Amendment 0003.pdf

PDF 86 KB Posted

Attached to
McNary Motor Controllers for Drainage Pump 4 and Unwatering Pumps
Solicitation number
W912EF-09-B-0005
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Plans.zip ZIP file
09-B-0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV82628907

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

TITLE: McNary Motor Controllers for DP4 and Unw atering Pumps

The purpose of this amendment is to revise the specif ications and draw ings as listed in the Summary of Changes.

Bid opening date of January 22, 2009 remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jan-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-09-B-0005

X 9B. DATED (SEE ITEM 11)

16-Dec-2008

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jan-2009

CODE

USAED, WALLA WALLA CONTRACTING DIVISION

JANI C. LONG

201 NORTH 3RD AVE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-09-B-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

1. SECTION 26 05 00.00 28 GENERAL ELECTRICAL WORK – inserted new paragraph 1.1 Existing Conditions and subsequent paragraphs.

2. SECTION 26 05 00.00 28 GENERAL ELECTRICAL WORK, paragraph 1.3 Submittals – added submittals for Qualifications Of The Asbestos Contractor and Waste Shipment Records.

3. SECTION 01 33 00 SUBMITTAL PROCEDURES – Submittal Register changed as a result of added submittals (see note 2).

4. Sheet E-504 – Detail D, replaced text ""SP203-c2", SEE NOTE 10" with ""SP203-c2", SEE

NOTE 7."

5. Sheet E-601 – replaced text "SEE NOTE 7 ON SHEET E-507" with "SEE NOTE 7 ON

SHEET E-504."

6. Sheet E-603 – In Table Schedule A – changed number of conductors in SP128-p1-SP2. The "4" was replace with a "3."

(End of Summary of Changes)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES

W912EF-09-B-0005

McNary Motor Controllers for DP4 & Unwatering Pumps

25 31 00.01 28 2.1.1Enclosures 2.2.1Control Relays 2.2.2Selector Switches 2.2.3Pushbuttons and Control Stations 2.2.4Indicating Lights 2.2.5Terminal Blocks 2.2.6Fuses

26 05 00.00 28 SD-01 Preconstruction Submittals

3.1 G ELEquipment Replacement and

Cutover Plan SD-06 Test Reports

1.1.1.3Waste Shipment Records SD-07 Certificates

1.1.1.1Qualifications Of The Asbestos Contractor

26 05 19.01 28 SD-03 Product Data 3.3Installation Instructions

2.1 G ELInsulated Wire and Cable

2.5 G ELSpecial Wire And Cable

2.1.5.3Hinge Wire 3.3.1Splices and Connectors

SD-06 Test Reports 1.4Tests, Inspections, and

Verifications 3.4.1Insulation-Resistance Test 3.4.1Continuity Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

G4EDDLKC

Typewritten Text Amendment 0003

G4EDDLKC

Line

McNary Motor Controllers for DP4 & Unwatering Pumps W912EF-09-B-0005

SECTION TABLE OF CONTENTS

DIVISION 26 - ELECTRICAL

SECTION 26 05 00.00 28

GENERAL ELECTRICAL WORK

PART 1 GENERAL

1.1 EXISTING CONDITIONS

1.1.1 Asbestos in Wiring

1.1.1.1 Removal

1.1.1.2 Disposal

1.1.1.3 Waste Shipment Records

1.1.2 Lead-Based Paint

1.2 REFERENCES

1.3 SUBMITTALS

1.4 PREVENTION OF CORROSION

1.5 GENERAL REQUIREMENTS

1.5.1 Departures from Drawings

1.5.2 Code

1.5.3 Coordination

1.5.4 Special Environments

1.5.4.1 Weatherproof Locations

1.5.5 Materials and Equipment

1.5.6 Standard Products

1.5.7 UL Listing

1.5.8 Identification Nameplates

1.5.9 Warnings

1.5.10 As-Built Drawings

1.6 WORKMANSHIP

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION

3.1 EQUIPMENT REPLACEMENT AND CUTOVER PLAN

3.1.1 General

3.1.2 Unwatering and Drainage Pump Coordination

3.1.3 Required Provisions

3.1.4 Sequence of Work

3.1.5 Sump Watch

3.2 REPAIR OF EXISTING WORK

3.2.1 Workmanship

3.2.2 Existing Concealed Wiring to be Removed

3.3 PAINTING AND FINISHING

3.3.1 Factory-Applied Paint

3.3.2 Field-Applied Prime Coats

3.3.3 Repair of Zinc Coatings

-- End of Section Table of Contents --

SECTION 26 05 00.00 28

G4EDDLKC

Line

G4EDDLKC

Line

G4EDDLKC

Typewritten Text Amendment 0003

SECTION 26 05 00.00 28

GENERAL ELECTRICAL WORK

PART 1 GENERAL

1.1 EXISTING CONDITIONS

1.1.1 Asbestos in Wiring

Wire samples were taken from the SP2 Board at McNary on 1/9/09. The sample results verify 60% chrysotile asbestos. The test results are included at the end of this SECTION. The dark woven fabric is free of asbestos, but the asbestos is contained in the underlying tan insulation, thus pulling the wiring should not release any fibers. Fibers could be released during cutting, however this would be minimal since the fibers are bound up in a matrix that would not allow them to be easily released.

1.1.1.1 Removal

Remove existing board SP2 from the powerhouse with all wiring intact and remove from the project site. Once offsite, existing wiring with asbestos-containing material in the insulation shall be removed by a qualified and licensed asbestos contractor. Qualifications of the asbestos contractor shall be submitted to the Contracting Officer for approval prior to start of asbestos removal.

1.1.1.2 Disposal

Disposal of asbestos-containing material shall be at a landfill approved for asbestos disposal by the USEPA, and state and local regulatory agencies. The Contractor shall provide written evidence that the landfill to be used is approved for asbestos disposal by the USEPA, and state and local regulatory agencies.

1.1.1.3 Waste Shipment Records

The Contractor shall complete and provide the Contracting Officer final completed copies of the Waste Shipment Record for all shipments of asbestos waste material and other required state waste manifest shipment records, within three (3) days of delivery to the landfill. Each Waste Shipment Record shall be signed and dated by the Contractor, the waste transporter, and disposal facility operator.

1.1.2 Lead-Based Paint

Lead-based is present on the SP2 board. The Contractor's activities shall not include any abrasive operations, such as sanding, grinding, etc.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

SECTION 26 05 00.00 28

G4EDDLKC

Typewritten Text Amendment 0003

G4EDDLKC

Line

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI/NECA 1 (2000) Standard Practices for Good Workmanship in Electrical Contracting

ASTM INTERNATIONAL (ASTM)

ASTM A 123/A 123M (2002) Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A 780 (2001) Repair of Damaged and Uncoated Areas of Hot-Dipped Galvanized Coatings

FEDERAL SPECIFICATIONS (FED. SPEC.)

Fed. Spec. TT-P-38 Paint, Aluminum (Ready Mixed) & Revs

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C2 (2008) National Electrical Safety Code

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2005) National Electrical Code

THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC Paint 25 (1997; R 2004) Zinc Oxide, Alkyd, Linseed Oil Primer for Use Over Hand Cleaned Steel, Type I and Type II

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Equipment Replacement and Cutover Plan; G EL

SD-06 Test Reports

Waste Shipment Records

SD-07 Certificates

Qualifications Of The Asbestos Contractor

1.4 PREVENTION OF CORROSION

Protect metallic materials against corrosion. Provide equipment enclosures with the standard finish by the manufacturer when used for most indoor installations. Do not use aluminum when in contact with earth or concrete and, where connected to dissimilar metal, protect by approved fittings and treatment. Ferrous metals such as, but not limited to, anchors, bolts, braces, boxes, bodies, clamps, fittings, guards, nuts, pins, rods, shims, SECTION 26 05 00.00 28

G4EDDLKC

Line

G4EDDLKC

Typewritten Text Amendment 0003 thimbles, washers, and miscellaneous spare parts not of corrosion-resistant steel must be hot-dip galvanized except where other equivalent protective treatment is specifically approved in writing.

1.5 GENERAL REQUIREMENTS

1.5.1 Departures from Drawings

The contract drawings constitute the working drawings for construction and for purchase of required materials, and indicate the extent and general location and arrangement of equipment, conduit, and wiring. The Contractor shall become familiar with all details of the work and verify all dimensions in the field so that the outlets and equipment shall be properly located and readily accessible. If any departures from the contract drawings are deemed necessary by the Contractor, details of such departures and reasons therefore shall be submitted to the Contracting Officer for approval as soon as practicable but not later than 30 days before installation. No such departure shall be made without the prior written approval of the Contracting Officer.

1.5.2 Code

The installation shall be in accordance with the National Electrical Code ( NFPA 70), and National Electrical Safety Code (IEEE C2) except where more stringent requirements are indicated herein or shown on the contract drawings. Omission of details on the drawings or in the specifications shall not be construed as permitting deviations from Code requirements.

1.5.3 Coordination

Raceways, outlets, and other equipment and materials shall be carefully coordinated with new and existing mechanical or structural features prior to installation and positioned accordingly. The Contractor shall coordinate the electrical requirements of the mechanical work and provide all power related circuits, wiring, hardware and structural support, even if not shown on the drawings.

1.5.4 Special Environments

1.5.4.1 Weatherproof Locations

Wiring, fixtures, and equipment shall conform to NFPA 70 requirements for installation in damp or wet locations.

1.5.5 Materials and Equipment

Materials and equipment shall be approved based on the manufacturer's published data. All electrical materials shall be new, not used or refurbished. Defective equipment or equipment damaged in the course of installation shall be replaced or repaired without cost to the Government in a manner meeting the approval of the Contracting Officer. Insofar as practicable, equipment for the same, similar, or allied service shall be of the same make and type, and when of the same rating it shall be interchangeable.

1.5.6 Standard Products

Unless otherwise indicated, the products to be furnished under this specification shall be the standard products of manufacturers regularly engaged in the production of such items and shall be the manufacturer's latest standard marketed design. Products shall be new, not used or refurbished.

1.5.7 UL Listing

The materials and equipment to be furnished under this specification shall be UL listed. The label or listing of the Underwriters Laboratories, Inc., shall be accepted as evidence that the materials or equipment conform to the applicable standards of that agency. In lieu of this label or listing, a statement from a nationally recognized, adequately equipped testing laboratory indicating that the items have been tested in accordance with required procedures and that the materials and equipment comply with all requirements of the governing authority will be accepted.

1.5.8 Identification Nameplates

Major items of electrical equipment and major components shall be permanently marked with an identification name to identify the equipment by type or function and specific unit number as indicated. Designation of motors shall coincide with their designation in the motor control center or panel. Unless otherwise specified, all identification nameplates shall be made of laminated plastic with black outer layers and a white core. Edges shall be chamfered. Plates shall be fastened with black- finished round-head drive screws, except motors, or approved nonadhesive metal fasteners. When the nameplate is to be installed on an irregular-shaped object, the Contractor shall devise an approved support suitable for the application and ensure the proper installation of the supports and nameplates. In all instances, the nameplate shall be installed in a conspicuous location. At the option of the Contractor, the equipment manufacturer's standard embossed nameplate material with black paint-filled letters may be furnished in lieu of laminated plastic. The following equipment, as a minimum, shall be provided with identification nameplates:

Minimum 1/4-Inch High Letters Minimum 1/8-Inch High Letters

Motor Control Centers Control Power Transformers Motors and Starters Pilot Lights

Each panel, section, or unit in motor control centers, switchgear or similar assemblies shall be provided with a nameplate in addition to nameplates listed above, which shall be provided for individual compartments in the respective assembly, including nameplates which identify "future," "spare," and "dedicated" or "equipped spaces."

Identification plates must be furnished for all line voltage enclosed circuit breakers, identifying the equipment served, voltage, phase(s) and power source.

1.5.9 Warnings

Circuits 480 volts and above must have conspicuously located warning signs in accordance with OSHA requirements.

1.5.10 As-Built Drawings

Following the project completion or turnover, the Contractor shall furnish as-built drawings to the Contracting Officer in accordance with SECTION

01 11 01.00 28, SUPPLEMENTARY REQUIREMENTS.

1.6 WORKMANSHIP

All work shall be completed in a neat and workmanlike manner and shall conform to the best modern practice in the class of work regardless of any omission in the drawings and specifications. Accepted industry practices are as described in ANSI/NECA 1 and other ANSI approved installation standards.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION

3.1 EQUIPMENT REPLACEMENT AND CUTOVER PLAN

3.1.1 General

The Contractor shall submit at least 60 days prior to the equipment installation date the proposed step-by-step removal and installation procedure and system cutover schedule. The procedures and schedule shall include those activities and requirements listed in the TECHNICAL SPECIFICATIONS and indicated on the drawings. The construction sequence will be critical in maintaining availability and operability of Drainage Pump No. 4 and the Unwatering Pumps during the change-out of the equipment. Outages shall be kept to a minimum and shall be coordinated with the Contracting Officer. Temporary outages of individual circuits will be required as loads are transferred from the existing panels and Unwatering Pump MCC to the new MCC and Control Panel. Proper sequencing of the work shall be required to minimize the duration of pump outages.

3.1.2 Unwatering and Drainage Pump Coordination

Unwatering Pumps No. 2 (UP2) and Unwatering Pump No. 3 (UP3) are back-up pumps for the Drainage Pump No. 4 (DP4). DP4 must be fully operational and able to pump down the Drainage Sump without unwatering Pumps, before UP2 and UP3 can be disabled. At no time shall the Drainage Pump and Unwatering Pumps No. 2 or No. 3 all be out of commission at the same time. Circuit the DP4 water level control circuit from the Unwatering Pump MCC (SP2) to the Drainage Pump motor controller (DP4C). Provide temporary "Preferred AC" power to FS2 and disconnect the "Preferred AC" power coming from SP2.

Install Unwatering Pump control panel (SP2C) and cut-in parallel control and annunciations circuits. Remove existing Unwatering Pump MCC. Install the new Unwatering Pump MCC; connect, test and verify operations.

Disconnect and remove (demo) remaining conduit and conductors for the old MCC. The SEQUENCE OF WORK paragraph below provides more detail.

3.1.3 Required Provisions

The Contractor shall submit for approval a detailed step-by-step installation plan and schedule for performing the work. The plan shall include a detailed sequential list of activities, duration of each activity, and duration of all outages required. The plan shall reflect the Project's safe clearance procedure for de-energizing equipment, in accordance with SECTION 01 35 29.10 28 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS. No work will be allowed to commence until the plan is approved. Any revisions to the approved plan shall be submitted for approval.

3.1.4 Sequence of Work

The following is the recommended major sequence of work that shall be followed to minimize outages during cutover of the entire installation.

This is not all-inclusive and does not address replacement of equipment or circuits beyond the Unwatering Pump MCC and Control Panel and the Drainage Pump motor controller (DP4C). The Contractor's submitted plan shall address all tasks specified in this contract, as well as those major tasks listed below. Changes to the required sequence may be recommended as part of the Contractor's plan if the changes provide economy of labor without increasing the required outages.

a. Install new Drainage Pump No. 4 motor controller (DP4C) and connect to Drainage Pump No.4. Inspect and test the DP4 and DP4C together.

Observe if DP4 can lower the water levels in the Drainage Sump without an Unwatering Pump operating. If DP4 cannot lower water levels in the Drainage Sump without an Unwatering Pump operating also, notify the Contracting Officer in writing.

b. Move the automatic control for DP4 from SP2 to the Drainage Sump motor controller panel DP4C. The Drainage Sump pump control is connected to Drainage Sump sensor and relay panel (FS2). Connect the DP4 automatic input to the appropriate FS2 relay and disconnect input to SP2.

c. The FS2 relays and sensors require "Preferred AC." Cut-in to conduit SO11-u1-SP203 connected to SP2 and provide parallel temporary power to FS2 so DP4 can operate automatically from FS2 without SP2.

Maintain "Preferred AC" power to SP2.

d. Install SP2C. Provide parallel control and annunciation circuits for the existing SP2 control and the new SP2C. The parallel circuits shall allow SP2C to be connected and tested while the existing SP2 controls are functional. Run parallel conduit and conductors from SP2C to existing control and annunciation circuits and cut-in. Test SP2C with existing control and annunciation circuits. Verify SP2C meets Unwatering Pump controls including sequence of operation.

e. After the SP2C has been tested and approved by Contracting Officer;

remove (demo) the old MCC SP2. Install new MCC SP2. Connect 4160 VAC and 250/125 VDC power to the MCC and test in local manual mode.

Maintain manual operability while the SP2C circuits are being connected. Connect control and annunciation circuits. Test and verify operation.

f. Disconnect and remove control and annunciation circuit that connected to the old MCC.

3.1.5 Sump Watch

The pumps and pump control shall remain operational as much as is practical. During period when the automatic pump controls are being cut-in and reconnected, the Unwatering Pumps shall remain operable in the manual (hand) mode. While in the "manual" mode the Contractor shall station a person to watch and monitor the Unwatering Sump and the Drainage Sump. The sump watch shall be responsible to notify the Contracting Officer if the sump levels are raising too high or lowing too close to the pump bowls.

3.2 REPAIR OF EXISTING WORK

Repair of existing work, demolition, and modification of existing electrical distribution systems shall be performed as follows.

3.2.1 Workmanship

Lay out work in advance. Exercise care where cutting, channeling, chasing, or drilling of floors, walls, partitions, ceilings, or other surfaces is necessary for proper installation, support, or anchorage of conduit, raceways, or other electrical work. Repair damage to buildings, piping, and equipment using skilled craftsmen of trades involved.

3.2.2 Existing Concealed Wiring to be Removed

Existing concealed wiring to be removed shall be disconnected from its source. Remove conductors; cut conduit flush with floor, underside of floor, and through walls; and seal openings.

3.3 PAINTING AND FINISHING

3.3.1 Factory-Applied Paint

The enclosures for the following listed items shall be factory painted inside and outside using the manufacturer's standard practice.

Item Finish Color

Motors Manufacturer's Motor control enclosure Manufacturer's ANSI - Gray

3.3.2 Field-Applied Prime Coats

All ferrous-metal surfaces not specified to be factory painted shall be painted with one (1) primer coat of SSPC Paint 25 and two (2) top coats of Fed. Spec. TT-P-38. Surface preparation and application of paint shall be in accordance with the manufacturer's printed application instructions.

3.3.3 Repair of Zinc Coatings

Application of zinc coatings shall be in a manner and of a thickness and quality conforming to ASTM A 123/A 123M. In all cases where zinc coating is damaged by cutting, welding, or other causes, the affected areas shall be regalvanized by use of repair sticks or powders, as specified in ASTM A 780, Type Zinc-based Solders, Annex A1. The repaired area shall be at least equal in thickness and protection as the original hot-dipped coating. Repairing of zinc coatings by painting with zinc-rich or other corrosion inhibiting paint will not be permitted.

-- End of Section --