BidOpeningWorksheet.pdf

PDF 7 KB Posted

Attached to
Lower Monumental Transformer Drain Oil/Water Separator
Solicitation number
W912EF-17-B-0010
Issued by

About this file

Bid opening worksheet

View the file

Other files

File Type Posted
Amend-0003_plans.pdf PDF
W912EF_17_B_0010_Amend0003.pdf PDF
Amendment_2_Tech_Specs.pdf PDF
Amend2Plans.pdf PDF
Amend2_17_B_0010.pdf PDF
Amend_1_extend_bid_opening.pdf PDF
Site_Visit_Sign_attendees.pdf PDF
17_B_0010.pdf PDF
Plans.pdf PDF
IFB_17-B-0010_Site_Visit_Info.pdf PDF
Techspecs.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID OPENING WORKSHEET – 8/25/17, 2:00 p.m.

Solicitation Number: W912EF-17-B-0010 AMENDMENTS: 3 CONSTRUCTION: Lower Monumental Transformer Drain Oil/Water Separator

CONTRACT SPECIALIST: Valerie Reller (509)527-7215 Issue Date: 26 June 2017 Revised Bid Schedule: No

VENDOR Included Bid Bond

Acknowledge Amendments

TOTAL BID

Northbank Civil & Marine

X X $595,000.00

Greenwater Energy LLC

X X $329,000.00

POW Contracting, Inc

X X $472,438.00

Emagineered Solutions

X X $472,370.00

GOVERNMENT ESTIMATE

$650,279.00

File details come from the government source that posted it. Updated .