to f ive IDIQ contracts to the offeror(s) w hose proposal, conforming to the RFP, w ill be most advantageous to the Government resulting in the Best Value.

HILLARY A MORGAN 509-527-7214

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

16-Apr-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________00 70 00

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A.

local time ______________18 May 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USAED, WALLA WALLA - CONTRACTING DIV.

HILLARY A. MORGAN

201 N. THIRD AVENUE

WALLA WALLA WA 99362

W912EF

PAGE OF PAGES

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

Sealed offers in original and 0 copies to perform the w ork required are due at the place specif ied in Item 8 by 04: ___________00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

509-527-7802FAX:TEL: 509-527-7214 TEL: FAX:

W912EF21R0012 1 OF 75

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 01 10 - Table of Contents

Section 00 10 00, Solicitation Contract Form Section 00 21 00, Instructions Section 00 45 00, Representations and Certifications Section 00 70 00, Conditions of the Contract Section 00 73 00 Supplementary Conditions Technical Specifications Drawings

Section 00 21 00 - Instructions

ATTENTION TO OFFERORS

Offeror(s) may be asked to provide the following information for the Government’s use in the determination of offeror(s) responsibility, pursuant to FAR Part 9. Do not include it with your offer.

1. Current Balance Sheet and latest Profit and Loss Statement prepared from the most recent fiscal/calendar year and certified by an officer of the company.

2. The name of your banking institution, telephone number and the name of the individual to contact for a line-of-credit reference. (If you are notified of being in the competitive range, please contact your bank reference to let him/her know our office will be calling for financial information.)

Bank Institution ________________________________ Telephone Number ______________________________ Contact ________________________________________ Email Address __________________________________

3. Tax Identification Number ________________________

4. List of present work to include agency or firm name, address, telephone number, and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list) Will performance of the present work inhibit your ability to perform this contract? ___________

5. Offeror’s email address: ____________________________________

Return completed form with all attachments to:

Email: Hillary.A.Morgan@usace.army.mil

OR

Physical/Mailing Address: Walla Walla District Corps of Engineers, 201 North Third Avenue, Walla Walla, WA 99362-1876.

mailto:Kent.R.Bernard@usace.army.mil

REQUIRED LIABILITY INSURANCE PURSUANT TO FAR 28.306

In accordance with the clause 52.228-5 Insurance – Work on a Government Installation, the Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:

(i) Coverage complying with state laws governing insurance requirements pertaining to Workmen’s Compensation and Employers” Liability Insurance.

(ii) Bodily injury liability insurance with minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.

(iii) Automobile bodily injury and property damage liability with minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury liability; and $20,000 per occurrence for property damage liability shall be required.

(iv) The coverage required under Longshore and Harbor Workers Compensation Act, if applicable.

(v) The Insurance Certificate will name the Walla Walla District, U.S. Army Corps of Engineers, 201 N. Third Avenue, Walla Walla, Washington 99362 as the Certificate Holder.

CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY

In order to determine a contractor’s responsibility for purposes of contract award the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work.

(See the Attention to Offerors form included in this solicitation.) In accordance with FAR 9.104-1, to be determined responsible, a prospective contractor must –

(a) Have adequate financial resources to perform the contract, or the ability to obtain them;

(b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;

(c) Have a satisfactory performance record. (A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history except as provided in FAR 9.104-2);

(d) Have a satisfactory record of integrity and business ethics;

(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them;

(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and

(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

BIDDER INQUIRY:

Bidder/Offeror Solicitation Questions:

All inquiries regarding this solicitation are to be submitted via Bidder Inquiry. Telephone and email inquiries will not be accepted. Bidder Inquiry is a web-site that allows bidders to post questions regarding the solicitation and view all questions by other bidders and responses by USACE. Bidder Inquiry can be accessed through ProjNet at (https://www.projnet.org)

Offerors are encouraged to submit bidder inquiries promptly. The Government will make every effort to answer all inquiries; however, the closer to the proposal due date an inquiry is received, the less likely it is that a timely response can be provided.

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.

https://www.projnet.org/

The Bidder Inquiry Key is: 7KHI7N-7INAA7

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Instructions for Entering Questions:

1. After you are logged in click on the "post new inquiry", it is on the left side of the window under the Word "Submit" a.) This is the window where you will enter your questions b.) Comment Classification: Click on the down arrow to the right of the words “Please select from below”, select “Public” c.) Discipline: This is where you select who this question should be directed to. Example; if the question is about an electrical drawing or specification select: “Electrical” from the pull down list.

d.) Sheet. Enter the sheet number of the drawing you are asking about.

e.) Detail. Enter the detail name of the detail shown on the drawing that you are asking about.

f.) Specification. Enter the Specification number and paragraph number.

g.) File. Use this if you are going to attach a pdf file.

h.) Question. Enter your question here.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

For questions about the ProjNet Bidder Inquiry, please contact the Call Center help desk toll free at 1-800- 428-HELP, which operates from 8AM to 5PM (Central US time zone). Bidder inquiry help questions can also be emailed to the helpdesk at staff@rcesupport.com.

mailto:staff@rcesupport.com

The following are the primary requirements/key elements from the various Division 01 specifications that will be included in each task order. Each task order will contain the complete set of specifications needed to perform the work.

1. AT-OPSEC

Task orders will contain specification SECTION 01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC) or similar.

Contractor personnel are required to submit Biographical Information so a background check can be completed to allow for unescorted access. Personnel are required to complete Anti-Terrorism Level 1, Suspicious Activity Reporting Training as well as pre-screened using the E-verify Program website (http://www.uscis.gov/e-verify) to meet established employment eligibility requirements.

2. Project Schedule Project schedule requirements are addressed in specification SECTION 01 32 01.00 28 PROJECT SCHEDULE or similar.

Scheduling software used by the contractor must be commercially available from the software vendor for purchase with vendor software support agreements available. The software routine used to create the required sdef file must be created and supported by the software manufacturer.

The Government intends to use Primavera P6. If the contractor chooses software other than Primavera P6, the contractor shall provide two software licenses and two computers for Government-use, and training for two Government employees in the use of the software. These computers are stand-alone and not connected to the Government network. Computers and licenses are returned at project completion.

Project scheduler qualifications for the contractor’s designated representative for preparing and updating the schedule shall be submitted to demonstrate experience scheduling projects of similar size and nature with the scheduling software.

For projects that are smaller in size, scope and complexity, software such as Microsoft Project may be authorized.

3. Submittal Procedures Submittal procedures and requirements are included in specification SECTION 01 33 00 SUBMITTAL PROCEDURES or similar.

Submittals requirements are specified in the technical sections in the task order. Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals SD-02 Shop Drawings SD-03 Product Data SD-04 Samples SD-05 Design Data SD-06 Test Reports SD-07 Certificates SD-08 Manufacturer's Instructions SD-09 Manufacturer's Field Reports SD-10 Operation and Maintenance Data SD-11 Closeout Submittals

Each submittal is submitted in PDF format, unless otherwise noted, through RMS CM and via e-mail to the Contracting Officer’s Representative (COR) and the transmittal mailbox designated for the particular district. Each submittal has an ENG Form 4025 completed in RMS 3.0 Contractor Mode.

The majority of submittals are classified as “G” which require Government approval or an “I” (or no designation for most districts) which are information only and do not require Government approval. The standard Government review time is 30 calendar days from receipt of the submittal unless otherwise noted. Submittals are returned to the contractor with one of the notations listed on the ENG Form 4025.

For Design Build task orders, there are Contractor-generated design submittals. Code “D” require the Contractor’s designer of record approval, code “C’ are for submittals that the Government will be reviewing, i.e. intermediate or final designs, code “R” are for deviations for the approved design that do not require contract modification, and code “A” are for deviations from the approved design that do require a contract modification.

4. Design Data (Design After Award) Design Build task orders may include specification SECTION 01 33 16.00 28 DESIGN DATA (DESIGN AFTER AWARD) or similar. Some districts may have 01 33 00.36 for 60 PERCENT DESIGN REQUIRMENTS and 01 33

00.38 for 100 PERCENT DESIGN REQUIREMENTS. The specification will contain the requirements and standards for design quality control plans, Designer of Record (DOR) requirements, design submittals requirements, standards, and programs/software to use for design drawings, specifications, models, and design analysis. For specifications, process using SpecsIntact software. Drawings shall be compliant with the A/E/C CAD Standard ERDC/ITL TR-19-7 and A/E/C Graphics Standard ERDC/ITL TR-19-6 and the latest version of Bentley DGN format shall be used to produce contract drawings.

5. Safety Requirements Safety requirements for on-site work are addressed in specification SECTION 01 35 29.10 28 GOVERNMENT SAFETY REQUIREMENTS or similar.

Primary requirements include, but are not limited to the following:

Accident Prevention Plan (APP) A site-specific APP is submitted in accordance with the format and requirements of EM 385-1-1, Appendix A, and as supplemented by information included in the safety specification.

Activity Hazard Analysis (AHA) An AHA is required before beginning each activity, task or Definable Feature of Work (DFOW) involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work. An electronic copy of the AHA is available to download from the following site:

http://www.usace.army.mil/Portals/2/docs/AHA2.pdf

Lockout/Tagout (Loto)-Safe Clearance or Hazardous Energy Control Program (HECP) Procedures Safe Clearance procedures are used by Project and contractor personnel to protect personnel, equipment and the environment as well as ensuring continuity of service. Any work performed by the contractor that requires taking project operated equipment out of service is done only after a formal clearance is obtained through the Government.

Government HECP procedures are used on equipment/systems owned by the Government and on all points interfacing with Government owned equipment/systems.

Contractor, subcontractor, vendors, and visitors shall take the appropriate level of HECP Procedure training commensurate with their job duties. The three types are Awareness Level Training, Affected Persons and Authorized Individuals. Typically, only HECP certificates generated from the specific District or the project are acceptable as each district has its own training requirements.

Based on the scope of work and size of crew, the contractor is required to have the appropriate number of Authorized Individuals trained to ensure that there are no delays. All contractor personnel working in areas under a Safe Clearance are trained as Affected Persons. Any non-working personnel, vendors and visitors, entering an area under Safe Clearance take Awareness Level training. Training and written tests for the modules below are completed on-line prior to commencing on-site work. Time estimates for training follow:

a. Awareness Level Training: Approximately 1 hour (non-working personnel, vendors and visitor

b. Affected Persons: Approximately 2 hours in addition to Awareness Level training

c. Authorized Individuals: Approximately 3 hours in addition to Awareness Level training and Affected Personnel Training

Training is an annual requirement and expires one year from completion date. Training is provided by Vivid Learning Systems and is available on-line at http://Hecp.vividlms.com.

Standard Lift Plan (SLP) A written SLP in accordance with EM 385-1-1, Section 16.A.03, using Form 16-2 is required for every lift or series of lifts (if duty cycle or routine lifts are being performed). The SLP is developed, reviewed and accepted by all personnel involved in the lift in conjunction with the associated AHA. Signature on the AHA constitutes acceptance of the plan.

Critical Lift Plan (Crane or Load Handling Equipment) A Critical Lift Plan is required by EM 385-1-1, Section 16.H.01, using Form 16-3. Critical lifts require detailed planning and additional or unusual safety precautions. Comply with load testing requirements in accordance with EM 385-1-1, Section 16.F.03.

Crane Wheel and Outrigger Loading Diagram and Deck Protection for Outriggers A submittal is required prior to using any crane on any of the Project decks at the dams. Cranes and equipment furnished conform to all applicable OSHA Requirements and EM 385-1-1.

Crane Operators/Riggers Crane operators shall meet the requirements in EM 385-1-1, Section 15.B for Riggers and Section 16.B for Crane Operators. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacities of 50,000 pounds or greater, designate crane operators qualified by a source that qualifies crane operators (i.e., union, a government agency, or an organization that tests and qualifies crane operators). Provide proof of current qualification.

SSHO And Alternate SSHO A Site Safety and Health Officer (SSHO) is required that meets the requirements of EM 385-1-1 Section 1. The SSHO ensures that the requirements of 29 CFR 1926.16 are met for the project. Provide a safety oversight team that includes a minimum of one (1) person at each project site to function as the SSHO. The SSHO or an equally qualified Alternate SSHO is at the work site at all times, with the exception of temporary absences less than 24 hours, to implement and administer the contractor's safety program and government-accepted Accident Prevention Plan. The SSHO and Alternate SSHO have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17, and all associated sub-paragraphs including the following.

The SSHO is employed by the prime contractor and meets the following requirements:

a. A minimum of 5 years safety work on similar projects

b. 30-hour OSHA construction safety class or equivalent within the last 5 years

c. Provide documentation that shows the completion of a minimum of 8 hours of formal, on-line, or self-study safety and health related coursework each year during the last five (5) years

6. Contract Administration The Government uses the Resident Management System (RMS) to assist in its monitoring and administration of task orders. Specifications include SECTION 01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) or similar.

The Government accesses the system using the Government Mode of RMS (RMS GM) and the contractor accesses the system using the Contractor Mode (RMS CM). The term RMS is used in the remainder of this section for both RMS GM and RMS CM. The joint Government-Contractor use of RMS facilitates electronic exchange of information and overall management of the contract. The contractor accesses RMS to record, maintain, input, track, and electronically share information with the Government throughout the contract period in the following areas:

Administration, Finances, Quality Control, Submittal Monitoring, Scheduling, Closeout, and Import/Export of Data.

RMS is a Windows-based program. RMS software, user manuals, access and installation instructions, program updates and training information are available from the RMS website (http://rmsdocumentation.com). The Government and the contractor have different access authorities to the same contract database through RMS. The common database is updated automatically each time a user finalizes an entry or change.

7. Quality Control Quality Control shall be addressed in each task order. Specification SECTION 01 45 04.00 28 CONTRATOR QUALITY CONTROL, or similar, will be included.

The contractor shall provide quality control and establish and maintain an effective quality control system in compliance with the clause entitled “INSPECTION OF CONSTRUCTION" of the CONTRACT CLAUSES. The quality control system consists of plans, procedures, and organization necessary to produce an end product that complies with the contract requirements. The system covers all on-site work, be keyed to the proposed work sequence, and utilize established in-house quality control procedures to assure full compliance with all off-site work.

Daily reports are required for all on-site work and for all off-site work.

The contractor Quality Control Plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. Construction will be permitted to begin only after acceptance of the CQC Plan.

The contractor is required to establish a CQC organization/staff that is led by the CQC System Manager who is responsible for overall management of the CQC. A Design Quality Manager is also required for Design Build projects. The CQC staff maintains a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure contract compliance. The contractor submits qualifications for the CQC System Manager that are commensurate to the size, scope and complexity of the work.

8. Environmental Considerations Environmental Considerations shall be addressed for on-site work. Task order specifications will include SECTION 01 57 20.00 28 ENVIRONMENTAL PROTECTION or similar.

The Contractor shall minimize environmental pollution and damage that may occur as the result of on-site operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work are protected during the entire duration of any on-site work. The Contractor shall comply with all applicable environmental Federal, State, and local laws and regulations. Any delays resulting from failure to comply with environmental laws and regulations are the contractor's responsibility.

An Environmental Protection Plan (EPP) is required to present a comprehensive overview of known or potential environmental issues to be addressed during construction activities. The plan shall include, but limited to, the Contractor’s plan for solid wastes management, handling Hazardous Waste, fugitive dust control, oil management, wastewater management, asbestos abatement, metals based paint abatement, storm water pollution prevention, and concrete on-site wash areas.

9. Closeout submittals Closeout Submittals are addressed in specification SECTION 01 78 00.00 28 CLOSEOUT SUBMITTALS or similar. Typical closeout submittals include, but are not limited to Final Shop Drawings, Working As-Built Drawings, As-Built Drawings and Record Drawings.

Final Shop Drawings show all changes and revisions, including any field changes, made up to the time that the work is completed and accepted. The shop drawings are not required to comply with A/E/C CAD and Graphic Standards.

The contractor furnishes a complete set of Shop Drawings, commonly using Bentley DGN format, for all shop drawings produced in performance of the specific task order.

Working As-Built Drawings are maintained on-site to accurately record any variations or changes made on-site. At the completion of the work, the contractor submits a copy of the Final As-Built Drawings after all As-Built conditions from the working as-built drawings have been incorporated in the CAD drawings. Submit in ADOBE .pdf format.

After approval of the Final As-Built Drawings submittal, the contractor creates the CAD Record Drawings to update the Contract Drawings with the as-built conditions. The Record Drawing files are in the same drawing format as initially provided by the Government. The Government provides all original CAD files of the contract drawings, commonly in Bentley DGN format. Record drawings comply with ERDC/ITL TR-19-6 A/E/C Graphics Standard and ERDC/ITL TR-19-7 A/E/C CAD Standard.

10. Operation and Maintenance Data Operation and Maintenance (O&M) Data is addressed in specification SECTION 01 78 23.00 28 OPERATION AND MAINTENANCE DATA or similar. Typical O&M submittals include, but are not limited to, providing electronic and hard copy Preliminary, Draft and Final O&M Data and Parts Manuals, updating existing O&M manuals with new O&M data, and providing and O&M Data Base.

A. BASIS FOR AWARD

The MATOC awards and Task Order 0001 will be made based on the best value to the Government by using the Best Value trade-off source selection process in FAR Part 15 and two-phase design-build procedures in FAR Part 36.3. The total contract dollar capacity shared among firms will not exceed $99,900,000. Any unused capacity in one period may be carried over into the subsequent contract period. The minimum guarantee amount for the entire life of the contract for each IDIQ awardee is $10,000. The minimum Task Order value is $2,000 and the maximum Task Order value is $20,000,000. The Government intends to award up to five IDIQ contracts to the offeror(s) whose proposal, conforming to the RFP, will be most advantageous to the Government resulting in the Best Value. Task Orders may be issued either as Design Build or Design-Bid Build projects. Task Orders will be primarily awarded on a firm-fixed price basis; however, task orders may be awarded on a Time and Materials (T&M) or Labor Hour basis if necessary to address unusual circumstances.

The government will initially evaluate offerors’ proposals submitted in response to Phase One of this solicitation. After evaluation of Phase One, the government will select up to five of the most highly qualified firms to submit Phase Two proposals. Upon the conclusion of Phase One, the solicitation will be amended to include the Phase Two evaluation factors including price and the scope of work for the first Task Order 0001 that will be awarded along with the MATOC IDIQ contracts. Phase One submissions and evaluations will not be carried over into Phase Two. All offerors selected to propose for Phase Two will be evaluated only on the Evaluation Factors outlined in the Phase Two RFP. PHASE 1 DOES NOT INVOLVE ANY SUBMISSION OF PRICING

INFORMATION.

Phase Two of the solicitation will include the informational plans (floor plan, cross section, and elevation), Statement of Work, and the specifications for Task Order 0001. The estimated construction magnitude for Task Order 0001 is between $5,000,000 and $10,000,000. A pre-proposal conference/site visit may be conducted during Phase Two. Phase Two offerors will have a minimum of 30 days to submit their proposals.

Phase Two evaluation factors are as follows:

Factor 1- Design Experience Factor 2- Project Management Factor 3 – Small Business Participation Factor 4- Price

During Phase Two, the government will provide submission requirements and specific information pertaining to the Phase Two evaluation factors which will be based on the requirements for Task Order 0001.

Additionally, the relative importance of the Phase Two factors both to each other and to price will be identified in the Phase Two solicitation. The seed project for phase two will be a rotating crane with a boom. All offerors selected as most highly qualified and invited to Phase Two source selection will be required to submit a proposal for all evaluation factors in order to be considered both for the seed project and to be a MATOC holder. Further, any deficiency in the Phase Two source selection will render the proposal unawardable both for the seed project and the overall MATOC.

The government may award the MATOC contracts and Task Order 0001 on the basis of initial offers received in Phase Two, without discussions; therefore, an offeror’s proposal should contain the offeror’s best terms from a technical and price standpoint.

The price proposal will not be assigned a rating for evaluation. The government reserves the right to award to other than the lowest prices offered. Awards will be made based on the proposals found to be the most advantageous to the government considering the technical and price proposals.

The government will evaluate offerors’ proposals based on how well the proposals address each of the Evaluation Factors provided below for Phase One and the Evaluation Factors that will be provided in more detail for Phase Two. The evaluation process includes an assessment of the offerors’ strengths, weaknesses, deficiencies, risks and uncertainties in addressing the government’s requirements as specified in the RFP.

B. SCOPE OF WORK

Task Orders will primarily be for providing new cranes, hoists and lifting devices, which may be a replacement, and the rehabilitation of various types of cranes, hoists and lifting devices at locks and dams. Project locations are within the states of Kansas, Missouri, Nebraska, Colorado, Montana, North Dakota, South Dakota, Iowa, Idaho, Oregon, Washington, and Wyoming. The equipment will include but is not limited to the following:

• Overhead Bridge Cranes (typical capacity may range from 15 tons to 600 tons)

• Gantry Cranes (typical capacity may range from 15 tons to 480 tons)

• Underhung Monorail Cranes (typical capacity may range from 5 tons to 15 tons)

• Derrick/Pedestal Cranes (typical capacity may range from 10 tons to 200 tons)

• Below-the-hook devices

• Base/wall mounted jib hoists/booms

Rehabilitation work may consist of construction, repairing, replacing, and/or upgrading worn components of crane and hoist systems to make the equipment fully functional for support of mission requirements. Components may include lifting beams and/or lifting devices, hoist machinery such as wire rope drums, speed reducers and open gearing, load brake systems, motors, brakes, wire rope, load blocks, load indicating systems (load cells), structural repairs, crane rails, crane access/egress and safety upgrades, operator cabs, painting, control systems (including variable frequency drives (VFDs) and programmable logic controllers (PLCs)), warning/alarm systems, electrical systems, electric rail feeders, and may include similar crane projects that fall under NAICS 238290. Rehabilitation and replacement crane and hoist work may require analysis, design, and documentation of new and existing components, stability calculations, capacity uprating, load tests, supporting and securing structures, and crane components by registered engineers.

Activities may include removal of metals based paint (which includes lead), asbestos, and other hazardous material;

painting; final inspections and testing services; and classification/ marking of final product. Work areas may be difficult to access, requiring entrance of confined spaces, traffic control, construction of scaffolding, or facilitation of access by crane/lift.

Task orders may be Hybrid supply-construction, Design-Bid-Build or Design-Build in which the contractor is required to act as the Engineer of Record for the design and construction services. (See ER 1110-1-12, Paragraph 8- 2). Design-Bid-Build task orders may be performance and include plans and specifications detailing the performance metrics of the rehabilitation or replacement, for which the Contractor may be required to provide manufacturing, installation, testing, training, submittals for approval, and incidental design. Rehabilitation and replacement efforts may include some or all of the following: design, manufacturing, fabrication, supply, installation, testing, and certification. Logistic support of individual tasks will include spares determination and inclusion and statements of intended availability of spare parts by the original equipment manufacturer.

C. PHASE ONE FACTORS TO BE EVALUATED

1. Evaluation Factors. The following evaluation factors will be used to evaluate each proposal. All three Phase One evaluation factors are of approximately equal importance.

FACTOR 1: EXPERIENCE

FACTOR 2: TECHNICAL APPROACH

FACTOR 3: PAST PERFORMANCE

FACTOR 1: EXPERIENCE

The Government will evaluate and assess the extent of an offeror’s relevant Construction and Design-Build experience and proposed team’s experience (design firm and major subcontractors) on crane and hoist projects completed in the last fifteen (15) years or at least 50% complete at the time proposals are due. The Government will evaluate the offeror’s depth and breadth of relevant crane and hoist design, manufacturing, and installation experience. The Government will evaluate no more than eight (8) projects. The combined experience demonstrated by the submitted projects must address the following:

1. All projects must exceed $750,000 with at least one submitted project exceeding $5,000,000; and

2. Design was facilitated for the end user/customer from design concept through 100% design completion including construction of the design

3. Two crane projects must demonstrate experience with large capacity (minimum of 50 tons) custom hoist and crane system rather than a packaged hoist system and crane components.

4. Include two examples of crane work to include both rehabilitation and new crane work as defined below. A minimum of one (1) example must be new. Projects must demonstrate experience for each of the following types of cranes:

• Overhead bridge cranes with a capacity of 50 tons or more;

• Gantry cranes with capacity of 50 tons of more;

Offerors including new cranes in which structure frame was fabricated by the proposed team will be considered more relevant and rated more favorably.

Offerors demonstrating experience with underhung monorail cranes with a capacity of 5 tons or more, fixed hoist machinery, derrick or pedestal cranes with a capacity of 10 tons or more will be rated more favorably.

Fully completed projects will be rated more favorably than projects that are substantially complete projects.

“Substantially complete” projects are defined as projects that are 100% designed and at least 50% construction progress.

Proposals including multiple new crane designs will be rated more favorably than those including mostly crane rehabilitation projects.

The following parameters apply for evaluation purposes:

“Design-Build” construction is defined as a civil-works type project in which the contractor is provided less than a full design and is required to: complete the design with a licensed Architect Engineer (A-E);

participate in design review; and accomplish full construction of the designed project.

“New” is defined as not as existing before or complete replacement of the entire crane to the tracks or support.

“Custom hoist and crane system” is demonstrated by design calculations and detail shop drawing development for custom designed hoist and crane systems that included but not limited to gantry frames, bridge crane, trolley frames, end trucks, speed reducer, gearing, hoist drums, and load blocks; where components are NOT commercial off the shelf items.

“Packaged hoist and crane system”: Example of packaged hoist and crane systems include but not limed to designs that only include component sizing of standard catalog items of commercial off the shelf components;

custom design calculation and detail shop drawings development are omitted.

Experience provided for proposed design firm and major subcontractors will only be evaluated if a letter of commitment is signed by each proposed firm and submitted with the proposal. A letter of commitment is not required if the offeror is a joint-venture and the firm is part of the joint-venture agreement.

FACTOR 2: TECHNICAL APPROACH

The government will evaluate and assess the offeror’s understanding of the requirements, feasibility of the proposed technical approach, and risks and mitigation in the execution of task order projects wherein the Government provides minimal or limited design consisting of informational drawings and functional/performance specifications. The purpose of this factor is to determine whether the offeror has appropriate understanding of the design-build process and is not intended to limit an offeror to any proposed technical solution or to allow an offeror to provide less than the minimum requirements for Phases One and

Two of the solicitation.

Based on your understanding of the MATOC scope of work, describe your technical approach for design-build task order projects wherein the Government provides minimal or limited design consisting of informational drawings and functional/performance specifications. This narrative shall not exceed fifteen

(15) pages. Pages in excess of this limitation will be removed and not evaluated by the Source Selection Evaluation Board.

Address the following areas in your technical approach to include any risks and the proposed approach for risk mitigation:

Organization. Provide an organizational chart showing the reporting structure and lines of authority for the proposed team key functions such as project manager, superintendent, lead designer, safety manager, and others.

Without identifying by name, describe the role of the key functional members during design and construction.

Cost effectiveness and expedited completion. Describe your process for providing a task order proposal that is cost-effective and will allow you to expedite completion of the project. Describe your approach to streamlining design and construction resulting in reduced costs and achievement of aggressive schedules with consideration to operational or environmental restraints.

Communication and coordination. Describe your communication and coordination approach within the design-build team, and with the government during the design and construction phases. Describe your approach to facilitate design and construction submittal reviews. Describe in detail the Designer of Record’s involvement throughout the entire project period.

Quality control. Describe your approach for quality control for both design and construction. Include:

quality control organization; review of design; verification of construction materials; construction inspection; permit compliance; project documentation; and change request process.

Technical Factor Ratings for Factors 1 and 2: ratings outlined below focus on the strengths, deficiencies, weaknesses, risks, and uncertainties of the offeror’s proposal. The rating depicts how well the offeror’s proposal meets the technical factor requirements.

Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.

Proposal is un-awardable.

FACTOR 3: PAST PERFORMANCE

There are three aspects to the past performance evaluation: Recency, Relevancy (including context of data) and Quality (including general trends in contractor performance and source of information).

a. The Government will focus its inquiries on the offeror’s (and major sub-contractors’) record of performance as it relates to all solicitation requirements, including price, schedule, performance, and management of sub-contractors. Major sub-contractors are defined as members of an offeror’s overall team who are expected to perform ten (10) percent or more of the proposed effort. Therefore, offerors are reminded to include the most current and relevant past performance efforts (within the past fifteen years) in their proposal. Absent any current and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be assigned an “unknown confidence rating” and its proposal will not be evaluated either favorably or unfavorably on past performance. The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data in Government files or data obtained through interviews with personnel familiar with the contractor and their current and past performance under Federal, State or Local government or commercial contracts for same or similar services as compared to the North American Industry Classification System NAICS 238290, Other Building Equipment Contractors.

Data submitted by the offeror or gathered from other sources by the government in conducting performance risk assessments shall not extend past fifteen years prior to the issue date of the RFP, but may include performance data generated during the past fifteen years without regard to the contract award date.

CPARS data is limited to the past 6 years. Offeror’s should provide additional performance data for projects beyond 6 years.

b. Offerors should submit all Government and/or commercial contract numbers and descriptions for the prime offeror and each major sub-contractor in performance or awarded during the past fifteen years, from the issue date of this RFP, which are relevant to the efforts required by this RFP.

c. RECENCY; The Government will evaluate recency by examining the offerors’ record of past performance and to assess the time period during which the offeror’s past performance is considered relevant.

d. RELEVANCY: The Government will evaluate those aspects of an offeror’s history of contract performance that would provide the most context and give the greatest ability to measure whether the offeror will successfully satisfy the current requirement. This evaluation will include all aspects of the offeror’s execution of schedule, performance, customer support and subcontracting plan for these projects and the offeror’s record of: 1) Conforming to specifications and standards of good workmanship; 2) Maintaining program execution within price; 3) Adherence to contract schedules, including the administrative aspects of performance; 4) Ability to resolve technical and manufacturing problems quickly and effectively; 5) Businesslike concern for the interest of its customers; 6) Establishing and maintaining adequate management of sub-contractors; and 7) Compliance with subcontracting plans submitted on previous projects.

Past Performance Relevancy Ratings

Rating Definition

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

e. QUALITY: The third aspect of the past performance evaluation is to establish the overall quality of the offeror’s past performance. The quality past performance evaluation conducted gathers information from the offeror’s customers to determine how well the offeror performed those past contracts. This quality assessment will be reflected in the overall confidence assessment described below.

PERFORMANCE CONFIDENCE ASSESSMENT: Because this source selection requires a greater level of discernment with the past performance evaluation, the SSEB shall use all ratings in the chart below and reach a single consensus performance confidence assessment for the offeror, selecting the most appropriate rating below. This rating considers the assessed quality of the relevant efforts gathered (documented results from Past Performance Questionnaires, interviews, CPARS, and other sources form the support and basis for this assessment). The rationale for the conclusions reached by the SSEB will be included in the SSEB report.

Performance Confidence Assessments Rating Definition

Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence…