B.08.02_Solicitation_(W912EF19Q0042).pdf

PDF 2 MB Posted

Attached to
MCL - VEG MGMT Services Federal contract opportunity
Solicitation number
W912EF19Q0042
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to MCL - VEG MGMT Services, newest first.
File Type Posted
B.06.04_Past_Performance_Questionnaires.pdf PDF
B.08.03_Solicitation_Amendment_(W912EF19Q00420002).pdf PDF
B.08.03_Solicitation_Amendment_(W912EF19Q0042).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912EF19Q0042 28-Feb-2019

b. TELEPHONE NUMBER

509-527-7232

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 15 Mar 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EF9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ANDREW J SPRYS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USAED, WALLA WALLA - CONTRACTING DIV.

ANDREW J SPRYS

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: 509-527-7232 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

X

SIZE STANDARD:

$7,500,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF133

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912EF19Q0042

Section SF 1449 - CONTINUATION SHEET

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS

This is a request for quote Vegetation Management Services in accordance with the Performance Work Statement for the U.S. Army Corps of Engineers, Walla Walla District, at Mill Creek Project, Walla Walla, WA.

Registration at www.sam.gov is required. Failure to register in the SAM database will make an offeror ineligible for award. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required in order for the GSA Federal Service Desk (FSD) to activate the entity's registration. Both Federal Assistance entities and all non-Federal entities must mail the original, signed copy of the notarized letter to the Federal Service Desk.

Failure to do so within 30 days of activation may result in the registration no longer being active. Mail the completed, signed, notarized letter to:

FEDERAL SERVICE DESK

ATTN: SAM.GOV REGISTRATION PROCESSING

460 INDUSTRIAL BLVD

LONDON, KY 40741-7285

UNITED STATES OF AMERICA

Completion of the required FAR 52.212-3, Offeror Representations and Certifications – Commercial Items is required. When you complete your SAM registration, the link to complete your Representations and Certifications is also available. Please do not hesitate to contact Andrew J. Sprys, or the SAM web site for assistance or have questions.

TO ENSURE RECEIPT OF YOUR QUOTE, PLEASE SEND TO THE ATTENTION OF ANDREW

SPRYS AT andrew.j.sprys@usace.army.mil OR SARA EDWARDS AT Sara.Edwards@usace.army.mil

If you have any questions or concerns regarding the Request for Quote, please contact Andrew Sprys by Telephone 509-527-7232; or send an email to andrew.j.sprys@usace.army.mil

Please return all pages of this request for quote. Be sure to also complete Blocks 17a, 30a, 30b, and 30c on page 1.

Name: _____________________________________________________________

Contact Telephone Number: ____________________________________________

Email Address: __________________________________________________________________

Company’s Federal Tax Identification Number: ____________________________________________

CAGE CODE: _________________________ DUNS Number ________________________________

The System for Award Management (SAM) is online. SAM replaces CCR/FedReg, ORCA, and EPLS.

If you have been using those systems, you should now go to www.sam.gov to find your information.

Completion of FAR 52.212-3 Offeror Representations and Certifications–Commercial Items – Alternate 1 (May 2014). Electronic completion is encouraged (see http://farsite.hill.af.mil to download Representations and Certifications).

An offeror shall complete only paragraph (b) of this provision if the offeror has completed the annual representations and certifications electronically via https://www.acquisition.gov. If an offeror has not completed the annual representations and certifications electronically at the ORCA website, the offeror shall complete only paragraphs (b) through (i) of this provision.

In accordance with FAR Part 29.3 – State and Local Taxes, and per Title 4 of US Code 104-107, the Government is exempt from paying state and local taxes. Exempt tax identification number 91-0828090.

ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS

Submission of Price Quote – Offeror shall submit 1 copy of the following:

1. Signed and dated Standard Form 1449 (Solicitation/Contract/Order for Commercial Items)

2. Signed and dated Standard Form 30, if applicable, for any Amendments to the Solicitation

3. Completed schedule (pricing information) for all contract line item numbers

4. Completed Clause 52.212-3 and Alt I, “Offeror Representations and Certifications—Commercial Items” as noted above.

5. Any information required to evaluate the quote, as stated in FAR Clause 52.212-2.

PRICES QUOTED MUST BE VALID FOR 30 DAYS. Solicitation shall result in a firm-fixed-price contract.

All pricing shall include shipping FOB destination (include shipping cost in price).

BUSINESS HOURS: The standard business hours for the Walla Walla District, Corps of Engineers are Monday through Friday from 8:00 a.m. to 4:00 p.m., excluding federal holidays.

BASIS FOR AWARD

The Government will award one contract resulting from this solicitation in accordance with FAR 13.106 to the responsible offeror meeting or exceeding all solicitation requirements and representing the best value based on price.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Pesticide Application

FFP

Total Control: 1’ border along Paved Roads/Trails that are within 15’-50’ of the OHWM. One time application between March and May. In accordance with C- 5.2.1 FOB: Destination

NET AMT

0002 1 Job Pesticide Application

FFP

Total Control: 1’ border along Paved Roads/Trails that are over 50’ from OHWM.

One time application between March and May. In accordance with C-5.2.1.

0003 1 Job Pesticide Application

FFP

Total Control: 1’ border along Paved Parking Areas and all cracks within the Paved Parking Areas that are within 15’- 50’ of the OHWM. One time application between March and May. In accordance with C-5.2.1.

0004 1 Job Pesticide Application

FFP

Total Control: 1’ border along Paved Parking Areas and all cracks within the Paved Parking Areas that are over 50’ from OHWM. One time application between March and May. In accordance with C-5.2.1.

0005 1 Job Pesticide Application

FFP

Total Control: Gravel Roads within 15’- 50’ of the OHWM. One time application

0006 1 Job Pesticide Application

FFP

Gravel Roads over 50’ from OHWM. One time application between March and May. In accordance with C-5.2.1.

0007 1 Job Pesticide Application

FFP

Gravel Parking Areas. One time application between March and May. In accordance with C-5.2.1.

0008 1 Job Pesticide Application

FFP

Bennington Lake Dam. One time application between March and May. In

0009 1 Job Pesticide Application

FFP

Wet side of the Diversion Dam. One time application between March and May. In

0010 1 Job Pesticide Application

FFP

Christmas Tree Piles. One time application between March and May. In

Pesticide Application

FFP

Project office: 2 applications. 1 in May and one in July. In accordance with C- 5.2.1.

0011AA 1 Job Application 1 in May.

FFP

0011AB 1 Job Application 2 in July

Glyphosate Treatment

Glyphosate treatment to achieve bare ground. In Accordance with C-5.2.1.1

0012AA 1 Job Application 1 March to April

0012AB 1 Job Application 1 April to May

0013 30 Acre Broadleaf Boom Spray

FFP

Thirty Acres split up around the project designated by the COR to be sprayed between March and June. In accordance with C-5.2.2.

0014 5 Acre Broadleaf Spot Spray

FFP

Five Acres split up around the project designated by the COR to be sprayed between March and September. In accordance with C-5.2.2.

0015 1 Job Broadleaf Spot Spray Outside Levee Slope

FFP

One time broadleaf application between March and September. In accordance with C-5.2.2.

0016 4 Acre Broadleaf Spot Spray

FFP

Spray Inside Slope of Levee. 4 acres of levee area treated with a broadleaf aquatic pesticide between July 1 and August 15th. Goats may graze this area ahead of pesticide application. Application will need to be timed after plants start to leaf back out and grow. Contractor will need to coordinate timing during monthly meetings. In accordance with C-5.2.2.

0017 6 Acre Broadleaf Boom Spray

FFP

Irrigated Lawn Rook’s Park. Six Acres sprayed between March and September. In accordance with C-5.2.2.

0018 1.50 Acre Plant/Prepare/Fertilize Food Plot

FFP

1.5 acre food plot in coordination with COR. In accordance with C-5.2.3.

0019 .85 Acre Plant/Prepare/Fertilize Food Plot 2

FFP

Plant/Prepare/Fertilize Food Plot 2. 0.85 acre food plot in coordination with COR.

In accordance with C-5.2.3.

0020 .70 Acre Plant/Prepare/Fertilize Food Plot 3

FFP

0.7 acre food plot in coordination with COR. In accordance with C-5.2.3.

0021 .80 Acre Plant/Prepare/Fertilize Food Plot 4

FFP

0.8 acre food plot in coordination with COR. In accordance with C-5.2.3.

0022 .90 Acre Plant/Prepare/Fertilize Food Plot 5

FFP

0.9 acre food plot in coordination with COR. In accordance with C-5.2.3.

0023 4.75 Acre Pesticide Application

FFP

Control weeds in food plots. 4.75 acres of food plot in coordination with COR. In accordance with C-5.2.3.

0024 20 Acre Grass Seeding

FFP

Twenty Acres, at 25 lbs per acre, seeding in September. Area may be split up and will vary year to year. In accordance with C-5.2.3.

0025 1 Acre Flail Mowing of Blackberries

FFP

Flail mowing of blackberries, or high density brush areas. 1 acre mowed in September or October. In accordance with C-5.2.4.

0026 1 Job Poison Hemlock Biological Control

FFP

Poison Hemlock Biological Control. 1,000 Poison Hemlock Moths per year. In accordance with C-5.2.5.

0027 1 Job Yellowstar Thistle Biological Control

FFP

Yellowstar Thistle Biological Control. 1,000 Yellowstar Thistle hairy weevil per year. In accordance with C-5.2.5.

0028 6 Acre Fertilize Rooks Lawn

FFP

Six acres of lawn area fertilized between March and September. In accordance with C-5.2.7.

1001 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Roads/Trails that are within 15’-50’ of the OHWM. One time application between March and May. In accordance with C-

1002 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Roads/Trails that are over 50’ from OHWM.

1003 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Parking Areas and all cracks within the Paved Parking Areas that are within 15’- 50’ of the OHWM. One time application

1004 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Parking Areas and all cracks within the Paved Parking Areas that are over 50’ from OHWM. One time application between

1005 1 Job OPTION Pesticide Application

FFP

Total Control: Gravel Roads within 15’- 50’ of the OHWM. One time application

1006 1 Job OPTION Pesticide Application

FFP

Gravel Roads over 50’ from OHWM. One time application between March and

1007 1 Job OPTION Pesticide Application

FFP

Gravel Parking Areas. One time application between March and May. In

1008 1 Job OPTION Pesticide Application

FFP

Bennington Lake Dam. One time application between March and May. In

1009 1 Job OPTION Pesticide Application

FFP

Wet side of the Diversion Dam. One time application between March and May. In

1010 1 Job OPTION Pesticide Application

FFP

Christmas Tree Piles. One time application between March and May. In

OPTION Pesticide Application

FFP

1011AA 1 Job OPTION Application 1 in May

1011AB 1 Job OPTION Application 2 in July

OPTION Glyphosate Treatment

Glyphosate treatment to achieve bare ground. In Accordance with C-5.2.1.11

1012AA 1 Job OPTION Application 1 March to April

1012AB 1 Job OPTION Application 1 April to May

1013 30 Acre OPTION Broadleaf Boom Spray

FFP

Thirty Acres split up around the project designated by the COR to be sprayed

1014 5 Acre OPTION Broadleaf Spot Spray

FFP

Five Acres split up around the project designated by the COR to be sprayed

1015 1 Job OPTION Broadleaf Spot Spray Outside Levee Slope

FFP

One time broadleaf application between March and September. In accordance with

1016 4 Acre OPTION Broadleaf Spot Spray

FFP

Spray Inside Slope of Levee. 4 acres of levee area treated with a broadleaf aquatic pesticide between July 1 and August 15th. Goats may graze this area ahead of pesticide application. Application will need to be timed after plants start to leaf back out and grow. Contractor will need to coordinate timing during monthly

1017 6 Acre OPTION Broadleaf Boom Spray

FFP

Irrigated Lawn Rook’s Park. Six Acres sprayed between March and September. In

1018 1.50 Acre OPTION Plant/Prepare/Fertilize Food Plot

FFP

1019 .85 Acre OPTION Plant/Prepare/Fertilize Food Plot 2

FFP

Plant/Prepare/Fertilize Food Plot 2. 0.85 acre food plot in coordination with COR.

1020 .70 Acre OPTION Plant/Prepare/Fertilize Food Plot 3

FFP

1021 .80 Acre OPTION Plant/Prepare/Fertilize Food Plot 4

FFP

1022 .90 Acre OPTION Plant/Prepare/Fertilize Food Plot 5

FFP

1023 4.75 Acre OPTION Pesticide Application

FFP

Control weeds in food plots. 4.75 acres of food plot in coordination with COR. In

1024 20 Acre OPTION Grass Seeding

FFP

Twenty Acres, at 25 lbs per acre, seeding in September. Area may be split up and

1025 1 Acre OPTION Flail Mowing of Blackberries

FFP

Flail mowing of blackberries, or high density brush areas. 1 acre mowed in

1026 1 Job OPTION Poison Hemlock Biological Control

FFP

Poison Hemlock Biological Control. 1,000 Poison Hemlock Moths per year. In

1027 1 Job OPTION Yellowstar Thistle Biological Control

FFP

Yellowstar Thistle Biological Control. 1,000 Yellowstar Thistle hairy weevil per

1028 6 Acre OPTION Fertilize Rooks Lawn

FFP

Six acres of lawn area fertilized between March and September. In accordance with C-5.2.7

2001 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Roads/Trails that are within 15’-50’ of the OHWM. One time application between March and May. In accordance with C-

2002 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Roads/Trails that are over 50’ from OHWM.

2003 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Parking Areas and all cracks within the Paved Parking Areas that are within 15’- 50’ of the OHWM. One time application

2004 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Parking Areas and all cracks within the Paved Parking Areas that are over 50’ from OHWM. One time application between

2005 1 Job OPTION Pesticide Application

FFP

Total Control: Gravel Roads within 15’- 50’ of the OHWM. One time application

2006 1 Job OPTION Pesticide Application

FFP

Gravel Roads over 50’ from OHWM. One time application between March and

2007 1 Job OPTION Pesticide Application

FFP

Gravel Parking Areas. One time application between March and May. In

2008 1 Job OPTION Pesticide Application

FFP

Bennington Lake Dam. One time application between March and May. In

2009 1 Job OPTION Pesticide Application

FFP

Wet side of the Diversion Dam. One time application between March and May. In

2010 1 Job OPTION Pesticide Application

FFP

Christmas Tree Piles. One time application between March and May. In

OPTION Pesticide Application

FFP

2011AA 1 Job OPTION Application 1 in May

2011AB 1 Job OPTION Application 2 in July

OPTION Glyphosate Treatment

2012AA 1 Job OPTION Application 1 March to April

2012AB 1 Job OPTION Application 1 April to May

2013 30 Acre OPTION Broadleaf Boom Spray

FFP

Thirty Acres split up around the project designated by the COR to be sprayed

2014 5 Acre OPTION Broadleaf Spot Spray

FFP

Five Acres split up around the project designated by the COR to be sprayed

2015 1 Job OPTION Broadleaf Spot Spray Outside Levee Slope

FFP

One time broadleaf application between March and September. In accordance with

2016 4 Acre OPTION Broadleaf Spot Spray

FFP

Spray Inside Slope of Levee. 4 acres of levee area treated with a broadleaf aquatic pesticide between July 1 and August 15th. Goats may graze this area ahead of pesticide application. Application will need to be timed after plants start to leaf back out and grow. Contractor will need to coordinate timing during monthly

2017 6 Acre OPTION Broadleaf Spot Spray

FFP

Irrigated Lawn Rook’s Park. Six Acres sprayed between March and September. In

2018 1.50 Acre OPTION Plant/Prepare/Fertilize Food Plot

FFP

2019 .85 Acre OPTION Plant/Prepare/Fertilize Food Plot 2

FFP

Plant/Prepare/Fertilize Food Plot 2. 0.85 acre food plot in coordination with COR.

2020 .70 Acre OPTION Plant/Prepare/Fertilize Food Plot 3

FFP

2021 .80 Acre OPTION Plant/Prepare/Fertilize Food Plot 4

FFP

2022 .90 Acre OPTION Plant/Prepare/Fertilize Food Plot 5

FFP

2023 4.75 Acre OPTION Pesticide Application

FFP

Control weeds in food plots. 4.75 acres of food plot in coordination with COR. In

2024 20 Acre OPTION Grass Seeding

FFP

Twenty Acres, at 25 lbs per acre, seeding in September. Area may be split up and

2025 1 Acre OPTION Flail Mowing of Blackberries

FFP

Flail mowing of blackberries, or high density brush areas. 1 acre mowed in

2026 1 Job OPTION Poison Hemlock Biological Control

FFP

Poison Hemlock Biological Control. 1,000 Poison Hemlock Moths per year. In

2027 1 Job OPTION Yellowstar Thistle Biological Control

FFP

Yellowstar Thistle Biological Control. 1,000 Yellowstar Thistle hairy weevil per

2028 6 Acre OPTION Fertilize Rooks Lawn

FFP

Six acres of lawn area fertilized between March and September. In accordance with

3001 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Roads/Trails that are within 15’-50’ of the OHWM. One time application between March and May. In accordance with C-

3002 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Roads/Trails that are over 50’ from OHWM.

3003 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Parking Areas and all cracks within the Paved Parking Areas that are within 15’- 50’ of the OHWM. One time application

3004 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Parking Areas and all cracks within the Paved Parking Areas that are over 50’ from OHWM. One time application between

3005 1 Job OPTION Pesticide Application

FFP

Pesticide Application – Total Control: Gravel Roads within 15’- 50’ of the OHWM. One time application between March and May. In accordance with C-

3006 1 Job OPTION Pesticide Application

FFP

Gravel Roads over 50’ from OHWM. One time application between March and

3007 1 Job OPTION Pesticide Application

FFP

Gravel Parking Areas. One time application between March and May. In

3008 1 Job OPTION Pesticide Application

FFP

Bennington Lake Dam. One time application between March and May. In

3009 1 Job OPTION Pesticide Application

FFP

Wet side of the Diversion Dam. One time application between March and May. In

3010 1 Job OPTION Pesticide Application

FFP

Christmas Tree Piles. One time application between March and May. In

OPTION

3011AA 1 Job OPTION Application 1 in May.

3011AB 1 Job OPTION Application 2 in July

OPTION Glyphosate Treatment

3012AA 1 Job OPTION Application 1 March to April

3012AB 1 Job OPTION Application 1 April to May

3013 30 Acre OPTION Broadleaf Boom Spray

FFP

Thirty Acres split up around the project designated by the COR to be sprayed

3014 5 Acre OPTION Broadleaf Spot Spray

FFP

Five Acres split up around the project designated by the COR to be sprayed

3015 1 Job OPTION Broadleaf Spot Spray Outside Levee Slope

FFP

One time broadleaf application between March and September. In accordance with

3016 4 Acre OPTION Broadleaf Spot Spray

FFP

Spray Inside Slope of Levee. 4 acres of levee area treated with a broadleaf aquatic pesticide between July 1 and August 15th. Goats may graze this area ahead of pesticide application. Application will need to be timed after plants start to leaf back out and grow. Contractor will need to coordinate timing during monthly

3017 6 Acre OPTION Broadleaf Boom Spray

FFP

Irrigated Lawn Rook’s Park. Six Acres sprayed between March and September. In

3018 1.50 Acre OPTION Plant/Prepare/Fertilize Food Plot

FFP

3019 .85 Acre OPTION Plant/Prepare/Fertilize Food Plot 2

FFP

Plant/Prepare/Fertilize Food Plot 2. 0.85 acre food plot in coordination with COR.

3020 .70 Acre OPTION Plant/Prepare/Fertilize Food Plot 3

3021 .80 Acre OPTION Plant/Prepare/Fertilize Food Plot 4

FFP

3022 .90 Acre OPTION Plant/Prepare/Fertilize Food Plot 5

FFP

3023 4.75 Acre OPTION Pesticide Application

FFP

Control weeds in food plots. 4.75 acres of food plot in coordination with COR. In

3024 20 Acre OPTION Grass Seeding

FFP

Twenty Acres, at 25 lbs per acre, seeding in September. Area may be split up and

3025 1 Acre OPTION Flail Mowing of Blackberries

FFP

Flail mowing of blackberries, or high density brush areas. 1 acre mowed in

3026 1 Job OPTION Poison Hemlock Biological Control

FFP

Poison Hemlock Biological Control. 1,000 Poison Hemlock Moths per year. In

3027 1 Job OPTION Yellowstar Thistle Biological Control

FFP

Yellowstar Thistle Biological Control. 1,000 Yellowstar Thistle hairy weevil per

3028 6 Acre OPTION Fertilize Rooks Lawn

FFP

Six acres of lawn area fertilized between March and September. In accordance with

4001 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Roads/Trails that are within 15’-50’ of the OHWM. One time application between March and May. In accordance with C-

4002 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Roads/Trails that are over 50’ from OHWM.

4003 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Parking Areas and all cracks within the Paved Parking Areas that are within 15’- 50’ of the OHWM. One time application

4004 1 Job OPTION Pesticide Application

FFP

Total Control: 1’ border along Paved Parking Areas and all cracks within the Paved Parking Areas that are over 50’ from OHWM. One time application between

4005 1 Job OPTION Pesticide Application

FFP

Pesticide Application – Total Control: Gravel Roads within 15’- 50’ of the OHWM. One time application between March and May. In accordance with C-

4006 1 Job OPTION Pesticide Application

FFP

Gravel Roads over 50’ from OHWM. One time application between March and

4007 1 Job OPTION Pesticide Application

FFP

Gravel Parking Areas. One time application between March and May. In

4008 1 Job OPTION Pesticide Application

FFP

Bennington Lake Dam. One time application between March and May. In

4009 1 Job OPTION Pesticide Application

FFP

Wet side of the Diversion Dam. One time application between March and May. In

4010 1 Job OPTION Pesticide Application

FFP

Christmas Tree Piles. One time application between March and May. In

OPTION Pesticide Application

FFP

4011AA 1 Job OPTION Application 1 in May

4011AB 1 Job OPTION Application 2 in July

OPTION Glyphosate Treatment

4012AA 1 Job OPTION Application 1 March to April

4012AB 1 Job OPTION Application 1 April to May

4013 30 Acre OPTION Broadleaf Boom Spray

FFP

Thirty Acres split up around the project designated by the COR to be sprayed

4014 5 Acre OPTION Broadleaf Spot Spray

FFP

Five Acres split up around the project designated by the COR to be sprayed

4015 1 Job OPTION Broadleaf Spot Spray Outside Levee Slope

FFP

One time broadleaf application between March and September. In accordance with

4016 4 Acre OPTION Broadleaf Spot Spray

FFP

Spray Inside Slope of Levee. 4 acres of levee area treated with a broadleaf aquatic pesticide between July 1 and August 15th. Goats may graze this area ahead of pesticide application. Application will need to be timed after plants start to leaf back out and grow. Contractor will need to coordinate timing during monthly

4017 6 Acre OPTION Broadleaf Boom Spray

FFP

Irrigated Lawn Rook’s Park. Six Acres sprayed between March and September. In

4018 1.50 Acre OPTION Plant/Prepare/Fertilize Food Plot

FFP

4019 .85 Acre OPTION Plant/Prepare/Fertilize Food Plot 2

FFP

Plant/Prepare/Fertilize Food Plot 2. 0.85 acre food plot in coordination with COR.

4020 .70 Acre OPTION Plant/Prepare/Fertilize Food Plot 3

FFP

4021 .80 Acre OPTION Plant/Prepare/Fertilize Food Plot 4

FFP

4022 .90 Acre OPTION Plant/Prepare/Fertilize Food Plot 5

FFP

4023 4.75 Acre OPTION Pesticide Application

FFP

Control weeds in food plots. 4.75 acres of food plot in coordination with COR. In

4024 20 Acre OPTION Grass Seeding

FFP

Twenty Acres, at 25 lbs per acre, seeding in September. Area may be split up and

4025 1 Acre OPTION Flail Mowing of Blackberries

FFP

Flail mowing of blackberries, or high density brush areas. 1 acre mowed in September or October. In accordance with C-5.2.4

4026 1 Job OPTION Poison Hemlock Biological Control

FFP

Poison Hemlock Biological Control. 1,000 Poison Hemlock Moths per year. In

4027 1 Job OPTION Yellowstar Thistle Biological Control

FFP

Yellowstar Thistle Biological Control. 1,000 Yellowstar Thistle hairy weevil per

4028 6 Acre OPTION Fertilize Rooks Lawn

FFP

Six acres of lawn area fertilized between March and September. In accordance with

PERFORMANCE WORK STATEMENT

Section C-1 General Information C 1.1 Scope of Work The Contractor shall furnish all necessary labor, equipment, supplies, materials, licenses, permits, transportation, training, and supervision to satisfactorily perform all work required by this contract in the manner and frequencies specified. The work will be performed at the areas described in this contract and shown on the included maps. The work will include pesticide spraying, wildlife food plot planting, seeding, and mowing.

C 1.2 Contractor Personnel

C-1.2.1. The Contractor must designate an on-site supervisor with written authority to act in behalf of the Contractor in dealing with the Government. This supervisor will have experience applying pesticides in the state of Washington and be a Washington State Department of Agriculture (WSDA) Licensed Pesticide Applicator. The primary duties of the supervisor will be to supervise employees and to serve as quality control person, with full responsibility described in Quality Control. This individual will have a thorough knowledge of the contract requirements and the work to be performed under this contract. The name, phone number, fax number and email address of this person must be designated in writing to the Contracting Officer‘s Representative (COR) at the pre-work meeting.

C-1.2.2 The supervisor must have full authority to act for the Contractor on all matters relating to daily operation of this contract.

C-1.2.3 The supervisor must be able to fluently read, write, speak and understand English.

C-1.2.4 Contractor personnel and regular subcontractors must wear clothing marked with identifying name of the Contractor. All Contractor vehicles must be readily identified with either permanent or magnetic signs that state the Company‘s name.

C-1.2.5 Contractor employees shall be skilled in and capable of performing the work under this contract. All employees of the Contractor applying chemicals under this contract, must have valid WSDA Pesticide Commercial Applicator Licenses. Subcontracting: Compliance with the provisions of this contract by subcontractors shall be the responsibility of the Contractor.

C-1.2.6 Training. The Contractor must ensure that all employees and subcontractors applying chemicals have current WSDA Pesticide Commercial Applicator’s Licenses and all employees and subcontractors have safety training covering safe work practices, personal protective equipment, proper housekeeping, proper chemical storage, and fire protection. The Contractor must also ensure that all employees have necessary certificates as required by local, state and Federal laws. The Contractor must apply risk management strategies to ensure personnel safety, and must comply with safety requirements articulated in EM 385-1-1, the US Army Corps of Engineers Safety Manual. The safety manual can be accessed at:

https://www.usace.army.mil/Safety-and-Occupational-Health/Safety-and-Health-Requirements- Manual/

C-1.3. QUALITY CONTROL

C-1.3.1 A Quality Control Program is the means by which the Contractor assures himself/herself that adequate inspection of work performances are being conducted so that all work meets contract specifications. Contractor must provide the COR a quality control plan for acceptance prior to the pre-work conference. COR will notify Contractor of acceptance or required modifications to the plan before the contract start date; Contractor must make appropriate modifications and obtain acceptance of the plan by the COR before work may begin. If the quality control plan is not approved within 30 days after contract award date, the pre-work conference and work cannot commence and will not be considered a delay by the government.

C-1.3.2. The Quality Control plan must minimally include:

C-1.3.2.1. A description of the inspection system for all services listed on the Performance Requirements Summary (PRS). The description must specify a monitoring strategy and include both the frequency and location of inspections, and the titles and organizational placement of the inspectors.

C-.1.3.2.2. A description of the methods to be used for identifying and preventing defects in the quality of service performed.

C-1.3.2.3. A description of the records to be kept to document inspections and corrective or preventive actions taken.

C-1.3.3 Records of Quality Control inspections must be kept and made available to the COR, at the monthly contracting meeting or at the time of invoicing whichever come first, throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.

C-1.4. QUALITY ASSURANCE

The Government will evaluate the Contractor‘s performance under this contract for those tasks listed on the Performance Work Statement (PWS) to establish acceptance of monthly invoices.

The COR or Quality Assurance (QA) evaluators will follow the methods of surveillance specified in the PWS; generally systematic random sampling will be employed. Government personnel will record all QA inspections, and the COR will retain such records.

C-1.5. MEETINGS & COMMENCEMENT

C-1.5.1. Pre-Work Meeting. Prior to commencement of work on this contract, the Contractor must attend a pre-work meeting at the Mill Creek Project Office at a time mutually agreed to by the Contractor and the COR. At this meeting, the COR will establish lines of authority and Government procedures for contractual administrative and work issues. The schedule of required submittals and reports will also be discussed. The Government shall furnish a letter of record documenting pre-work conference discussions to attendees within one week following the meeting. The Contractor shall submit, in completed form, the following items at the pre-work conference:

o Certificate(s) of Insurance o Letter of Authority for the Contract Supervisor.

o Quality Control Plan o Accident Reporting Plan o Accident Prevention Plan o Activity Hazardous Analysis Plan o Hazardous Material Communication Plan o Hazardous Waste Disposal Plan o A list of names and addresses of all employees who will be working for the Contractor, o A list of all vehicles and equipment to be used by the Contractor.

o A list of supplies and materials to be used in the contract o E-Verify for all employees who will be working for the contractor o Training certificates for AT Level I awareness training and OPSEC Training o Pesticide licenses o A list of any subcontractors

C-1.5.2. Commencement. The plans noted above must be approved by the COR prior to commencement of work by the Contractor. Failure to complete plans approved by the COR will result in delays in notification to proceed which shall not be the basis of a Contractor claim.

C-1.5.3. Monthly Contract Meetings. The Contract Manager must meet monthly from February to September with the COR to review the past month‘s performance and to discuss contract issues.

The meetings will be held at the Mill Creek Project office at a time agreed to by the COR and the Contract Manager prior to the meeting. The Contractor must submit a draft invoice for the previous month. Contractor shall submit a monthly work plan for the upcoming month at the meeting. These meeting will also include site tours of infested areas to discuss spraying for the following month if needed. Phone meetings are acceptable if onsite meetings are not needed.

C-1.5.4 There will be an annual meeting to discuss general expectation for the contract year in the in the beginning of the contract year. The meeting will be held at the Mill Creek Project office at a time agreed to by the COR and the Contract Manager prior to the meeting.

C-1.6 PHYSICAL SECURITY

C-1.6.1. The Contractor must ensure that all Government facilities, property and materials must be appropriately secured at all times and that all doors, gates, enclosures, etc. are locked or secured as they were found. Unusual conditions should be reported immediately. Specific security conditions may change based on threats to national defense, and based on the risk of specific facilities to these threats. The Contractor must abide by these changing conditions at all times.

C-1.6.2. Key Control. The Contractor must ensure all keys issued to the Contractor by the Government are not lost, stolen or duplicated and are not used by unauthorized persons.

C-1.6.2.1. The Contractor must immediately report to the COR any occurrences of lost or stolen keys.

C-1.6.2.2. In the event keys are lost or stolen, the Contractor may be required, upon written direction of the COR, to re-key or replace the affected lock or locks without cost to the Government. The Government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the Contractor. If a master key is lost or stolen, the Government must replace all locks and keys for that system. The total cost of such replacement will be deducted from the monthly payment due the Contractor.

C-1.6.2.3. The Contractor must prohibit the use of keys issued by the Government by any persons other than the Contractor‘s employees. The Contractor must not facilitate access of secured areas to persons other than Contractor personnel or subcontractors engaged in performance of contract work requirements.

C-1.7. HOURS OF OPERATION

C-1.7.1. Normal Hours of Operation. The contractor must meet the requirements by working Monday – Friday from 5:00 am to 8:00 pm. Work is not allowed on federal holidays and weekends and should be avoided during higher levels of visitation. Coordinate with COR during monthly meetings to avoid potential conflicts with higher levels of visitation.

C-1.8. CONSERVATION OF RESOURCES

C-1.8.1. Government Facilities: Contractor shall be responsible for restoring any Government facilities, structures or equipment damaged as a result of his/her operation. Reasonable care will be used to avoid damage to structures, equipment and vegetation in the recreation areas and other areas of Government property. Any such damage will be repaired or the items replaced as directed by the COR at no cost to the Government. If Contractor does not make such repair or replacement, the cost will be deducted from payments to be made to him/her. Contractor will advise the COR of any damage to the facilities due to vandalism or other causes on the day he/she first notices such damage.

C-1.8.2. Private Property: Contractor shall be responsible for injuries to persons or damages to private property (vehicles, camping units or equipment) caused by his/her operations.

C-1.8.3. Environmental Protection: For the purpose of this contract, environmental pollution is defined as the presence of chemicals, physical or biological elements, or other agents which adversely affect human health or welfare; unfavorably alter ecological balances; affect other species; or degrade the utility of the environment for aesthetic and recreational purposes. The control of environmental pollution requires consideration of air, water and land and involves solid waste management as well as any other pollutants. In order to prevent, and to provide abatement and control of any environmental pollution arising from the activities in the performance of this contract, Contractor and his/her subcontractors will comply with all applicable Federal, State, and local laws and regulations concerning pollution control, abatement, spill reporting, and storage of chemicals.

C-1.8.4 Pest Management: Contractor will comply with the Corps of Engineers Pest Management Implementation Instructions which is provided online at:

https://www.nww.usace.army.mil/Missions/Projects/Pest-Management .

These documents provides guidance for pesticides that can be applied and the manner in which they are applied.

https://www.nww.usace.army.mil/Portals/28/docs/programsandprojects/PestManagement/201722 08%20FINAL%20Terrestrial%20Integrated%20Pest%20Management%20Program%20Instructio ns.pdf C-1.8.5. Fish and Wildlife: Contractor shall perform all work and take such steps required to minimize interference with or disturbance to fish and wildlife including threatened and endangered species. The Endangered Species Act, Migratory Bird Treaty Act, Bald and Golden Eagle Act, and any other environmental laws that apply must be strictly adhered to.

C-1.8.6. Water Resources: Contractor shall turn off water faucets and valves when not in use.

Contractor will not pollute drainage ditches, ponds, or lakes with fuels, oils, bitumins, calcium chlorides, acid, or other harmful materials. Disposal: Discarding of any materials, wastes, effluents, trash, garbage, grease, chemicals, etc., in areas adjacent to drainage ditches, ponds or lakes will not be permitted. If any waste material is dumped in any unauthorized area, Contractor will remove the material and restore the area to its original conditions. If necessary, contaminated ground will be excavated, disposed of as directed by the COR, and replaced with suitable fill material, compacted, finished with topsoil and planted as required to re-establish vegetation.

C-1.8.7. Environmental and Hazardous Materials: Contractor shall establish systems and controls to minimize using hazardous materials and the generation of hazardous wastes, maximize recycling of materials and comply with local, state and Federal guidelines for hazardous material and waste storage and disposal. Contractor shall furnish the Government with copies of all Safety Data Sheets (SDS) prior to using or storing such chemicals in Government facilities.

C-1.8.8 Historical, Archeological, and Cultural Resources: Existing historical, archeological and cultural resources in Contractor‘s work area will be so designated by the COR and precautions will be taken to preserve such resources as they existed at the time they are pointed out to the Contractor. Contractor shall install necessary protection for these resources so designated on the drawings and will be responsible for their preservation during this contract. If, during contract activities, Contractor observes unusual items that might have historical or archeological value, such observations will be reported as soon as possible to the COR.

C-1.9. RECORDS

The Contractor is responsible for reporting any pesticides applied as described in the Implementation Instructions. These reports may be made through Geographic Information Systems (GIS) or through a PDF submitted to the COR using the “email data” button on the PDF.

There are specific instructions on how to report any pesticides applied in the pest management program instructions. Records must submitted within 7 days of application. A new record must be completed for each pest control category or change in formulation.

http://www.nww.usace.army.mil/Missions/Projects/Pest-Management/ Anticipated Application Form:

https://www.nww.usace.army.mil/Portals/28/docs/programsandprojects/PestManagement/170822 AnticipatedApplicationRecord%20-%20OPS.pdf Actual Application Form https://www.nww.usace.army.mil/Portals/28/docs/programsandprojects/PestManagement/170822 ActualApplicationRecord%20-%20OPS.pdf GIS – The Contractor will need a GIS program and will be able to submit spray application records to the COR via the GIS. Instruction regarding the GIS program will be provided if needed.

PDF - The Contractor will need access to a PC and have the free Adobe software installed. The Contractor will email the filled in PDF to the COR using the “email data” button on the form.

Instruction regarding submission requirements for PDF are provided in the form and in the Integrated Pesticide Management instructions.

The contractor shall report in accordance to all Washington State regulations.

SECTION C-2 DEFINITIONS

C-2.1. Acceptable Quality Level (AQL). A predetermined value selected and used by the Government Quality Assurance inspector to distinguish between satisfactory and unsatisfactory performance. For evaluation by random sampling, AQL‘s are stated in percentages and have three parts: lot size, sample size and allowable reject level.

C-2.2. Allowable Reject Level (ARL). The allowable margin of error observed under statistically sound quality assurance surveillance.

C-2.3. Contracting Officer (KO). ―Contracting Officer is the person executing this contract on behalf of the Government. The KO is the only person that can modify this contract.

C-2.4. Contracting Officer‘s Representative (COR). An individual designated in writing by the Contracting Officer responsible for administration of the contract.

C-2.5. Contractor. The term Contractor refers to the prime Contractor and all contractor employees and personnel. The prime Contractor shall be responsible for ensuring all subcontractors comply with the provisions of this contract.

C-2.6. Deduct Percentage. The percentage obtained when the price for providing a specific requirement for a billing cycle is diminished because the Observed Acceptance Rate (OAR) is below the Acceptable Quality Level (AQL).

C-2.7. Defective Service. A service or output that does not meet the standard of performance requirement specified in the contract for that service.

C-2.8. Observed Acceptance Rate (OAR). The observed rate of acceptable performance based on statistically sound quality assurance surveillance.

C-2.9. Ordinary High Water Mark (OHWM). Line on the shore established by the fluctuations of water and indicated by physical characteristics such as clear, natural line impressed on the bank, shelving, changes in the character of the soil, destructing of terrestrial vegetation, the presence of litter and debris, or other appropriate means that consider the characteristics of the surrounding areas. (33 CFR 328.3(e))

C-2.10. Performance Requirement. The point that divides acceptable and unacceptable performance of a task according to the PRS and the Inspection of Services clause. It is the number of defects or maximum percentage of defects in the lot that is acceptable.

C-2.11. Periodic: Inspection method used by the Government by the COR to insure that contractor is providing satisfactory performance for payment. Periodic inspections are not scheduled or necessarily routine in nature and can/will be conducted when COR is in the vicinity of where services are performed.

C-2.12. Quality Assurance. A planned and systematic pattern of all Government actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. For purposes of this contract, quality assurance refers to actions by the Government assurance functions for a contracted service.

C-2.13. Quality Assurance Representative (QAR). A government individual designated to inspect the Contractor‘s performance.

C-2.14. Quality Control. Those actions taken by a Contractor to control the production of outputs to ensure that they conform to the contract requirements.

SECTION C-3A GOVERNMENT FURNISHED SERVICES

C-3.1. The Government will not any services.

SECTION C-3B GOVERNMENT FURNISHED STORAGE AREAS

The Government will not provide any storage areas.

SECTION C-4 CONTRACTOR-FURNISHED ITEMS AND SERVICES

Except for those items or services specifically stated in Section C-3, the Contractor must furnish everything necessary to perform this contract according to all its terms. The Contractor must provide all training to Contractor employees required by applicable safety, health or licensing requirements.

C-4.1. The Contractor shall submit for COR approval at the pre-work meeting a list of supplies, material, and equipment to be used on the job. All equipment items shall be in good condition and be capable of efficiently accomplishing the task for which they are designed. The Contractor shall submit Material Safety Data Sheets (MSDS) and Safety Data Sheets (SDS) under the Global Harmonization System on all pesticides or any other chemicals that they bring onto USACE Property.

The following are definitions for the major sections of this contract. It is not the intent of the following definition to imply that these are the only items necessary to comply with the provisions of the contract.

C-4.1.1 Pesticides: Pesticides used must be listed and used as described in the Pest Management Implementation Instructions.

C-4.1.2 Sprayers: Spray equipment must comply with the Pest Management Implementation Instructions.

C-4.1.3 Plot supplies: Contractor will be responsible for obtaining seed, fertilizer, pesticides, and equipment for food plot generation and restoration areas.

C-4.1.4 Signage: Signs will be posted and removed as per WSDA Pesticide Application Rules. The signs will have all required information as per WSDA.

https://agr.wa.gov/PestFert/Pesticides/LawsRules.aspx

SECTION C-5 TASKS

C-5.1. GENERAL INFORMATION

The Contractor must provide all personnel, materials, supplies, and other items and services necessary to perform pesticide application, food plot planting, and soil restoration planting as defined in this Performance Work Statement (PWS). The Contractor must perform to the standards in this contract.

All of the facilities are open year round for the purposes of this contract.

Additional information about the facility is available on the internet at:

http://www.nww.usace.army.mil/Missions/Recreation/MillCreekDamandBenningtonLake.aspx Each application will be done at an agreed upon date and be completed within 15 days of the agreed date.

Current Conditions as of 15 October 2018:

Paved Trails/ Roads – There are 1 mile of paved roads that are within 15’-50’ of the OHWM. Currently less than 1% vegetation cover in 1’ perimeter.

Paved Trails/Roads – There are 3 miles of paved roads that are over 50’ from the OHWM.

Currently less than 1% vegetation cover in 1’ perimeter.

Paved Parking areas – .5 Acres of paved parking areas within 15’-50’ of the OHWM with about 500 feet of the perimeter located within 15’-50’ from the OHWM. Currently less than 1% vegetation cover in 1’ perimeter.

Paved Parking areas – 2.5 Acres of paved parking areas over 50’ of the OHWM with about 3,500 feet of the perimeter located over 50’ from the OHWM. Currently less than 1% vegetation cover in 1’ perimeter.

Gravel Roads – There is 1 mile of 14’ wide gravel road that is within 15’-50’ of the OHWM.

Currently less than 1% vegetation cover.

Gravel Roads – There are 5 miles of 14’ wide gravel road that are over 50’ from the OHWM. Currently less than 1% vegetation cover.

The Bennington Lake Dam is 50 Acres and has a 4:1 slope on one side and a 3:1 slope on the other side.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.