Amendment 0003.pdf

PDF 47 KB Posted

Attached to
RECOVERY--Z--PROJECT NUMBER 10210, Lower Monumental Lock And Dam, WA
Solicitation number
W912EF-09-R-0065
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
Amendment 0004.pdf PDF
Amendment 0002.pdf PDF
Plans-Amendment 0002.zip ZIP file
Site Visit Attendees List.pdf PDF
Amendment 0001.pdf PDF
Amend 1 Plans.zip ZIP file
Site Visit Information.pdf PDF
Downloading and viewing drawings.pdf PDF
W912EF-09-R-0065.pdf PDF
Plans 1 of 2.zip ZIP file
Plans 2 of 2.zip ZIP file
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV92376399

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

TITLE: Low er Monumental Navigation Lock Lift Gate Replacement

The purpose of this amendment is to make corrections to the Proposal Instructions and Evaluation Factors as follow s:

-Remove the reference to Factor III under d. Proposal Submission -Add the Attention to Bidders Form NPW FL 118. This Form is required for Factor II, Number (4) Contract Administration

Proposal submission date remains unchanged, October 22, 2009.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Oct-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-09-R-0065

X 9B. DATED (SEE ITEM 11)

22-Sep-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Oct-2009

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

JANI C. LONG

201 NORTH 3RD AVE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-09-R-0065

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

PROPOSAL INSTRUCTIONS AND EVALUATION FACTORS

A. BASIS FOR AWARD

The objective is to award to an offeror who gives the greatest confidence that it will affordably meet the requirements.

The award will be made based on the best overall (i.e. best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to two evaluation factors: Current and Past Performance and Price.

RELATIVE ORDER OF IMPORTANCE

The evaluation factors are listed below in order of relative importance. Current and Past Performance is slightly more important than price. To receive consideration for award, an overall rating of “Acceptable” must be achieved. Offerors are cautioned that the award may not necessarily be made to the lowest price offer.

B. FACTORS AND SUBFACTORS TO BE EVALUATED

FACTOR I – CURRENT AND PAST PERFORMANCE

FACTOR II – PRICE

C. 1 Evaluation Plan for FACTOR I, CURRENT AND PAST PERFORMANCE

The goal of this factor is to evaluate the relative risks associated with an Offeror's likelihood to perform the solicitation requirements as indicated by the offeror's record of relevant current and past performance.

Relevant current and past performance is defined as current or past performance as documented in Table I and Table II of this section, and is performance that is the same as or similar to the work and complexity required in the solicitation.

a) The Government will conduct a performance assessment of the offeror and its major subcontractors based on the currency and relevance of the information, source of the information, context of the data, and general trends in the offeror’s performance as it relates to the probability of successful accomplishment of the required efforts. Major subcontractors (Table II) are defined as fabricators and heavy lift contractors. These efforts include all aspects of schedule, performance and customer support, and the Offeror’s record of (1) conforming to specifications and standards of good workmanship; (2) adherence to contract schedules, including the administrative aspects of performance; (3) ability to resolve technical and manufacturing problems quickly and effectively; (4) businesslike concern for the interest of its customers; (5) establishing and maintaining adequate management of major subcontractors, to include those that are AISC Level III certified; and (6) extent of participation of small businesses in performance of the contract and/or past performance of offerors in complying with the requirements of the clause FAR 52.219-8, Utilization of SB concerns.

b) Offerors are cautioned that in evaluating current and past performance (to include the performance risk assessment), the Government may use data provided in the offeror's proposal and data obtained from other sources. Since the Government may not necessarily interview all of the sources provided by the Offerors, it is incumbent upon the Offerors to explain the relevance of the data provided. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proving low performance risk rests with the Offerors. The Government will base its evaluation of the elements on information received from Offerors, offeror's former customers, business associates, Federal, State, and local government agencies, and electronic databases [e.g., Past Performance Information Retrieval System (PPIRS)].

c) The lack of a relevant performance record may result in an unknown performance risk assessment, which will be used neither to the advantage or disadvantage of the offeror.

Offerors are advised to:

(1) Record all references and projects in the tables in Section 00100 and provide the Customer Satisfaction

Survey link to each reference included in the tables.

(2) These tables may be a source of information to contact the references and request additional information regarding the offeror.

(3) Individuals may be listed more than once if they have specific experience with more than one project.

The evaluations they provide will be specific to the project listed.

C.2 Evaluation Plan for FACTOR II – PRICE

The Government will evaluate offers for award purposes using the Government estimate for comparison and evaluation. The Government will evaluate offers for award purposes by reviewing individual contract line items (CLINs) and evaluating the total of all CLIN prices proposed in Section 00100 – Bidding Schedule/Instructions to Bidders.

D. PROPOSAL SUBMISSION

Any costs related to proposal preparation and submission will not be reimbursed by the Government.

a. Format

Submit each copy of the proposal in a 3-ring binder with a “D” ring or locking closures. Each copy must include the Offeror’s name and address, title, and number of the solicitation clearly identified on the front cover of the binder.

Each binder containing the proposal is expected to include a table of contents and a summary section that contains a brief abstract of the information being presented.

If the materials do not fit within a single binder, they should be separated in additional binders, but all must be clearly identified.

Separate the information by using tabs within the binders. Label the tabs to identify the factor intended for evaluation.

Pages containing text are expected to be 8 ½ x 11 inches with at least one-inch margins at the top, bottom, and both sides. Larger format drawings or tables may be added by folding them to fit within the binder.

Paragraphs should be separated by at least one blank line. A standard 12-point font in either Arial or Times

New Roman fonts are required. Tables and illustrations may use a reduced font size not less than 8-point and the layout may be landscape.

Submit the price proposal information in the same binder, clearly marked with tabs.

b. Content Requirements

To reduce proposal size, the Offeror must confine the proposal to relevant information and documentation sufficient to provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of the proposal.

The evaluation panel for the Government is instructed to evaluate the non-price proposal factors on the basis of the information provided. Extraneous information provided in the proposals will not be considered in the evaluations; therefore, the offeror should only provide information that satisfies the solicitation requirements.

DO NOT cross reference past performance information. It is acceptable to repeat data, project information or experience in more than one non-price area as long as it satisfies the requirements of the factor.

Proprietary information must be clearly marked.

FACTOR I – CURRENT AND PAST PERFORMANCE

The Government will use data provided by listed references or customers and other data sources to evaluate the offeror and major subcontractor relevant current and past performance.

The offeror shall provide references as described in Section 00100 and provide completed Table I and completed Table II (if applicable).

References or customers listed in Tables I and II will complete and submit the “Evaluation of Contractor/Vendor Performance” questionnaire available at:

http://www.surveymonkey.com/s.aspx?sm=ciAsTdcrsTULyiAqi_2bAzrg_3d_3d Right click on your mouse and select “open hyperlink” or cut and paste to your web browser to access the survey.

The references or customers shall complete the questionnaire by using the on-line survey monkey only.

Offerors, please strongly encourage your references or customers to complete the on-line survey prior to the date proposals are due.

FACTOR II – PRICE

The price proposal shall include the following:

(1) Completed, signed and dated Standard Form 1442 (Solicitation, Offer, and Award)

(2) Section 00100 – Completed Bid Schedule (Pricing Information for all CLINs)

(3) Representations and Certifications in Section 00600

(4) Contract Administration Data (Attention to Bidders, Form NPW FL 118)

d. Proposal Submission

Binder Content Number of Copies

One 3-ring binder Factor I, Factor II Original + 5 Copies for each copy

Proposals must be received at the address in Block 7 of the SF 1442 no later than 4:00 p.m. on October 22, 2009.

(End of Summary of Changes)

NPW FL 118 (Rev)

ATTENTION TO BIDDERS

Following bid opening, the low bidder will be requested to submit the data referenced below.

This will expedite our preaward process and facilitate award of the contract.

BIDDER’S QUALIFICATIONS

1. CURRENT BALANCE SHEET and latest PROFIT AND LOSS STATEMENT prepared from the most recent fiscal year and certified by an officer of the company. The name of your banking firm, telephone number and the name of the individual to contact for a line-of-credit reference.

Banking Firm Telephone Number Person to Contact

2. YEARS EXPERIENCE in the field of proposed work ( ) Also indicate similarity between work currently being produced and work required under subject invitation.

Financial Institution Ratings Is your firm listed in:

a. Dun & Bradstreet: ____No ____Yes: If yes, what is rating?

b. Thomas Register: ____No ____Yes: If yes, what is rating?

3. LIST OF PRESENT WORK on hand (year, dollar value, and Firm - including names, addresses and telephone numbers of project supervisors responsible for inspection and acceptance of the work).

a. Government Agencies:

b. Others:

c. Will the above work in any way interfere with the satisfactory completion of the proposed work (i.e. equipment, manpower, etc.)?

____No ____Yes (If yes, explain on reverse of this form.)

4. LIST OF PREVIOUS WORK with Government agencies (year, dollar value, and Firm - including name, addresses and telephone numbers of project supervisors responsible for inspection and acceptance of the work).

5. PERCENTAGE OF WORK expected to be performed by others (subcontract). %

6. MATERIAL SAFETY DATA SHEETS for all substances that may be used on the work site (FAR 52.223-3).

7. Return this form, with all attachments, to Walla Walla District, COE, Contracting Division, 201 N.

Third, Walla Walla, WA 99362.

8. TAX ID No. ________________________________________

9. SUBCONTRACTING PLAN, if required by the solicitation.

File details come from the government source that posted it. Updated .