01_22_00.00_28_Amend_2.pdf
PDF 12 KB Posted
- Solicitation number
- W912EF-17-B-0012
About this file
Amendment 2 specs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidOpeningWorksheet.pdf | ||
| W912EF17B0012-0003.pdf | ||
| Amend_2_17B0012.pdf | ||
| AMEND-0002_PLANS.pdf | ||
| Amend1_Specs_ext_Bid_Due_Date.pdf | ||
| Amend_1_Tech_Spec.pdf | ||
| Site_Visit_Attendees_List.pdf | ||
| 17B0012Solicitation_TechSpec.pdf | ||
| 17B0012Solicitation_Plans.pdf | ||
| A.07.23_R_W012EF17B0012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dworshak Fish Hatchery Burrows Ponds Concrete Repair W912EF17B0012
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 RETAINAGE OF PAYMENT
1.2 BURROWS PONDS REPAIR
1.3 BURROWS PONDS REPAIR(OPTIONAL)
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00.00 28 Page 1 Amendment 2
Dworshak Fish Hatchery Burrows Ponds Concrete Repair W912EF17B0012
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.
1.1 RETAINAGE OF PAYMENT
Retainage in the amount of at least 10% of present contract value will be withheld until the final submittals for Final Operation and Maintenance Manuals and Parts Catalogs, Final Approved Versions of Contractor Prepared Drawings and AS-BUILT CONTRACT DRAWINGS AND FIO DRAWINGS have been approved by the Government. See section 01 33 00 "SUBMITTAL PROCEDURES" for additional information.
1.2 BURROWS PONDS REPAIR
Repair of the Burrows ponds will be measured for payment as a complete pay item (LS). Payment will be made at the lump sum price for Item No. 0001, "Burrows Ponds Concrete Repair (23 ponds total - Pond numbers 16, 18, 20, 22, 24, 26, 28, 30, 32, 34, 36, 38, 40, 42, 44, 46, 48, 50, 52, 54, 56, 58,& 68)," which price and payment shall be full compensation for all work required for repairing the Burrows ponds, complete, as specified and approved.
1.3 BURROWS PONDS REPAIR(OPTIONAL)
If the option to repair additional Burrows ponds is exercised, measurement for payment will be the number of ponds(EA) satisfactorily repaired.
Payment will be made at the price per pond for Item No. 0002, "Burrows Pond Concrete Repair (Pond numbers 2, 4, 6, 8, 10, 12 & 14)" which price and payment shall be full compensation for all work required for repairing the Burrows ponds, complete, as specified and approved.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --