This document provides an amendment to a solicitation for construction services. The U.S. Army Corps of Engineers Engineering District Vicksburg is seeking a contractor to perform PL 84-99 Emergency Bank Stabilization at 6 sites along the Ouachita River in Ouachita and Caldwell Parishes in Louisiana. Work includes mobilization, clearing, grubbing, placement of longitudinal stone fill revetments, tiebacks, excavation, backfill, and stormwater pollution prevention. The estimated value is over $10 million. The bid opening date remains July 7, 2022. The contractor performance period has decreased from 394 to 349 days to reflect an average placement rate of 1,500 tons per day.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Solicitation Invitation of Bids (IFB) W912EE22B0004, Ouachita River Basin, Ouachita & Caldw ell Parishes P.L. 84-99 Emergency Bank Stabilizaiton River Mile 159-108, Sites 1-6.
See Continuation Page for Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Jul-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EE22B0004
X 9B. DATED (SEE ITEM 11)
31-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Jul-2022
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EE22B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
SUMMARY OF CHANGES_AMEND 0002
SUMMARY OF CHANGES
Standard Form (SF) 1442 has been revised and replaced in its entirety.
Bid Opening will remain unchanged: 07July2022 @ 2:30 p.m. CST.
Section “Notes”
Contractors are advised to review current navigation bulletins regarding a scheduled lock outage at Old River Lock on the Mississippi River. The outage is currently scheduled to be a continuous closure commencing on approximately 30 August 2022 and continuing through approximately 12 November 2022. Dates are subject to change. Contractors should monitor for updates to the associated navigation bulletins. Old River Lock is anticipated to be on the primary transportation route for delivery of stone under this contract. The duration of the Old River Lock closure will be considered an excusable delay to the extent it impacts delivery of materials under this contract, but will not be grounds for any change in contract pricing or claim against the government. Issuance of the Notice to Proceed for work under this contract will be coordinated with the contractor after contract award. At the contractor’s option, the Notice to Proceed can be issued immediately after receipt and verification of bonds as noted, or delayed up until, but no later than, completion of the Old River Lock closure. “
*Pages revised by this amendment have the notation “Revised by Amendment 0002” at the bottom of page.
W912EE22B0004
SECTION 00010 - SOLICITATION CONTRACT FORM
The contractor period of performance end date has decreased by 45 days from 394 days to 349 days.
The required performance has changed from Ouachita River BasinOuachita & Caldwell ParishesPL 84-99 Emergency Bank StabilizationRiver Mile 159-108 Sites 1-6DESCRIPTION OF WORK: The work consists of furnishing all plant, labor, materials, and equipment, and constructing the PL 84-99 Emergency Bank Stabilization at 6 sites on the Ouachita in Ouachita & Caldwell Parish, Louisiana. The principal features of work include mobilization and demobilization, clearing, grubbing, longitudinal stone fill revetments, tiebacks, excavation, backfill, and storm water pollution prevention.The estimated value of the proposed work is over $10,000,000. to Ouachita River BasinOuachita & Caldwell ParishesPL 84-99 Emergency Bank StabilizationRiver Mile 159-108 Sites 1-6
DESCRIPTION OF WORK: The work consists of furnishing all plant, labor, materials, and equipment, and constructing the PL 84-99 Emergency Bank Stabilization at 6 sites on the Ouachita in Ouachita & Caldwell Parish, Louisiana. The principal features of work include mobilization and demobilization, clearing, grubbing, longitudinal stone fill revetments, tiebacks, excavation, backfill, and storm water pollution prevention.
The duration shown below reflects the average 1500 tons per calendar day specified in Section 00 80 00.00 09 paragraph 1.2, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, plus 38 days total for mobilization, movement between sites, and final cleanup. Actual final required duration will be based on actual quantity of stone placed in accordance with these contract provisions.
The estimated value of the proposed work is over $10,000,000..
(End of Summary of Changes)