This document provides details for a federal solicitation seeking articulated concrete mattress casting services. The U.S. Army Corps of Engineers, Vicksburg District, requires a contractor to provide articulated concrete mattress casting at a mat casting field in Delta, Louisiana. The estimated value of the work is between $10-25 million. Solicitation number W912EE23B0002 was issued as an invitation for bid on December 2, 2022, with bids due on January 4, 2023 at 2:00 PM Central. The solicitation package is available electronically and bidders should monitor the site for amendments. Bidders must be registered in SAM, including the applicable NAICS code, to receive an award. Drawings will be made available later.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Solicitation No. W912EE23B0002, for Delta, Louisiana, Madison Parish, Louisiana, RM 438.0-R A.H.P., FC/MR&T, Channel Improvement, Articulated Concrete Mattress Casting, FY-23, is amended as follows.
SEE CONTINUATION PAGE FOR SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EE23B0002
X 9B. DATED (SEE ITEM 11)
02-Dec-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Dec-2022
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EE23B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
Amendment 0001:
SPECIFICATIONS: Bid Schedule has been replaced in its entirety.
Special Notes to the Contractor, Section 01 00 00.00 09, Section 01 22 00.00 09, and Section 03 30 01.00 09 are revised and replaced.
Specifications revised by this amendment have the notation "Revised by Amendment 0001" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.
All other terms and conditions remain unchanged.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The below Table of Contents has been added
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 AM 0001 61 23-DEC-2022
(End of Summary of Changes)
Section B - Supplies or Services and Prices
DELTA, LA, MADISON PARISH, RM 438.0-R, A.H.P.
FC/MR&T, CHANNEL IMPROVEMENT
ARTICULATED CONCRETE MATTRESS CASTING
BIDDING SCHEDULE
CASTING AT DELTA, LA
EST UNIT EST
ITEM DESCRIPTION QTY U/M PRICE AMOUNT
BASE WORK
0001 Articulated Concrete Mattress
0001AA Casting Mattress (exclusive 60,000 SQ $__________ $____________ of cement, and fly ash), using Portland Cement, fly ash, and water-reducing admixture
0001AB Portland Cement 146,100 CWT $__________ $____________
0001AC Fly Ash 27,000 CF $__________ $____________
0001AD Metal Chairs 240,000 EA $__________ $____________
Total Base Work: $________________________
OPTION 1
0002 Articulated Concrete Mattress
0002AA Casting Mattress (exclusive 10,000 SQ $__________ $____________ of cement, and fly ash), using
0002AB Portland Cement 24,350 CWT $__________ $____________
0002AC Fly Ash 4,500 CF $__________ $____________
0002AD Metal Chairs 40,000 EA $__________ $____________
Total Option 1: $________________________
Revised By Amendment 0001
B4EDGDML
Cross-Out
CASTING AT DELTA, LA continued…
OPTION 2
0003 Articulated Concrete Mattress
0003AA Casting Mattress (exclusive 10,000 SQ $__________ $____________ of cement, and fly ash), using
0003AB Portland Cement 24,350 CWT $__________ $____________
0003AC Fly Ash 4,500 CF $__________ $____________
0003AD Metal Chairs 40,000 EA $__________ $____________
Total Option 2: $________________________
OPTION 3
0004 Articulated Concrete Mattress
0004AA Casting Mattress (exclusive 5,000 SQ $__________ $____________ of cement, and fly ash), using
0004AB Portland Cement 12,175 CWT $__________ $____________
0004AC Fly Ash 2,250 CF $__________ $____________
0004AD Metal Chairs 20,000 EA $__________ $____________
Total Option 3: $________________________
CASTING AT DELTA, LA continued…
OPTION 4
0005 Articulated Concrete Mattress
0005AA Casting Mattress (exclusive 5 ,000 SQ $__________ $____________ of cement, and fly ash), using
0005AB Portland Cement 12,175 CWT $__________ $____________
0005AC Fly Ash 2,250 CF $__________ $____________
0005AD Metal Chairs 20,000 EA $__________ $____________
Total Option 4: $________________________
CASTING AT DELTA, LA
TOTAL OF BASE BID Plus Options 1, 2, 3, & 4: $______________________________
ITEM DESCRIPTION
EST.
QUANTITY U/M U/P
EST.
AMOUNT
BASE WORK
0001 Articulated Concrete Mattress 60,000 SQ ________ ___________
Total Base Work: $ ____________________
OPTION 1
0002 Articulated Concrete Mattress 10,000 SQ ________ ___________
Total Option 1: $ ____________________
OPTION 2
0003 Articulated Concrete Mattress 10,000 SQ ________ ___________
Total Option 2: $ ____________________
OPTION 3
0004 Articulated Concrete Mattress 5,000 SQ ________ ___________
Total Option 3: $ ____________________
OPTION 4
0005 Articulated Concrete Mattress 5,000 SQ ________ ___________
Total Option 4: $ ____________________
TOTAL OF BASE BID Plus Options 1, 2, 3, & 4: $__________________________
Delta, LA, Madison Parish, RM 438.0-R A.H.P.
FC/MR&T, Channel Improvement
Articulated Concrete Mattress Casting
Revised By Amendment 0001
B4EDGDML
Underline
B4EDGDML
Underline
B4EDGDML
Underline
B4EDGDML
Underline
Underline
Special Notes to the Contractor: THIS PROCUREMENT IS UNRESTRICTED.
NOTE 1: The bidder is required to bid on all line items on Casting at Delta, LA. Failure to submit a bid on all line items shall result in a non-responsive bid, requiring rejection thereof. If a bidder is willing to waive costs associated with the individual line item, he/she is required to insert descriptive words or abbreviations such as "no charge" or "N.C.". Award will be based upon the lowest responsible, reasonable bid. See note below regarding evaluation of options.
NOTE 2: END ITEMS. For small business concern representative purposes, the end item being procured under this solicitation are completed squares of articulated concrete mattress. Ingredients such as Portland Cement and Fly Ash, etc., are not end items.
NOTE 3: Cement and Fly Ash quantities are based on theoretical quantities and will be used to evaluate bids.
Actual amounts will depend on the various mix designs furnished by the Government during the contract performance period. Fly Ash may vary from 0 to 35 percent of total cementitious materials as directed by the Government.
NOTE 4: For variation in quantity clause see Section F – DELIVERIES OR PERFORMANCE, paragraph entitled
“VARIATION IN QUANTITY (FAR 52.211-16 - APR 1984)”.
NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTION WORK Items by written notice to the Contractor. Option 1 and/or 2 can be exercised and awarded by the Contracting Officer up until August 1, 2023. Option 3 and/or 4 can be exercised and awarded by the Contracting Officer up until September 1, 2023. Options are not required to be awarded in consecutive order. The Contracting Officer may elect not to award any options or may award any combination of options at his discretion. Bidders shall bid on all items including optional items (see “EVALUATION OF OPTIONS” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 - JUL 1990). The Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
NOTE 7: Bid Items 0001AB, 0001AC, 0002AB, 0002AC, 0003AB, 0003AC, 0004AB, 0004AC, 0005AB, and 0005AC are estimated quantities only. (See Note 3 above.) Actual pay quantities will be the theoretical quantities based on government mix design and the actual number of accepted mats. The Government mix design may vary as directed during casting operations.
NOTE 8: Bidders shall furnish unit prices for each item listed in the schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND
THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE DECLARED
NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR AWARD.
NOTE 9: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well.
Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).
NOTE 10: RAPID VENDOR PAYMENT. Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment
NOTE 11: This contract shall be performed at Delta Point Casting Field as indicated unless the designated field becomes inaccessible or inoperable. If for any reason the designated field becomes inoperable, the Government, Revised By Amendment 0001
B4EDGDML
Cross-Out shall require the bidder to cast the squares required for this contract at either St. Francisville, LA Casting Field or Richardson Landing, TN Casting Field depending on availability. If this situation arises where the location of performance changes, the bidder may upon request and approval of the Contracting Officer, be allowed to request an equitable adjustment in contract price for concrete mattress pursuant to the Contract Clause, CHANGES – FIXED
PRICE (FAR 52.243-1).
NOTE 12: The Contractor shall provide a vehicle and operator for hauling and delivering the field concrete specimens to the onsite testing laboratory. A vehicle operator shall be provided during the hours of concrete placement and at any time requested by the Contracting Officer Representative. The Contractor shall maintain the vehicle in a safe and reliable operating condition.
NOTE 13: All technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. See Special Notes to Bidders Page entitled “TECHNICAL INQUIRIES
AND QUESTIONS”.
NOTE 14: The SF33, Bidding Schedule, and Section K (representations, certifications, and other statement of offerors) must be accurately completed and returned with your bid, or it may be rejected as nonresponsive. See Section L for Instructions and Special Notices to Bidders.
NOTE 15: Please be advised that the System for Award Management Registration (SAM) replaces CCR/FedReg and ORCA. All references to CCR and ORCA are to be replaced with SAM. Contractors may obtain information on registration and annual confirmation requirements via the SAM accessed through https://www.acquisition.gov or by calling 866-606-8220, or 334-206-7828 for international calls.
NOTE 16: SITE VISITS. For site visit information see Section L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS, paragraph entitled “SITE VISIT”.
NOTE 17: AUTHORITY, APPROPRIATIONS, AND FUNDING INFORMATION
1. AUTHORITY: Flood Control Acts of 1928 (Section 1); 1936 (Section 1); 1938 (Section 4); 1941 (Section 3); 1944 (Section 10); 1962 (Section 203); 1965 (Section 201, 204); 1966 (Section 202, 203);
and 1970 (Section 207) Further Continuing and Security Assistance Appropriations Act, 2017.
2. APPROPRIATION: Inventory Account
3. FUNDING CITATION: 096 NA X 4902 0000
NOTE 18: Subcontracting Plans are to be completed (as applicable) and included in the bid package submitted by the bidder. See Section J Attachment 11 for the Subcontracting Plan Requirement Checklist.
W912EE-23-B-0002
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00.00 09
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 PARTNERING
1.4 RIGHTS-OF-WAY
1.5 LAYOUT AND MARKING OF RIGHTS-OF-WAY
1.6 PRECONSTRUCTION CONFERENCE
1.7 SUBMITTAL OF SUBCONTRACTING PLAN
1.8 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK
1.9 PROGRESS CHART
1.10 DESIGNATED BILLING OFFICE
1.11 PAYMENT INVOICES
1.12 PROJECT SIGN
1.13 MINIMUM REQUIRED INSURANCE
1.14 CERTIFICATES OF COMPLIANCE
1.15 PROCESS FOR OBTAINING CURRENT REQUIREMENTS OF THE U.S. ARMY CORPS
OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL (EM 385-1-1)
1.16 SAFETY SIGN
1.17 ACCIDENT PREVENTION PLAN
1.18 DAILY INSPECTIONS
1.19 ACCIDENT INVESTIGATIONS AND REPORTING
1.20 IDENTIFICATION OF GOVERNMENT-FURNISHED PROPERTY
1.20.1 General
1.20.1.1 Steel Forms
1.20.1.2 Wire Mesh
1.20.2 Requisition
1.20.3 Indemnification
1.21 RECORD OF GOVERNMENT PROPERTY
1.22 CLEANUP
1.23 STORAGE OF CONTRACTOR'S EQUIPMENT
1.23.1 General
1.23.2 Government Obligation
1.24 MOORING PERMITS
1.24.1 Licenses and Permits
1.25 ACCOMMODATIONS FOR GOVERNMENT REPRESENTATIVES
1.25.1 General
1.25.2 Description
1.25.3 Office Space
1.25.4 Conference Room
1.25.5 Restroom
1.25.6 Kitchen
1.25.7 Utilities
1.25.8 Janitorial Services
1.26 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.27 CERTIFICATES OF COMPLIANCE
SECTION 01 00 00.00 09 Page 1
1.28 CONTRACTOR FURNISHED EQUIPMENT
1.29 MACHINERY AND MECHANIZED EQUIPMENT
1.30 VEHICLE WEIGHT LIMITATIONS
1.31 PROTECTION OF MATERIALS AND WORK
1.32 CONTRACTOR’S CERTIFICATES
1.33 DAMAGE TO WORK
1.34 COLOR COORDINATION
1.35 CONTROL OF ACCESS TO CONSTRUCTION AREAS
1.36 MAINTENANCE OF TRAFFIC
1.37 QUALITY ASSURANCE TESTING FACILITY
1.38 HARBOR MAINTENANCE FEE
1.39 COOPERATION WITH OTHER CONTRACTORS
1.40 ACCEPTANCE OF COMPLETED WORK
1.40.1 General
1.40.2 Reports
1.40.3 Squares
1.40.4 Stacks
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 00 00.00 09 Page 2
SECTION 01 00 00.00 09
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FED-STD-595 (Rev C; Notice 1) Colors Used in Government Procurement
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
19 CFR 24.24 Harbor Maintenance Fee
33 CFR 156 Oil and Hazardous Material Transfer Operations
1.2 SUBMITTALS
Government approval is required for all submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Accident Prevention Plan; G, GA
1.3 PARTNERING
The Government encourages formation of informal project partnerships on all projects. A project partnership strives to utilize a cooperative working relationship to jointly establish and effectively reach mutual project execution goals. The partnering process will in no way relax or stiffen the requirements of the contract, but will enhance the likelihood of success through improved working relationships and joint risk management. The possibility of an informal partnership may be discussed at the Pre-construction Conference for this project.
1.4 RIGHTS-OF-WAY
a. The rights-of-way for Contractor performance under this contract, within the limits indicated on the drawings, will be provided by the
SECTION 01 00 00.00 09 Page 3
Government without cost to the Contractor. It is the Contractor's responsibility to carefully review and determine the scope of the rights-of-way. Any questions should be clarified with the Government prior to use. If these rights-of-way are used by the Contractor, he shall, at his own expense, do all work necessary to make such rights-of-way suitable for safe travel to and from the worksite. Upon completion of the Contractor's work, any such rights-of-way furnished by the Government shall be left in a condition satisfactory to the Contracting Officer.
b. When so directed by the Contracting Officer, the Contractor shall, without expense to the Government, promptly vacate and clean up any part of the Government grounds or rights-of-way that have been allotted to or have been in use by the Contractor.
c. The Contractor shall not obstruct any existing roads or any other means of existing ingress or egress on lands controlled by the United States except with written permission of the Contracting Officer and shall maintain such roads and other means of ingress or egress in as good condition as exists at the time of commencement of work performance under this contract.
d. The Contractor shall procure, without expense to the Government, all additional lands, access roads, rights-of-way, and any other property rights necessary for his use in the performance of the work or as required by his method of operation. The Contractor shall provide the Contracting Officer with an authenticated copy of the conveyance under which the Contractor acquired such property rights, prepared and executed in accordance with the laws of the State in which the land is located. The Contractor shall also obtain from the property owners and present to the Contracting Officer a release of all claims against the Government which may result from the Contractor's use or possession of such real estate or property rights. The written conveyance and release shall be provided to the Contracting Officer prior to the Contractor's use of Contactor obtained real estate or property rights. If temporary rights-of-way are obtained by the Contractor the period of time for those rights shall coincide with Section 00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS, paragraph COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, plus a reasonable time for any extension granted for the completion of the work. Any agreements or permits with levee boards, counties, parishes, municipalities, or other political subdivisions for moving material and equipment will be the responsibility of the Contractor and shall be obtained at no expense to the Government. Any delays to the Contractor resulting from delays in procuring access roads, rights-of-way, permits, or other real estate and property rights necessary for moving material and equipment for his work under this contract will not be a basis for any claim for increase in the cost of this contract. The Contractor shall make his own investigations to determine the conditions, restrictions and difficulties which may be encountered in acquiring such real estate, rights-of-way, or other property rights and in the transportation of material and equipment. In addition, the Contractor shall be solely liable for any and all damages and claims of any nature whatsoever arising from, related to, or growing out of the acquisition and use of this real estate, rights-of-way, property rights, etc.
e. Notwithstanding any language or drawings to the contrary in this contract, the United States will not provide access or rights-of-way
SECTION 01 00 00.00 09 Page 4 over any public lands and will not be responsible for acquiring such.
f. The Contractor shall repair at no expense to the Government, any and all damage to any existing roads or other means of existing ingress or egress when such damage is a result of his operations under this contract.
1.5 LAYOUT AND MARKING OF RIGHTS-OF-WAY
The Contractor shall layout and mark the rights-of-way limits as indicated on the drawings prior to beginning any other work, unless otherwise approved. The marking shall be placed at intervals approved by the Contracting Officer. The rights-of-way limits shall be marked by stakes, flagging or other approved means. The marking shall be highly visible from a distance of at least 100 feet, and shall be maintained for the duration of the contract. If the rights-of-way marking should fade significantly in color, become damaged or lost as a result of the Contractor's operation or as a result of vandalism, or in any other way cease to function as a highly visible marker of the rights-of-way limits, the Contractor shall layout and restore the marking to the original condition. After all work is complete and upon approval of the Contracting Officer, the Contractor shall remove all marking. No separate payment will be made for layout, marking and maintaining the rights-of-way limits or for removing the marking.
1.6 PRECONSTRUCTION CONFERENCE
a. A preconstruction conference will be arranged by the Area Engineer as soon after contract award as possible, and the conference will be conducted before work is allowed to commence. The Area Engineer will notify the Contractor of the time, date, and location for the meeting. At this conference, the Contractor will be oriented with respect to contract administration procedures, lines of authority, opportunity for formation of project partnerships including joint risk management, and construction matters. All known subcontractors performing at least 20 percent of the contract are required to attend this conference. Additional conferences may be established by the Area Engineer for any major subcontractors unknown at the time of the initial conference.
b. Submission by the Contractor of the items listed below will determine the date of the conference. The following items shall be submitted to the Area Engineer in hard copy and electronic (pdf) format for review at least seven (7) calendar days prior to the preconstruction conference:
(1) Accident Prevention Plan
(2) Quality Control Plan
(3) Environmental Protection Plan
(4) Six copies of the certified Small Notice of Intent (SNOI)
(5) Submittal register
c. The Contractor shall bring to this conference, in completed form, the following:
SECTION 01 00 00.00 09 Page 5
(1) Letter of superintendent appointment and authority
(2) List of subcontractors
d. Minutes of this conference will be taken and prepared by the Area Engineer and sent to the Contractor for his concurrence and signature.
1.7 SUBMITTAL OF SUBCONTRACTING PLAN
a. This paragraph does not apply to small business concerns.
b. After bid opening, and within 7 days, the apparent low bidder, upon telephone notification by the Small and Disadvantaged Business Utilization Specialist, shall submit a Small and Disadvantaged Business Subcontracting Plan. The plan shall be submitted in accordance with the Contract Clauses SMALL BUSINESS SUBCONTRACTING PLAN - ALTERNATE I. The person responsible for administering the plan shall be named in paragraph AGENT FOR SUBMITTING SMALL BUSINESS SUBCONTRACTING PLAN of the Representations and Certifications.
1.8 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK
At least 7 days before beginning work, and at least one day before resuming work after a period of 7 days or more when no work has been performed, the Contractor shall notify U.S. Army Corps of Engineers, Mr.
Robin Blake, Chief, Vidalia Area Office, 100 Advocate Row, Vidalia, Louisiana 71373-3032, telephone (318) 336-5226 .
1.9 PROGRESS CHART
The progress chart required by provisions of paragraph (a) of the Contract Clause SCHEDULES FOR CONSTRUCTION CONTRACTS shall be prepared on ENG FORM 2454, copies of which will be furnished to the Contractor by the Government. Three (3) copies of the schedule will be required. The Progress Chart shall be periodically updated.
1.10 DESIGNATED BILLING OFFICE
The designated billing office for this contract shall be U.S. Army Corps of Engineers, Vidalia Area Office, 100 Advocate Row, Vidalia, Louisiana 71373-3032 .
1.11 PAYMENT INVOICES
a. The Federal Acquisition Regulation requires that the "REMIT TO" address on the invoice match the "REMIT TO" address on the contract or a proper notice of assignment. The Payment Office will verify a match of the "REMIT TO" address in the contract and Contractor’s invoice prior to payment. If the addresses do not match, the invoice will be determined improper and returned to the Contractor for correction and resubmission. If an invoice is improperly returned, the original invoice receipt date shall be used as the basis for determining interest to be paid in accordance with the PROMPT PAYMENT ACT.
b. Among other things, the Contract Clause PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS requires that a proper invoice for payment include substantiation of the amounts requested. As required in Office of Management and Budget, 5 CFR Part 1315, September 29, 1999, PROMPT PAYMENT, substantiation of the amount requested for progress
SECTION 01 00 00.00 09 Page 6 payments under construction contracts includes the following:
(1) An itemization of the amounts requested related to the various elements of work required by the contract covered by the payment request;
(2) A listing of the amount included for work performed by each subcontractor under the contract;
(3) A listing of the total amount of each subcontract under the contract;
(4) A listing of the amounts previously paid to each such subcontractor under the contract; and,
(5) Additional supporting data in a form and detail required by the Contracting Officer.
c. Failure to include the above information in a Contractor’s invoice will result in the invoice being considered defective under the provisions of the PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS clause of the contract, and it will be returned to the Contractor for correction and resubmission.
1.12 PROJECT SIGN
The Contractor shall fabricate, erect and maintain one sign for project identification. The sign shall be displayed and positioned for reading by passing viewers. The exact location is subject to Contracting Officer's approval. Information for the right side of the project sign shall be as follows:
Title: DELTA, LA, MADISON PARISH, RM 438.0-R A.H.P.
FC/MR&T, CHANNEL IMPROVEMENT
ARTICULATED CONCRETE MATTRESS CASTING
Contract No: W912EE-23-C-0XXX
Contractor: (Contractor's name and city)
The project identification sign shall meet the requirements specified in the U.S. Army Corps of Engineers Sign (USACES) Standards Manual, EP 310-1-6a and EP 310-1-6b. A copy of the sign standards manual is available for review at the office of the Vicksburg District Sign Program Manager and questions concerning manufacture and installation of the project identification sign may be addressed to:
Vicksburg District Sign Program Manager (Aaron Posner)
ATTN: CEMVK-OD-MN
4155 Clay Street Vicksburg, MS 39183-3435 Telephone: (601) 631-5287
1.13 MINIMUM REQUIRED INSURANCE
The following paragraph is applicable if the services involved are performed on a Government Installation. Government Installation is defined as property where the Government holds by fee simple title, by construction rights-of-way, or perpetual easement, etc., an interest in
SECTION 01 00 00.00 09 Page 7 real property. See the Contract Clause INSURANCE-WORK ON A GOVERNMENT
INSTALLATION.
a. Workmen's Compensation and Employer's Liability Insurance. The Contractor shall comply with all applicable workmen's compensation Statutes of the State of Louisiana and shall furnish evidence of Employer's Liability Insurance in an amount of not less than $100,000.
b. General Liability Insurance. Bodily injury liability insurance in the minimum limits of $500,000 per occurrence on the comprehensive form of policy.
c. Automobile Liability Insurance. Minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. This insurance shall be on the comprehensive form of policy and shall cover the operation of all automobiles used in performance of the contract.
1.14 CERTIFICATES OF COMPLIANCE
Any certificates required for demonstrating proof of compliance of material with specification requirements shall be executed in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.
1.15 PROCESS FOR OBTAINING CURRENT REQUIREMENTS OF THE U.S. ARMY CORPS OF
ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL (EM 385-1-1)
Contractors are required to comply with the latest version, and all posted changes, of the U.S. Army Corps of Engineers Safety and Health Requirements Manual in effect on the issue date of this solicitation.
EM 385-1-1 version 2014 and changes are available on the Internet at http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx, Search for EM_385-1-1, then click on EM_385-1-1 2014 english version.
Prior to making an offer, offerors should check the referenced website for the latest changes. No separate payment will be made for compliance with the requirements of this paragraph, or for compliance with other safety requirements of the contract.
1.16 SAFETY SIGN
The Contractor shall fabricate, erect and maintain a safety sign at the site, as located by the Contracting Officer. The sign shall be erected as soon as practicable, but not later than 15 calendar days after the date established for commencement of work. The data required shall be current. The safety sign shall meet the requirements specified in the U.S. Army Corps of Engineers Sign (USACES) Standards Manual, EP 310-1-6a and EP 310-1-6b. A copy of the sign standards manual is available for review at the office of the Vicksburg District Sign Program Manager and questions concerning manufacture and installation of the safety sign may
SECTION 01 00 00.00 09 Page 8 be addressed to:
Vicksburg District Sign Program Manager (Aaron Posner)
ATTN: CEMVK-OD-MN
4155 Clay Street Vicksburg, MS 39183-3435 Telephone: (601) 631-5287
1.17 ACCIDENT PREVENTION PLAN
Refer to the Contract Clause ACCIDENT PREVENTION (Alternate I). Within 15 days after receipt of award of the contract, an Accident Prevention Plan shall be submitted to the Contracting Officer for review and acceptance.
The plan shall be prepared as specified in Appendix A, "Minimum Basic Outline for Accident Prevention Plans" of EM 385-1-1. In addition to the requirements listed, the Contractor shall also submit the required information on the forms outlined below, which can be found on the Vicksburg District Construction Division home page, http://www.mvk.usace.army.mil/Missions/EngineeringandConstructionDivision.aspx, click on Construction Services Branch, then click on Forms.
a. An executed LMV Form 358-R, "Administrative Plan".
b. An executed MVK Form 385-359-R, "Hazard Analysis" for each definable feature of work.
c. When marine plant and equipment are in use under a contract, the method of fuel oil transfer shall be submitted on LMV Form 414R, "Fuel Oil Transfer-Floating Plant". (Refer to 33 CFR 156 .)
d. The Contractor shall not commence physical work at the site until the plan has been accepted by the Contracting Officer, or his authorized representative. At the Contracting Officer's discretion, the Contractor may submit his Hazard Analysis only for the first phase of construction provided that it is accompanied by an outline of the remaining phases of construction. All remaining phases shall be submitted and accepted prior to the beginning of work in each phase.
Also, refer to Section 1, "Program Management", paragraph 01.B, "Indoctrination and Training" of EM 385-1-1.
1.18 DAILY INSPECTIONS
Refer to Section 01 45 04.00 09 CONTRACTOR QUALITY CONTROL and the Contract Clause INSPECTION OF CONSTRUCTION. The Contractor shall perform daily safety inspections and record them on the forms approved by the Contracting Officer. Reports of daily inspections shall be maintained at the job site. The reports shall be records of the daily inspections and resulting actions. As a minimum each report shall include the following:
a. Phase(s) of construction underway during the inspection.
b. Locations or areas inspections were made.
c. Results of inspection, including nature of deficiencies observed and corrective actions taken, or to be taken, date, and signature of the person responsible for its contents.
SECTION 01 00 00.00 09 Page 9
1.19 ACCIDENT INVESTIGATIONS AND REPORTING
Refer to EM 385-1-1, Section 1, "Program Management", paragraph 01.D, "Accident Reporting and Recordkeeping". Accidents shall be investigated and reports completed by the immediate supervisor of the employee(s) involved and reported in writing to the Contracting Officer or his representative within one working day after the accident occurs.
1.20 IDENTIFICATION OF GOVERNMENT-FURNISHED PROPERTY
1.20.1 General
The Government will furnish to the Contractor as free issue the following property to be incorporated or installed in the work or used in its performance. Any property so furnished, which is excess upon the completion of the work, shall remain the property of the Government. The Contractor shall check the quantity and condition of such property when delivered to him and acknowledge receipt thereof in writing to the Contracting Officer and in case of damage to, or shortage of, such property, he/she shall within 24 hours, report in writing such damage and/or shortage to the Contracting Officer.
1.20.1.1 Steel Forms
Steel forms having a value of $2,905.00 each will be furnished by the Government. The Contractor shall immediately notify the COR of any steel forms removed from service. Prior to initiating any repairs to damaged steel forms, the Contractor shall notify the COR of the needed repairs (including straightening). A Government representative shall be present during the repairs of the steel forms. If cutting and/or welding is required for form repair, the Contractor shall first submit his/her welding procedure, welding materials, and material certifications for approval and shall follow AWS-D1.1 procedures. The Contractor shall, during casting operations, maintain in good repair all steel forms furnished by the Government. Upon completion of casting operations, the Contractor shall clean, repair, oil and store all steel forms as may be necessary to place them in as good condition as when received from the Government less fair wear and tear. Prior to storing and oiling the forms, the Contractor shall check the condition of the pins to ensure they function properly. Any problems regarding the pins shall be reported to the COR. The steel forms shall be stored in stacks not to exceed five feet, supported by dunnage and located at the mat casting field as directed by the Contracting Officer. Stacking and repairs to the steel forms shall be made at no additional expense to the Government and shall include replacement of all parts lost or broken during casting operations.
The forms to be furnished by the Government are located at the casting field and are available for inspection by the Contractor. A total of 1,300 steel forms are presently available for use on the Delta casting field.
Welding procedures and welding material for form repairs will be approved by the Contracting Officer.
1.20.1.2 Wire Mesh
A sufficient quantity of fabric will be furnished to produce the required quantity of mattress. The fabric shall conform to that shown on Sheet C-501, entitled "Standard Layout and Typical Details." All wire mesh required for prosecution of the contract will be stored on the field or adjacent thereto by the Government in time to meet the required casting rate. Should the Contractor lose or damage any wire mesh squares, he/she
SECTION 01 00 00.00 09 Page 10 shall reimburse the Government for the same at the current contract unit price for Non-Corrosive 16-Block Wire Mesh.
1.20.2 Requisition
The Contractor shall be required to requisition the Government property specified herein to be furnished as free issue for use in the work to be performed under the Contract. Corps of Engineers Form 4900 will be furnished the Contractor without cost for the purpose of making requisition for such property. Subject to the provisions of this paragraph, Government property will be delivered or made available to the Contractor not later than five calendar days after the receipt of the Contractor's properly executed requisition. Delays to the work as a result of the Contractor's failure to submit requisitions in sufficient time to allow for delivery of the property as stated above will not be made the basis of any claim for an increase in costs or time of performance of the work.
1.20.3 Indemnification
The Contractor shall indemnify, hold harmless and defend the Government against any and all claims, demands, or liabilities against the Government arising out of the use and operation of Government-furnished property during the period such property is in possession and under the control of the Contractor excepting only claim for injuries to Government employees not due to the fault or negligence of the Contractor.
1.21 RECORD OF GOVERNMENT PROPERTY
The Accountable Property Officer, U.S. Army Engineer District, Vicksburg, Corps of Engineers, Vicksburg, Mississippi, is designated as the Officer to maintain the necessary property records in connection with this contract at the Delta, LA Field Casting Site.
1.22 CLEANUP
The Contractor shall at all times keep the construction area, including storage areas used by him/her, free from accumulations of waste material or rubbish. When the Contractor has completed casting operations at the field, he/she shall within 15 calendar days, unless otherwise authorized, deliver all Government property not incorporated into the mattress to the Government as herein before specified, and cleanup the site by removing, distributing or destroying all objectionable foreign matter and debris in a manner satisfactory and acceptable to the Contracting Officer. The Contractor shall remove any rubbish and all tools, equipment, and materials not the property of the Government, and leave the surface of the field equal to the condition as when received. Any wire fabric remaining on the field shall be returned to the designated storage area as shown in the plans. All steel forms shall be cleaned, repaired, straightened, and oiled as described in contract section paragraphs 1.20.1.1 Steel Forms and Section 03 30 00.00 09 ARTICULATED CONCRETE MATTRESS, paragraph 3.5.2 Form Cleanup and Repair. The steel forms shall be placed in stacks not to exceed five feet in the designated areas as shown in the contract plans or as directed by the Contracting Officer Representative. In the event of failure of the Contractor to clean up the site as indicated above, the Contracting Officer may proceed to have this work done and deduct the cost thereof from amounts due or to become due the Contractor.
SECTION 01 00 00.00 09 Page 11
1.23 STORAGE OF CONTRACTOR'S EQUIPMENT
1.23.1 General
The Contractor may store his/her equipment, facilities and surplus materials on the field until 15 calendar days after Notice of Award of a new casting contract on the field or one year from date of completion of mattress casting operations under this contract, whichever is the earlier date unless otherwise approved by the Contracting Officer. The Contractor shall indemnify, hold harmless and defend the Government against any and all claims, demands or liabilities arising out of the storage of the said property on Government premises. In the event of failure of the Contractor to remove his/her equipment, facilities and surplus materials by the time specified, the Contracting Officer may proceed to have this work done and deduct the cost thereof from amounts due or to become due the Contractor.
1.23.2 Government Obligation
The Government will assume no obligations for the Contractor's plant, facilities, surplus materials, and/or equipment when stored on the field.
Increase of surplus materials, and/or movement of additional plant or equipment onto the site will not be permitted after completion of casting operations. Failure to comply with these requirements shall be cause for revoking this storing privilege. The Government will withhold payment for the final 600 squares of mattress, not including cement or fly ash, pending final cleanup specified in the requirements of this section as specified in paragraph entitled "CLEANUP" and removal of the Contractor's equipment from Government property as specified above.
1.24 MOORING PERMITS
Temporary permits for mooring will be issued upon request for such floating equipment as may be essential in supplying sand, gravel and cement. The plant shall be properly moored with a minimum of four bank lines, one stern, one head and two spring lines. The dock or crane barge shall be equipped with permanent marine deck fitting of sufficient size and number to adequately moor the plant and to secure and maneuver the supply barges. Mooring lines shall be fixed to bank anchorage of sufficient size and number for the purpose. The plant shall be equipped with stop logs or bumpers to prevent equipment from rolling overboard, and an approach ramp or bridge of sufficient size and strength to safely carry the loaded gravel and/or sand and/or cement hauling equipment to be used.
All mooring and methods of operation will be subject to inspection and approval by the Contracting Officer. Permits may be revoked at any time the unloading operation is considered a hazard to men employed on it or to other plant and equipment moored in the vicinity.
1.24.1 Licenses and Permits
The Contractor shall, without additional expense to the Government, obtain any and all necessary licenses and permits, and comply with any applicable Federal, State, and municipal laws, codes and regulations applicable to the performance of the work.
1.25 ACCOMMODATIONS FOR GOVERNMENT REPRESENTATIVES
1.25.1 General
The Contractor shall furnish and maintain a temporary office facility on
SECTION 01 00 00.00 09 Page 12 site for the exclusive use of the Government Representatives from 20 days following the notice to mobilize until 45 days following substantial completion of the contract. Minimum furnishings shall be provided as described below. The office layout, utility plans, and other pertinent details shall be submitted for approval in advance of delivery to the site. Siting of the trailer and utility connection points shall be coordinated with the Contracting Officer's Representative.
1.25.2 Description
The building shall be a mobile office trailer configuration, minimum 12 by 60 ft, with two offices (4 workstations), one on each end of the trailer, and a conference room, toilet, and kitchenette located between the offices. All exterior doors shall be of wood panel or solid core construction and be equipped with a padlock and heavy-duty hasp bolted to the door. Insect screens shall be provided for windows. Glass panels in windows shall be equipped with bars or heavy mesh screens, which will prevent easy access to the building through these panels. The full space shall be conditioned with a heating and cooling A/C system. Each door shall be provided with stairs and a railed landing for safe access. Each room will have several electrical outlets for running computers with printers, copiers, and other typical equipment. Lighting shall be suitable for an office environment.
1.25.3 Office Space
Offices shall be sized to accommodate 2 full sized workstations/desks in each office. High speed data lines shall be provided in each office capable of a minimum transfer rate of 10 MB/sec for downloading and 2 Mbps for uploading. Each office shall have 2 desks, 4 chairs, a standard 4 drawer letter size office filing cabinet and sufficient number of windows to admit ample natural light. Windows shall be arranged to open and to be securely fastened from the inside.
1.25.4 Conference Room
The conference room will have a conference table with chairs capable of seating 10 persons.
1.25.5 Restroom
Standard restroom facilities shall be provided including a single sink and toilet.
1.25.6 Kitchen
A kitchen space shall be provided that includes a full-size refrigerator/freezer, sink, and microwave.
1.25.7 Utilities
All utility lines and connections shall be provided by the contractor as needed to provide a fully functioning office trailer. Sewage holding tank(s) shall be utilized for the toilet and kitchen sink and shall be maintained and pumped out by the contractor at least monthly or more often if needed. Electrical and water service for this government office trailer only can be connected to existing government billed service lines on site.
Contractor is responsible for all materials and connections, and the Government will pay the monthly utility bill associated with the water and
SECTION 01 00 00.00 09 Page 13 electrical service once connected.
1.25.8 Janitorial Services
The Contractor shall furnish daily janitorial services for the above office trailer and the existing laboratory facility and perform any required maintenance of subject facility and adjacent grounds during the entire life of the contract. Toilet facilities shall be clean and sanitary at all times. Services shall be performed at such a time and in such a manner to least interfere with the operations but will be accomplished only when the office is in daily use. The Contractor shall also provide daily trash collection and cleanup of the building and adjacent outside areas and shall dispose of all discarded debris in a manner approved.
1.26 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the Contract Clause DEFAULT (FIXED PRICE CONSTRUCTION). In order for the Contracting Officer to award a time extension under this paragraph, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON FIVE (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
(5) (5) (5) (5) (4) (5) (5) (5) (3) (3) (4) (5)
c. Upon acknowledgement of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor shall record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The number of actual adverse weather days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days.