B.08.Amendment W912EE2BA009-0002_Combined Bulkheads_from Lock 1 Drawings.pdf
PDF 7 MB Posted
- Solicitation number
- W912EE25BA009
About this file
These are engineering design drawings for Lock Bulkheads (Types A, B, and C) for the Red River Waterway Lock & Dam No. 1, Phase III Construction project. The detailed technical drawings, dated June 1978, include comprehensive structural plans and sections for lock bulkheads with intricate specifications for components such as upper and lower trusses, horizontal truss layouts, emergency bulkhead hoist operations, end framing, and various mechanical details like reaction rollers, bumpers, bearing pads, and water seals. The drawings are prepared by the U.S. Army Engineer District in New Orleans and provide precise engineering specifications for structural elements of lock infrastructure, with multiple view perspectives including plans, elevations, sections, and detailed mechanical component drawings.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
b4eddrlm Line
| 15-1 |
| 15-2 |
| 15-3 |
| 15-4 |
| 15-5 |
| 15-6 |
| 15-9 |
File details come from the government source that posted it. Updated .