This document summarizes a federal contract solicitation for raw water piping replacement services in Caddo River, Arkansas. The United States Army Corps of Engineers, Vicksburg District is seeking bids for inspection, replacement, and construction of the raw water piping system at the DeGray Power Plant. Key project elements include mobilization, hazardous material abatement, installation of new isolation valves, inspection and replacement of existing pipes with new pipes. Bidders must provide fixed pricing for furnishing all necessary labor, materials, and equipment. The solicitation is set aside exclusively for small businesses under NAICS Code 237110, with bids due by September 23, 2021. Interested vendors can access plans and specifications through the System for Award Management website.

View the file

Other files

File Type Posted
A22_W912EE21B0006 0007.pdf PDF
A22_W912EE21B0006 0006.pdf PDF
A22_W912EE21B0006 0006.pdf PDF
A22_W912EE21B0006 0005.pdf PDF
A22_W912EE21B0006 0004.pdf PDF
A22_W912EE21B0006 0003.pdf PDF
A22_W912EE21B0006 0002.pdf PDF
A22_W912EE21B0006 0001.pdf PDF
A22_W912EE21B0006.pdf PDF
A02_W912EE21B0006 DRAWINGS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM DESCRIPTION

EST

QTY U/M UNIT PRICE AMOUNT

MOBILIZATION AND

DEMOBILIZATION 1 JOB FOR $ 94,254.00

ABATE ALL HAZARDOUS MATERIAL

FOR THE COMPLETION OF THE

PROJECT AND REPACEMENT OF ALL

ELEMENT ON THE RAW SYSTEM 1 JOB FOR $ 101,557.00

INSTALLATION OF ISOLATION

VALVES, GENERATOR CONNECTION,

OIL ROOM CONNECTIONS AND

REPLACEMENT OF ALL WATER PIPE 1 JOB FOR $ 1,988,731.00

LEAK AND PRESSURE TESTING OF

THE RAW WATER SYSTEM,

REPLACEMENT OF ALL STRAINER

BASKETS PRIOR TO COMPLETION OF

THE PROJECT, INSPECTION OF ALL

ENCASED IN CONCRETE PIPE, AND

PROVIDE REPORT AND

RECOMMENDATIONS OF ALL

INSPECTION FINDINGS 1 JOB FOR $ 102,795.00

2,287,337.00$

REPLACE COOLER RAW WATER PIPES

(OPTION) 1 JOB FOR $ 983,018.00

3,270,355.00$

CADDO RIVER, ARKANSAS

RAW WATER PIPING REPLACEMENT

OUACHITA RIVER AND TRIBUTARIES

IHP INDUSTRIAL

TOTAL BASE

TOTAL BASE PLUS OPTION

ITEM DESCRIPTION

EST

QTY U/M UNIT PRICE AMOUNT

MOBILIZATION AND

DEMOBILIZATION 1 JOB FOR $ 81,000.00

ABATE ALL HAZARDOUS MATERIAL

FOR THE COMPLETION OF THE

PROJECT AND REPACEMENT OF ALL

ELEMENT ON THE RAW SYSTEM 1 JOB FOR $ 117,000.00

INSTALLATION OF ISOLATION

VALVES, GENERATOR CONNECTION,

OIL ROOM CONNECTIONS AND

REPLACEMENT OF ALL WATER PIPE 1 JOB FOR $ 1,618,000.00

LEAK AND PRESSURE TESTING OF

THE RAW WATER SYSTEM,

REPLACEMENT OF ALL STRAINER

BASKETS PRIOR TO COMPLETION OF

THE PROJECT, INSPECTION OF ALL

ENCASED IN CONCRETE PIPE, AND

PROVIDE REPORT AND

RECOMMENDATIONS OF ALL

INSPECTION FINDINGS 1 JOB FOR $ 75,500.00

1,891,500.00$

REPLACE COOLER RAW WATER PIPES

(OPTION) 1 JOB FOR $ 141,000.00

2,032,500.00$

CADDO RIVER, ARKANSAS

RAW WATER PIPING REPLACEMENT

OUACHITA RIVER AND TRIBUTARIES

INDEPENDENT GOVERNMENT ESTIMATE

TOTAL BASE PLUS OPTION

I CERTIFY THAT I HAVE OPENED, READ AND RECORDED ON THIS ABSTRACT ALL OFFERS

RECEIVED IN RESPONSE TO THE SOLICITATION

SIGNATURE AND DATE

TOTAL BASE

2021-10-26T15:35:03-0500
SCREWS.ROBERT.1384614503