Amendment_0001.pdf
PDF 6 MB Posted
- Attached to
- Bid Opening Results Federal contract opportunity
- Solicitation number
- W912EF-15-B-0015
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15-B-0015_Bid_Opening_Results.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| SITE_VISIT_ATTENDEES_15-B-0015.pdf | ||
| Amendment_0002.pdf | ||
| Amend-0002_Plans.pdf | ||
| Plans-FIOs.pdf | ||
| Site_Visit_Information.pdf | ||
| W912EF-15-B-0015.pdf | ||
| Plans-Signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV50158838
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
TITLE: Low er Granite Pow erhouse HVAC Upgrade
The purpose of this amendment is to make the changes indicated in the Summary of Changes.
Bid opening date is extended to September 9, 2015 at 2:00 p.m.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-B-0015
X 9B. DATED (SEE ITEM 11)
04-Aug-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Aug-2015
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
JANI C. LONG
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-15-B-0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. Revised the specification
Removed “BCOES Certification” from the bottom of all pages throughout entire project specifications.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 03-Sep-2015 02:00 PM to 09-Sep-2015 02:00 PM.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE DETERMINATION
General Decision Number: WA150050 08/21/2015 WA50
Superseded General Decision Number: WA20140050
State: Washington
Construction Type: Building
County: Garfield County in Washington.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/02/2015 1 02/27/2015 2 05/29/2015 3 06/12/2015 4 07/03/2015
5 07/10/2015 6 07/24/2015 7 07/31/2015 8 08/21/2015
BRWA0003-002 06/01/2015
Rates Fringes
BRICKLAYER.......................$ 28.82 14.60
BRWA0003-009 06/01/2014
Rates Fringes
TILE SETTER......................$ 22.00 11.85
CARP0001-013 06/01/2015
Rates Fringes
CARPENTER (Including Drywall Hanging and Form Work)...........$ 27.61 14.00
ZONE PAY:
ZONE 1 0-40 MILES FREE
ZONE 2 41-65 MILES $2.25/PER HOUR
ZONE 3 66-100 MILES $3.25/PER HOUR
ZONE 4 OVER 100 MILES $4.75/PER HOUR
DISPATCH POINTS:
CARPENTERS/MILLWRIGHTS: PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
HAZMAT PROJECTS:
Anyone working on a HAZMAT job (task, where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows:
LEVEL D+ $.25 per hour - This is the lowest level of proection. No respirator is used and skin proection is minimal.
LEVEL C+ $.50 per hour - This level uses an air purifying respirator or additional protective clothing.
LEVEL B+ $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit."
LEVEL A+ $1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line.
ELEC0112-014 06/01/2015
Rates Fringes
ELECTRICIAN......................$ 38.80 18.59
ENGI0370-019 06/01/2015
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 26.16 13.55
GROUP 2.....................$ 26.48 13.55
GROUP 3.....................$ 27.09 13.55
GROUP 4.....................$ 27.25 13.55
GROUP 5.....................$ 27.41 13.55
GROUP 6.....................$ 27.69 13.55
GROUP 7.....................$ 27.96 13.55
GROUP 8.....................$ 29.06 13.55
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Rollers, all types on subgrade, including seal and chip coatings
GROUP 2: Fork Lift
GROUP 3: Bulldozer (up to D-6 or equivalent)
GROUP 4: Loaders (overhead & front-end, under 4 yds. R/T)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under 3/4 yd.)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.);
Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Mechanic
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over) Loaders (overhead & front-end, over 8 yds. to 10 yds.)
GROUP 8: Loaders (overhead and front-end, 10 yards and over)
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-012 07/01/2015
Rates Fringes
IRONWORKER (Ornamental, Reinforcing and Structural)......$ 32.76 23.19
LABO0238-007 06/01/2013
Rates Fringes
Laborer, Mason Tender Brick......$ 24.10 10.65
LABO0238-008 06/01/2013
Rates Fringes
LABORER (Spokane)
GROUP 3.....................$ 24.07 10.65
GROUP 4.....................$ 24.34 10.65
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 3: Mason Tender-Cement/Concrete; Pipelayer
GROUP 4: Grade Checker
PAIN0005-001 07/01/2015
Rates Fringes
PAINTER (Brush and Roller, Excludes Spray and Drywall Finishing/Taping)................$ 29.15 10.78
PAIN0005-035 07/01/2015
Rates Fringes
PAINTER (Brush, Roller and Spray)...........................$ 23.05 10.85
PAIN0054-004 10/01/2005
Rates Fringes
FLOOR LAYER: Carpet and Vinyl....$ 15.50 4.22
* PLAS0072-008 06/01/2015
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.01 12.59
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee
Zone 1: 0 - 45 radius miles from the main post office
Zone 2: 45 radius miles from the main post office
PLUM0598-018 06/01/2014
Rates Fringes
PIPEFITTER.......................$ 48.72 27.19
ROOF0189-001 07/01/2011
Rates Fringes
ROOFER (Includes Roof Tear Off, Waterproofing, and Installation of Metal Roofs).....$ 23.10 9.95
SFWA0699-005 04/01/2015
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 30.70 20.25
SHEE0066-027 06/01/2013
Rates Fringes
Sheet metal worker (Including HVAC Duct Work)..................$ 32.83 17.16
SHEE0066-028 06/01/2013
Rates Fringes
Sheet metal worker (HVAC Duct Installation Only)...............$ 32.83 17.16
SUWA2002-005 06/18/2009
Rates Fringes
LABORER: Common or General......$ 16.91 0.00
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 27.94 0.00
OPERATOR: Crane.................$ 25.53 0.00
PIPE INSULATOR/WRAPPER...........$ 24.21 4.07
PLUMBER..........................$ 35.00 0.00
TRUCK DRIVER: Dump Truck........$ 23.50 6.87
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
Lower Granite Powerhouse HVAC Upgrade W912EF-15-B-0015 Amend-0001
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 28 GENERAL REQUIREMENTS
01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS
01 14 00.10 28 PROJECT SITE RESTRICTIONS
01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY
(OPSEC)
01 22 00.10 28 MEASUREMENT AND PAYMENT
01 32 01.00 28 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 29.10 28 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 02.00 28 QUALITY CONTROL SYSTEM (QCS)
01 45 04.00 28 CONTRACTOR QUALITY CONTROL
01 51 00.00 28 TEMPORARY UTILITIES
01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS
01 57 20.00 28 ENVIRONMENTAL PROTECTION
01 78 00.00 28 CLOSEOUT SUBMITTALS
01 78 23.00 28 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00.00 28 DEMOLITION AND DECONSTRUCTION
02 82 13.99 28 ASBESTOS ABATEMENT
02 83 33.12 28 LEAD BASED PAINT (LBP) REMOVAL AND DISPOSAL
DIVISION 03 - CONCRETE
03 30 90.00 28 MINISCULE CONCRETE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00.00 28 FIRE SAFING INSULATION AND FIRESTOPPING
DIVISION 09 - FINISHES
09 29 00.00 28 METAL JOISTS AND STUDS, GYPSUM BOARD AND CEILING ACCESS
DOORS
09 51 00.00 28 ACOUSTICAL CEILINGS
09 90 00.00 28 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 22 19 DEMOUNTABLE PARTITIONS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00.10 28 BASIC MECHANICAL MATERIALS AND METHODS
23 00 01.10 28 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 00 05.10 28 AIR HANDLING UNITS
23 01 30.00 28 HVAC SYSTEM CLEANING
23 02 23.10 28 AIR FILTERS
23 05 29.10 28 METAL SUPPORTS FOR MECHANICAL SYSTEMS
23 05 93.00 28 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00.00 28 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.10 28 COMMISSIONING OF HVAC SYSTEMS
23 09 23.00 28 DIRECT DIGITAL CONTROL FOR HVAC
PROJECT TABLE OF CONTENTS Page 1
23 64 26.10 28 HYDRONIC PIPING
23 64 52.10 28 AIR HEATING AND COOLING COILS
23 82 02.10 28 UNITARY COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 28 GENERAL ELECTRICAL WORK
26 05 19.00 28 INSULATED WIRE AND CABLE
26 20 00.00 28 INTERIOR DISTRIBUTION SYSTEM
26 24 16.00 28 PANELBOARDS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00.00 28
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS
CONTRACTS
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 00 00.00 28 - Page 1
SECTION 01 00 00.00 28
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS
222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx
Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/
Department of Veterans Affairs-VOW to Hire Heroes Act http://benefits.va.gov/vow/
Army Wounded Warrior Program -http://wtc.army.mil/modules/employers/index.html
U.S. Chamber of Commerce Foundation-Hiring Our Heroes http://www.hiringourheroes.org/
Guide to Hiring Veterans - Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house _business_council_-_guide_to_hiring_veterans_0.pdf
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 00 00.00 28 - Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 01.00 28
SUPPLEMENTARY REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 FIELD VERIFICATION OF SITE CONDITIONS
1.4 DEFINITIONS
1.5 WEEKLY WORK SCHEDULES
1.5.1 Contractor's Work Schedule
1.5.2 Government's Work Schedule
1.6 REGULAR CLEANUP AND DEBRIS DISPOSAL
1.7 EQUIPMENT LIST
1.8 TESTING OF EQUIPMENT
1.9 DISPOSITION OF REMOVED EQUIPMENT
1.10 PROTECTION AND RESTORATION OF EXISTING FACILITIES
1.11 PRE-WORK AND POST WORK SURVEYS
1.12 CARE OF DRAINS
1.13 PROTECTION OF POWERHOUSE FLOORS
1.14 AIR PURITY CONTROL IN THE POWERHOUSE
1.15 FIRE CONTROL
1.16 TRAINING
1.17 PROJECT OPERATORS' TRAINING
1.18 PROJECT TECHNICAL SUPPORT
1.19 PROJECT SUPERINTENDENT
1.20 KEY PERSONNEL SUBSTITUTION
1.21 POST AWARD MEETINGS
1.21.1 Pre-Work Meeting
1.21.2 Pre-Construction Meeting
1.21.2.1 Minutes
1.21.2.2 Demobilizing And Remobilizing
1.22 WEEKLY PRODUCTION MEETINGS
1.22.1 Minutes
1.23 ADDITIONAL MEETINGS
1.24 CRANE SUPPORT
1.25 USE OF POWERHOUSE BRIDGE CRANE
1.25.1 General
1.25.2 Crane Operators
1.25.3 Use of the Cranes
1.25.4 Riggers
1.25.5 Lifting Devices
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
SECTION 01 11 01.00 28 - Page 1
ATTACHMENTS:
Weekly Meeting Agenda Template
SECTION 01 11 01.00 28 - Page 2
SECTION 01 11 01.00 28
SUPPLEMENTARY REQUIREMENTS
PART 1 GENERAL
The work covered by this section of the specifications consists of work common to more than one section of these TECHNICAL SPECIFICATIONS.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. Designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Equipment List; I C
Pre-Work Survey Photos And Report; I C
Air Purity Control Program; I C
Project Superintendent; I C
SD-07 Certificates
Key Personnel Substitution; G C
Qualifications; G C
SD-11 Closeout Submittals
Post-Work Survey Photos And Report; I C
Training Manuals; G C
SECTION 01 11 01.00 28 - Page 3
1.3 FIELD VERIFICATION OF SITE CONDITIONS
The Contractor shall field verify all elevations, dimensions, and coordinates of existing features indicated on the contract drawings that affect new construction. Any deviations shall be updated as per Section 01 78 00.00 28, CLOSEOUT SUBMITTALS, paragraph MAINTAIN WORKING AS-BUILT
CONTRACT DRAWINGS AND FIO DRAWINGS.
1.4 DEFINITIONS
a. Qualified Person.
As defined in EM 385-1-1; "DEFINITIONS", unless otherwise specified.
1.5 WEEKLY WORK SCHEDULES
1.5.1 Contractor's Work Schedule
At the Pre-Work Meeting, furnish a schedule of number of working days per week, shifts per day, and hours per shift for contract work. The Contractor shall furnish notification of any change of schedule of regular work hours, overtime work hours, and shifts of work crews and personnel at the site. This notification shall be provided a minimum of 48 hours prior to any schedule change to allow suitable scheduling of Government personnel and inspection. Exception to this requirement may be allowed in case of schedule change due to emergency conditions.
1.5.2 Government's Work Schedule
The maintenance crews at the dam work from 6:30 a.m. to 5:00 p.m., Monday through Thursday. Crews and staff do not work on weekends and Federal holidays. If a Federal holiday falls on a Friday, the crews and staff do not work on the preceeding Thursday. A powerhouse operator is at the site 24 hours a day, 7 days a week, including Federal holidays but is not available to assist the Contractor.
If the Contractor requires Government support or assistance outside of normal work hours, the Contractor must make a formal written request to the Contracting Officer at least one week prior to the date that support/assistance is needed. The Government will review this request, but there is no guarantee that Government support or assistance can be provided.
1.6 REGULAR CLEANUP AND DEBRIS DISPOSAL
With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government, all wastes and demolished materials shall become the property of the Contractor and shall be removed from the job site daily in accordance with Federal, State, and local regulations. The Contractor shall furnish waste containers. All waste containers provided by the contractor shall be emptied daily.
1.7 EQUIPMENT LIST
The Contractor shall furnish a complete list of all equipment to be used on the project 30 days prior to commencement of on-site work. The Contractor shall submit a revised list in the event of change of equipment. Lists shall include rented equipment as well as lease-purchase or sale-leaseback
SECTION 01 11 01.00 28 - Page 4 equipment. The initial list and the revised lists shall indicate dates equipment is assigned to or removed from the project and adequate identification or description of each item of equipment including manufacturer's name (abbreviated), model number, manufacturer's serial number, year of manufacture, and Contractor's assigned serial or record number.
1.8 TESTING OF EQUIPMENT
Before any machinery or mechanized equipment is put to use on the job, it shall be inspected and tested by a qualified person and determined to be in safe operating condition. Cranes or derricks shall be tested by the Contractor or a qualified testing agency in accordance with EM 385-1-1.
Equipment shall be large enough to safely handle proposed picks or tasks without exceeding the crane rating established by these tests.
1.9 DISPOSITION OF REMOVED EQUIPMENT
Unless otherwise specified in other sections of the specifications, all existing equipment removed and not reinstalled shall become the property of the Contractor, removed from the Project site, and disposed of in a legal manner. Materials that cannot be removed daily may be temporarily stored on-site at an approved area. Salvaged materials shall not be sold on the project site.
1.10 PROTECTION AND RESTORATION OF EXISTING FACILITIES
The Contractor shall take precautions to prevent damage to existing facilities while performing work under this contract. Upon completion of the work, all the existing facilities not included as a portion of the work shall be left in a condition better than or equal to the condition existing at time of contract award. Costs for maintenance, repair and restoration of any facilities shall be considered as incidental to and included in the contract price.
1.11 PRE-WORK AND POST WORK SURVEYS
The Contractor shall conduct a pre-work survey prior to start of on-site work and a post-work survey during project cloesout, with the Contracting Officer Representative, of the Government facilities at the work areas.
The results of the surveys shall be documented by digital photographs and descriptive narrative reports. A color copy of the survey photographs and narrative reports shall be submitted to the Contracting Officer within 5 days after survey has been completed.
1.12 CARE OF DRAINS
Existing powerhouse floor drains shall not be used for disposal of any solid material or any liquids other than clean clear water. The Contractor shall demonstrate that the pipes and drains are unobstructed when so directed.
1.13 PROTECTION OF POWERHOUSE FLOORS
a. Care shall be taken to prevent damage to floors (tile and non-tile) and curbs within the powerhouse. Protection shall include a continuous layer of oil-impervious craft paper over the existing floor surface with joints of the craft paper joined with an appropriate tape. In addition, 3/4-inch-thick plywood shall be installed over the craft
SECTION 01 11 01.00 28 - Page 5 paper at all work and storage areas. Plywood joints shall be fastened to ensure edges of plywood sheets are, and remain, flush with each other and do not pose a tripping hazard during execution of this work.
Minimum 4-inch x 4-inch wood timbers shall be installed along existing curb features within the contractor work areas and along perimeters of the work areas. Wood timbers used for curb protection shall be secured in place without anchoring into the existing floors or curbs.
b. Pipe trenches shall remain accessible even if covered. All designations relating to fire protection equipment that get covered shall be remarked after covering. Provide additional blocking and timbers when required. Also suitably protect other surfaces of work.
Damage to floors or curbs caused by Contractor's operation shall be repaired at no additional cost to Government. Repairs shall match surrounding area in color, texture, and surface finish and are subject to approval. Work in the powerhouse shall not start until floor and curb protection meets the satisfaction of the Contracting Officer.
1.14 AIR PURITY CONTROL IN THE POWERHOUSE
The Contractor shall take all necessary precautions to maximize the control, and prevention, of all dust and fumes created by operations under this contract from escaping into the powerhouse. To the maximum extent possible, all dust and dirt shall be removed by vacuum cleaning. At least 10 working days prior to commencement of work in the powerhouse, the Contractor shall submit for approval, in writing, a proposed Air Purity Control Program. Air Purity Control Program shall include, but not necessarily be limited to, the following:
(1) Adequate isolation and ventilation of air arcing, welding, burning, and grinding operations.
(2) Provision of exhaust ducts that shall discharge outside the powerhouse structure where mechanical ventilation is used.
(3) Controlled operation of power driven tools.
(4) Furnishing and removing of oiled sawdust or other dust preventatives in areas that cannot be properly rendered free from excessive dusting by vacuum cleaning or other methods.
(5) Vacuum cleaning of spaces within the work areas where dust accumulates.
(6) Air-, electrical-, or battery-driven equipment may be used inside the powerhouse.
(7) Internal-combustion engine powered equipment will not be permitted to operate inside the powerhouse unless exhausted to the exterior except for short periods of time (not to exceed 15 minutes in a 2 hour window) to unload materials and equipment.
Depending upon the Contractor's plant, equipment, and methods of operation, additional provisions for satisfactory air purity control will be required and shall be included in the proposed Air Purity Control Program.
1.15 FIRE CONTROL
Each piece of internal combustion engine driven equipment used at the work
SECTION 01 11 01.00 28 - Page 6 site shall be equipped with a fire extinguisher in accordance with recommendation of the National Fire Protection Association (NFPA) as appropriate. The minimum approved rating of extinguishers shall not be less than 5-B:C.
1.16 TRAINING
The Contractor shall provide the services of authorized start-up engineers (Manufacturer's Representatives) as necessary to provide training in programming, operation and maintenance. The training shall be provided for operators and maintenance personnel prior to project operation of the HVAC. Provide one, eight-hour class session for operators and maintenance personnel. The class session shall include approximately 8 employees. The Government will provide for the training location. The Contractor shall submit training manuals and documentation for approval 30 days prior to scheduled classes and shall furnish sufficient training materials at the training classes for all students plus a minimum of 3 copies for project files. Where audio/visual materials are used in training classes, 3 copies of such materials shall be furnished to the Project for use in future training. It shall be the Contractor's responsibility to coordinate the training sessions with the Project to ensure minimum conflicts with ongoing Project work.
1.17 PROJECT OPERATORS' TRAINING
The Contractor shall provide the services of one or more authorized individuals for Project Operators' training. Contractor personnel shall be experienced in the operational requirements of all newly installed equipment, and control features. Contractor personnel shall be present at the project and available for assistance for three (3) ten hour work shifts immediately following Government acceptance of newly installed features.
Required work shifts shall be coordinated with the Contracting Officer.
1.18 PROJECT TECHNICAL SUPPORT
a. Contractor shall provide 20 hours of project technical support after Government acceptance of the completed project. One or more Contractor personnel experienced in the operational requirements of all newly installed equipment, and control features shall be available for Technical Support during normal Government Work Schedule hours. See paragraph "Government's Work Schedule" in this section.
b. Support shall include site visits by Contractor personnel. Contractor personnel shall be available at the project within 48 hours, or the next normal Government Work Schedule day following notification by the Government - whichever is later. Technical support shall be available for 60 days following Government acceptance of the newly installed system, or until final Operation and Maintenance Manuals and Parts Catalogs have been approved and received by the Government - whichever is later. See Sections 01 78 00.00 28 CLOSEOUT SUBMITTALS, and 01 78 23.00 28 OPERATION AND MAINTENANCE DATA for requirements of Operation and Maintenance Manuals and Parts Catalogs submittals.
1.19 PROJECT SUPERINTENDENT
At all times during performance of this contract and until the work is completed and accepted the Contractor shall assign and have on the worksite a competent superintendent as per FAR Clause 52.236-6 "Superintendence by the Contractor". Submit Superintendent name and contact information prior
SECTION 01 11 01.00 28 - Page 7 to start of on-site construction.
1.20 KEY PERSONNEL SUBSTITUTION
If the Contractor plans on replacing any Key personnel (Project Superintendent, CQC System Manager, or CQC staff Members) they must have the approval of the Contracting Officer. Personnel shall possess the qualifications that meet or exceed those stated in the specifications for the position of the individual they are replacing. Submit qualifications of new personnel at least 15 calendar days in advance of date of replacement.
1.21 POST AWARD MEETINGS
1.21.1 Pre-Work Meeting
Within 15 days after receipt of Notice to Proceed, the Contractor shall attend a Pre-Work meeting. Senior Level members of the Contractor's staff involved with this contract shall participate in this meeting to discuss the overall contract requirements. The Government will lead this meeting and take the meeting minutes.
1.21.2 Pre-Construction Meeting
The Project Superintendent shall coordinate with the Contracting Officer and establish the date of the Pre-Construction Meeting. The meeting will be held at the project site at least one (1) week prior to mobilizing to the job site. The Project Superintendent shall lead the Pre-Construction Meeting discussing the Contractor's plan on executing the work at the project site, schedule, required clearances and timeframe for them, and plan for implementing safety and quality control. The Government will have key members from the Project staff to discuss environmental and clearance issues. Key members of the contractor staff shall attend this meeting including the Quality Control (QC) System Manager, Site Safety and Health Officer (SSHO) and any other members determined by the Government to be required.
1.21.2.1 Minutes
The Project Superintendent shall be responsible for taking the meeting minutes and shall send them electronically within 48 hours of the meeting to the Government's Project Engineer, Quality Assurance Representative, and Resident Engineer.
1.21.2.2 Demobilizing And Remobilizing
Anytime the Contractor demobilizes from the site and remobilizes at a later date, another Pre-Construction meeting shall be held and shall follow the requirements listed above.
1.22 WEEKLY PRODUCTION MEETINGS
During all onsite construction work the Project Superintendent shall lead a weekly production meeting using the attached "Weekly Meeting Agenda Template " to brief the Government on the status of the project. All elements listed in the agenda shall be thoroughly discussed. For example, the Project Superintendent shall provide the Government a three (3) week "look-ahead" that describes all the planned construction activities, onsite and offsite, over the next three (3) weeks. These activities shall align
SECTION 01 11 01.00 28 - Page 8 to the overall construction schedule submitted under SECTION 01 32 01.00 28 PROJECT SCHEDULE, and if the three (3) week "look-ahead" differs from the construction schedule, the construction schedule shall be updated to include these changes by the next scheduled update. Key members of the Contractor's staff shall attend this meeting, including the Quality Control System Manager, who is responsible for discussing QC aspects of the work as outlined under SECTION 01 45 04.00 28 CONTRACTOR QUALITY CONTROL and SSHO.
The Government reserves the right to require any person from the Contractor's staff, such as the Project Manager, Engineer, scheduler, etc., or key subcontractor personnel to attend this meeting, if Government feels their participation is required.
1.22.1 Minutes
The Project Superintendent shall be responsible for taking the meeting minutes and shall send them electronically within 24 hours of the meeting to the Government's Project Engineer, Quality Assurance Representative, and Resident Engineer.
1.23 ADDITIONAL MEETINGS
The Contractor shall record the minutes of all meetings, including all conference calls, that occur between the Contractor and Government.
Minutes shall be sent electronically within 24 hours of the meeting to the Contracting Officer for concurrence. E-mail subject line shall include project name and meeting topic.
1.24 CRANE SUPPORT
Government mobile crane and crane operator will be available to assist the Contractor with crane support. Crane support will be limited to picks with the intake deck crane to lower elevations. The Contractor shall request support to the Contracting Officer no less than two weeks ahead of the scheduled use. Government crane support will be limited to avoid impacting normal operations by government personnel.
1.25 USE OF POWERHOUSE BRIDGE CRANE
1.25.1 General
The Government's bridge crane within the powerhouse will be available for the work within the working load and movement limits of the crane. The bridge crane will be available for use by the Contractor at such times as not required for other maintenance and repair work performed by Government personnel. The Government will furnish electric power, lubrication, and normal maintenance including adjustments without cost to the Contractor.
The Contractor shall give the Government at least 24 hours notice in advance each time of desired use of the cranes on weekdays and 48 hours notice for use on weekends and Federal holidays.
1.25.2 Crane Operators
The Contractor shall furnish qualified bridge crane operators for their operations. Each operator in addition to meeting the requirements of EM 385-1-1 shall have had at least 1-year experience on a bridge crane of equivalent capacity and characteristics. Qualifications for each operator in the form of an affidavit signed by the operator and the Contractor shall be submitted. The affidavit shall include a complete record of all related work with particular emphasis on experience directly related to operation
SECTION 01 11 01.00 28 - Page 9 of a bridge crane handling comparable loads. Before any operator is approved they shall spend at least 1 hour in being checked out on the cranes under the direct surveillance of a Government operator. The operators may be retested at any time. The Contractor shall ensure that the crane operators have current (within the previous 12 months) physical or medical examinations with emphasis on hearing, eyesight, and cardiovascular conditions. Dates of physical exams shall be submitted to the Contracting Officer.
1.25.3 Use of the Cranes
The Contractor will be liable for all damage, due to fault or negligence, incurred while the cranes are operated by the Contractor's crane operators.
1.25.4 Riggers
Only qualified riggers shall be used in preparing loads for lifting and in attaching such loads to the cranes. See SECTION 01 35 29.10 28 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS paragraph "Riggers" for additional information.
1.25.5 Lifting Devices
The following Government lifting devices will be available for use by the Contractor:
(1) One lifting beam with attachment to lift one generator rotor and shaft combination.
(2) One lifting bracket to lift the generator upper bracket.
The Contractor shall be responsible for furnishing all other rigging, lifting devices, and containers for use with the cranes. Any special lifting devices required for handling new equipment furnished by the Contractor shall be turned over to the Government upon completion of the contract. Standard slings and shackles are not considered "special" lifting devices.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
SECTION 01 11 01.00 28 - Page 10
Weekly Meeting agenda template
Schedule - Work scheduled over the next week Three week look ahead Overall Schedule Review
Submittals Review- Submittal Register Submittals approved by QC Outstanding Submittals RFI’s Letters
Coordination - Clearances required over the next week, include the following:
A description of the work to be performed under the Clearance.
Determine the correct energy isolation points needed to perform the work safely.
Physical barriers, protective grounds, piping blanks, or bulkheads that shall be used, including locations.
Determine the procedure and method of testing for stored energy if applicable.
The date and time the Clearance shall be required.
The estimated length of time the system or equipment shall be out of service and the time to return the system or equipment to service in an emergency.
Coordination issues
Safety- Review of AHA’s for ongoing work Pending AHA’s
Required for new work Status of Gov’t approval
Safety issues
QC -
Preparatory meetings Held over last week- status of meeting minutes
Required over the next week Initial meetings over the next week Follow up over the next week Rework list Review Deficiency tracking log
This page intentionally left blank
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 14 00.10 28
PROJECT SITE RESTRICTIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 LOWER GRANITE SITE AND SAFETY INFORMATION
1.4 PROJECT SECURITY NOTIFICATION PAGERS
1.5 EMPLOYEE TRAINING AND IDENTIFICATION SUMMARY
1.6 PROJECT SECURITY
1.6.1 Contractor Vehicle Access
1.6.2 Vehicle Access
1.6.3 Identification of Employees
1.6.4 Delivery of Equipment
1.7 ACCESS TO AUTOMATED INFORMATION SYSTEMS
1.8 FACILITY OCCUPANCY CLOSURE
1.9 WORK SCHEDULES
1.9.1 Contractor's Work Schedule
1.9.2 Government's Work Schedule
1.10 USE OF WALLA WALLA DISTRICT PARKS
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
ATTACHMENTS:
Security Badge Form
SECTION 01 14 00.10 28 - Page 1
SECTION 01 14 00.10 28
PROJECT SITE RESTRICTIONS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. A designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Employee Training and Identification Summary; I C
Access To Automated Information Systems; G SLE
1.3 LOWER GRANITE SITE AND SAFETY INFORMATION
All Contractor personnel (including all subcontractors) working on-site are required to view the Lower Granite Site and Safety Information DVD prior to beginning on-site work. DVD runs approximately 30 minutes and will be provided to the Contractor by the COR.
1.4 PROJECT SECURITY NOTIFICATION PAGERS
The Government (Project personnel) will issue the Contractor's SSHO and/or Project Superintendent with pagers to be carried at all times while on-site to receive Project Security Notifications. All pagers shall immediately be delivered to the Quality Assurance Representative upon the release of the employee or project completion.
1.5 EMPLOYEE TRAINING AND IDENTIFICATION SUMMARY
a. Provide a spreadsheet containing the following information for all Contractor and Subcontractor personnel working on the Project site:
1. Employee name.
SECTION 01 14 00.10 28 - Page 2
2. Employee photo ID Type Issued: Proximity Card #*** (for Gate/Door Access) OR Photo ID Only.
3. Date Photo ID Issued.
4. Date Photo ID Returned.
5. All applicable employee training that has been completed.
Include all training from Section 01 35 29.10 28 SAFETY AND
OCCUPATIONAL HEALTH REQUIREMENTS, 01 14 00.90 28 INTEGRATING
ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC), and other as specified.
b. Submit EMPLOYEE TRAINING AND IDENTIFICATION SUMMARY prior to beginning of Contractor on-site work. Update and resubmit within 48 hours of any changes.
1.6 PROJECT SECURITY
The Project site is a secured area and access onto the Project is restricted. The security measures affect all of the Contractor's vehicles and personnel. There will be delays when entering Projects due to locked gates, vehicle inspections, and personnel checks. Inspections and checks may include inspection of tool boxes, brief cases, lunch boxes, and other containers. Weapons, alcohol, and illegal drugs are not allowed on the project site.
1.6.1 Contractor Vehicle Access
Only Contractor's work vehicles and equipment that are essential to the conduct of the work will be allowed in any work areas. No privately owned vehicles (POV's) will be allowed. All Contractor vehicles shall display suitable permanent or temporary identification, as well as a Parking Placard issued by the Government. Placard must be hung from the rear view mirror at all times the Contractor vehicle is inside the security fencing.
A limited number of Contractor vehicles will be issued Parking Placards.
Number of vehicles requiring placards will be coordinated at the Pre-Construction meeting. All Contractor vehicles that pass through locked gates will be subject to being searched.
1.6.2 Vehicle Access
Project access roads on both sides of the dams are secured with locked gates. All vehicles that pass through the locked gates will be subject to being searched. No privately owned vehicles (POV's) will be allowed through locked gates. Only Contractor's work vehicles and equipment that are essential to the conduct of the work will be allowed in the work areas. All Contractor vehicles shall display suitable permanent or temporary identification.
1.6.3 Identification of Employees
Government Project personnel will provide the Contractor's personnel with identification badges as they arrive on site. The Contractor shall be responsible for furnishing the Security Badge Form(attached to the end of this SECTION)and initial identification (driver's license) for each employee 5 business days prior to the employee arriving to work on the Project site, and upon issuance of official badges, for requiring each employee engaged on the work to display identification at all times.
SECTION 01 14 00.10 28 - Page 3
Ensure each employee's full name with middle initial is included with the initial identification. All prescribed identification shall immediately be delivered to the Quality Assurance Representative for cancellation upon the release of the employee or project completion. If required by the Contracting Officer, employees will be photographed by the Government.
Employees who fail to submit to photographing will not be allowed on the project site.
Every Contractor employee (prime or subcontractor) shall have a hard hat meeting the requirements of EM 385-1-1. Hardhats shall display the Prime Contractor name, subcontractor name, and the employee's name. Contractor employee hardhats shall not be white with red markings. It shall be the responsibility of the Project Superintendent to enforce this requirement.
1.6.4 Delivery of Equipment
Contractor is responsible for delivery and receipt of all materials and equipment. Government personnel will not be available to assist contractor in these activities. To the maximum extent possible, deliveries shall arrive on the same side of the river as the Contractor's work area.
Delivery vehicles will be allowed to cross the river over the dam only with Government approval. Delivery vehicles arriving on the opposite side of the river as the work area shall be unloaded outside the locked gate, equipment shall be loaded onto Contractor's vehicles, and Contractor's vehicles will then be allowed to cross the dam to the work area.
1.7 ACCESS TO AUTOMATED INFORMATION SYSTEMS
All Contractor employees (U.S. citizens and Non- U.S. citizens) working under this contract (to include grants, cooperative agreements and task orders) who require access to Automated Information Systems (AIS), (stand alone computers, network computers/systems, e-mail, sensitive data areas such as the Control Room) shall, at a minimum, be designated into an ADP-III position (non-sensitive) in accordance with DoD 5220-22-R, Industrial Security Regulation.