18B0020_TechSpec.pdf

PDF 3 MB Posted

Attached to
Multiple Dam Site Locations Waterstop Repair Federal contract opportunity
Solicitation number
W912EF18B0020
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Technical Specification W912EF18B0020 Multiple Dam Waterstop Repairs

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Dam Site Locations Waterstop Repair, newest first.
File Type Posted
BID_Opening_Results_18-B-0020.pdf PDF
W912EF18B0020_Amend_0005.pdf PDF
W912EF18B0020_Amend_0004.pdf PDF
Amend_0003_W912EF18R0020.pdf PDF
W912EF18B0020_Amendment_0002.pdf PDF
W912EF18B0020_Amendment_0001.pdf PDF
18B0020_Plans.pdf PDF
Solicitation_18B0020-Multiple_Dam_Waterstop_Repairs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mul t i pl e Dam Si t e Locat i ons Wat er st op Repai r W912EF18B0020

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15. 00 28 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00. 00 28 GENERAL REQUI REMENTS

01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS

01 14 00. 10 28 PROJECT SI TE RESTRI CTI ONS

01 14 00. 90 28 I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY

(OPSEC)

01 22 00. 00 28 MEASUREMENT AND PAYMENT

01 33 00 SUBMI TTAL PROCEDURES

01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL

01 51 00. 00 28 TEMPORARY UTI LI TI ES

01 55 10. 00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20. 00 28 ENVI RONMENTAL PROTECTI ON

01 78 00. 00 28 CLOSEOUT SUBMI TTALS

DI VI SI ON 03 - CONCRETE

03 15 20. 00 28 REPLACEMENT WATERSTOPS

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

This page intentionally left blank

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

1. 2 CONTRACT DRAWI NGS

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

1. 3 FOR I NFORMATI ON ONLY DRAWI NGS ( FI O)

- - End of Sect i on Tabl e of Cont ent s - -

DOCUMENT 00 01 15. 00 28

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

FI LE NUMBER SHEET

NUMBER

DESCRIPTION Revision Number

Date

GENERAL

MP-WS-1/1 G-001 COVER SHEET AND LOCATI ON MAPS

MP-WS-1/2 G-002 I NDEX TO DRAWI NGS

MP-WS-1/3 G-101 MCNARY LOCK AND DAM - GENERAL PLAN -

WATERSTOP REPAI RS

MP-WS-1/4 G-102 I CE HARBOR LOCK AND DAM - GENERAL PLAN -

WATERSTOP REPAI RS

MP-WS-1/5 G-103 LOWER MONUMENTAL LOCK AND DAM - GENERAL PLAN

- WATERSTOP REPAI RS

MP-WS-1/6 G-104 LI TTLE GOOSE LOCK AND DAM - GENERAL PLAN -

WATERSTOP REPAI RS

MP-WS-1/7 G-105 LOWER GRANI TE LOCK AND DAM - GENERAL PLAN -

WATERSTOP REPAI RS

MP-WS-1/8 G-106 DWORSHAK DAM AND RESERVOI R - GENERAL PLAN -

WATERSTOP REPAI RS

CIVIL

MP-WS-1/9 C-301 EXAMPLE POWERHOUSE AND NAVI GATI ON LOCK -

SECTIONS

MP-WS-1/10 C-302 EXAMPLE DWORSHAK SECTI ON, - DRI LL HOLE

DETAI LS, - AND ANTI CI PATED DEPTHS

MP-WS-1/11 C-501 DRI LL HOLE DETAI LS AND - RECTANGULAR

WATERSTOP SEALS

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

a. Cont r act CAD dr awi ng f i l es r equest s by t he Cont r act or wi l l be gr ant ed onl y when t he Cont r act or i s pl anni ng t o use t he el ect r oni c CAD f i l es f or cr eat i ng shop dr awi ngs.

b. No For I nf or mat i on Onl y dr awi ngs ar e avai l abl e on CAD.

c. The Cont r act or assumes al l r i sks associ at ed i n usi ng el ect r oni c CAD drawings.

d. El ect r oni c copi es of CAD dr awi ngs ar e onl y avai l abl e i n Bent l ey Mi cr oSt at i on f or mat .

e. The cont r act dr awi ngs shal l gover n i f t her e ar e any di scr epanci es bet ween t he el ect r oni c copy and t he cont r act dr awi ng. The Cont r act or shal l pr ompt l y not i f y t he Cont r act i ng Of f i cer of any di scr epanci es.

The Gover nment wi l l not be r esponsi bl e t o cor r ect t he el ect r oni c CAD drawing.

1. 3 FOR I NFORMATI ON ONLY DRAWI NGS ( FI O)

These FI O dr awi ngs ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on. The Gover nment does not war r ant t he accur acy of t he FI O dr awi ngs. The Gover nment r ecommends t hat t he Cont r act or ver i f y t he accur acy of FI O drawings.

FI O dr awi ngs ar e as f ol l ows:

FI LE NUMBER SHEET

NUMBER

DESCRIPTION Revision Number

Date

MDP-1-2-0/14 FIO-001 MCNARY LOCK AND DAM - POWERHOUSE -

PLANS AND ELEVATI ONS

MDP-2.1-4-0/357 FIO-002 MCNARY LOCK AND DAM - POWERHOUSE

CONCRETE OUTLI NE - TRANSVERSE SECTI ON

UNI TS 1- 8

MDP-1.3-4-0/50 FIO-003 MCNARY LOCK AND DAM - POWERHOUSE

CONCRETE OUTLI NE - TRANSVERSE SECTI ON

UNI TS 9- 14

MDN-2-0-0/2 FIO-004 MCNARY LOCK AND DAM - NAVI GATI ON LOCK -

GENERAL MASONRY PLAN

MDN-1-4-1/1 FIO-005 MCNARY LOCK AND DAM - NAVI GATI ON LOCK

PLAN - MONOLI THS 1 TO 13

IHP-1.1-4-0/1 FIO-006 I CE HARBOR LOCK AND DAM - POWERHOUSE -

GENERAL PLAN

IHP-6-0-0/13 FIO-007 I CE HARBOR LOCK AND DAM - POWERHOUSE -

TRANSVERSE SECTI ON UNI TS 4- 6

FI LE NUMBER SHEET

NUMBER

DESCRIPTION Revision Number

Date

IHN-1-4-1/1 FIO-008 I CE HARBOR LOCK AND DAM - NAVI GATI ON

LOCK - GENERAL MASONRY PLAN

LMP-1.8-0-0/2 FIO-009 I CE HARBOR LOCK AND DAM - POWERHOUSE

STRUCTURE - GENERAL PLAN

LMP-1.8-0-0/3 FIO-010 LOWER MONUMENTAL LOCK AND DAM -

POWERHOUSE STRUCTURE - TRANSVERSE

SECTI ON BAYS 1- 3

LMP-1.8-0-0/11 FIO-011 LOWER MONUMENTAL LOCK AND DAM -

POWERHOUSE - TRANSVERSE SECTI ON BAYS 4- 6

LMN-1-4-1/1 FIO-012 LOWER MONUMENTAL LOCK AND DAM -

NAVI GATI ON LOCK - GENERAL PLANS AND

SECTIONS

LGP-1.9-0-0/2 FIO-013 LI TTLE GOOSE LOCK AND DAM - POWERHOUSE

STRUCTURE - GENERAL PLAN

LGP-1.9-0-0/3 FIO-014 LI TTLE GOOSE LOCK AND DAM - POWERHOUSE

STRUCTURE - TRANSVERSE SECTI ON BAYS 1- 3

LGP-1.9-0-0/11 FIO-015 LI TTLE GOOSE LOCK AND DAM - POWERHOUSE

STRUCTURE - TRANSVERSE SECTI ON BAYS 4- 6

LGN-1-4-1/1 FIO-016 LI TTLE GOOSE LOCK AND DAM - NAVI GATI ON

LOCK - GENERAL PLANS AND SECTI ONS

GDP-1.5-0-0/2 FIO-017 LOWER GRANI TE LOCK AND DAM - POWERHOUSE

STRUCTURE - GENERAL PLAN

GDP-6-0-0/8 FIO-018 LOWER GRANI TE LOCK AND DAM - POWERHOUSE

- GENERATOR BAY TRANSVERSE SECTI ON

GDP-1.5-0-0/11 FIO-019 LOWER GRANI TE LOCK AND DAM - POWERHOUSE

- TRANSVERSE SECTI ON BAYS 4- 6

GDN-1-0-1/2 FIO-020 LOWER GRANI TE LOCK AND DAM - NAVI GATI ON

LOCK - GENERAL PLANS AND SECTI ONS

FI LE NUMBER SHEET

NUMBER

DESCRIPTION Revision Number

Date

DWD-1-0-1/2 FIO-021 DWORSHAK DAM AND RESERVOI R - GENERAL

PLAN

DWD-1-4-2/17 FIO-022 DWORSHAK DAM AND RESERVOI R - CONCRETE

OUTLI NE - MONOLI THS 16- 20 SECTI ONS

DWD-1-4-2/2 FIO-023 DWORSHAK DAM AND RESERVOI R - GENERAL -

ROADWAY DECK AND CRANE RAI L DETAI LS

- - End of Document - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS

CONTRACTS

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS CONTRACTS

I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS

222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:

Feder al Vet er an empl oyment i nf or mat i on at http://www.fedshirevets.gov/index.aspx

Depar t ment of Labor Vet er ans Empl oyment Assi st ance http://www.dol.gov/vets/

Depar t ment of Vet er ans Af f ai r s- VOW t o Hi r e Her oes Act http://benefits.va.gov/vow/

Ar my Wounded War r i or Pr ogr am -http://wtc.army.mil/modules/employers/index.html

U. S. Chamber of Commer ce Foundat i on- Hi r i ng Our Her oes http://www.hiringourheroes.org/

Gui de t o Hi r i ng Vet er ans - Ref er ence Mat er i al http://www.whitehouse.gov/sites/default/files/docs/white_house _business_council_-_guide_to_hiring_veterans_0.pdf

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

1. 4 DEFI NI TI ONS

1. 5 PROJECT SCHEDULE

1. 6 REGULAR CLEANUP AND DEBRI S DI SPOSAL

1. 7 EQUI PMENT LI ST

1. 8 TESTI NG OF EQUI PMENT

1. 9 DI SPOSI TI ON OF REMOVED EQUI PMENT

1. 10 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

1. 11 PRE- WORK AND POST WORK SURVEYS

1. 12 FI RE CONTROL

1. 13 PROJECT SUPERI NTENDENT

1. 14 KEY PERSONNEL SUBSTI TUTI ON

1. 15 POST AWARD MEETI NGS

1. 15. 1 Pr e- Wor k Meet i ng

1. 15. 2 Pr e- Const r uct i on Meet i ng

1. 15. 2. 1 Mi nut es

1. 15. 2. 2 Demobi l i z i ng And Remobi l i z i ng

1. 16 WEEKLY PRODUCTI ON MEETI NGS

1. 16. 1 Mi nut es

1. 17 ADDI TI ONAL MEETI NGS

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

ATTACHMENTS:

Weekl y Meet i ng Agenda

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

Compl y wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. Desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t i n accor dance wi t h SECTI ON

01 33 00 SUBMI TTAL PROCEDURES:

SUBMI T THE FOLLOWI NG AS SPECI FI ED FOR EACH I NDI VI DUAL TASK ORDER.

SD- 01 Pr econst r uct i on Submi t t al s

Pr oj ect Schedul e; G, C

Equi pment Li st ; I C

Pr e- Wor k Sur vey Phot os And Repor t ; I C

Pr oj ect Super i nt endent ; I C

SD- 07 Cer t i f i cat es

Key Per sonnel Subst i t ut i on; G C

SD- 11 Cl oseout Submi t t al s

Post - Wor k Sur vey Phot os And Repor t ; I C

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

Fi el d ver i f y al l el evat i ons, di mensi ons, and coor di nat es of exi st i ng f eat ur es i ndi cat ed on t he cont r act dr awi ngs t hat af f ect new const r uct i on.

Any devi at i ons shal l be updat ed as per SECTI ON 01 78 00. 00 28, CLOSEOUT

SUBMI TTALS, par agr aph MAI NTAI N WORKI NG AS- BUI LT CONTRACT DRAWI NGS AND FI O

DRAWINGS.

1. 4 DEFINITIONS

a. Qual i f i ed Per son.

As def i ned i n EM 385- 1- 1; " DEFI NI TI ONS" , unl ess ot her wi se specified.

b. F. O. B.

An abbr evi at i on f or f r ee on boar d, whi ch means t hat a vendor or consi gnor wi l l del i ver goods on a r ai l r oad car , t r uck, vessel , or ot her conveyance wi t hout any expense t o t he pur chaser or consi gnee.

1. 5 PROJECT SCHEDULE

a. Fur ni sh a schedul e i n accor dance wi t h Cl ause 52. 236- 15 Schedul es f or Const r uct i on Cont r act s wi t hi n 15 days af t er r ecei pt of Not i ce t o Pr oceed f or each i ndi v i dual Task Or der .

b. Emai l an el ect r oni c copy of t he schedul e, i n t he or i gi nal f or mat t he schedul e was devel oped i n ( e. g. . xer , . x l s. , . mpp, et c. ) , t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) . See SECTI ON 01 33 00 SUBMI TTAL PROCEDURES par agr aph " El ect r oni c Copi es" f or emai l addr ess.

1. 6 REGULAR CLEANUP AND DEBRI S DI SPOSAL

Wi t h t he except i on of mat er i al s speci f i cal l y i ndi cat ed or speci f i ed t o be sal vaged f or r euse i n const r uct i on, or t ur ned over t o t he Gover nment , al l wast es and demol i shed mat er i al s shal l become t he pr oper t y of t he Cont r act or and shal l be r emoved f r om t he j ob s i t e dai l y i n accor dance wi t h Feder al , St at e, and l ocal r egul at i ons. The Cont r act or shal l f ur ni sh wast e cont ai ner s. Al l smal l wast e cont ai ner s pr ovi ded by t he cont r act or shal l be empt i ed dai l y, l ar ge bi n cont ai ner s shal l be empt i ed when f ul l or once a week.

1. 7 EQUI PMENT LI ST

Fur ni sh a compl et e l i s t of al l equi pment t o be used on t he Pr oj ect 30 days pr i or t o commencement of on- si t e wor k. Submi t a r evi sed l i s t i n t he event of change of equi pment . Li st s shal l i ncl ude r ent ed equi pment as wel l as l ease- pur chase or sal e- l easeback equi pment . The i ni t i al l i s t and t he r evi sed l i s t s shal l i ndi cat e dat es equi pment i s assi gned t o or r emoved f r om t he Pr oj ect and adequat e i dent i f i cat i on or descr i pt i on of each i t em of equi pment i ncl udi ng manuf act ur er ' s name ( abbr evi at ed) , model number , manuf act ur er ' s ser i al number , year of manuf act ur e, and Cont r act or ' s assi gned ser i al or r ecor d number .

1. 8 TESTI NG OF EQUI PMENT

Bef or e any machi ner y or mechani zed equi pment i s put t o use on t he j ob, i t shal l be i nspect ed and t est ed by a qual i f i ed per son and det er mi ned t o be i n saf e oper at i ng condi t i on. Cr anes or der r i cks shal l be t est ed by t he Cont r act or or a qual i f i ed t est i ng agency i n accor dance wi t h EM 385- 1- 1.

Equi pment shal l be l ar ge enough t o saf el y handl e pr oposed pi cks or t asks wi t hout exceedi ng t he cr ane r at i ng est abl i shed by t hese t est s.

1. 9 DI SPOSI TI ON OF REMOVED EQUI PMENT

Unl ess ot her wi se speci f i ed i n ot her sect i ons of t he speci f i cat i ons, al l exi st i ng equi pment r emoved and not r ei nst al l ed shal l become t he pr oper t y of t he Cont r act or , r emoved f r om t he Pr oj ect s i t e, and di sposed of i n a l egal manner . Mat er i al s t hat cannot be r emoved dai l y may be t empor ar i l y st or ed on- si t e at an appr oved ar ea. Sal vaged mat er i al s shal l not be sol d on t he pr oj ect s i t e.

1. 10 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

Ref er ence FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s ( Apr 1984) .

1. 11 PRE- WORK AND POST WORK SURVEYS

Conduct a pr e- wor k sur vey pr i or t o st ar t of on- si t e wor k and a post-work survey dur i ng pr oj ect c l oseout , wi t h t he Cont r act i ng Of f i cer Repr esent at i ve, of t he Gover nment f aci l i t i es at t he wor k ar eas. The r esul t s of t he sur veys shal l be document ed by di gi t al phot ogr aphs and descr i pt i ve nar r at i ve r epor t s. A col or copy of t he sur vey phot ogr aphs and nar r at i ve r epor t s shal l be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n f i ve ( 5) days af t er sur vey has been compl et ed.

1. 12 FI RE CONTROL

Each pi ece of i nt er nal combust i on engi ne dr i ven equi pment used at t he wor k s i t e shal l be equi pped wi t h a f i r e ext i ngui sher i n accor dance wi t h r ecommendat i on Nat i onal Fi r e Pr ot ect i on Associ at i on ( NFPA) as appr opr i at e.

The mi ni mum appr oved r at i ng of ext i ngui sher s shal l not be l ess t han 5- B: C.

1. 13 PROJECT SUPERI NTENDENT

At al l t i mes dur i ng per f or mance of t hi s cont r act and unt i l t he wor k i s compl et ed and accept ed, assi gn and have on t he wor ksi t e, a compet ent super i nt endent as per FAR Cl ause 52. 236- 6 " Super i nt endence by t he Cont r act or " . Submi t Super i nt endent name and cont act i nf or mat i on pr i or t o st ar t of on- si t e const r uct i on.

1. 14 KEY PERSONNEL SUBSTI TUTI ON

I f t he Cont r act or pl ans on r epl aci ng any Key per sonnel ( Pr oj ect Super i nt endent , CQC Syst em Manager , or CQC st af f Member s) t hey must have t he appr oval of t he Cont r act i ng Of f i cer . Per sonnel shal l possess t he qual i f i cat i ons t hat meet or exceed t hose st at ed i n t hi s cont r act f or t he posi t i on of t he i ndi v i dual t hey ar e r epl aci ng. Submi t qual i f i cat i ons of new per sonnel at l east 15 cal endar days i n advance of dat e of r epl acement .

1. 15 POST AWARD MEETI NGS

1. 15. 1 Pr e- Wor k Meet i ng

Wi t hi n 30 cal endar days af t er r ecei pt of Not i ce t o Pr oceed, at t end a Pr e- Wor k Meet i ng. Seni or Level member s of t he Cont r act or ' s st af f i nvol ved wi t h t hi s cont r act shal l par t i c i pat e i n t hi s meet i ng t o di scuss t he over al l cont r act r equi r ement s. The Gover nment wi l l l ead t hi s meet i ng and t ake t he meet i ng mi nut es.

1. 15. 2 Pr e- Const r uct i on Meet i ng

The Pr oj ect Super i nt endent shal l coor di nat e wi t h t he Cont r act i ng Of f i cer and est abl i sh t he dat e of t he Pr e- Const r uct i on Meet i ng. The meet i ng wi l l be hel d at t he Pr oj ect s i t e at l east one ( 1) week pr i or t o mobi l i z i ng t o t he j ob s i t e. The Pr oj ect Super i nt endent shal l l ead t he Pr e- Const r uct i on Meet i ng di scussi ng t he Cont r act or ' s pl an on execut i ng t he wor k at t he pr oj ect s i t e, schedul e, r equi r ed c l ear ances and t i mef r ame f or t hem, and pl an f or i mpl ement i ng saf et y and qual i t y cont r ol . The Gover nment wi l l have key member s f r om t he Pr oj ect st af f t o di scuss envi r onment al and c l ear ance i ssues. Key member s of t he cont r act or st af f shal l at t end t hi s meet i ng i ncl udi ng t he Qual i t y Cont r ol ( CQC) Syst em Manager , Si t e Saf et y and Heal t h Of f i cer ( SSHO) and any ot her member s det er mi ned by t he Gover nment t o be required.

1. 15. 2. 1 Minutes

The Pr oj ect Super i nt endent shal l be r esponsi bl e f or t aki ng t he meet i ng mi nut es and shal l send t hem el ect r oni cal l y wi t hi n 48 hour s of t he meet i ng t o t he Gover nment ' s Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer .

1. 15. 2. 2 Demobi l i z i ng And Remobi l i z i ng

Anyt i me t he Cont r act or demobi l i zes f r om t he s i t e and r emobi l i zes at a l at er dat e, anot her Pr e- Const r uct i on Meet i ng shal l be hel d and shal l f ol l ow t he r equi r ement s l i s t ed above.

1. 16 WEEKLY PRODUCTI ON MEETI NGS

Dur i ng al l f abr i cat i on and onsi t e const r uct i on wor k, hol d a weekl y pr oduct i on meet i ng t o br i ef t he Gover nment on t he st at us of t he pr oj ect .

a. Use t he at t ached " Weekl y Meet i ng Agenda" and di scuss al l el ement s of t hi s agenda.

b. Pr ovi de a t hr ee ( 3) week ' l ook ahead' .

1. Descr i be al l pl anned const r uct i on act i v i t i es, on- si t e and of f - s i t e over t he next t hr ee ( 3) weeks.

2. ENSURE t hese act i v i t i es al i gn t o t he over al l const r uct i on SCHEDULE speci f i ed i n par agr aph " PROJECT SCHEDULE" of t hi s SECTI ON.

3. RECORD any changes t o t he Pr oj ect Schedul e AND I NCLUDE I N t he next schedul ed updat e.

c. Key member s of t he Cont r act or ' s st af f i ncl udi ng t he Qual i t y Cont r ol Syst em Manager and t he SI TE SAFETY AND HEALTH OFFI CER shal l at t end.

d. The Qual i t y Cont r ol Syst em Manager shal l di scuss al l QC aspect s out l i ned i n SECTI ON 01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL.

e. The Gover nment r eser ves t he r i ght t o r equi r e any per son f r om t he Cont r act or ' s st af f such as t he Pr oj ect Manager , Engi neer , Schedul er or Key Subcont r act or Per sonnel t o at t end t he meet i ng.

f . Submi t each meet i ng agenda t o t he COR 24 hour s pr i or t o t he meet i ng.

1. 16. 1 Minutes

The Cont r act or shal l be r esponsi bl e f or t aki ng t he meet i ng mi nut es and shal l send t hem el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Gover nment ' s Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer .

1. 17 ADDI TI ONAL MEETI NGS

Recor d t he mi nut es of al l meet i ngs, i ncl udi ng al l conf er ence cal l s, t hat occur bet ween t he Cont r act or and Gover nment . Send mi nut es el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Cont r act i ng Of f i cer f or concur r ence.

E- mai l subj ect l i ne shal l i ncl ude pr oj ect name and meet i ng t opi c.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on - -

Weekly Meeting agenda template

Schedule - Work scheduled over the next week Three week look ahead Overall Schedule Review

Submittals Review- Submittal Register Submittals approved by QC Outstanding Submittals RFI’s Letters

Coordination - Clearances required over the next week, include the following:

A description of the work to be performed under the Clearance.

Determine the correct energy isolation points needed to perform the work safely.

Physical barriers, protective grounds, piping blanks, or bulkheads that shall be used, including locations.

Determine the procedure and method of testing for stored energy if applicable.

The date and time the Clearance shall be required.

The estimated length of time the system or equipment shall be out of service and the time to return the system or equipment to service in an emergency.

Coordination issues

Safety- Review of AHA’s for ongoing work Pending AHA’s

Required for new work Status of Gov’t approval

Safety issues

QC -

Preparatory meetings Held over last week- status of meeting minutes

Required over the next week Initial meetings over the next week Follow up over the next week Rework list Review Deficiency tracking log

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 10 28

PROJECT SI TE RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 PROJECT SECURI TY

1. 2. 1 I dent i f i cat i on of Empl oyees

1. 2. 2 Cont r act or Access Badges

1. 2. 3 Vehi c l e Access

1. 2. 4 Del i ver y of Equi pment

1. 3 FACI LI TY OCCUPANCY CLOSURE

1. 4 WORK SCHEDULES

1. 4. 1 Cont r act or ' s Wor k Schedul e

1. 4. 2 Gover nment ' s Wor k Schedul e

1. 5 USE OF WALLA WALLA DI STRI CT PARKS

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

ATTACHMENTS:

Secur i t y Badge For m

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 14 00. 10 28

PROJECT SI TE RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

The Cont r act or shal l be r esponsi bl e f or compl yi ng wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s solicitation.

1. 2 PROJECT SECURI TY

Al l of t he pr oj ect s i t e' s ar e secur ed ar ea' s and access ont o each pr oj ect i s r est r i c t ed. The secur i t y measur es af f ect al l of t he Cont r act or ' s vehi c l es and per sonnel . Ther e wi l l be del ays when ent er i ng Pr oj ect s due t o l ocked gat es, vehi c l e i nspect i ons, and per sonnel checks. I nspect i ons and checks may i ncl ude i nspect i on of t ool boxes, br i ef cases, l unch boxes, and ot her cont ai ner s.

1. 2. 1 I dent i f i cat i on of Empl oyees

a. The Cont r act or shal l be r esponsi bl e f or f ur ni shi ng an i dent i f i cat i on badge/ car d t o each empl oyee pr i or t o t he empl oyee' s wor k on each pr oj ect s i t e ever y t i me a t ask or der i s awar ded, and f or r equi r i ng each empl oyee engaged on t he wor k t o di spl ay i dent i f i cat i on at al l t i mes. Badges shal l i ncl ude phot o i dent i f i cat i on, company name, and t he i ndi v i dual ' s name and company i dent i f i cat i on number as a mi ni mum. Badges shal l be l ami nat ed pl ast i c t ype. Al l pr escr i bed i dent i f i cat i on shal l i mmedi at el y be del i ver ed t o t he Cont r act i ng Of f i cer ( KO) f or cancel l at i on upon t he r el ease of t he empl oyee or pr oj ect compl et i on. I f r equi r ed by t he KO, empl oyees wi l l be phot ogr aphed by t he Gover nment . Empl oyees who f ai l t o submi t t o phot ogr aphi ng wi l l not be al l owed on t he Pr oj ect s i t e.

b. Ever y Cont r act or empl oyee ( pr i me or subcont r act or ) shal l have a har d hat meet i ng t he r equi r ement s of EM 385- 1- 1. Har dhat s shal l di spl ay t he Pr i me Cont r act or name, subcont r act or name, and t he empl oyee' s name. Cont r act or empl oyee har dhat s shal l not be whi t e wi t h r ed mar ki ngs. I t shal l be t he r esponsi bi l i t y of t he Pr oj ect Super i nt endent t o enf or ce t hi s r equi r ement .

1. 2. 2 Cont r act or Access Badges

The Gover nment ( Pr oj ect per sonnel ) wi l l pr ovi de t he Cont r act or ' s per sonnel wi t h access badges as t hey ar r i ve on s i t e. The Cont r act or shal l be r esponsi bl e f or f ur ni shi ng t he Secur i t y Badge For m ( at t ached t o t he end of t hi s SECTI ON) and i ni t i al i dent i f i cat i on ( dr i ver ' s l i cense) f or each empl oyee 5 busi ness days pr i or t o t he empl oyee ar r i v i ng t o wor k on t he Pr oj ect s i t e. Ensur e each empl oyee' s f ul l name wi t h mi ddl e i ni t i al i s i ncl uded wi t h t he i ni t i al i dent i f i cat i on. Al l pr escr i bed access badges shal l i mmedi at el y be del i ver ed t o t he Qual i t y Assur ance Repr esent at i ve f or cancel l at i on upon t he r el ease of t he empl oyee or pr oj ect compl et i on.

1. 2. 3 Vehi c l e Access

Pr oj ect access r oads on bot h s i des of t he dams ar e secur ed wi t h l ocked gat es. Al l vehi c l es t hat pass t hr ough t he l ocked gat es wi l l be subj ect t o bei ng sear ched. No pr i vat el y owned vehi c l es ( POV' s) wi l l be al l owed t hr ough l ocked gat es. Onl y Cont r act or ' s wor k vehi c l es and equi pment t hat ar e essent i al t o t he conduct of t he wor k wi l l be al l owed i n t he wor k ar eas. Al l Cont r act or vehi c l es shal l di spl ay sui t abl e per manent or t empor ar y i dent i f i cat i on.

1. 2. 4 Del i ver y of Equi pment

Cont r act or i s r esponsi bl e f or del i ver y and r ecei pt of al l mat er i al s and equi pment . Gover nment per sonnel wi l l not be avai l abl e t o assi st cont r act or i n t hese act i v i t i es. To t he maxi mum ext ent possi bl e, del i ver i es shal l ar r i ve on t he Sout h s i de of t he r i ver ( access f r om t he Nor t h Shor e i s l i mi t ed) . Del i ver y vehi c l es wi l l be al l owed t o cr oss t he r i ver over t he dam onl y wi t h Gover nment appr oval . Del i ver y vehi c l es not appr oved f or cr ossi ng t he dam, shal l be unl oaded out s i de t he l ocked gat e, equi pment shal l be l oaded ont o Cont r act or ' s vehi c l es, and Cont r act or ' s vehi c l es wi l l t hen be al l owed t o cr oss t he dam t o t he wor k ar ea.

1. 3 FACI LI TY OCCUPANCY CLOSURE

St r eet s, wal ks, and ot her f aci l i t i es occupi ed and used by t he Gover nment shal l not be c l osed or obst r uct ed wi t hout wr i t t en per mi ssi on f r om t he KO.

1. 4 WORK SCHEDULES

1. 4. 1 Cont r act or ' s Wor k Schedul e

At t he Pr e- Wor k Meet i ng, f ur ni sh a schedul e of number of wor ki ng days per week, shi f t s per day, and hour s per shi f t f or cont r act wor k. The Cont r act or shal l f ur ni sh not i f i cat i on of any change of schedul e of r egul ar wor k hour s, over t i me wor k hour s, and shi f t s of wor k cr ews and per sonnel at t he s i t e. Thi s not i f i cat i on shal l be pr ovi ded a mi ni mum of 48 hour s pr i or t o any schedul e change t o al l ow sui t abl e schedul i ng of Gover nment per sonnel and i nspect i on. Except i on t o t hi s r equi r ement may be al l owed i n case of schedul e change due t o emer gency condi t i ons.

1. 4. 2 Gover nment ' s Wor k Schedul e

The mai nt enance cr ews at t he dam wor k f r om 6: 30 a. m. t o 5: 00 p. m. , Monday t hr ough Thur sday. Cr ews and st af f do not wor k on weekends and Feder al hol i days. I f a Feder al hol i day f al l s on a Fr i day, t he cr ews and st af f do not wor k on t he pr eceedi ng Thur sday. A power house oper at or i s at t he s i t e 24 hour s a day, 7 days a week, i ncl udi ng Feder al hol i days but i s not avai l abl e t o assi st t he Cont r act or .

I f t he Cont r act or r equi r es Gover nment suppor t or assi st ance out s i de of nor mal wor k hour s, t he Cont r act or must make a f or mal wr i t t en r equest t o t he KO at l east 72 hour s pr i or t o t he dat e t hat suppor t / assi st ance i s needed.

The Gover nment wi l l r evi ew t hi s r equest , but t her e i s no guar ant ee t hat Gover nment suppor t or assi st ance can be pr ovi ded.

1. 5 USE OF WALLA WALLA DI STRI CT PARKS

Speci al consi der at i on f or t he use of t he Wal l a Wal l a Di st r i c t Campi ng Gr ounds wi l l not be gi ven t o t he Cont r act or i f campi ng at t hese s i t es.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used) - - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 2. 1 Bi ogr aphi cal I nf or mat i on Submi t t al ( HC)

1. 3 ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES

1. 4 DOD FACI LI TY REQUI REMENTS ( COMMON ACCESS CARD NOT REQUI RED)

1. 5 FOR CONTRACTS THAT REQUI RE OPSEC TRAI NI NG

1. 6 EMPLOYEE ESCORT

1. 7 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS. Thi s cont r act does not r equi r e access t o or handl i ng of c l assi f i ed mat er i al .

Thi s cont r act r equi r es access t o secur ed and r est r i c t ed ar eas, sensi t i ve i nf or mat i on, or equi pment . Secur ed ar ea i s consi der ed any l ocat i on wher e on- si t e wor k i s per f or med by Cont r act or empl oyees. The r est r i c t ed ar eas, sensi t i ve i nf or mat i on, or equi pment consi st s of ever yt hi ng i nsi de t he secur i t y f ence at t he pr oj ect .

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY ( DA)

AR 190- 13 ( 2011) The Ar my Physi cal Secur i t y Pr ogr am

Ar my Di r ect i ve 2014- 05 ( 2014) Pol i cy and I mpl ement at i on Pr ocedur es f or Common Access Car d Cr edent i al i ng and I nst al l at i on Access f or Uncl ear ed Cont r act or s

Websi t e f or Depar t ment of t he Ar my Regul at i ons:

http://armypubs.army.mil/

Feder al Acqui s i t i on Regul at i on ( FAR)

FAR 52. 204- 9 ( 2015) Per sonal I dent i t y Ver i f i cat i on of Cont r act or Per sonnel

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. The desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:

SUBMI T THE FOLLOWI NG AS SPECI FI ED FOR EACH I NDI VI DUAL TASK ORDER.

SD- 01 Pr econst r uct i on Submi t t al s

Level 1 OPSEC t r ai ni ng; I , SLE

Pr e- Scr een Candi dat es Usi ng E- Ver i f y Pr ogr am; I , SLE

1. 2. 1 Bi ogr aphi cal I nf or mat i on Submi t t al ( HC)

The f ol l owi ng submi t t al shal l onl y be submi t t ed t o t he addr ess bel ow.

Submi t one har d copy.

Bi ogr aphi cal I nf or mat i on; See par agr aph " ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES" f or det ai l s

Di st r i c t Commander

ATTN: CENWW- EC- C

Wal l a Wal l a Di st r i c t Cor ps of Engi neer s 201 Nor t h Thi r d Avenue Wal l a Wal l a, WA 99362- 1876

1. 3 ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES

Al l cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees, shal l compl y wi t h al l appl i cabl e f aci l i t y access and secur i t y pol i c i es and pr ocedur es. Local f aci l i t y pol i c i es and pr ocedur es shal l be pr ovi ded by a gover nment r epr esent at i ve.

The cont r act or shal l pr ovi de al l i nf or mat i on r equi r ed f or backgr ound checks t o meet f aci l i t y access r equi r ement s. Backgr ound checks wi l l be per f or med by Wal l a Wal l a Di st r i c t Secur i t y Of f i ce. Cont r act or wor kf or ce must compl y wi t h al l per sonal i dent i t y ver i f i cat i on r equi r ement s ( FAR 52. 204- 9, Per sonal I dent i t y Ver i f i cat i on of Cont r act or Per sonnel :

http://www.ecfr.gov/cgi-bin/text-idx?rgn=div8&node=48:2.0.1.1.1.2.1.28 ) as di r ect ed by DOD and/ or l ocal pol i cy.

I n addi t i on t o t he changes ot her wi se aut hor i zed by t he changes c l ause of t hi s cont r act , shoul d t he For ce Pr ot ect i on Condi t i on ( FPCON) at any f aci l i t y change, t he Gover nment may r equi r e changes i n cont r act or secur i t y mat t er s or pr ocesses.

1. 4 DOD FACI LI TY REQUI REMENTS ( COMMON ACCESS CARD NOT REQUI RED)

Cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees, shal l compl y wi t h adj udi cat i on st andar ds and pr ocedur es usi ng t he Nat i onal Cr i me I nf or mat i on Cent er I nt er st at e I dent i f i cat i on I ndex ( NCIC-III ) and Ter r or i st Scr eeni ng Dat abase ( TSDB) ( Ar my Di r ect i ve 2014- 05 / AR 190- 13), appl i cabl e f aci l i t y and ar ea access secur i t y pol i c i es and pr ocedur es ( pr ovi ded by a gover nment r epr esent at i ve, as NCI C and TSDB ar e avai l abl e) .

1. 5 FOR CONTRACTS THAT REQUI RE OPSEC TRAI NI NG

Al l new cont r act or empl oyees, i nc l udi ng al l associ at ed sub- cont r act or empl oyees, wi l l compl et e Level I OPSEC Tr ai ni ng wi t hi n 30 cal endar days of t hei r r epor t i ng f or dut y. Addi t i onal l y, al l empl oyees must compl et e annual OPSEC awar eness t r ai ni ng unt i l pr oj ect compl et i on. The cont r act or shal l submit Level 1 OPSEC t r ai ni ng cer t i f i cat es of compl et i on f or each af f ect ed empl oyee, t o t he COR or t o t he cont r act i ng of f i cer ( i f a COR i s not assi gned) , wi t hi n 5 cal endar days af t er compl et i on of t r ai ni ng.

OPSEC awar eness t r ai ni ng i s avai l abl e at t he f ol l owi ng websi t es:

https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html ; or i t can be pr ovi ded by t he OPSEC Of f i cer i n pr esent at i on f or m whi ch wi l l be document ed v i a memorandum.

1. 6 EMPLOYEE ESCORT

Al l cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees, who ar e not i n possessi on of t he appr opr i at e secur i t y c l ear ance or access pr i v i l eges, wi l l be escor t ed i n sensi t i ve or r est r i c t ed ar eas and/ or ar eas wher e t hey may be exposed t o c l assi f i ed and/ or sensi t i ve materials.

1. 7 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM

The Cont r act or must pr e- scr een Candi dat es usi ng t he E- ver i f y Pr ogr am ( http://www.uscis.gov/e-verify ) websi t e t o meet t he est abl i shed empl oyment el i gi bi l i t y r equi r ement s. The Vendor must ensur e t hat t he Candi dat e has t wo val i d f or ms of Gover nment i ssued i dent i f i cat i on pr i or t o enr ol l ment t o ensur e t he cor r ect i nf or mat i on i s ent er ed i nt o t he E- ver i f y syst em.

An i ni t i al l i s t of ver i f i ed/ el i gi bl e Candi dat es must be pr ovi ded t o t he COR or t o t he cont r act i ng of f i cer ( i f a COR i s not assi gned) , no l at er t han 30 busi ness days af t er r ecei pt of r ecei pt of Not i ce t o Pr oceed.

* When cont r act s ar e wi t h i ndi v i dual s, t he i ndi v i dual s wi l l be r equi r ed t o compl et e a For m I - 9, Empl oyment El i gi bi l i t y Ver i f i cat i on, wi t h t he desi gnat ed Gover nment r epr esent at i ve. Thi s For m wi l l be pr ovi ded t o t he Cont r act i ng Of f i cer and shal l become par t of t he of f i c i al cont r act f i l e.

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 RETAI NAGE OF PAYMENT

1. 2 SCHEDULE A - BASE YEAR 2018 - 2019

1. 2. 1 CLI N 0001 Suppl y Rect angul ar Seal s

1. 2. 2 MCNARY PROJECT

1. 2. 2. 1 CLI N 0002AA Mobi l i zat i on And Demobi l i zat i on ( Sout hsi de Of

Navlock)

1. 2. 2. 2 CLI N 0002AB Dr i l l Hol e Set up ( Sout h s i de Navl ock)

1. 2. 2. 3 CLI N 0002AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cyl i nder s ( Sout h s i de Navl ock)

1. 2. 2. 4 CLI N 0002AD Gr out Voi ds ( Sout h s i de Navl ock)

1. 2. 2. 5 CLI N 0002AE Re- Dr i l l Gr out ( Sout h Si de Navl ock)

1. 2. 2. 6 CLI N 0002AF Mobi l i zat i on And Demobi l i zat i on ( Al l Ot her

Locat i ons at McNar y)

1. 2. 2. 7 CLI N 0002AG Dr i l l Hol e Set up ( Al l Ot her Locat i ons At Mcnar y)

1. 2. 2. 8 CLI N 0002AH Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cyl i nder s ( Al l Ot her Locat i ons at McNar y)

1. 2. 2. 9 CLI N 0002AI Gr out Voi ds ( Al l Ot her Locat i ons At Mcnar y)

1. 2. 2. 10 CLI N 0002AJ Re- Dr i l l Gr out ( Al l Ot her Locat i ons At Mcnar y)

1. 2. 3 I CE HARBOR PROJECT

1. 2. 3. 1 CLI N 0003AA Mobi l i zat i on And Demobi l i zat i on

1. 2. 3. 2 CLI N 0003AB Dr i l l Hol e Set up

1. 2. 3. 3 CLI N 0003AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 2. 3. 4 CLI N 0003AD Gr out Voi ds

1. 2. 3. 5 CLI N 0003AE Re- Dr i l l Gr out

1. 2. 4 LOWER MONUMENTAL PROJECT

1. 2. 4. 1 CLI N 0004AA Mobi l i zat i on And Demobi l i zat i on

1. 2. 4. 2 CLI N 0004AB Dr i l l Hol e Set up

1. 2. 4. 3 CLI N 0004AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 2. 4. 4 CLI N 0004AD Gr out Voi ds

1. 2. 4. 5 CLI N 0004AE Re- Dr i l l Gr out

1. 2. 5 LI TTLE GOOSE PROJECT

1. 2. 5. 1 CLI N 0005AA Mobi l i zat i on And Demobi l i zat i on

1. 2. 5. 2 CLI N 0005AB Dr i l l Hol e Set up

1. 2. 5. 3 CLI N 0005AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 2. 5. 4 CLI N 0005AD Gr out Voi ds

1. 2. 5. 5 CLI N 0005AE Re- Dr i l l Gr out

1. 2. 5. 6 CLI N 0005AF Suppl y and I nst al l 6" Wat er st op Cyl i nder s

1. 2. 6 LOWER GRANI TE PROJECT

1. 2. 6. 1 CLI N 0006AA Mobi l i zat i on And Demobi l i zat i on

1. 2. 6. 2 CLI N 0006AB Dr i l l Hol e Set up

1. 2. 6. 3 CLI N 0006AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

SECTI ON 01 22 00. 00 28

Cylinders

1. 2. 6. 4 CLI N 0006AD Gr out Voi ds

1. 2. 6. 5 CLI N 0006AE Re- Dr i l l Gr out

1. 2. 7 DWORSHAK PROJECT

1. 2. 7. 1 CLI N 0007AA Mobi l i zat i on And Demobi l i zat i on

1. 2. 7. 2 CLI N 0007AB Dr i l l Hol e Set up

1. 2. 7. 3 CLI N 0007AC Dr i l l , Suppl y, and I nst al l 8" Wat er st op

Cylinders

1. 2. 7. 4 CLI N 0007AD Gr out Voi ds

1. 2. 7. 5 CLI N 0007AE Re- Dr i l l Gr out

1. 3 OPTI ONAL SCHEDULE B: 1ST OPTI ON YEAR - 2019 - 2020

1. 3. 1 CLI N 1001 Suppl y Rect angul ar Seal s

1. 3. 2 MCNARY PROJECT

1. 3. 2. 1 CLI N 1002AA Mobi l i zat i on And Demobi l i zat i on ( Sout hsi de Of

Navlock)

1. 3. 2. 2 CLI N 1002AB Dr i l l Hol e Set up ( Sout h s i de Navl ock)

1. 3. 2. 3 CLI N 1002AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cyl i nder s ( Sout h s i de Navl ock)

1. 3. 2. 4 CLI N 1002AD Gr out Voi ds ( Sout h s i de Navl ock)

1. 3. 2. 5 CLI N 1002AE Re- Dr i l l Gr out ( Sout h Si de Navl ock)

1. 3. 2. 6 CLI N 1002AF Mobi l i zat i on And Demobi l i zat i on ( Al l Ot her

Locat i ons at McNar y)

1. 3. 2. 7 CLI N 1002AG Dr i l l Hol e Set up ( Al l Ot her Locat i ons At Mcnar y)

1. 3. 2. 8 CLI N 1002AH Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cyl i nder s ( Al l Ot her Locat i ons at McNar y)

1. 3. 2. 9 CLI N 1002AI Gr out Voi ds ( Al l Ot her Locat i ons At Mcnar y)

1. 3. 2. 10 CLI N 1002AJ Re- Dr i l l Gr out ( Al l Ot her Locat i ons At Mcnar y)

1. 3. 3 I CE HARBOR PROJECT

1. 3. 3. 1 CLI N 1003AA Mobi l i zat i on And Demobi l i zat i on

1. 3. 3. 2 CLI N 1003AB Dr i l l Hol e Set up

1. 3. 3. 3 CLI N 1003AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 3. 3. 4 CLI N 1003AD Gr out Voi ds

1. 3. 3. 5 CLI N 1003AE Re- Dr i l l Gr out

1. 3. 4 LOWER MONUMENTAL PROJECT

1. 3. 4. 1 CLI N 1004AA Mobi l i zat i on And Demobi l i zat i on

1. 3. 4. 2 CLI N 1004AB Dr i l l Hol e Set up

1. 3. 4. 3 CLI N 1004AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 3. 4. 4 CLI N 1004AD Gr out Voi ds

1. 3. 4. 5 CLI N 1004AE Re- Dr i l l Gr out

1. 3. 5 LI TTLE GOOSE PROJECT

1. 3. 5. 1 CLI N 1005AA Mobi l i zat i on And Demobi l i zat i on

1. 3. 5. 2 CLI N 1005AB Dr i l l Hol e Set up

1. 3. 5. 3 CLI N 1005AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 3. 5. 4 CLI N 1005AD Gr out Voi ds

1. 3. 5. 5 CLI N 1005AE Re- Dr i l l Gr out

1. 3. 5. 6 CLI N 1005AF Suppl y and I nst al l 6" Wat er st op Cyl i nder s

1. 3. 6 LOWER GRANI TE PROJECT

1. 3. 6. 1 CLI N 1006AA Mobi l i zat i on And Demobi l i zat i on

1. 3. 6. 2 CLI N 1006AB Dr i l l Hol e Set up

1. 3. 6. 3 CLI N 1006AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 3. 6. 4 CLI N 1006AD Gr out Voi ds

1. 3. 6. 5 CLI N 1006AE Re- Dr i l l Gr out

1. 3. 7 DWORSHAK PROJECT

1. 3. 7. 1 CLI N 1007AA Mobi l i zat i on And Demobi l i zat i on

1. 3. 7. 2 CLI N 1007AB Dr i l l Hol e Set up

1. 3. 7. 3 CLI N 1007AC Dr i l l , Suppl y, and I nst al l 8" Wat er st op Cylinders

1. 3. 7. 4 CLI N 1007AD Gr out Voi ds

1. 3. 7. 5 CLI N 1007AE Re- Dr i l l Gr out

1. 4 OPTI ONAL SCHEDULE C: 2nd OPTI ON YEAR - 2020 - 2021

1. 4. 1 CLI N 2001 Suppl y Rect angul ar Seal s

1. 4. 2 MCNARY PROJECT

1. 4. 2. 1 CLI N 2002AA Mobi l i zat i on And Demobi l i zat i on ( Sout hsi de Of

Navlock)

1. 4. 2. 2 CLI N 2002AB Dr i l l Hol e Set up ( Sout h s i de Navl ock)

1. 4. 2. 3 CLI N 2002AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cyl i nder s ( Sout h s i de Navl ock)

1. 4. 2. 4 CLI N 2002AD Gr out Voi ds ( Sout h s i de Navl ock)

1. 4. 2. 5 CLI N 2002AE Re- Dr i l l Gr out ( Sout h Si de Navl ock)

1. 4. 2. 6 CLI N 2002AF Mobi l i zat i on And Demobi l i zat i on ( Al l Ot her

Locat i ons at McNar y)

1. 4. 2. 7 CLI N 2002AG Dr i l l Hol e Set up ( Al l Ot her Locat i ons At Mcnar y)

1. 4. 2. 8 CLI N 2002AH Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cyl i nder s ( Al l Ot her Locat i ons at McNar y)

1. 4. 2. 9 CLI N 2002AI Gr out Voi ds ( Al l Ot her Locat i ons At Mcnar y)

1. 4. 2. 10 CLI N 2002AJ Re- Dr i l l Gr out ( Al l Ot her Locat i ons At Mcnar y)

1. 4. 3 I CE HARBOR PROJECT

1. 4. 3. 1 CLI N 2003AA Mobi l i zat i on And Demobi l i zat i on

1. 4. 3. 2 CLI N 2003AB Dr i l l Hol e Set up

1. 4. 3. 3 CLI N 2003AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 4. 3. 4 CLI N 2003AD Gr out Voi ds

1. 4. 3. 5 CLI N 2003AE Re- Dr i l l Gr out

1. 4. 4 LOWER MONUMENTAL PROJECT

1. 4. 4. 1 CLI N 2004AA Mobi l i zat i on And Demobi l i zat i on

1. 4. 4. 2 CLI N 2004AB Dr i l l Hol e Set up

1. 4. 4. 3 CLI N 2004AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 4. 4. 4 CLI N 2004AD Gr out Voi ds

1. 4. 4. 5 CLI N 2004AE Re- Dr i l l Gr out

1. 4. 5 LI TTLE GOOSE PROJECT

1. 4. 5. 1 CLI N 2005AA Mobi l i zat i on And Demobi l i zat i on

1. 4. 5. 2 CLI N 2005AB Dr i l l Hol e Set up

1. 4. 5. 3 CLI N 2005AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 4. 5. 4 CLI N 2005AD Gr out Voi ds

1. 4. 5. 5 CLI N 2005AE Re- Dr i l l Gr out

1. 4. 5. 6 CLI N 2005AF Suppl y and I nst al l 6" Wat er st op Cyl i nder s

1. 4. 6 LOWER GRANI TE PROJECT

1. 4. 6. 1 CLI N 2006AA Mobi l i zat i on And Demobi l i zat i on

1. 4. 6. 2 CLI N 2006AB Dr i l l Hol e Set up

1. 4. 6. 3 CLI N 2006AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 4. 6. 4 CLI N 2006AD Gr out Voi ds

1. 4. 6. 5 CLI N 2006AE Re- Dr i l l Gr out

1. 4. 7 DWORSHAK PROJECT

1. 4. 7. 1 CLI N 2007AA Mobi l i zat i on And Demobi l i zat i on

1. 4. 7. 2 CLI N 2007AB Dr i l l Hol e Set up

1. 4. 7. 3 CLI N 2007AC Dr i l l , Suppl y, and I nst al l 8" Wat er st op

Cylinders

1. 4. 7. 4 CLI N 2007AD Gr out Voi ds

1. 4. 7. 5 CLI N 2007AE Re- Dr i l l Gr out

1. 5 OPTI ONAL SCHEDULE D: 3r d OPTI ON YEAR - 2021 - 2022

1. 5. 1 CLI N 3001 Suppl y Rect angul ar Seal s

1. 5. 2 MCNARY PROJECT

1. 5. 2. 1 CLI N 3002AA Mobi l i zat i on And Demobi l i zat i on ( Sout hsi de Of

Navlock)

1. 5. 2. 2 CLI N 3002AB Dr i l l Hol e Set up ( Sout h s i de Navl ock)

1. 5. 2. 3 CLI N 3002AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cyl i nder s ( Sout h s i de Navl ock)

1. 5. 2. 4 CLI N 3002AD Gr out Voi ds ( Sout h s i de Navl ock)

1. 5. 2. 5 CLI N 3002AE Re- Dr i l l Gr out ( Sout h Si de Navl ock)

1. 5. 2. 6 CLI N 3002AF Mobi l i zat i on And Demobi l i zat i on ( Al l Ot her

Locat i ons at McNar y)

1. 5. 2. 7 CLI N 3002AG Dr i l l Hol e Set up ( Al l Ot her Locat i ons At Mcnar y)

1. 5. 2. 8 CLI N 3002AH Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cyl i nder s ( Al l Ot her Locat i ons at McNar y)

1. 5. 2. 9 CLI N 3002AI Gr out Voi ds ( Al l Ot her Locat i ons At Mcnar y)

1. 5. 2. 10 CLI N 3002AJ Re- Dr i l l Gr out ( Al l Ot her Locat i ons At Mcnar y)

1. 5. 3 I CE HARBOR PROJECT

1. 5. 3. 1 CLI N 3003AA Mobi l i zat i on And Demobi l i zat i on

1. 5. 3. 2 CLI N 3003AB Dr i l l Hol e Set up

1. 5. 3. 3 CLI N 3003AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 5. 3. 4 CLI N 3003AD Gr out Voi ds

1. 5. 3. 5 CLI N 3003AE Re- Dr i l l Gr out

1. 5. 4 LOWER MONUMENTAL PROJECT

1. 5. 4. 1 CLI N 3004AA Mobi l i zat i on And Demobi l i zat i on

1. 5. 4. 2 CLI N 3005AB Dr i l l Hol e Set up

1. 5. 4. 3 CLI N 3005AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 5. 4. 4 CLI N 3004AD Gr out Voi ds

1. 5. 4. 5 CLI N 3004AE Re- Dr i l l Gr out

1. 5. 5 LI TTLE GOOSE PROJECT

1. 5. 5. 1 CLI N 3005AA Mobi l i zat i on And Demobi l i zat i on

1. 5. 5. 2 CLI N 3005AB Dr i l l Hol e Set up

1. 5. 5. 3 CLI N 3005AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 5. 5. 4 CLI N 3005AD Gr out Voi ds

1. 5. 5. 5 CLI N 3005AE Re- Dr i l l Gr out

1. 5. 5. 6 CLI N 3005AF Suppl y and I nst al l 6" Wat er st op Cyl i nder s

1. 5. 6 LOWER GRANI TE PROJECT

1. 5. 6. 1 CLI N 3006AA Mobi l i zat i on And Demobi l i zat i on

1. 5. 6. 2 CLI N 3006AB Dr i l l Hol e Set up

1. 5. 6. 3 CLI N 3006AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 5. 6. 4 CLI N 3006AD Gr out Voi ds

1. 5. 6. 5 CLI N 3006AE Re- Dr i l l Gr out

1. 5. 7 DWORSHAK PROJECT

1. 5. 7. 1 CLI N 3007AA Mobi l i zat i on And Demobi l i zat i on

1. 5. 7. 2 CLI N 3007AB Dr i l l Hol e Set up

1. 5. 7. 3 CLI N 3007AC Dr i l l , Suppl y, and I nst al l 8" Wat er st op

Cylinders

1. 5. 7. 4 CLI N 3007AD Gr out Voi ds

1. 5. 7. 5 CLI N 3007AE Re- Dr i l l Gr out

1. 6 OPTI ONAL SCHEDULE E: 4t h OPTI ON YEAR - 2022 - 2023

1. 6. 1 CLI N 4001 Suppl y Rect angul ar Seal s

1. 6. 2 MCNARY PROJECT

1. 6. 2. 1 CLI N 4002AA Mobi l i zat i on And Demobi l i zat i on ( Sout hsi de Of

Navlock)

1. 6. 2. 2 CLI N 4002AB Dr i l l Hol e Set up ( Sout h s i de Navl ock)

1. 6. 2. 3 CLI N 4002AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cyl i nder s ( Sout h s i de Navl ock)

1. 6. 2. 4 CLI N 4002AD Gr out Voi ds ( Sout h s i de Navl ock)

1. 6. 2. 5 CLI N 4002AE Re- Dr i l l Gr out ( Sout h Si de Navl ock)

1. 6. 2. 6 CLI N 4002AF Mobi l i zat i on And Demobi l i zat i on ( Al l Ot her

Locat i ons at McNar y)

1. 6. 2. 7 CLI N 4002AG Dr i l l Hol e Set up ( Al l Ot her Locat i ons At Mcnar y)

1. 6. 2. 8 CLI N 4002AH Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cyl i nder s ( Al l Ot her Locat i ons at McNar y)

1. 6. 2. 9 CLI N 4002AI Gr out Voi ds ( Al l Ot her Locat i ons At Mcnar y)

1. 6. 2. 10 CLI N 4002AJ Re- Dr i l l Gr out ( Al l Ot her Locat i ons At Mcnar y)

1. 6. 3 I CE HARBOR PROJECT

1. 6. 3. 1 CLI N 4003AA Mobi l i zat i on And Demobi l i zat i on

1. 6. 3. 2 CLI N 4003AB Dr i l l Hol e Set up

1. 6. 3. 3 CLI N 4003AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 6. 3. 4 CLI N 4003AD Gr out Voi ds

1. 6. 3. 5 CLI N 4003AE Re- Dr i l l Gr out

1. 6. 4 LOWER MONUMENTAL PROJECT

1. 6. 4. 1 CLI N 4004AA Mobi l i zat i on And Demobi l i zat i on

1. 6. 4. 2 CLI N 4004AB Dr i l l Hol e Set up

1. 6. 4. 3 CLI N 4004AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 6. 4. 4 CLI N 4004AD Gr out Voi ds

1. 6. 4. 5 CLI N 4004AE Re- Dr i l l Gr out

1. 6. 5 LI TTLE GOOSE PROJECT

1. 6. 5. 1 CLI N 4005AA Mobi l i zat i on And Demobi l i zat i on

1. 6. 5. 2 CLI N 4005AB Dr i l l Hol e Set up

1. 6. 5. 3 CLI N 4005AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 6. 5. 4 CLI N 4005AD Gr out Voi ds

1. 6. 5. 5 CLI N 4005AE Re- Dr i l l Gr out

1. 6. 5. 6 CLI N 4005AF Suppl y and I nst al l 6" Wat er st op Cyl i nder s

1. 6. 6 LOWER GRANI TE PROJECT

1. 6. 6. 1 CLI N 4006AA Mobi l i zat i on And Demobi l i zat i on

1. 6. 6. 2 CLI N 4006AB Dr i l l Hol e Set up

1. 6. 6. 3 CLI N 4006AC Dr i l l , Suppl y, and I nst al l 6" Wat er st op

Cylinders

1. 6. 6. 4 CLI N 4006AD Gr out Voi ds

1. 6. 6. 5 CLI N 4006AE Re- Dr i l l Gr out

1. 6. 7 DWORSHAK PROJECT

1. 6. 7. 1 CLI N 4007AA Mobi l i zat i on And Demobi l i zat i on

1. 6. 7. 2 CLI N 4007AB Dr i l l Hol e Set up

1. 6. 7. 3 CLI N 4007AC Dr i l l , Suppl y, and I nst al l 8" Wat er st op

Cylinders

1. 6. 7. 4 CLI N 4007AD Gr out Voi ds

1. 6. 7. 5 CLI N 4007AE Re- Dr i l l Gr out

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON ( Not Appl i cabl e)

- - End of Sect i on Tabl e of Cont ent s - -

MEASUREMENT AND PAYMENT

PART 1 GENERAL

I n each i nst ance, t he cont r act pr i ce f or an i t em shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , and mat er i…