01_22_00.00_28_Amend_2.pdf

PDF 12 KB Posted

Attached to
Dworshak National Fish Hatchery Burrow Pond Repair
Solicitation number
W912EF-17-B-0012
Issued by

About this file

Amendment 2 specs

View the file

Other files

File Type Posted
BidOpeningWorksheet.pdf PDF
W912EF17B0012-0003.pdf PDF
Amend_2_17B0012.pdf PDF
AMEND-0002_PLANS.pdf PDF
Amend1_Specs_ext_Bid_Due_Date.pdf PDF
Amend_1_Tech_Spec.pdf PDF
Site_Visit_Attendees_List.pdf PDF
17B0012Solicitation_TechSpec.pdf PDF
17B0012Solicitation_Plans.pdf PDF
A.07.23_R_W012EF17B0012.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dworshak Fish Hatchery Burrows Ponds Concrete Repair W912EF17B0012

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 RETAINAGE OF PAYMENT

1.2 BURROWS PONDS REPAIR

1.3 BURROWS PONDS REPAIR(OPTIONAL)

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

SECTION 01 22 00.00 28 Page 1 Amendment 2

Dworshak Fish Hatchery Burrows Ponds Concrete Repair W912EF17B0012

SECTION 01 22 00.00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.

1.1 RETAINAGE OF PAYMENT

Retainage in the amount of at least 10% of present contract value will be withheld until the final submittals for Final Operation and Maintenance Manuals and Parts Catalogs, Final Approved Versions of Contractor Prepared Drawings and AS-BUILT CONTRACT DRAWINGS AND FIO DRAWINGS have been approved by the Government. See section 01 33 00 "SUBMITTAL PROCEDURES" for additional information.

1.2 BURROWS PONDS REPAIR

Repair of the Burrows ponds will be measured for payment as a complete pay item (LS). Payment will be made at the lump sum price for Item No. 0001, "Burrows Ponds Concrete Repair (23 ponds total - Pond numbers 16, 18, 20, 22, 24, 26, 28, 30, 32, 34, 36, 38, 40, 42, 44, 46, 48, 50, 52, 54, 56, 58,& 68)," which price and payment shall be full compensation for all work required for repairing the Burrows ponds, complete, as specified and approved.

1.3 BURROWS PONDS REPAIR(OPTIONAL)

If the option to repair additional Burrows ponds is exercised, measurement for payment will be the number of ponds(EA) satisfactorily repaired.

Payment will be made at the price per pond for Item No. 0002, "Burrows Pond Concrete Repair (Pond numbers 2, 4, 6, 8, 10, 12 & 14)" which price and payment shall be full compensation for all work required for repairing the Burrows ponds, complete, as specified and approved.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

SECTION 01 22 00.00 28 Page 2 Amendment 2 s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Line s0cwh1rw Line