Amend_0001_W912EF18B0029.pdf
PDF 586 KB Posted
- Attached to
- Little Goose Dam Pump Replacement Federal contract opportunity
- Solicitation number
- W912EF18B0029
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Abstract.pdf | ||
| Amendment_0002_W912EF18B0029_Little_Goose_Pumps_and_Oil-Water_Separator_Upgrades.pdf | ||
| Site_Visit_Roster.pdf | ||
| 18B0029-Vol2_PLANS(A).pdf | ||
| A.07.23_Drainage_and_Unwatering_Pumps_and_Oil_Water_Separator_Upgrades_18B0029.pdf | ||
| 18B0029-Vol2_PLANS.pdf | ||
| 18B0029-Vol1_PLANS.pdf | ||
| A.03.10_JA_for_sole-brand_PLC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The prupose of this amendment is to incorporate the changes outlined below .
The proposal date and time has been revised to not later than 2:00 PM Pacif ic TIme on 21 September 2018.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF18B0029
X 9B. DATED (SEE ITEM 11)
17-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Sep-2018
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
HILLARY A. MORGAN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF18B0029
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Summary of changes for Amend – 0001
Little Goose Drainage & Unwatering Pumps and Oil Water Separator
W912EF18B0029
SPECIFICATIONS
1. Revised the following Specification:
SECTION 00 01 15.00 28 “LIST OF DRAWINGS”
- Added paragraph 1.4, 1.4.1, 1.5
SECTION 13 48 00.01 28 “SEISMIC RESTRAINT FOR MECHANICAL AND
ELECTRICAL EQUIPMENT (V1)”
- Revised paragraph 2.1.1 “Undercut Anchors” – See redline for revision location
PLANS
1. Revised the following drawings – See clouded areas for revision locations
- MD101
- MD102
- M-101
- M-102
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 18-Sep-2018 02:00 PM to 21-Sep-2018 02:00 PM.
(End of Summary of Changes)
Drainage & Unwatering Pumps and Oil Water Separator Upgrades W912EF18B0029 Amend-0001
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 01 15.00 28
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS (Volume 1)
1.2.1 Use Of Government Prepared Contract CAD Electronic Files
1.3 FOR INFORMATION ONLY DRAWINGS (FIO) (Volume 1)
1.4 CONTRACT DRAWINGS (Volume 2)
1.4.1 Use Of Government Prepared Contract CAD Electronic Files
1.5 FOR INFORMATION ONLY DRAWINGS (FIO) (Volume 2)
-- End of Section Table of Contents --
DOCUMENT 00 01 15.00 28 - Page 1 g4edddca Line
SECTION 00 01 15.00 28
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS (Volume 1)
Contract drawings for volume 1 are as follows:
FILE NUMBER SHEET
NUMBER
DESCRIPTION REVISION
NUMBER
DATE
GENERAL
LGG-1-0-1/393 G-001 COVER SHEET AND LOCATION MAPS
LGG-1-0-1/394 G-002 INDEX TO DRAWINGS
LGG-1-0-1/395 G-101 GENERAL - WORK AREA - EL 498 AND EL
465 KEY PLANS
LGG-1-0-1/396 G-102 GENERAL - WORK AREA - EL 522 KEY PLAN
STRUCTURAL
LGD-1-5-15/1 S-001 DRAINAGE PUMP SEISMIC BRACE & -
UNWATERING PUMP SEISMIC BRACE -
ISOMETRIC VIEWS
LGD-1-5-15/2 S-101 DRAINAGE PUMP SEISMIC BRACE - PLANS
LGD-1-5-15/3 S-102 UNWATERING PUMP SEISMIC BRACE - PLANS
LGD-1-5-15/4 S-201 DRAINAGE PUMP SEISMIC BRACE -
ELEVATION VIEW
LGD-1-5-15/5 S-202 DRAINAGE PUMP SEISMIC BRACE - WING
ASSEMBLY
LGD-1-5-15/6 S-203 UNWATERING PUMP SEISMIC BRACE -
ELEVATION VIEW
LGD-1-5-15/7 S-204 UNWATERING PUMP SEISMIC BRACE - WING
ASSEMBLY - AND MISCELLANEOUS DETAILS
LGD-1-5-15/8 S-205 UNWATERING PUMP SEISMIC BRACE - WING
TOPS
LGD-1-5-15/9 S-501 DRAINAGE PUMP SEISMIC BRACE - UHMW
TAPER DETAILS
DOCUMENT 00 01 15.00 28 - Page 2
LGD-1-5-15/10 S-502 UNWATERING PUMP SEISMIC BRACE - UHMW
TAPER DETAILS
MECHANICAL
LGD-1-3-15/4 M-101 MECHANICAL - NEW WORK OPTION - EL
498 PLAN AND SECTIONS
LGD-1-3-15/12 M-102 MECHANICAL - NEW WORK - BUTTERFLY
VALVE
LGD-1-3-15/5 M-301 MECHANICAL - NEW WORK - DRAINAGE PUMPS
LGD-1-3-15/6 M-302 MECHANICAL - NEW WORK - UNWATERING
PUMPS
LGD-1-3-15/7 M-303 MECHANICAL - DRAINAGE SUMP - SECTIONS
LGD-1-3-15/8 M-304 MECHANICAL - DRAINAGE SUMP -
SECTIONAL DETAIL
LGD-1-3-15/9 M-305 MECHANICAL - DRAINAGE SUMP - SENSOR
SECTIONS
LGD-1-3-15/10 M-401 MECHANICAL - SUPPORTS AND TEMPLATES -
DETAILS
LGD-1-3-15/1 MD101 MECHANICAL - DEMOLITION - EL 498 PLAN
AND SECTIONS
LGD-1-3-15/11 MD102 MECHANICAL - DEMOLITION - BUTTERFLY
VALVE
LGD-1-3-15/2 MD301 MECHANICAL - DEMOLITION - DRAINAGE
PUMPS
LGD-1-3-15/3 MD302 MECHANICAL - DEMOLITION - UNWATERING
PUMPS
ELECTRICAL
LGD-1-6-15/1 E-001 ELECTRICAL - LEGEND AND SYMBOLS
LGD-1-6-15/2 ED101 ELECTRICAL - DEMOLITION PLAN -
ERECTION BAY EL 522
LGD-1-6-15/3 ED201 ELECTRICAL - CPO DEMOLITION ELEVATION
- ERECTION BAY EL 522
LGD-1-6-15/4 ED601 CPO - ONE LINE DIAGRAM - DEMOLITION
LGD-1-6-15/5 E-101 ELECTRICAL - INSTALLATION PLAN -
ERECTION BAY EL 522
LGD-1-6-15/6 E-102 ELECTRICAL - INSTALLATION PLAN -
ERECTION BAY EL 542
LGD-1-6-15/7 E-103 ELECTRICAL - INSTALLATION PLAN -
ERECTION BAY EL 598
LGD-1-6-15/8 E-201 ELECTRICAL - ELEVATIONS - ERECTION
BAY EL 522
LGD-1-6-15/9 E-202 ELECTRICAL - CPO UNWATERING BUS -
ERECTION BAY EL 522
LGD-1-6-15/10 E-203 ELECTRICAL - CPO DRAINAGE BUS -
ERECTION BAY EL 522
LGD-1-6-15/11 E-301 ELECTRICAL - DUPLC1 ENCLOSURE - SHEET
TITLE LINE 3
LGD-1-6-15/12 E-302 ELECTRICAL - MANUAL CONTROL
INTERFACES - DRAINAGE AND UNWATERING
DOCUMENT 00 01 15.00 28 - Page 3
LGD-1-6-15/13 E-501 ELECTRICAL - CABLE TRAY - DETAILS
LGD-1-6-15/14 E-601 CPO - ONE LINE DIAGRAM - INSTALLATION
LGD-1-6-15/15 E-602 ELECTRICAL - COMMUNICATION - BLOCK
DIAGRAM
LGD-1-6-15/16 E-603 ELECTRICAL - PUMPS SEQUENCE
OPERATIONS - SHEET TITLE LINE 3
LGD-1-6-15/17 E-604 ELECTRICAL - GROUNDING AND BONDING -
DIAGRAM
LGD-1-6-15/18 E-605 ELECTRICAL - PUMP CONTROL - LADDER
LOGIC 1
LGD-1-6-15/19 E-606 ELECTRICAL - PUMP CONTROL - LADDER
LOGIC 2
LGD-1-6-15/20 E-607 ELECTRICAL - CABLE AND CONDUIT -
SCHEDULE
LGD-1-6-15/24 E-608 ELECTRICAL - CONTROL SYSTEM - VLAN
DIAGRAM
LGD-1-6-15/21 E-801 ELECTRICAL - HMI SCREEN LAYOUTS -
SHEET TITLE LINE 3
LGD-1-6-15/22 E-802 ELECTRICAL - DATA EXPORT FORMAT -
SHEET TITLE LINE 3
LGD-1-6-15/23 E-901 PUMPS REPLACEMENT - ELECTRICAL -
PHOTOS 1
1.2.1 Use Of Government Prepared Contract CAD Electronic Files
a. No For Information Only drawings are available on CAD.
b. The Contractor assumes all risks associated in using electronic CAD drawings.
c. Electronic copies of CAD drawings are only available in Bentley MicroStation format.
d. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies.
The Government will not be responsible to correct the electronic CAD drawing.
1.3 FOR INFORMATION ONLY DRAWINGS (FIO) (Volume 1)
These FIO drawings are included with the drawings for information. The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
FIO drawings are as follows:
FILE NUMBER SHEET
NUMBER
DESCRIPTION REVISION
NUMBER
DATE
LGP-1-3-8/17 FIO-001 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - CROSS SECTION
THRU SUMP
DOCUMENT 00 01 15.00 28 - Page 4
LGP-1-4-3/1 FIO-002 POWERHOUSE - ERECTION BAY -
CONCRETE OUTLINE - TRANSVERSE -
SECTION THRU SUMPS
PLATE_23.45-1 FIO-003 PIPING DIAGRAM - UNWATERING AND
DRAINAGE - PUMPS
LGP-1-4-3/6 FIO-004 POWERHOUSE - ERECTION BAY -
CONCRETE OUTLINE - SUMPS -
PLANS & SECTIONS
LGP-1-4-3/78 FIO-005 POWERHOUSE - ERECTION BAY -
REINFORCEMENT - SUMP SLABS -
EL'S 403.5 & 433 & 465
LGP-1-4-3/79 FIO-006 POWERHOUSE - ERECTION BAY -
REINFORCEMENT - SUMP WALLS -
SHEET 1
LGP-1-4-3/81 FIO-007 POWERHOUSE - ERECTION BAY -
REINFORCEMENT - SUMP WALLS -
SHEET 3
LGP-1.1-3-9/82 FIO-008 POWERHOUSE - ERECTION BAY -
EXPOSED PIPING - BRACKET DETAILS
LGP-1.1-3-9/84 FIO-009 ERECTION BAY - EXPOSED PIPING -
PUMP BUBBLERS & FLOAT - ARRGT.
- SECTIONS & DETAILS
LGP-1.1-3-9/88 FIO-010 ERECTION BAY - EXPOSED PIPING -
UNWATERING & DRAINAGE - PUMP
DISCH. PLAN & SECTIONS
LGP-1.1-6-1D51/5 FIO-011 ERECTION BAY - EXPOSED PIPING -
UNWATERING & DRAINAGE - PUMP
DISCH. PLAN & SECTIONS
LGP-1-3-8/29 FIO-012 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - PLAN EL 522 & 505
LGP-1-3-8/30 FIO-013 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - SECTIONS EL 522
& 505 & 454.5
LGP-1-3-8/31 FIO-014 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - PLAN EL 498 &
454.5
LGP-1-3-8/32 FIO-015 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - SECTIONS EL 522
& 498
LGP-1-3-8/33 FIO-016 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - PIPE SHAFT
DOCUMENT 00 01 15.00 28 - Page 5
LGP-1-3-8/34 FIO-017 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - MISC SECTIONS &
DETAILS
SK-43 FIO-018 POWERHOUSE - FOUNDATION DRAINAGE
LGP-1.1-3-9/83 FIO-019 POWERHOUSE - ERECTION BAY -
EXPOSED PIPING - PLAN EL. 522 -
SEWAGE DISPOSAL ROOM-SECTIONS
LGP-1.1-6-1D21/1 FIO-020 POWERHOUSE - ONE LINE DIAGRAM -
SQ0 & SQ1 & CP0
LGP-1.1-6-1A7/1 FIO-021 POWERHOUSE - 4.16KV SP SWGR
ONELINE & - CONTROLLERS CP0 &
CP1 & CP2 & CP3
E-S445090-LA1 FIO-022 JOHN DAY & LITTLE GOOSE - LOCK
& DAM - 4.16KV CONTROLLERS
LGP-1-6-1D1/2 FIO-023 POWERHOUSE - EMBEDDED - CONDUIT
& GROUNDING - ERECTION BAY - EL
LGP-1-6-1D1/3 FIO-024 POWERHOUSE - EMBEDDED - CONDUIT
& GROUNDING - ERECTION BAY - EL
LGP-1-6-2D1/2 FIO-025 POWERHOUSE - LIGHTING -
ERECTION BAY - EL 522
LGP-1-6-1A13/1 FIO-026 POWERHOUSE - CONDUIT &
GROUNDING - TYPICAL EMBEDDED
DETAILS
LGP-1-3-8/34 FIO-027 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - MISC SECTIONS &
DETAILS
LGN-1-3-16/1 FIO-028 NAVIGATION LOCK - UNWATERING
SYSTEM - ARRANGEMENT
LGN-1-3-16/2 FIO-029 NAVIGATION LOCK - UNWATERING
SYSTEM - U/ S DRAIN LINES
1.4 CONTRACT DRAWINGS (Volume 2)
Contract drawings for volume 2 are as follows:
FILE NUMBER SHEET
NUMBER
DESCRIPTION REVISION
NUMBER
DATE
GENERAL
LGG-1-0-1/418 G-001 COVER SHEET AND LOCATION MAPS
DOCUMENT 00 01 15.00 28 - Page 6
LGG-1-0-1/419 G-002 INDEX TO DRAWINGS
LGG-1-0-1/420 G-003 INDEX TO FOR INFORMATION -
ONLY DRAWINGS
LGG-1-0-1/421 G-101 WORK AREA - ELEVATION 465 KEY
PLAN
LGG-1-0-1/422 G-102 WORK AREAS - EL 498 AND EL 522
KEY PLANS
LGG-1-0-1/423 G-103 WORK AREA - EL 598 KEY PLAN
LGG-1-0-7/12 G-901 GENERATOR BAY #1 - PHOTOS KEY
PLANS
LGG-1-0-7/13 G-902 GENERATOR BAY #1 - SPIRAL CASE
DRAIN VALVE - PHOTOS
LGG-1-0-7/14 G-903 GENERATOR BAY #1 - DRAFT TUBE
DRAIN VALVE OPERATOR - PHOTOS
LGG-1-0-7/15 G-904 GENERATOR BAY #1 - STAIRWELL
AND FISHWAY DRAIN VALVE - PHOTOS
LGG-1-0-7/16 G-905 ERECTION BAY - NAVLOCK DRAIN
VALVE AND - STAIRWELL - PHOTOS
LGG-1-0-7/17 G-906 GENERATOR BAY #1 - DRAINAGE
GALLERY - PHOTOS
STRUCTURAL
LGP-1-13-6/1 S-101 GENERATOR BAY #1 - PLAN VIEW
LGP-1-13-6/2 SE101 PHASE 1 - CONCRETE DEMOLITION -
ABOVE FLOOR ELEVATION 465.00 -
PLAN VIEW
LGP-1-13-6/3 SE301 PHASE 1 - CONCRETE DEMOLITION -
ABOVE FLOOR ELEVATION 465.00 -
SECTIONS
LGP-1-13-6/4 SF101 PHASE 2 - CONCRETE DEMOLITION -
WEIR OPENINGS AT EL 465.00 -
PLAN VIEW
LGP-1-13-6/5 SF301 PHASE 2 - CONCRETE DEMOLITION -
WEIR OPENINGS AT EL 465.00 -
SECTIONS AND DETAILS
LGP-1-13-6/6 SF302 PHASE 2 - CONCRETE DEMOLITION -
WEIR OPENINGS AT ELEVATION
465.00 - SECTIONS
LGP-1-13-6/7 SG101 PHASE 3 - CONCRETE DEMOLITION -
WEIR GUIDES AND PIPE BYPASS -
PLANS
DOCUMENT 00 01 15.00 28 - Page 7
LGP-1-13-6/8 SG301 PHASE 3 - CONCRETE DEMOLITION -
WEIR GUIDES AND PIPE BYPASS -
SECTIONS 1
LGP-1-13-6/9 SG302 PHASE 3 - CONCRETE DEMOLITION -
WEIR GUIDES AND PIPE BYPASS -
SECTIONS 2
LGP-1-13-6/10 SH101 PHASE 4 - CONCRETE DEMOLITION -
DRAINAGE GALLERY & CORE DRILLS
- PLANS
LGP-1-13-6/11 SJ101 PHASE 5 - DRAINAGE GALLERY -
CURVED WALL PLATE
LGP-1-13-6/12 SJ102 SHEET TITLE LINE 1 -
REINFORCEMENT SECTION
MECHANICAL
LGP-1-3-6/2 M-101 GENERATOR BAY #1 - ENLARGED
MECHANICAL KEY PLAN
LGP-1-3-6/3 M-102 GENERATOR BAY #1 - ELEVATION
465 PLAN
LGP-1-3-6/4 M-103 GENERATOR BAY #1 - ELEVATION
465 KEY PLAN - EMBEDDED STEEL
LGP-1-3-6/5 M-301 GENERATOR BAY #1 - UPSTREAM
AND DOWNSTREAM WEIRS - EMBEDDED
STEEL SECTIONS SHEET 1
LGP-1-3-6/6 M-302 GENERATOR BAY #1 - UPSTREAM
AND DOWNSTREAM WEIRS - EMBEDDED
STEEL SECTIONS SHEET 2
LGP-1-3-6/7 M-303 GENERATOR BAY #1 - UPSTREAM
AND DOWNSTREAM WEIRS - EMBEDDED
STEEL SECTIONS SHEET 3
LGP-1-3-6/8 M-304 GENERATOR BAY #1 - UPSTREAM
AND DOWNSTREAM WEIRS - EMBEDDED
STEEL SECTIONS SHEET 4
LGP-1-3-6/9 M-305 GENERATOR BAY #1 - UPSTREAM
AND DOWNSTREAM WEIRS - EMBEDDED
STEEL SECTIONS SHEET 5
LGP-1-3-6/10 M-306 GENERATOR BAY #1 - UPSTREAM
AND DOWNSTREAM WEIRS - EMBEDDED
STEEL SECTIONS SHEET 6
LGP-1-3-6/11 M-307 GENERATOR BAY #1 - UPSTREAM
AND DOWNSTREAM WEIRS - EMBEDDED
STEEL SECTIONS SHEET 7
DOCUMENT 00 01 15.00 28 - Page 8
LGP-1-3-6/87 M-308 GENERATOR BAY #1 - SKIMMER,
DECANTER AND - CLOSURE GATE
ELEVATION
LGP-1-3-6/12 MJ001 GENERATOR BAY #1 - UPSTREAM
WEIR ASSEMBLY - ISOMETRIC &
PARTS LIST
LGP-1-3-6/13 MJ101 GENERATOR BAY #1 - UPSTEAM
WEIR ASSEMBLY - ASSEMBLY VIEWS
LGP-1-3-6/14 MJ102 GENERATOR BAY #1 - UPSTREAM
WEIR ASSEMBLY - EMBEDDED
LGP-1-3-6/15 MJ401 GENERATOR BAY #1 - UPSTEAM
WEIR ASSEMBLY - EMBEDDED
SLEEVE ASSEMBY 1
LGP-1-3-6/16 MJ402 GENERATOR BAY #1 - UPSTEAM
WEIR ASSEMBLY - EMBEDDED
SLEEVE ASSEMBLY 2 & 3
LGP-1-3-6/17 MJ403 GENERATOR BAY #1 - UPSTEAM
WEIR ASSEMBLY - EMBEDDED
SLEEVE ASSEMBLY 4
LGP-1-3-6/18 MJ404 GENERATOR BAY #1 - UPSTEAM
WEIR ASSEMBLY - LIFTING LINK
GUIDE & ASSEMBLY
LGP-1-3-6/19 MJ405 GENERATOR BAY #1 - UPSTEAM
WEIR ASSEMBLY - PLATE & GASKET
DETAILS
LGP-1-3-6/20 MJ406 GENERATOR BAY #1 - UPSTEAM
WEIR ASSEMBLY - TAIL PULLEY
GUIDE DETAILS
LGP-1-3-6/21 MJ407 GENERATOR BAY #1 - UPSTREAM
WEIR ASSEMBLY - WEIR GUIDE
ASSEMBLY - SHEET 1
LGP-1-3-6/22 MJ408 GENERATOR BAY #1 - UPSTREAM
WEIR ASSEMBLY - WEIR GUIDE
ASSEMBLY - SHEET 2
LGP-1-3-6/23 MJ409 GENERATOR BAY #1 - UPSTREAM
WEIR ASSEMBLY - WEIR PLATE
ASSEMBLY - SHEET 1
LGP-1-3-6/24 MJ410 GENERATOR BAY #1 - UPSTREAM
WEIR ASSEMBLY - WEIR PLATE
ASSEMBLY - SHEET 2
LGP-1-3-6/25 MJ411 GENERATOR BAY #1 - UPSTREAM
WEIR ASSEMBLY - WEIR PLATE
ASSEMBLY - SHEET 3
LGP-1-3-6/26 MK401 GENERATOR BAY #1 - SKIMMER
SUPPORT STAND ASSEMBLY -
ISOMETRIC & PARTS LIST
DOCUMENT 00 01 15.00 28 - Page 9
LGP-1-3-6/27 MK402 GENERATOR BAY #1 - SKIMMER
SUPPORT STAND ASSEMBLY -
ASSEMBLY VIEWS
LGP-1-3-6/28 MK403 GENERATOR BAY #1 - SKIMMER
SUPPORT STAND ASSEMBLY - FUME
HOOD TOP ASSEMLBLY
LGP-1-3-6/29 MK404 GENERATOR BAY #1 - SKIMMER
SUPPORT STAND ASSEMBLY -
SUPPORT FRAME ASSEMBLY
LGP-1-3-6/30 MK405 GENERATOR BAY #1 - SKIMMER
SUPPORT STAND ASSEMBLY -
DETAILS
LGP-1-3-6/31 MK701 GENERATOR BAY #1 - CLOSURE
GATE ASSEMBLY - ISOMETRIC &
PARTS LIST
LGP-1-3-6/32 MK702 GENERATOR BAY #1 - CLOSURE
GATE ASSEMBLY - ASSEMBLY VIEWS
LGP-1-3-6/33 MK703 GENERATOR BAY #1 - CLOSURE
GATE BASE PLATE - ASSEMBLY
LGP-1-3-6/34 MK704 GENERATOR BAY #1 - CLOSURE
GATE ASSEMBLY - DETAILS 1
LGP-1-3-6/35 MK705 GENERATOR BAY #1 - CLOSURE
GATE ASSEMBLY - DETAILS 2
LGP-1-3-6/36 ML401 GENERATOR BAY #1 - RECTANGULAR
DECANTER ASSEMBLY - ISOMETRIC &
PARTS LIST
LGP-1-3-6/37 ML402 GENERATOR BAY #1 - RECTANGULAR
DECANTER ASSEMBLY - ASSEMBLY
VIEWS
LGP-1-3-6/38 ML403 GENERATOR BAY #1 - RECTANGULAR
DECANTER TANK - DETAILS
LGP-1-3-6/39 ML404 GENERATOR BAY #1 - RECTANGULAR
DECANTER STAND - ASSEMBLY -
DETAILS
LGP-1-3-6/40 ML405 GENERATOR BAY #1 - SEDIMENT
TRAY & HALF PIPE - DETAILS
LGP-1-3-6/41 MM001 GENERATOR BAY #1 - DOWBSTREAM
WEIR ASSEMBLY - ISOMETRIC &
PARTS LIST
LGP-1-3-6/42 MM101 GENERATOR BAY #1 - DOWNSTREAM
WEIR ASSEMBLY - ASSEMBLY VIEWS
LGP-1-3-6/43 MM102 GENERATOR BAY #1 - DOWBSTREAM
WEIR ASSEMBLY - EMBEDDED
SLEEVE ASSEMBLY ISOMETRIC
DOCUMENT 00 01 15.00 28 - Page 10
LGP-1-3-6/44 MM401 GENERATOR BAY #1 - DOWNSTREAM
WEIR ASSEMBLY - EMBEDDED
SLEEVE ASSEMBLY 1
LGP-1-3-6/45 MM402 GENERATOR BAY #1 - DOWNSTREAM
WEIR ASSEMBLY - EMBEDDED
SLEEVE ASSEMBLY 2 / TUBE
LGP-1-3-6/46 MM403 GENERATOR BAY #1 - DOWNSTREAM
WEIR ASSEMBLY - EMBEDDED
SLEEVE COVER PLATE / GASKET
LGP-1-3-6/47 MM404 GENERATOR BAY #1 - DOWNSTREAM
WEIR ASSEMBLY - LIFTING LINK
ASSEMBLY
LGP-1-3-6/48 MM405 GENERATOR BAY #1 - DOWNSTREAM
WEIR ASSEMBLY - WEIR GUIDE
ASSEMBLY - SHEET 1
LGP-1-3-6/49 MM406 GENERATOR BAY #1 - DOWNSTREAM
WEIR ASSEMBLY - WEIR GUIDE
ASSEMBLY - SHEET 2
LGP-1-3-6/50 MM407 GENERATOR BAY #1 - DOWNSTREAM
WEIR ASSEMBLY - WEIR PLATE
ASSEMBLY - SHEET 1
LGP-1-3-6/51 MM408 GENERATOR BAY #1 - DOWNSTREAM
WEIR ASSEMBLY - WEIR PLATE
ASSEMBLY - SHEET 2
LGP-1-3-6/52 MM409 GENERATOR BAY #1 - DOWNSTREAM
WEIR ASSEMBLY - WEIR PLATE
ASSEMBLY - SHEET 3
LGP-1-3-6/53 MM410 GENERATOR BAY #1 - DOWNSTREAM
WEIR ASSEMBLY - AIR PIPE
ASSEMBLY
LGP-1-3-6/54 MN401 GENERATOR BAY #1 - HYDROCARBON
SENSOR STILLING WELL -
ASSEMBLY - ISOMETRIC & PARTS
LIST
LGP-1-3-6/55 MN402 GENERATOR BAY #1 - HYDROCARBON
SENSOR STILLING WELL -
ASSEMBLY - ASSEMBLY VIEWS
LGP-1-3-6/56 MN403 GENERATOR BAY #1 - HYDROCARBON
SENSOR STILLING WELL -
ASSEMBLY - DETAILS 1
LGP-1-3-6/57 MN404 GENERATOR BAY #1 - HYDROCARBON
SENSOR STILLING WELL -
ASSEMBLY - DETAILS 2
LGP-1-3-6/58 MN405 GENERATOR BAY #1 - HYDROCARBON
SENSOR STILLING WELL -
ASSEMBLY - CABLE GUARD
DOCUMENT 00 01 15.00 28 - Page 11
LGP-1-3-6/59 MP101 GENERATOR BAY #1 - DRAINAGE
SUMP DRAIN PIPING
LGP-1-3-6/60 MP102 ERECTION BAY - EL 465 PLAN
LGP-1-3-6/61 MP103 GENERATOR BAY #1 - COMPRESSED
AIR PIPING - EL 465 PLAN
LGP-1-3-6/62 MP104 GENERATOR BAY #1 - COMPRESSED
AIR PIPING - PARTS LIST
LGP-1-3-6/63 MP105 ERECTION BAY - OSCT PLAN
LGP-1-3-6/64 MP106 ERECTION BAY - OSCT AND
APPURTENANCES - PARTS LIST
LGP-1-3-6/65 MP107 ERECTION BAY - OSCT DISCHARGE
PIPING - EL 498 PLAN
LGP-1-3-6/66 MP108 ERECTION BAY - OSCT DISCHARGE
PIPING PARTS LIST
LGP-1-3-6/67 MP301 GENERATOR BAY #1 - COMPRESSED
AIR PIPING - ELEVATION
LGP-1-3-6/68 MP302 GENERATOR BAY #1 - COMPRESSED
AIR PIPING - ISOMETRIC VIEW
LGP-1-3-6/69 MP303 GENERATOR BAY #1 - AND
ERECTION BAY - DECANTER TO
LGP-1-3-6/70 MP304 ERECTION BAY - DECANTER TO
OSCT PIPING - SHEET 1
LGP-1-3-6/71 MP305 ERECTION BAY - DECANTER TO
OSCT PIPING - SHEET 2
LGP-1-3-6/72 MP306 ERECTION BAY - DECANTER TO
OSCT PIPING - SHEET 3
LGP-1-3-6/73 MP307 ERECTION BAY - PIPING AT OSCT
- ISOMETRIC VIEW
LGP-1-3-6/74 MP308 ERECTION BAY - OSCT DISCHARGE
PIPING - ELEVATIONS SHEET 1
LGP-1-3-6/75 MP309 ERECTION BAY - OSCT DISCHARGE
PIPING - ELEVATIONS SHEET 2
LGP-1-3-6/76 MP310 ERECTION BAY - OSCT DISCHARGE
PIPING - ISOMETRIC VIEWS
LGP-1-3-6/77 MP401 GENERATOR BAY #1 - DRAINAGE
PIPE SECTION VIEWS
LGP-1-3-6/78 MP402 GENERATOR BAY #1 - DRAINAGE
GALLERY CEILING DRAIN - TEE
ASSEMBLY - DETAILS
LGP-1-3-6/79 MP403 GENERATOR BAY #1 - TRENCH
DRAIN WALL PIPE ASSEMBLY -
DETAILS
DOCUMENT 00 01 15.00 28 - Page 12
LGP-1-3-6/80 MP404 GENERATOR BAY #1 & ERECTION
BAY - COMPRESSED AIR AND OSCT
LGP-1-3-6/81 MP405 ERECTION BAY - OSCT DISCHARGE
PIPING - PART DETAILS
LGP-1-3-6/82 MP601 GENERATOR BAY #1 & - ERECTION
BAY - PIPING DIAGRAMS - AND
VALVE SCHEDULE
LGP-1-3-6/83 MR401 GENERATOR BAY #1 - HAND HOIST
ASSEMBLY - ISOMETRIC & PARTS
LIST
LGP-1-3-6/84 MR402 GENERATOR BAY #1 - HAND HOIST
ASSEMBLY - ASSEMBLY VIEWS
LGP-1-3-6/85 MR403 GENERATOR BAY #1 - HAND HOIST
ASSEMBLY - DETAILS 1
LGP-1-3-6/86 MR404 GENERATOR BAY #1 - HAND HOIST
ASSEMBLY - DETAILS 2
ELECTRICAL
LGP-1-6-6/1 E-001 ELECTRICAL - LEGENDS AND
SYMBOLS
LGP-1-6-6/2 E-101 BLOCK DIAGRAM
LGP-1-6-6/3 E-102 EQUIPMENT LAYOUT
LGP-1-6-6/4 E-103 EQUIPMENT LAYOUT
LGP-1-6-6/5 E-104 ERECTION BAY - DUPLC1 CONDUIT
ROUTING - ENLARGED PLAN AT EL
LGP-1-6-6/6 E-201 EQUIPMENT LAYOUT - OSCC EL 465
LGP-1-6-6/7 E-202 EQUIPMENT LAYOUT - DNCC EL 498
LGP-1-6-6/8 E-301 GENERATOR BAY #1 - OIL SKIMMER
CONDUIT ROUTING - ELEVATION
LGP-1-6-6/9 E-302 GENERATOR BAY #1 & ERECTION
BAY - OIL SKIMMER CONDUIT
ROUTING - ELEVATION
LGP-1-6-6/10 E-303 ERECTION BAY - OIL SKIMMER
CONDUIT ROUTING - ELEVATION
LGP-1-6-6/11 E-304 ERECTION BAY - OSCC CONDUIT
ROUTING - ELEVATIONS
LGP-1-6-6/12 E-305 ERECTION BAY - OSCT CONDUIT
ROUTING - ELEVATIONS
DOCUMENT 00 01 15.00 28 - Page 13
LGP-1-6-6/13 E-306 ERECTION BAY - OSCT TO DNCC
CONDUIT ROUTING - ELEVATION
LGP-1-6-6/14 E-307 ERECTION BAY - DNCC CONDUIT
ROUTING - ELEVATIONS
LGP-1-6-6/15 E-308 ERECTION BAY - DNCC TO CONTROL
ROOM - CONDUIT ROUTING
ELEVATION
LGP-1-6-6/16 E-601 SINGLE LINE DIAGRAM
LGP-1-6-6/17 E-602 LADDER LOGIC
LGP-1-6-6/18 E-603 PLC I/O
LGP-1-6-6/19 E-604 CONDUIT SCHEDULE
LGP-1-6-6/20 E-605 ELECTRICAL - SEQUENCES OF
OPERATION
LGP-1-6-6/21 E-606 ELECTRICAL - HMI & DUPLC1
COMMUNICATION
1.4.1 Use Of Government Prepared Contract CAD Electronic Files
a. No For Information Only drawings are available on CAD.
b. The Contractor assumes all risks associated in using electronic CAD drawings.
c. Electronic copies of CAD drawings are only available in Bentley MicroStation format.
d. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies.
The Government will not be responsible to correct the electronic CAD drawing.
1.5 FOR INFORMATION ONLY DRAWINGS (FIO) (Volume 2)
These FIO drawings are included with the drawings for information. The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
FILE NUMBER SHEET
NUMBER
DESCRIPTION REVISION
NUMBER
DATE
LGP-1-3-8/1 FIO-001 POWERHOUSE - EMBEDDED PIPING -
TYPICAL DETAILS - SHEET NO. 1
LGP-1-3-8/2 FIO-002 POWERHOUSE - EMBEDDED PIPING -
TYPICAL DETAILS - SHEET NO. 2
DOCUMENT 00 01 15.00 28 - Page 14
LGP-1-3-8/4 FIO-003 POWERHOUSE - EMBEDDED PIPING -
GENERATOR BAYS - TRANSVERSE
SECT, & DETAILS
LGP-1-3-8/9 FIO-004 POWERHOUSE - EMBEDDED PIPING -
GENERATOR BAYS - PLAN - TAILRACE
EL. 532, 522 & 502
LGP-1-3-8/10 FIO-005 POWERHOUSE - EMBEDDED PIPING -
GENERATOR BAYS - GALLERIES EL.
637, 621, 580, & 558
LGP-1-3-8/11 FIO-006 POWERHOUSE - EMBEDDED PIPING -
GENERATOR BAYS - ELEV. 542 - &
INTAKE DRAINAGE GALLERIES
LGP-1-3-8/12 FIO-007 POWERHOUSE - EMBEDDED PIPING -
GENERATOR BAY - PLAN ELEVATION
LGP-1-3-8/16 FIO-008 POWERHOUSE - EMBEDDED PIPING -
GENERATOR BAYS - PLAN EL. 465 &
SECT.
LGP-1-3-8/17 FIO-009 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - CROSS SECTION
THRU SUMP
LGP-1-3-8/28 FIO-010 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - PLAN EL. 542
LGP-1-3-8/29 FIO-011 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - PLAN EL. 522 & 505
LGP-1-3-8/31 FIO-012 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - PLAN EL. 498 &
454.5
LGP-1-3-8/32 FIO-013 POWERHOUSE - EMBEDDED PIPIING -
ERECTION BAY - SECTIONS EL. 522
LGP-1-3-8/34 FIO-014 POWERHOUSE - EMBEDDED PIPING -
ERECTION BAY - MISC. SECTIONS &
LGP-1-4-1/3 FIO-015 POWERHOUSE - WATERSTOPS AND
DRAINS - PIER P-1
LGP-1-4-1/4 FIO-016 POWERHOUSE - WATERSTOPS AND
DRAINS - PIERS P-2 THRU P-6
LGP-1-4-1/8 FIO-017 POWERHOUSE - WATERSTOPS AND
DRAINS - DETAILS
LGP-1-4-2/1 FIO-018 POWERHOUSE - GENERATOR BAYS -
CONCRETE OUTLINE - TRANSVERSE -
SECTION - BAYS 1, 2, & 3
LGP-1-4-2/12 FIO-019 POWERHOUSE - GENERATOR BAYS -
CONCRETE OUTLINE - GALLERIES -
EL. 457 & 465
LGP-1-4-2/32 FIO-020 POWERHOUSE - GENERATOR BAYS -
CONCRETE OUTLINE - INTAKE
DRAINAGE GALLERIES
DOCUMENT 00 01 15.00 28 - Page 15
LGP-1-4-2/12 FIO-021 POWERHOUSE - GENERATOR BAYS -
REINFORCEMENT - GALLERIES - EL.
457 AND EL. 465 - BAYS 1, 2 & 3
LGP-1-4-3/1 FIO-022 POWERHOUSE - ERECTION BAY -
CONCRET OUTLINE - TRANSVERSE
SECTION THRU SUMPS
LGP-1-4-3/3 FIO-023 POWERHOUSE - ERECTION BAY -
CONCRETE OUTLINE - LONGITUDINAL
SECTION
LGP-1-4-3/6 FIO-024 POWERHOUSE - ERECTION BAY -
CONCRETE OUTLINE - SUMPS - PLANS
& SECTIONS
LGP-1-4-3/7 FIO-025 POWERHOUSE - ERECTION BAY -
CONCRETE OUTLINE - PLAN - EL. 487
LGP-1-4-3/8 FIO-026 POWERHOUSE - ERECTION BAY -
CONCRETE OUTLINE - PLAN - EL. 498
LGP-1-4-3/9 FIO-027 POWERHOUSE - ERECTION BAY -
CONCRETE OUTLINE - PLAN - EL. 522
LGP-1-4-3/16 FIO-028 POWERHOUSE - ERECTION BAY -
CONCRETE OUTLINE - SUMP STAIRS
LGP-1-4-3/29 FIO-029 POWERHOUSE - ERECTION BAY -
CONCRETE OUTLINE - INTAKE
DRAINAGE GALLERIES
LGP-1-4-3/40 FIO-030 POWERHOUSE - ERECTION BAY -
CONCRETE OUTLINE - INTAKE SHAFTS
- EL. 498 TO EL. 558
LGP-1-4-3/41 FIO-031 POWERHOUSE - ERECTION BAY -
CONCRETE OUTLINE - INTAKE SHAFTS
- EL. 558 TO EL. 651
LGP-1-4-3/78 FIO-032 POWERHOUSE - ERECTION BAY -
REINFORCEMENT - SUMP SLABS -
EL.'S 403.5, 433 & 465
LGP-1-4-3/79 FIO-033 POWERHOUSE - ERECTION BAY -
REINFORCEMENT - SUMP WALLS -
SHEET 1
LGP-1-4-3/80 FIO-034 POWERHOUSE - ERECTION BAY -
REINFORCEMENT - SUMP WALLS -
SHEET 2
LGP-1-4-3/81 FIO-035 POWERHOUSE - ERECTION BAY -
REINFORCEMENT - SUMP WALLS -
SHEET 3
DOCUMENT 00 01 15.00 28 - Page 16
LGP-1-4-3/10 FIO-036 POWERHOUSE - ERECTION BAY -
REINFORCEMENT - SUMP STAIRS, EL.
465 TO EL. 522
LGP-1-5-0/18 FIO-037 POWERHOUSE - MISCELLANEOUS METAL
- FRAMES AND COVERS - SH. 4
LGP-1-5/0/19 FIO-038 POWERHOUSE - MISCELLANEOUS METAL
- GRATINGS
LGP-1-5-0/20 FIO-039 POWERHOUSE - MISCELLANEOUS METAL
- MISCELLANEOUS DETAILS - SHEET 1
SK-43 FIO-040 POWERHOUSE - FOUNDATION DRAINAGE
LGP-1.1-3-9/ FIO-041 POWERHOUSE - GENERATOR BAYS -
EXPOSED PIPING - DRAFT TUBE
GALLERY - EL. 465 - PLAN
SECTIONS & DETAILS
LGP-1.1-3-9/ FIO-042 POWERHOUSE - ERECTION BAY -
EXPOSED PIPING - UNWATERING -
SYSTEM - SECTIONS & MISC. DETAILS
LGP-1-6-2A1/ FIO-043 POWERHOUSE - LIGHTING - DRAFT
TUBE & - DRAINAGE GALLERIES
LGP-1-6-2A1/ FIO-044 POWERHOUSE - LIGHTING - INTAKE
SERVICE GALLERY - EL 637
LGP-1-6-2A1/ FIO-045 POWERHOUSE - LIGHTING - FIXTURE
SCHEDULE
LGP-1-6-2A1/ FIO-046 POWERHOUSE - LIGHTING -
EQUIPMENT SCHEDULE
LGP-1-6-2D1/ FIO-047 POWERHOUSE - LIGHTING - ERECTION
BAY - SECTIONS & DETAILS, SH 1
LGP-1-5-0/10 FIO-048 POWERHOUSE - MISCELLANEOUS METAL
- HANDRAILS - SHEET 2
LGG-1-0-1/39 FIO-049 DRAINAGE AND UNWATERING PUMP -
REPLACEMENT - GENERAL - WORK -
AREA - EL 498 & EL 465 KEY PLANS
LGD-1-3-15/7 FIO-050 DRAINAGE AND UNWATERING PUMP -
REPLACEMENT - MECHANICAL -
DRAINAGE SUMP - SECTIONS
LGD-1-3-15/8 FIO-051 DRAINAGE AND UNWATERING PUMP -
REPLACEMENT - MECHANICAL -
DRAINAGE SUMP - SECTIONAL DETAIL
LGD-1-6-15/5 FIO-052 DRAINAGE AND UNWATERING PUMP -
REPLACEMENT - ELECTRICAL -
INSTALL PLAN-ERECTION BAY EL 522
DOCUMENT 00 01 15.00 28 - Page 17
LGD-1-6-15/1 FIO-053 DRAINAGE AND UNWATERING PUMP -
REPLACEMENT - ELECTRICAL -
COMMUNICATION - BLOCK DIAGRAM
LGD-1.1-6-1D FIO-054 POWERHOUSE - ONE LINE DIAGRAM -
CQ01, CQ02, FCQ1 & FCQ2
LGD-1.1-6-1A FIO-055 POWERHOUSE - 480 VOLT CONTROL
CENTERS - CQ01, CQ02, CQ04 & CQ05
LGD-1.1-6-1D FIO-056 POWERHOUSE - EQUIPMENT
INSTALLATION - ERECTION BAY - EL
-- End of Document --
DOCUMENT 00 01 15.00 28 - Page 18
SECTION TABLE OF CONTENTS
DIVISION 13 - SPECIAL CONSTRUCTION
SECTION 13 48 00.01 28
SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT (V1)
PART 1 GENERAL
1.1 SCOPE OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DESIGN STANDARDS
1.4.1 General Requirements
1.4.2 Code Requirements for Equipment Restraint
1.4.3 Code Requirements for Systems Restraint
1.5 EQUIPMENT
1.6 SYSTEMS
1.7 DEFINITIONS
PART 2 PRODUCTS
2.1 CONCRETE ANCHORS
2.1.1 Undercut Anchors
2.1.2 Electrical Equipment and Pump Base Anchors
PART 3 EXECUTION
3.1 SEISMIC SWAY BRACING
3.1.1 Sway Bracing Design Requirements
3.1.2 Sway Bracing Required for Systems
3.1.3 Sway Bracing Layout
3.1.3.1 General
3.1.3.2 Transverse Braces
3.1.3.3 Longitudinal or Four-Way Braces
3.1.4 Seismic Isolation for Piping Systems
3.2 MONOLITH EXPANSION JOINTS
3.3 SPREADERS
3.4 CONCRETE ANCHORS
3.4.1 Limitations on Allowable Fasteners to Concrete
3.4.2 General Requirements for Fasteners to Concrete
3.4.3 Floor Mounted Equipment
3.4.4 Suspended Systems
3.4.5 Wall Mounted Systems
3.4.6 Wall Mounted and Suspended Equipment
3.5 QUALITY CONTROL
3.5.1 Contractor Installation Qualification
3.5.2 Concrete Anchor Testing
3.5.2.1 General
3.5.2.2 Torque Wrench Testing
3.5.2.3 Direct Pull Testing
-- End of Section Table of Contents --
SECTION 13 48 00.01 28 - Page 1
SECTION 13 48 00.01 28
SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT (V1)
PART 1 GENERAL
1.1 SCOPE OF WORK
The work covered in this section consists of furnishing all labor, equipment and materials to select, design, and provide seismic restraints for new systems and equipment provided as part of work performed.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 318 (2014; Errata 1-2 2014; Errata 3-4 2015) Building Code Requirements for Structural Concrete and Commentary
ACI 355.2 (2007) Qualification of Post-Installed Mechanical Anchors in Concrete and Commentary
ACI 355.4 (2011) Qualification of Post-Installed Adhesive Anchors in Concrete and Commentary
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-10 (2010; Change 2010; Change 2011) Minimum Design Loads for Buildings and Other Structures
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 693 (2005) Recommended Practice for Seismic Design of Substations
IEEE Std 628 (2001; R2006) IEEE Standard Criteria for the Design, Installation, and Qualification of Raceway Systems for Class 1E Circuits for Nuclear Power Generating Stations
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. When used, a designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
SECTION 13 48 00.01 28 - Page 2
Grout Foundation; G, ST
SD-02 Shop Drawings
Submit within 90 calendar days of Contract Award, detail drawings along with catalog cuts, templates, anchorage system including mechanical specifications of anchor bolts, erection and installation details for the items listed. Submittals shall be complete in detail; shall indicate thickness, type, grade, class of metal, and dimensions; and shall show construction details, anchorage, and installation. The submittals shall also show the ½" gap required between the Drainage and Unwatering pumps seismic brace and the suction bell. All drawings shall be stamped by the Professional Engineer (PE) who performs and stamps the calculations required above.
Equipment Detail Drawings; G, ST
Systems Detail Drawings; G, ST
SD-03 Product Data
Concrete Anchors; G, ST
SD-05 Design Data
Submit within 90 calendar days of Contract Award, structural design calculations performed by qualified civil or structural engineers who are presently registered professional engineers (PE). The calculations shall verify the capability of the seismic restraints and of structural members to which seismic restraint are attached for carrying the design load. The design shall include seismic anchorage design and details. All calculations shall be stamped and signed by a PE.
Structural Design Calculations for Seismic Restraints of Equipment;
G, ST
Structural Design Calculations for Seismic Restraints of Systems;
G, ST
SD-06 Test Reports
Concrete Anchor Test Reports; G, ST
Contractor Qualification Testing; G, ST
1.4 DESIGN STANDARDS
1.4.1 General Requirements
The requirements for seismic protection measures described in this section shall be applied to the equipment and systems below. Resistance to lateral forces induced by earthquakes shall be accomplished without consideration of friction resulting from gravity loads. Existing concrete strength shall be taken as f'c = 3,000 psi.
SECTION 13 48 00.01 28 - Page 3
1.4.2 Code Requirements for Equipment Restraint
Seismic design for equipment restraint shall be in accordance with Chapter 13, "Seismic Design Requirements for Nonstructural Components," of ASCE 7-10 with the seismic design force computed as per Section 13.3 "Seismic Demands on Nonstructural Components". Electrical equipment restraint shall designed in accordance with the provisions in IEEE 693 Annex D, or Section 1621 of ASCE 7-10 whichever produces the more adverse seismic effects.
For ASCE 7-10, use Seismic Risk Category III, spectral acceleration SDS = 0.170, IP = 1.25, and z=h=1. For IEEE 693, the seismic qualification level shall be high.
1.4.3 Code Requirements for Systems Restraint
Seismic design for systems restraint shall be in accordance with Chapter 13, "Seismic Design Requirements for Nonstructural Components," of ASCE 7-10 with the seismic design force computed as per Section 13.3 "Seismic Demands on Nonstructural Components". For ASCE 7-10, use Seismic Risk Category III, spectral acceleration SDS = 0.170, IP = 1.25, and z=h=1. Restraint of electrical systems shall conform to the requirements of IEEE Std 628.
1.5 EQUIPMENT
Submit structural design calculations for seismic restraints, grout foundation and detail drawings for the following equipment provided under this contract. The calculations and detail drawings shall be developed by the Contractor in accordance with the requirements of this specification and submitted under the titles listed below:
(a) Two pump motors for drainage pump and two pump motors for unwatering pump.
(b) One Motor Control Cabinet for 4160V
Structural Design Calculations for Seismic Restraints of Equipment
Equipment Detail Drawings.
1.6 SYSTEMS
Submit Structural Design Calculations for Seismic Restraints of Systems and Systems Detail Drawings for the following new systems provided under this contract. The calculations and detail drawings shall be developed by the Contractor in accordance with the requirements of this specification:
(a) Piping
(b) Conduit
(c) Cable Trays
1.7 DEFINITIONS
Sway Brace. An assembly intended to be attached to piping, conduit, bus, or raceways to resist horizontal earthquake loads.
Four-Way Brace. A sway brace intended to resist differential movement in all horizontal directions.
Lateral Brace. A sway brace intended to resist differential movement
SECTION 13 48 00.01 28 - Page 4 perpendicular to the axis of piping, conduit, bus, or raceways.
Longitudinal Brace. A sway brace intended to resist differential movement parallel to the axis of piping, conduit, bus, or raceways.
Undercut anchor. Undercut concrete anchors are bearing-type anchors designed to be installed in cured concrete in a hole with a conical undercut near its blind end.
Expansive anchor. Expansive concrete anchors are designed to be installed in cured concrete in a straight hole. Anchorage relies on an torque-controlled expansion wedge and the friction developed between the drilled hole and the expanded wedge.
Adhesive anchor. Adhesive concrete anchors are designed to be installed in cured concrete in a straight hole drilled with a roto-impact drill. Anchorage relies on a chemical adhesive bond to the threaded rod and to the concrete.
Monolith Expansion Joint. Expansion /contraction joint separating two adjacent, structurally independent monoliths.
PART 2 PRODUCTS
2.1 CONCRETE ANCHORS
This paragraph covers anchors used for electrical equipment, pump bases and seismic braces. Submit manufacturer's product data within 90 calendar days after receiving the Contract Award according to the submittal titles below. Each submittal shall include all types of anchors used and identify which anchors apply to which features of work. Manufacturer's product data shall include but is not limited to detail drawings showing dimensions, material data, allowable loads and detailed for manufactures printed installation instructions, anchor test data in accordance with ACI 355.2
AND ACI 355.4.
Installation of anchors shall be in accordance with the manufacturer's instructions. Anchor diameters and lengths shall be the larger of the indicated diameters and lengths or the manufacturer's standard diameters and lengths. Total lengths of anchors shall be as necessary so that at least 1/8", but not more than 1/4", of threaded rod extends past the nut when final installation is complete. Reinforcing steel or other embedded metals may be encountered when drilling for installation of the anchors.
Submit the product data of the anchorage to be installed.
2.1.1 Undercut Anchors
Anchors for the seismic braces shall meet the requirements of ACI 355.2 and be 300 series stainless steel with diameters as shown on contract drawings. These anchors shall conform to the following:
Ultimate Strength - 116,000 psi minimum Yield Strength - 92,800 psi minimum Allowable Tensile Load - 17,500 lbs minimum
2.1.2 Electrical Equipment and Pump Base Anchors
Anchors for electrical equipment and pump bases may be grouted in place or
SECTION 13 48 00.01 28 - Page 5 secured by an adhesive epoxy to the concrete pump bases. If grouted in place the grout shall be a two component material consisting of a polyester or vinylester resin and a hardener contained in a capsule. The grout shall be non soluble in water.
PART 3 EXECUTION
3.1 SEISMIC SWAY BRACING
3.1.1 Sway Bracing Design Requirements
Sway bracing conforming with the requirements of these specifications shall be designed and provided for both mechanical and electrical systems.
Seismic forces shall be applied both in lateral and vertical directions.
Design of sway braces shall be based on the water filled weight of pipe combined with the seismic forces. Design of sway braces for electrical conduit or raceways shall be based on the design weight of the completely filled conduit or raceway.
3.1.2 Sway Bracing Required for Systems
Sway bracing shall be provided for all suspended systems with the following exceptions. Sway bracing shall be provided for all piping greater than 2 1/2 inch diameter, or for piping larger than 1 inch diameter in boiler rooms or for gas piping, or for all pipe diameters if the piping is used as part of a fire protection system. Sway bracing shall be provided for all conduit larger than 2 1/2 inches in diameter. Sway bracing shall be provided at junctions, and at horizontal or vertical transitions for electrical service raceways and bus ducts. Sway bracing is not required for piping suspended by individual hangers 12 inches or less in length from the top of the pipe to the bottom of the structure the piping is attached to.
3.1.3 Sway Bracing Layout
3.1.3.1 General
Sway bracing shall consist of transverse, longitudinal, and 4-way braces.
Piping shall be designed such that sway bracing attachment and configuration does not interfere with thermal expansion of the piping.
3.1.3.2 Transverse Braces
Transverse sway braces for piping and conduit shall be provided at every fourth hanger for diameter sizes 1/4 through 2 1/2 inches and at every third hanger for pipe diameter sizes 3 inch through 8 inch. Transverse sway braces shall be provided for bus ducts and electrical raceways at vertical or horizontal transitions. Vertical systems shall be braced at not more than 20 foot intervals and the bracing shall be located above the center of gravity of the item being braced.
3.1.3.3 Longitudinal or Four-Way Braces
Longitudinal braces or four-way braces shall be provided at least once per monolith. Longitudinal or four-way braces shall be provided at least once per straight length of piping or conduit that is greater than 10 feet in length. Four-way sway braces shall be provided for bus ducts and electrical raceways at junctions.
SECTION 13 48 00.01 28 - Page 6
3.1.4 Seismic Isolation for Piping Systems
Spreaders or rack type hangers shall be provided between adjacent piping runs to prevent contact during seismic activity whenever pipe surfaces are less than 4 inches apart and shall be provided at the same interval as sway bracing at an equal distance between sway braces.
3.2 MONOLITH EXPANSION JOINTS
Equipment shall not be rigidly attached on each side of a monolith expansion joint. For systems which are rigidly attached on each side of a monolith expansion joint, flexible connections or system configurations that are capable of accommodating displacements equal to twice the full width of the joint in both orthogonal directions or a minimum of 2 inches in both orthogonal directions shall be provided. A individual seismic sway brace shall not be attached to the structure on each side of a monolith joint.
3.3 SPREADERS
Spreaders shall be provided between adjacent piping runs to prevent contact during seismic activity whenever pipe or insulated pipe surfaces are less than 4 inches apart. Spreaders shall be applied at same interval as sway braces at an equal distance between the sway braces. If rack type hangers are used where the pipes are restrained from contact by mounting to the rack, spreaders are not required for pipes mounted in the rack.
3.4 CONCRETE ANCHORS
3.4.1 Limitations on Allowable Fasteners to Concrete
Powder actuated fasteners, screw or coil type anchors shall not be utilized to secure equipment or systems to the powerhouse. Expansive drop-in threaded insert type anchors shall not be used to suspend equipment or systems from the powerhouse. Expansion anchors shall not be used to resist vibratory loads due to rotating machinery. Chemically bonded adhesive anchors shall not be used to resist pull-out in overhead and wall installations if the adhesive is manufactured with temperature sensitive epoxies and the location is susceptible to effects of a building fire or if the adhesive is unsuited to static tension load application. Chemically bonded adhesive anchors for use in low temperature or under-water applications shall have product data indicating suitability for use and pass on-site installation test(s) under anticipated environmental conditions.
3.4.2 General Requirements for Fasteners to Concrete
Anchors shall be at least 1/2 inch in diameter unless otherwise indicated in the plans or this specification section. cast-in anchors shall have an embedded depth equal to at least 12 times nominal diameter of the bolt.
Expansive or undercut anchors shall have a minimum embedded depth of at least 4 inches. Anchor capacity shall computed as per ACI 318 and the anchor capacity shall be reduced to account for the effect of spacing between anchor bolts and the distance between anchor bolt and the nearest concrete edge. Anchor test data in accordance with ACI 355.2 and ACI 355.4 Evaluation Reports shall be provided for each type and class of concrete anchor verifying the suitability of an anchor for the intended application. Install anchors per manufactures' printed installation instructions.
SECTION 13 48 00.01 28 - Page 7
3.4.3 Floor Mounted Equipment
Floor mounted equipment shall be anchored to concrete that is reinforced and integrally connected to the reinforced concrete structure.
Intermittent tension developed due to laterally applied seismic force of 500 pounds or less may be resisted with expansive concrete anchors capable of resisting dynamic loading in cracked and un-cracked concrete unless otherwise indicated on the drawings. Intermittent tension developed due to laterally applied seismic force greater than 500 pounds shall be resisted with undercut concrete anchors.
3.4.4 Suspended Systems
All sway brace assemblies including the vertical support component(s) shall be secured to the concrete with undercut anchors. Expansive concrete anchors capable of resisting dynamic loading in cracked and un-cracked concrete may only be used to secure hangers at locations without sway bracing. Suspended piping or conduit may be secured with 3/8 inch minimum diameter anchors for pipe and conduit nominal diameters of 3/8 inch through 2-inch to allow compatibility with piping requirements for threaded rod used as hangers. For systems not required to have sway bracing, the system shall be secured a minimum of every 40 feet with undercut anchors.
3.4.5 Wall Mounted Systems
Wall mounted systems shall be secured undercut anchor(s) at least once every 40 feet and when direct tension above 500 pounds develops due to gravity loads or laterally applied seismic force. Wall mounted systems may be secured with expansive anchors capable of resisting dynamic loading in cracked and un-cracked concrete at other locations.
3.4.6 Wall Mounted and Suspended Equipment
Wall mounted and suspended equipment shall be secured with undercut anchors if the equipment weighs 50 pounds and above.
3.5 QUALITY CONTROL
3.5.1 Contractor Installation Qualification
Concrete anchors shall only be installed by individuals qualified to install the type and class of concrete anchors indicated in the Contractor's approved shop drawings. The individual shall be qualified by installing an anchor as per manufacturer's instructions in the position indicated on the drawings and then having that anchor tested by Contractor personnel as per this specification and manufacturer's recommendations. The location where Contractor Qualification Testing is performed may be in the exact location shown on the shop drawings or in another location on-site as approved by the Contrating Officer. Any anchors installed as part of the testing and not used shall be removed and the hole repaired with non-shrink grout. Contractor shall provide written notice of Contractor Qualification Testing 10 days prior to performing the testing. Contractor Qualification Testing shall be witnessed by the Contracting Officer. Submit testing results within 10 days of completion of any on-site testing performed
SECTION 13 48 00.01 28 - Page 8
3.5.2 Concrete Anchor Testing
3.5.2.1 General
The Contractor shall test expansion, undercut, and chemically bonded anchors in place after installation at no further cost to the government.
The tests shall be conducted by an independent testing agency; testing shall be performed on anchor bolts as described below. Concrete Anchor Test Reports shall be submitted within 10 days of the completion of any on-site testing performed. At least one anchor of each type and class of anchor shall be tested. Testing shall be done on not less than 10 percent of the total installed anchors and at least one anchor for every piece of equipment containing more than two anchors. The test load shall correspond to the manufacturer's allowable load.
3.5.2.2 Torque Wrench Testing
Torque wrench testing shall only be performed if recommended by the anchor manufacturer. Torque wrenches shall be calibrated at the beginning the job. The applied torque shall be between 20 and 80 percent of wrench capacity. If any anchor fails the test, similar anchors not previously tested shall be tested until 10 consecutive anchors pass. Failed anchors shall be retightened and retested to the specified torque; if the anchor still fails the test, it shall be replaced and retested.
3.5.2.3 Direct Pull Testing
Chemically bonded anchors shall be tested by applying a pullout load using a hydraulic ram attached to the anchor bolt. Other types of anchors may also be tested by direct pull testing as recommended by the anchor manufacturer. The load shall be applied to the anchor without removing the nut; when that is not possible, the nut shall be removed and a threaded coupler shall be installed of the same tightness as the original nut. The test setup shall be checked to verify that the anchor is not restrained from withdrawing by the base plate, the test fixture, or any other fixtures. The support for the testing apparatus shall be at least 1.5 times the embedment length away from the bolt being tested. Each tested anchor shall be loaded to the allowable tension value for the anchor. The anchor shall have no observable movement at the test load. Anchors shall not spin in the hole. If any anchor fails the test, similar anchors not previously tested shall be tested until 100 percent pass. Failed anchors shall be retightened and retested to the specified load; if the anchor still fails the test, it shall be replaced and retested.
-- End of Section --
SECTION 13 48 00.01 28 - Page 9
K
MR
| Amend-0001_Plans.pdf |
| LG445697MD101--- |
| LG445697MD102--- |
| LG445697M-101--- |
| LG445697M-102--- |
| Amend-0001_Section 00 01 15.00 28.pdf |
| PROJECT TABLE OF CONTENTS |
| DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS |
| 00 01 15.00 28 - LIST OF DRAWINGS |
| LIST OF DRAWINGS |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 CONTRACT DRAWINGS Volume 1 |
| 1.2.1 Use Of Government Prepared Contract CAD Electronic Files |
| 1.3 FOR INFORMATION ONLY DRAWINGS FIO Volume 1 |
| 1.4 CONTRACT DRAWINGS Volume 2 |
| 1.4.1 Use Of Government Prepared Contract CAD Electronic Files |
1.5 FOR INFORMATION ONLY DRAWINGS FIO Volume 2
| DIVISION 13 - SPECIAL CONSTRUCTION |
| 13 48 00.01 28 - SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT V1 |
| SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT V1 |
| PART 1 GENERAL |
| 1.1 SCOPE OF WORK |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 DESIGN STANDARDS |
| 1.4.1 General Requirements |
| 1.4.2 Code Requirements for Equipment Restraint |
| 1.4.3 Code Requirements for Systems Restraint |
| 1.5 EQUIPMENT |
| 1.6 SYSTEMS |
| 1.7 DEFINITIONS |
| PART 2 PRODUCTS |
| 2.1 CONCRETE ANCHORS |
| 2.1.1 Undercut Anchors |
This is the start of the file's text. The full file is on GovTribe.