About this file

REAL Amendment 0001 for W912EF-16-R-0016

View the file

Other files

File Type Posted
2015__Herbicide_Totals.xlsx XLSX spreadsheet
ToothakerHMULitter.jpg JPG image
Contract_Tables.xlsx XLSX spreadsheet
Martindale_BurbakHeights_HMUsEastLitter.jpg JPG image
Update2015LandCoverHMU.xlsx XLSX spreadsheet
Yakima_Delta_HMU_Main_UnitLitter.jpg JPG image
Martindale_BurbakHeights_HMUsLitter.jpg JPG image
RichlandBendHMULitter.jpg JPG image
Yakima_Delta_HMU_Bridge_UnitLitter.jpg JPG image
Yakima_Delta_HMULitter.jpg JPG image
PestControlApplicationRecord.pdf PDF
Martindale_BurbakHeights_HMUsEast.jpg JPG image
RichlandBendHMU.jpg JPG image
BigFlatHMULitter.jpg JPG image
YakimaDeltaHMU.jpg JPG image
Martindale_BurbakHeights_HMUs.jpg JPG image
Fishhook_HMULitter.jpg JPG image
MAPS4(11).pdf PDF
MAPS3(3).pdf PDF
YakimaDeltaHMU_Irrigation.jpg JPG image
DRAWINGS.pdf PDF
Hollebeke_HMULitter.jpg JPG image
Pesticide_2011Totals.pdf PDF
Walker_Pit_HMULitter.jpg JPG image
Yakima_Delta_HMU_RO_Plan.jpg JPG image
MAPS2(10).pdf PDF
55_mile_HMULitter.jpg JPG image
ToothakerHMU.jpg JPG image
Skookum_HMULitter.jpg JPG image
YakimaDeltaHMU_BridgeIrrigationUnit.jpg JPG image
PestControlAnticipatedApplicationRecord.pdf PDF
Lost_Island_HMULitter.jpg JPG image
MAPS1(9).pdf PDF
CouchLanding_HMU.jpg JPG image
Hollebeke_HMU_Irrigation.jpg JPG image
Snake_River_Jct_HMU.jpg JPG image
Skookum_all_HMU.jpg JPG image
Hollebeke_HMU.jpg JPG image
NoName2_HMU.jpg JPG image
Lyons_Ferry_HMU.jpg JPG image
Skookum_HMU_Land_Cover.jpg JPG image
Lost_Island_HMU.jpg JPG image
NineteenMile_HMU.jpg JPG image
Lost_Island_HMU_Irrigation.jpg JPG image
Lake_Charlene_HMU.jpg JPG image
Quarter_Circle_HMU.jpg JPG image
Levey_HMU.jpg JPG image
JoSo_HMU.jpg JPG image
Hollebeke_HMU_Land_Cover1.jpg JPG image
Hollebeke_HMU_Land_Cover2.jpg JPG image
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Operation and Maintenance of Federally Mandated Wildlife Habitat Management Units(HMU)Managed under Tri-Rivers Natural Resources located along Lake Sacajaw ea, Lake Herbert G. West and Lake Wallula.

Purpose of this amendment is to:

1.) Acquisition Set Aside has changed from EDSWOSB to Small Business.

2.) Address Questions and Answ ers 3.) Revise Performance Work Statement section C-7.2. REQUIRED REPORTS 4.) Revise SUPPLIES OR SERVICES AND PRICES 5.) Provide 2015 Herbicide

Closing date remains unchanged at July 5, 2016, 2:00PM Pacific

1. CONTRACT ID CODE PAGE OF PAGES

J 1 110

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-16-R-0016

X 9B. DATED (SEE ITEM 11)

03-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jun-2016

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

MARY M. VAN SICKLE

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-16-R-0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT

If you are submitting an offer, ensure that you acknowledge receipt of the amendment (16-R-0016 0001) by completing Block 8 and 15A. The signed SF30 and amendment shall be included in proposal submission.

No responses will be posted to inquiries after the close of business (COB) on the third business day preceding the solicitation due date.

Question 1: Litter Removal: Certain maps included with the Solicitation package are marked with the designation "Litter" (i.e. "55_mile_HMULitter" and "BigFlatHMULitter"). Is it the government's intent that litter collection only occur at those sites where a "Litter" map has been supplied, or may/should litter collection efforts occur at any of the HMUs in the Project Area for which maps have been supplied?

Answer 1: See Appendix D Maps. All of the HMU in Appendix D and Parking Lots are the designated HMU.

Also see section C-5.3.1 The Contractor will regularly visit designated HMU….

Only map areas have litter pick up including both predominant shoreline, roadway and trails and any area within the boundaries as needed.

Question 2: This paragraph states that "Individual report deadlines for periodic reports will be negotiated with the contractor prior to award". Shouldn't this actually read that the deadline for individual reports will be negotiated with the contractor AFTER award of the contract?

Answer 2: After has replaced prior to in the following:

C-7.2. REQUIRED REPORTS

The Contractor is required to generate, complete and submit reports to the Government. The following is a list of reports, information to be furnished on each report and a time or frequency requirement for each report. Individual report deadlines for periodic reports will be negotiated with the Contractor prior to after award .

Question 3: With the Solicitation Package, the Corps of Engineers has included a document entitled "Pesticide 2011 Totals". However, in 2012, the Corps of Engineers implemented the IPMP (Integrated Pest Management Program) which restricts the contractor from using some of the herbicides listed in this document. Can the Corps of Engineers provide more recent annual pesticide totals which conforms to the restrictions outlined in the IPMP?

Answer 3: The recent annual pesticde totals which conforms to the restrictions outline in the IPMP is attached.

Question 4: The maps attached to the Solicitation include various maps marked "Litter" (such as "55_mile_HMULitter" and "BigFlatHMULitter"). However, while these maps provide an excellent view of the facilities and features at the HMU site, they do not appear to specifically highlight litter collection areas. Are these maps intended to specifically delineate areas where litter collection should occur? What was the Corps of Engineers intent in including these particular maps in the solicitation package?

Answer 4: To indicate that Litter Removal need to be performed on the designated HMU’s.

Only map areas have litter pick up including both predominant, shoreline, roadway and trails and any and all area within the boundaries as needed. Contractor will only be accountable for the 15 designated HMU’s as listed in the appendix Litter accumulates mainly in the parking and fishing areas.

Question 5: Gallinaceous Guzzlers – Lower Monumental Pool. CLIN 1003AK lists a unit of "Acre" for this line item. Shouldn't the quantity for this CLIN actually be "Each"?

Answer 5: CLIN 1003AK has been changed to Each.

Question 6: Mechanical Weed Treatment – Lower Monumental Pool. CLINs 0003AD, 1003AD, 2003AD and 3003AD requests the contractor provide 2 AC of Mechanical Weed Treatment in Lower Monumental Pool.

However, CLIN 4003AD requests the contractor provide 12 AC of Mechanical Weed Treatment in Lower Monumental Pool. Is the quantity listed for CLIN 4003AD correct?

Answer 6: CLIN 4003AD has been corrected to 2 AC.

The following have been modified:

Revise SUPPLIES OR SERVICES AND PRICES

Contractor will furnish all necessary personnel, equipment, materials, transportation, supervision and other items and services necessary for the operation and maintenance of natural resource and wildlife management related work to satisfactorily perform all work required by this contract in the manner and frequencies specified.

Services will be performed on lands and waters of the Snake and Columbia Rivers known as Lake Sacajawea (Ice Harbor Dam) this point forward called Ice Harbor Pool, Lake Herbert G. West (Lower Monumental Dam) this point forward called LoMo Pool and Lake Wallula (upstream of the Walla Walla River, McNary Dam) this point forward called McNary Pool; in accordance with specifications and drawings attached hereto and made a part hereof.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

McNary Wildlife Habitat Maintenance

FFP

Operation and Maintenance of Habitat Management Units for McNary Pool.

Overall Period of Performance: Date of Award through 31 January 2017.

FOB: Destination

0001AA 10 Acre Backpack Spraying

FFP

Weed Control.

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work Statement and Section C-7.7 Performance Requirement Summary.

0001AB 5 Acre Boom spraying w/an

FFP

Agricultural Spray Boom System Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

0001AC 6 Months Litter Removal

FFP

Litter collection and removal.

Contractor will regularly visit designated HMUs see Appendix-D (parking and prominent areas, and shorelines), to ensure that these managed areas appear fresh and neat. Services will be provided in accordance with Section C-5.3 of the Performance Work Statement and Section C-7.7 Performance Requirement Summary.

0001AD 1 Acre Mechanical Weed Treatment

FFP

Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

0001AE 5 Each Non-Security Fencing

FFP

Non-security fencing includes boundary fencing, livestock watering corridor fencing, and fencing in and around Parks and HMUs. Contractor shall provide services in accordance with Section C-5.8 of the Performance Work Statement and Section C-7.7 Performance Requirement Summary.

0001AG 5 Acre Tree Removal

FFP

Contractor shall be responsible for removal of invasive trees (e.g. Russian olive) and brush from designated areas by mechanical means with minimal landscape disturbance. Services will be provided in accordance with Section C-5.13 of the Performance Work Statement and Section C-7.7 Performance Requirement

0001AH 20 Labor

Hours

Non-Routine Maintenance

FFP

This is an estimated quantity. Number of hours used shall not exceed 20 hours.

This service is to be performed ONLY when directed by the Contracting Officer (by Modification to the Contract). The Government will only pay for actual services directed and subsequently performed.

Services will be provided in accordance with Section C-5.15 of the Performance Work Statement and Section C-7.7 Performance Requirement.

TOT ESTIMATED PRICE

CEILING PRICE

ITEM NO SUPPLIES/SERVICES

Ice Harbor Wildlife Habitat Maintenance

FFP

Operation and Maintenance of Habitat Management Units for Ice Harbor Pool.

Overall Period of Performance: Date of Award through 31 January 2017.

0002AA 10 Acre Backpack Spraying

FFP

Weed Control.

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

0002AB 5 Acre Boom spraying w/an

FFP

Agricultural Spray Boom System Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

0002AC 6 Months Litter Removal

FFP

Litter collection and removal.

Contractor will regularly visit designated HMUs see Appendix-D (parking and prominent areas, and shorelines), to ensure that these managed areas appear fresh and neat. Services will be provided in accordance with Section C-5.3 of the Performance Work Statement and Section C-7.7 Performance Requirement

0002AD 2 Acre Mechanical Weed Treatment

FFP

Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

0002AE 5 Each Non-Security Fencing

FFP

Contractor is responsible for Non-security fencing that includes boundary fencing, livestock watering corridor fencing, and fencing in and around Parks and HMUs.

Services will be provided in accordance with Section C-5.8 of the Performance Work Statement and Section C-7.7 Performance Requirement Summary.

0002AG 5 Acre Tree Removal

FFP

Contractor shall be responsible for removal of invasive trees (e.g. Russian olive) and brush from designated areas by mechanical means with minimal landscape disturbance. Services will be provided in accordance with Section C-5.13 of the Performance Work Statement and Section C-7.7 Performance Requirement

0002AH 20 Labor

This is an estimated quantity. Number of hours used shall not exceed 20 hours.

This service is to be performed ONLY when directed by the Contracting Officer (by Modification to the Contract). The Government will only pay for actual services directed and subsequently performed.

Services will be provided in accordance with Section C-5.15 of the Performance

0002AN 1 Job Winterization of Irrigation Systems

FFP

Contractor is responsible for Winterizing the irrigation systems prior to and following the irrigation season to prevent freeze damage and to prepare the system for operation prior to use. Services will be provided in accordance with Section C-

5.12 and C-7.9.3 of the Performance Work Statement and Section C-7.7 Performance Requirement Summary.

0002AP 10 Acre Meadows

FFP

Contractor shall ensure meadows are maintained to produce vigorous grass stands and are kept at a mature height to support specific wildlife needs. Services will be provided in accordance with Section C-5.5 of the Performance Work Statement and Section C-7.7 Performance Requirement Summary.

0002AQ 30 Acre Pastures/Trails

FFP

Contractor shall ensure pastures are maintained to produce vigorous grass stands and are mowed in the spring/early summer to provide grazing areas for Canada geese. Pastures will require a spring application of fertilizer. Services will be provided in accordance with Section C-5.6 of the Performance Work Statement

0002AR 3 Each Quail Roost - Brush Pile Refurbishment.

FFP

Contractor shall be responsible for refurbishment of quail roost and brush pile structures in accordance with Section C-5.2 in the Performance Work Statement

0002AS 2 Months Big Flat HMU - Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement Summary. Performance Period: 1 August 2016 through 30 September 2016.

0002AT 2 Months Hollebeke HMU - Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement

0002AU 2 Months Lost Island HMU - Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement

0002AV 5 Acre Field Seeding

FFP

Fields are non-irrigated uplands managed as vigorous grass stands to support specific wildlife needs. Fields may require occasional reseeding and other treatment such as mowing to compete with undesirable species. Under this requirement the Contractor will seed 5 acres into the native grass species at the rate provided in technical Exhibit C-7.5, and Section C-7.7 Performance Requirement

LoMo Wildlife Habitat Maintenance

FFP

Operation and Maintenance of Habitat Management Units for Lower Monumental Pool. Overall Period of Performance: Date of Award through 31 January 2017.

0003AA 10 Acre Backpack Spraying

FFP

Weed Control.

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

0003AB 5 Acre Boom spraying w/an

FFP

Agricultural Spray Boom System Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

0003AC 6 Months Litter Removal

FFP

Litter collection and removal.

Contractor will regularly visit designated HMUs see Appendix-D (parking and prominent areas, and shorelines), to ensure that these managed areas appear fresh and neat. Services will be provided in accordance with Section C-5.3 of the Performance Work Statement and Section C-7.7 Performance Requirement

0003AD 2 Acre Mechanical Weed Treatment

FFP

Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

0003AE 5 Each Non-Security Fencing

FFP

Contractor is responsible for Non-security fencing that includes boundary fencing, livestock watering corridor fencing, and fencing in and around Parks and HMUs.

Services will be provided in accordance with Section C-5.8 of the Performance

0003AH 20 Labor

This is an estimated quantity. Number of hours used shall not exceed 20 hours.

This service is to be performed ONLY when directed by the Contracting Officer (by Modification to the Contract). The Government will only pay for actual services directed and subsequently performed.

Services will be provided in accordance with Section C-5.15 of the Performance

0003AN 1 Job Winterization of Irrigation Systems

FFP

Contractor is responsible for Winterizing the irrigation systems prior to and following the irrigation season to prevent freeze damage and to prepare the system for operation prior to use. Services will be provided in accordance with Section C-

5.12 and C-7.9.3 of the Performance Work Statement and Section C-7.7

0003AP 5 Acre Meadows

FFP

Contractor shall ensure meadows are maintained to produce vigorous grass stands and are kept at a mature height to support specific wildlife needs. Services will be provided in accordance with Section C-5.5 of the Performance Work Statement

0003AQ 12 Acre Pastures/Trails

FFP

Contractor shall ensure pastures are maintained to produce vigorous grass stands and are mowed in the spring/early summer to provide grazing areas for Canada geese. Pastures will require a spring application of fertilizer. Services will be provided in accordance with Section C-5.6 of the Performance Work Statement

0003AS 2 Months 55-Mile HMU - Irrigation Systems

FFP

Operation and maintenance of irrigation sets at 55-Mile HMU. Provide services in accordance with Section C-5.12 of the Performance Work Statement. Performance Period: 1 August 2016 through 30 September 2016.

0003AT 2 Months Skookum HMU - Irrigation Systems

FFP

Operation and maintenance of irrigation sets at Skookum HMU. Provide services in accordance with Section C-5.12 of the Performance Work Statement.

Performance Period: 1 August 2016 through 30 September 2016.

OPTION McNary Wildlife Habitat Maintenance

FFP

Operation and Maintenance of Habitat Management Units for McNary Pool.

Overall Period of Performance: 1 February 2017 through 31 January 2018.

1001AA 80 Acre OPTION Backpack Spraying

FFP

Weed Control.

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

1001AB 10 Acre OPTION Boom spraying w/an

FFP

Agricultural Spray Boom System Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

1001AC 12 Months OPTION Litter Removal

FFP

Litter collection and removal.

Contractor will regularly visit designated HMUs see Appendix-D (parking and prominent areas, and shorelines), to ensure that these managed areas appear fresh and neat. Services will be provided in accordance with Section C-5.3 of the Performance Work Statement and Section C-7.7 Performance Requirement

1001AD 2 Acre OPTION Mechanical Weed Treatment

FFP

Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

1001AE 20 Each OPTION Non-Security Fencing

FFP

Non-security fencing includes boundary fencing, livestock watering corridor fencing, and fencing in and around Parks and HMUs. Contractor shall provide services in accordance with Section C-5.8 of the Performance Work Statement and

1001AF 5 Acre OPTION Wildlife Tree/Shrub Purchasing, Planting

FFP

Contractor shall maintain existing and establish new plantings of trees and shrubs in accordance with Section C-5.9 and Technical Exhibit C-7.6 in the Performance

1001AG 5 Acre OPTION Tree Removal

FFP

Contractor shall be responsible for removal of invasive trees (e.g. Russian olive) and brush from designated areas by mechanical means with minimal landscape disturbance. Services will be provided in accordance with Section C-5.13 of the Performance Work Statement and Section C-7.7 Performance Requirement

1001AH 20 Labor

OPTION Non-Routine Maintenance

This is an estimated quantity. Number of hours used shall not exceed 20 hours.

This service is to be performed ONLY when directed by the Contracting Officer (by Modification to the Contract). The Government will only pay for actual services directed and subsequently performed.

Services will be provided in accordance with Section C-5.15 of the Performance

OPTION Ice Harbor Wildlife Habitat Maintenance

FFP

Operation and Maintenance of Habitat Management Units for Ice Harbor Pool.

Overall Period of Performance: 1 February 2017 through 31 January 2018.

1002AA 80 Acre OPTION Backpack Spraying

FFP

Weed Control.

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

1002AB 10 Acre OPTION Boom spraying w/an

FFP

Agricultural Spray Boom System Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

1002AC 12 Months OPTION Litter Removal

FFP

Litter collection and removal.

Contractor will regularly visit designated HMUs see Appendix-D (parking and prominent areas, and shorelines), to ensure that these managed areas appear fresh and neat. Services will be provided in accordance with Section C-5.3 of the Performance Work Statement and Section C-7.7 Performance Requirement

1002AD 2 Acre OPTION Mechanical Weed Treatment

FFP

Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

1002AE 10 Each OPTION Non-Security Fencing

FFP

Contractor is responsible for Non-security fencing that includes boundary fencing, livestock watering corridor fencing, and fencing in and around Parks and HMUs.

Services will be provided in accordance with Section C-5.8 of the Performance

1002AF 5 Acre OPTION Wildlife Tree/Shrub Purchasing, Planting

FFP

Contractor shall maintain existing and establish new plantings of trees and shrubs in accordance with Section C-5.9 and Technical Exhibit C-7.6 in the Performance

1002AG 5 Acre OPTION Tree Removal

FFP

Contractor shall be responsible for removal of invasive trees (e.g. Russian olive) and brush from designated areas by mechanical means with minimal landscape disturbance. Services will be provided in accordance with Section C-5.13 of the Performance Work Statement and Section C-7.7 Performance Requirement

1002AH 5 Labor

This is an estimated quantity. Number of hours used shall not exceed 20 hours.

This service is to be performed ONLY when directed by the Contracting Officer (by Modification to the Contract). The Government will only pay for actual services directed and subsequently performed.

Services will be provided in accordance with Section C-5.15 of the Performance

1002AJ 19 Acre OPTION Food Plots

FFP

Contractor shall maintain food plots in established Habitat Management Units (HMUs) to meet habitat requirements to provide a winter food source for wildlife using the HMU. Services will be provided in accordance with Section C-5.4 of the Performance Work Statement and Section C-7.7 Performance Requirement

1002AK 20 Each OPTION Gallinaceous Guzzlers

FFP

Contractor shall inspect, clean and repair in accordance with Section C-5.10 of the Performance Work Statement and Section C-7.7 Performance Requirement

1002AL 30 Each OPTION Goose Nesting Structures

FFP

Contractor shall provide maintenance and refurbishment in accordance with Section C-5.11 of the Performance Work Statement and Section C-7.7

1002AM 1 Job OPTION Dewinterization of Irrigation Systems

FFP

Contractor is responsible for De-Winterizing the irrigation systems prior to and following the irrigation season to prevent freeze damage and to prepare the system for operation prior to use. Services will be provided in accordance with Section C-

5.12 and C-7.9.3 of the Performance Work Statement and Section C-7.7

1002AN 1 Job OPTION Winterization of Irrigation Systems

FFP

Contractor is responsible for Winterizing the irrigation systems prior to and following the irrigation season to prevent freeze damage and to prepare the system for operation prior to use. Services will be provided in accordance with Section C-

5.12 and C-7.9.3 of the Performance Work Statement and Section C-7.7

1002AP 10 Acre OPTION Meadows

FFP

Contractor shall ensure meadows are maintained to produce vigorous grass stands and are kept at a mature height to support specific wildlife needs. Services will be provided in accordance with Section C-5.5 of the Performance Work Statement

1002AQ 30 Acre OPTION Pastures/Trails

FFP

Contractor shall ensure pastures are maintained to produce vigorous grass stands and are mowed in the spring/early summer to provide grazing areas for Canada geese. Pastures will require a spring application of fertilizer. Services will be provided in accordance with Section C-5.6 of the Performance Work Statement

1002AR 6 Each OPTION Quail Roost - Brush Pile Refurbishment.

FFP

Contractor shall be responsible for refurbishment of quail roost and brush pile structures in accordance with Section C-5.2 in the Performance Work Statement

1002AS 6 Months OPTION Big Flat HMU - Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement Summary. Performance Period: 1 April 2017 through 30 September 2017.

1002AT 6 Months OPTION Hollebeke HMU - Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement

1002AU 6 Months OPTION Lost Island HMU - Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement

1002AV 5 Acre OPTION Field Seeding

FFP

Fields are non-irrigated uplands managed as vigorous grass stands to support specific wildlife needs. Fields may require occasional reseeding and other treatment such as mowing to compete with undesirable species. Under this requirement the Contractor will seed 5 acres into the native grass species at the rate provided in technical Exhibit C-7.5, and in Section C-7.7 Performance Requirement Summary.

OPTION LoMo Wildlife Habitat Maintenance

FFP

Operation and Maintenance of Habitat Management Units for Lower Monumental Pool. Overall Period of Performance: 1 February 2017 through 31 January 2018.

1003AA 80 Acre OPTION Backpack Spraying

FFP

Weed Control.

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

1003AB 10 Acre OPTION Boom spraying w/an

FFP

Agricultural Spray Boom System Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

1003AC 12 Months OPTION Litter Removal

FFP

Litter collection and removal.

Contractor will regularly visit designated HMUs see Appendix-D (parking and prominent areas, and shorelines), to ensure that these managed areas appear fresh and neat. Services will be provided in accordance with Section C-5.3 of the Performance Work Statement and Section C-7.7 Performance Requirement

1003AD 2 Acre OPTION Mechanical Weed Treatment

FFP

Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

1003AE 5 Each OPTION Non-Security Fencing

FFP

Contractor is responsible for Non-security fencing that includes boundary fencing, livestock watering corridor fencing, and fencing in and around Parks and HMUs.

Services will be provided in accordance with Section C-5.8 of the Performance

1003AF 1 Acre OPTION Wildlife Tree/Shrub Purchasing, Planting

FFP

Contractor shall maintain existing and establish new plantings of trees and shrubs in accordance with Section C-5.9 and Technical Exhibit C-7.6 in the Performance

1003AH 5 Labor

This is an estimated quantity. Number of hours used shall not exceed 20 hours.

This service is to be performed ONLY when directed by the Contracting Officer (by Modification to the Contract). The Government will only pay for actual services directed and subsequently performed.

Services will be provided in accordance with Section C-5.15 of the Performance

1003AJ 6 Acre OPTION Food Plots

FFP

Contractor shall maintain food plots in established Habitat Management Units (HMUs) to meet habitat requirements to provide a winter food source for wildlife using the HMU. Services will be provided in accordance with Section C-5.4 of the Performance Work Statement and Section C-7.7 Performance Requirement

1003AK 13 Each OPTION Gallinaceous Guzzlers

FFP

Contractor shall inspect, clean and repair in accordance with Section C-5.10 of the Performance Work Statement and Section C-7.7 Performance Requirement

Amendment 1: The unit of issue has changed from Acre to Each.

1003AL 21 Each OPTION Goose Nesting Structures

FFP

Contractor shall provide maintenance and refurbishment in accordance with Section C-5.11 of the Performance Work Statement and Section C-7.7

1003AM 1 Job OPTION Dewinterization of Irrigation Systems

FFP

Contractor is responsible for De-Winterizing the irrigation systems prior to and following the irrigation season to prevent freeze damage and to prepare the system for operation prior to use. Services will be provided in accordance with Section C-

5.12 and C-7.9.3 of the Performance Work Statement and Section C-7.7

1003AN 1 Job OPTION Winterization of Irrigation Systems

FFP

Contractor is responsible for Winterizing the irrigation systems prior to and following the irrigation season to prevent freeze damage and to prepare the system for operation prior to use. Services will be provided in accordance with Section C-

5.12 and C-7.9.3 of the Performance Work Statement and Section C-7.7

1003AP 5 Acre OPTION Meadows

FFP

Contractor shall ensure meadows are maintained to produce vigorous grass stands and are kept at a mature height to support specific wildlife needs. Services will be provided in accordance with Section C-5.5 of the Performance Work Statement

1003AQ 12 Acre OPTION Pastures/Trails

FFP

Contractor shall ensure pastures are maintained to produce vigorous grass stands and are mowed in the spring/early summer to provide grazing areas for Canada geese. Pastures will require a spring application of fertilizer. Services will be provided in accordance with Section C-5.6 of the Performance Work Statement

1003AR 4 Each OPTION Quail Roost - Brush Pile Refurbishment.

FFP

Contractor shall be responsible for refurbishment of quail roost and brush pile structures in accordance with Section C-5.2 in the Performance Work Statement

1003AS 6 Months OPTION 55-Mile HMU Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement

1003AT 6 Months OPTION Skookum HMU Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement

OPTION McNary Wildlife Habitat Maintenance

FFP

Operation and Maintenance of Habitat Management Units for McNary Pool.

Overall Period of Performance: 1 February 2018 through 31 January 2019

2001AA 80 Acre OPTION Backpack Spraying

FFP

Weed Control.

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

2001AB 10 Acre OPTION Boom spraying w/an

FFP

Agricultural Spray Boom System Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

2001AC 12 Months OPTION Litter Removal

FFP

Litter collection and removal.

Contractor will regularly visit designated HMUs see Appendix-D (parking and prominent areas, and shorelines), to ensure that these managed areas appear fresh and neat. Services will be provided in accordance with Section C-5.3 of the Performance Work Statement and Section C-7.7 Performance Requirement

2001AD 2 Acre OPTION Mechanical Weed Treatment

FFP

Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

2001AE 20 Each OPTION Non-Security Fencing

FFP

Non-security fencing includes boundary fencing, livestock watering corridor fencing, and fencing in and around Parks and HMUs. Contractor shall provide services in accordance with Section C-5.8 of the Performance Work Statement and

2001AF 5 Acre OPTION Wildlife Tree/Shrub Purchasing, Planting

FFP

Contractor shall maintain existing and establish new plantings of trees and shrubs in accordance with Section C-5.9 and Technical Exhibit C-7.6 in the Performance

2001AG 5 Acre OPTION Tree Removal

FFP

Contractor shall be responsible for removal of invasive trees (e.g. Russian olive) and brush from designated areas by mechanical means with minimal landscape disturbance. Services will be provided in accordance with Section C-5.13 of the Performance Work Statement and Section C-7.7 Performance Requirement

2001AH 5 Labor

This is an estimated quantity. Number of hours used shall not exceed 20 hours.

This service is to be performed ONLY when directed by the Contracting Officer (by Modification to the Contract). The Government will only pay for actual services directed and subsequently performed.

Services will be provided in accordance with Section C-5.15 of the Performance

OPTION Ice Harbor Wildlife Habitat Maintenance

FFP

Operation and Maintenance of Habitat Management Units for Ice Harbor Pool.

Overall Period of Performance: 1 February 2018 through 31 January 2019.

2002AA 80 Acre OPTION Backpack Spraying

FFP

Weed Control.

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

2002AB 10 Acre OPTION Boom spraying w/an

FFP

Agricultural Spray Boom System Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

2002AC 12 Months OPTION Litter Removal

FFP

Litter collection and removal.

Contractor will regularly visit designated HMUs see Appendix-D (parking and prominent areas, and shorelines), to ensure that these managed areas appear fresh and neat. Services will be provided in accordance with Section C-5.3 of the Performance Work Statement and Section C-7.7 Performance Requirement

2002AD 2 Acre OPTION Mechanical Weed Treatment

FFP

Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

2002AE 10 Each OPTION Non-Security Fencing

FFP

Contractor is responsible for Non-security fencing that includes boundary fencing, livestock watering corridor fencing, and fencing in and around Parks and HMUs.

Services will be provided in accordance with Section C-5.8 of the Performance

2002AF 5 Acre OPTION Wildlife Tree/Shrub Purchasing, Planting

FFP

Contractor shall maintain existing and establish new plantings of trees and shrubs in accordance with Section C-5.9 and Technical Exhibit C-7.6 in the Performance

2002AG 5 Acre OPTION Tree Removal

FFP

Contractor shall be responsible for removal of invasive trees (e.g. Russian olive) and brush from designated areas by mechanical means with minimal landscape disturbance. Services will be provided in accordance with Section C-5.13 of the Performance Work Statement and Section C-7.7 Performance Requirement

2002AH 5 Labor

This is an estimated quantity. Number of hours used shall not exceed 20 hours.

This service is to be performed ONLY when directed by the Contracting Officer (by Modification to the Contract). The Government will only pay for actual services directed and subsequently performed.

Services will be provided in accordance with Section C-5.15 of the Performance

2002AJ 19 Acre OPTION Food Plots

FFP

Contractor shall maintain food plots in established Habitat Management Units (HMUs) to meet habitat requirements to provide a winter food source for wildlife using the HMU. Services will be provided in accordance with Section C-5.4 of the Performance Work Statement and Section C-7.7 Performance Requirement

2002AK 20 Each OPTION Gallinaceous Guzzlers

FFP

Contractor shall inspect, clean and repair in accordance with Section C-5.10 of the Performance Work Statement and Section C-7.7 Performance Requirement

2002AL 30 Each OPTION Goose Nesting Structures

FFP

Contractor shall provide maintenance and refurbishment in accordance with Section C-5.11 of the Performance Work Statement and Section C-7.7

2002AM 1 Job OPTION Dewinterization of Irrigation Systems

FFP

Contractor is responsible for De-Winterizing the irrigation systems prior to and following the irrigation season to prevent freeze damage and to prepare the system for operation prior to use. Services will be provided in accordance with Section C-

5.12 and C-7.9.3 of the Performance Work Statement and Section C-7.7

2002AN 1 Job OPTION Winterization of Irrigation Systems

FFP

Contractor is responsible for Winterizing the irrigation systems prior to and following the irrigation season to prevent freeze damage and to prepare the system for operation prior to use. Services will be provided in accordance with Section C-

5.12 and C-7.9.3 of the Performance Work Statement and Section C-7.7

2002AP 10 Acre OPTION Meadows

FFP

Contractor shall ensure meadows are maintained to produce vigorous grass stands and are kept at a mature height to support specific wildlife needs. Services will be provided in accordance with Section C-5.5 of the Performance Work Statement

2002AQ 30 Acre OPTION Pastures/Trails

FFP

Contractor shall ensure pastures are maintained to produce vigorous grass stands and are mowed in the spring/early summer to provide grazing areas for Canada geese. Pastures will require a spring application of fertilizer. Services will be provided in accordance with Section C-5.6 of the Performance Work Statement

2002AR 6 Each OPTION Quail Roost - Brush Pile Refurbishment.

FFP

Contractor shall be responsible for refurbishment of quail roost and brush pile structures in accordance with Section C-5.2 in the Performance Work Statement

2002AS 6 Months OPTION Big Flat HMU - Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement Summary. Performance Period: 1 April 2018 through 30 September 2018.

2002AT 6 Months OPTION Hollebeke HMU - Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement

2002AU 6 Months OPTION Lost Island HMU - Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement

2002AV 5 Acre OPTION Field Seeding

FFP

Fields are non-irrigated uplands managed as vigorous grass stands to support specific wildlife needs. Fields may require occasional reseeding and other treatment such as mowing to compete with undesirable species. Under this requirement the Contractor will seed 5 acres into the native grass species at the rate provided in technical Exhibit C-7.5, and in Section C-7.7 Performance

OPTION LoMo Wildlife Habitat Maintenance

FFP

Operation and Maintenance of Habitat Management Units for Lower Monumental Pool. Overall Period of Performance: 1 February 2018 through 31 January 2019.

2003AA 80 Acre OPTION Backpack Spraying

FFP

Weed Control.

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

2003AB 10 Acre OPTION Boom spraying w/an

FFP

Agricultural Spray Boom System Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

2003AC 12 Months OPTION Litter Removal

FFP

Litter collection and removal.

Contractor will regularly visit designated HMUs see Appendix-D (parking and prominent areas, and shorelines), to ensure that these managed areas appear fresh and neat. Services will be provided in accordance with Section C-5.3 of the Performance Work Statement and Section C-7.7 Performance Requirement

2003AD 2 Acre OPTION Mechanical Weed Treatment

FFP

Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

2003AE 5 Each OPTION Non-Security Fencing

FFP

Contractor is responsible for Non-security fencing that includes boundary fencing, livestock watering corridor fencing, and fencing in and around Parks and HMUs.

Services will be provided in accordance with Section C-5.8 of the Performance

2003AF 1 Acre OPTION Wildlife Tree/Shrub Purchasing, Planting

FFP

Contractor shall maintain existing and establish new plantings of trees and shrubs in accordance with Section C-5.9 and Technical Exhibit C-7.6 in the Performance

2003AH 5 Labor

This is an estimated quantity. Number of hours used shall not exceed 20 hours.

This service is to be performed ONLY when directed by the Contracting Officer (by Modification to the Contract). The Government will only pay for actual services directed and subsequently performed.

Services will be provided in accordance with Section C-5.15 of the Performance

2003AJ 6 Acre OPTION Food Plots

FFP

Contractor shall maintain food plots in established Habitat Management Units (HMUs) to meet habitat requirements to provide a winter food source for wildlife using the HMU. Services will be provided in accordance with Section C-5.4 of the Performance Work Statement and Section C-7.7 Performance Requirement

2003AK 13 Each OPTION Gallinaceous Guzzlers

FFP

Contractor shall inspect, clean and repair in accordance with Section C-5.10 of the Performance Work Statement and Section C-7.7 Performance Requirement

2003AL 21 Each OPTION Goose Nesting Structures

FFP

Maintenance and refurbishment will be provided in accordance with Section C-

5.11 of the Performance Work Statement and Section C-7.7 Performance Requirement Summary

2003AM 1 Job OPTION Dewinterization of Irrigation Systems

FFP

Contractor is responsible for De-Winterizing the irrigation systems prior to and following the irrigation season to prevent freeze damage and to prepare the system for operation prior to use. Services will be provided in accordance with Section C-

5.12 and C-7.9.3 of the Performance Work Statement and Section C-7.7

2003AN 1 Job OPTION Winterization of Irrigation Systems

FFP

Contractor is responsible for Winterizing the irrigation systems prior to and following the irrigation season to prevent freeze damage and to prepare the system for operation prior to use. Services will be provided in accordance with Section C-

5.12 and C-7.9.3 of the Performance Work Statement and Section C-7.7

2003AP 5 Acre OPTION Meadows

FFP

Contractor shall ensure meadows are maintained to produce vigorous grass stands and are kept at a mature height to support specific wildlife needs. Services will be provided in accordance with Section C-5.5 of the Performance Work Statement

2003AQ 12 Acre OPTION Pastures/Trails

FFP

Contractor shall ensure pastures are maintained to produce vigorous grass stands and are mowed in the spring/early summer to provide grazing areas for Canada geese. Pastures will require a spring application of fertilizer. Services will be provided in accordance with Section C-5.6 of the Performance Work Statement

2003AR 4 Each OPTION Quail Roost - Brush Pile Refurbishment.

FFP

Contractor shall be responsible for refurbishment of quail roost and brush pile structures in accordance with Section C-5.2 in the Performance Work Statement

2003AS 6 Months OPTION 55-Mile HMU Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement

2003AT 6 Months OPTION Skookum HMU Irrigation Systems

FFP

Operation and maintenance of irrigation sets in accordance with Section C-5.12 of the Performance Work Statement and Section C-7.7 Performance Requirement

OPTION McNary Wildlife Habitat Maintenance

FFP

Operation and Maintenance of Habitat Management Units for McNary Pool.

Overall Period of Performance: 1 February 2019 through 31 January 2020.

3001AA 80 Acre OPTION Backpack Spraying

FFP

Weed Control.

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

3001AB 10 Acre OPTION Boom spraying w/an

FFP

Agricultural Spray Boom System Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

3001AC 12 Months OPTION Litter Removal

FFP

Litter collection and removal.

Contractor will regularly visit designated HMUs see Appendix-D (parking and prominent areas, and shorelines), to ensure that these managed areas appear fresh and neat. Services will be provided in accordance with Section C-5.3 of the Performance Work Statement and Section C-7.7 Performance Requirement

3001AD 2 Acre OPTION Mechanical Weed Treatment

FFP

Weed Control – Designated Areas

Contractor shall control weeds throughout all wildlife habitat management units.

This will include all portions of the habitat management units, whether accessed by vehicle, boat, or by air in accordance with Section C-5.14 in the Performance Work

3001AE 20 Each OPTION Non-Security Fencing

FFP

Non-security fencing includes boundary fencing, livestock watering corridor fencing, and fencing in and around Parks and HMUs.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .