About this file

Amendment 0001

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
Amend0002plans.zip ZIP file
Downloading and viewing drawings.pdf PDF
09-B-0003 LoMo Gate Repair 2009.pdf PDF
Plans Vol 1 of 1.zip ZIP file
Site visit.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV82417289

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

Change is made to the paragraph regarding explanation of Not To Exceed quantities on the Bid Schedule. No other changes are made as a result of this amendment.

LOWER MONUMENTAL DAM NAVIGATION LOCK DOWNSTREAM GATE REPAIR, SPRING 2009

1. CONTRACT ID CODE PAGE OF PAGES

J

FAR (48 CFR) 53.243

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Dec-2008

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-09-B-0003

X 9B. DATED (SEE ITEM 11)

02-Dec-2008

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Dec-2008

CODE

USAED, WALLA WALLA CONTRACTING DIVISION

PHYLLIS L. BUERSTATTE

201 NORTH 3RD AVE.

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-09-B-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

1. Bid opening date remains unchanged as a result of this amendment.

2. Bidders must acknowledge receipt of this amendment. See Block No. 11 of Standard Form 30 for methods of acknowledging solicitation amendments.

3. The following change is made to the solicitation: The NTE, Not To Exceed, paragraph at the end of the bid schedule is amended as shown.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

BID SCHEDULE

Lower Monumental Downstream Navlock Gate Repair The magnitude of this construction is between $250,000 and $500,000

ITEM

DESCRIPTION

QUANTITY

U/M

U/P

AMOUNT

0001 Mobilization and Demobilization 1 LS XXXXX $________

0002 Type 1 Crack Repair

0002AA Repair- 1 Crack 1 LS XXXXX $________

0002AB Additional Type 1 Crack Repair *NTE 3 EA _______ $________

0003 Type 2 Crack Repair

0003AA Repair- 3 Cracks 1 LS XXXXX $________

0003AB Additional Type 2 Crack Repair *NTE 1 EA _______ $________

0004 Type 3 Crack Repair

0004AA Repair- 29 Cracks 1 LS XXXXX $________

0004AB Additional Type 3 Crack Repair *NTE 4 EA _______ $________

0005 Type 4 Crack Repair

0005AA Repair- 3 Cracks 1 LS XXXXX $________

0005AB Additional Type 4 Crack Repair *NTE 2 EA _______ $________

0006 Type 5 Crack Repair

0006AA Repair- 1 Crack 1 LS XXXXX $________

0006AB Additional Type 5 Crack Repair *NTE 1 EA _______ $________

0007 Type 6 Crack Repair (6 Cracks) 1 LS XXXXX $________

0008 Type 7 Crack Repair

0008AA Repair- 1 Crack 1 LS XXXXX $________

0008AB Additional Type 7 Crack Repair *NTE 1 EA _______ $________

0009 Drain Holes (2 Locations) 1 LS XXXXX $________

0010 **NDT Inspection Before Repairs

(56 Crack Locations)

1 LS XXXXX $________

0011 **NDT Inspection After Repairs

0011AA 44 Crack Locations 1 LS XXXXX $________

0011AB Additional NDT Inspections *NTE 12 EA _______ $________

0012 Touchup Painting- Existing Repaired

Areas with Reinforcing Bars (21 Locations)

0013 Touch Painting- Existing Repaired Areas with Stiffeners. (28 Locations)

0014 Touchup Painting- NDT and New Crack

Repaired areas. (56 Locations)

0015 Structural Inspection: Skin Plate Framing

SCHEDULE TOTAL $__________

*NTE--Not to exceed. The Government will evaluate and award NTE items based on the maximum quantities noted in the bid schedule. The Government will pay the Contractor on a per unit basis for NTE CLINS. Payment will not exceed the extended amount of the respective NTE CLIN. For example: CLIN 0002AB has a NTE quantity of 3 each for Type 1 Crack Repair. If only 2 actual repairs need to be done, the Government will only pay for 2 repairs, not 3.

**NDT – Non Destructive Testing

File details come from the government source that posted it. Updated .